Attachment 0002 - CDRL 3 Gas Anaylyzer.pdf
PDF 420 KB Posted
- Attached to
- GAS ANALYZER - BRAND NAME Federal contract opportunity
- Solicitation number
- W9098S-21-R-0017
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 0001 - SOW-RIPD 21-9-39 3 Gas Anaylyzer - revised.pdf | ||
| MFR - Gas Analyzer.pdf | ||
| W9098S21R0017.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TARA-IFF Project E4000-21-9-39 B210 3rd Floor - 3 Gas Analyzer for Lab in Support of Additive
Manufacturing
Contract Data Requirements List
1. Owners/Operator’s Manual:
Format: The contractor shall provide (3) copies of this manual/information with delivery of the equipment. Of these, (2) will be paper, and (1) shall be electronic. Acceptable electronic formats include acrobat files (.pdf), drawing exchange files (.dxf), and initial graphic exchange specification (.igs).
Content: This section of the documentation shall include: Procedures for safe operation of the equipment in all modes. It shall include information necessary for performing all the operations and utilizing all the functions listed in the purchase description.
Delivery: Provide copies, as requested to the following:
Rock Island Arsenal
ATTN: TARA-IFF
Joe Carpentier Building 220, Basement E Wing, Planners Rm Rock Island, IL 61299-6400
2. Maintenance Manual:
Format: The contractor shall provide (3) copies of this manual/information with delivery of the equipment. Of these, (2) will be paper, and (1) shall be electronic. Acceptable electronic formats include acrobat files (.pdf), drawing exchange files (.dxf), and initial graphic exchange specification (.igs).
Content: This section of the documentation shall include: Daily Operator Checklist, Visual Inspections, and a Periodic Maintenance Schedule, and materials specifications for most often replaced components or fluids. Procedures and schedules for inspections, adjustments, cleaning, disassembly, and component replacements if required. The manual shall also include major component schematics, or diagrams (for hydraulic, and electrical systems).
Delivery: Provide copies, as requested to the following:
Rock Island Arsenal
ATTN: TARA- IFF
Joe Carpentier Building 220, Basement E Wing, Planners Rm Rock Island, IL 61299-6400
File details come from the government source that posted it. Updated .