Attach 5. Submittal Register.xlsx
XLSX spreadsheet 30 KB Posted
- Attached to
- B755 Remodel BX Restrooms Federal contract opportunity
- Solicitation number
- FA663324Q0013
About this file
This document is a Schedule of Material Submittals for a federal construction contract opportunity to Maintain Restrooms, Building 755. The key details are:
The solicitation number is FA663324Q0013 for the B755 Remodel BX Restrooms project. This is a Request for Quote (RFQ) for a Firm-Fixed Price award, with a desired period of performance of 120 calendar days from the notice to proceed. The magnitude of the acquisition is between $25,000 and $100,000, and it is a 100% Small Business set-aside. The applicable wage determination is for Hennepin County, Minnesota. The submittal register lists 26 required items such as schedules, plans, product data, and quality control documentation. Quotes must be valid for 90 days and should be emailed to the specified Contracting Officer and Contract Specialist.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attach 2. Specifications.pdf | ||
| Solicitation - FA663324Q0013.pdf | ||
| Attach. 1 Statement of Work.pdf | ||
| Attach 3. Final Design Drawings.pdf | ||
| Attach 4. Wage Determination.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| Project Number: | |||
| 24-9991E | Project Title: | ||
| MAINTAIN RESTROOMS, BUILDING 755 | Solicitation / Contract Number: |
[ enter here ]
| Line Number | (To be completed by Project Engineer) | (To be completed by Contract Administrator) | ||||||||||||||
| Number of Copies Required | Remarks | |||||||||||||||
| Item or Description of Item, Contract Reference, Type of Submittal | Certificate of Compliance | Shop Drawings | Samples | Color Selection | Manufacturer's Recommendation | Manufacturer's Warranty | Catalog Data | Operating Instructions | Schedules, Listings, Reports, Plans | Technical Data | Test Reports | Field Reports | Required Submission Date |
fergusog: Enter the due date from the Contractor (MM/DD/YY) Date Received in Contracting fergusog: Enter the date received from the Contractor. (MM/DD/YY) Date to Civil Engineering fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY) Return Suspense Date fergusog: Enter the date the submittal is due back from CE
(MM/DD/YY)
Submittal Numbers fergusog: Enter the Submittal Number
| Date Contractor | ||
| Notified | Contractor Resubmittal |
fergusog: Enter Resubmittal Number Final Approval fergusog: Enter the submittal final approval date
(MM/DD/YY)
Approved fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
fergusog: Enter Resubmittal Number Disapproved fergusog: Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
fergusog: Enter the submittal final approval date
(MM/DD/YY)
| 1 | 01 11 00 1.4 | |||||||
| Entry Authorization | X | |||||||
| 2 | 01 14 00 1.2.1.1 | |||||||
| Contract Personnel | X | |||||||
| 3 | 01 32 16.00 20 1.1.2 | |||||||
| Preliminary Project Schedule | X | |||||||
| 4 | 01 32 16.00 20 1.1.3 | |||||||
| Initial Project Schedule | X | |||||||
| 5 | 01 32 16.00 20 1.1.4 | |||||||
| Peridoic Schedule Update | X | |||||||
| 6 | 01 30 00 1.3 | |||||||
| Progress and Completion Pictures | X | |||||||
| 7 | 01 33 00 1.7 | |||||||
| Submittal Register | X | |||||||
| 8 | 01 35 26 1.6 | |||||||
| Accident Prevention Plan | X | |||||||
| 9 | 01 35 26 1.7 | |||||||
| Activity Hazard Analysis | X | |||||||
| 10 | 01 35 26 1.11.2 | |||||||
| Accident Report | X | |||||||
| 11 | 01 45 000000.10 20 1.6 | |||||||
| QC Plan | X | |||||||
| 12 | 01 4 19 1.6 | |||||||
| Construction Waste Management Plan | X | |||||||
| 13 | 01 4 19 1.9 | |||||||
| Final Waste Diversion Report | X | |||||||
| 14 | 01 78 00 1.4.1 | |||||||
| Warranty Management Plan | X | |||||||
| 15 | 01 78 00 1.4.1.d | |||||||
| As-built Record: Material & Equipment | X | |||||||
| 16 | 01 78 00 1.4.1.g | |||||||
| Posted Instructions | X | |||||||
| 17 | 01 78 00 3.1 | |||||||
| As-built Drawings | X | |||||||
| 18 | 01 78 00 3.3 | |||||||
| Operations and Maintenance Manuals | X | |||||||
| 19 | 02 41 00 1.2.2 | |||||||
| Demolition Plan | X | |||||||
| 20 | 02 41 00 1.10 | |||||||
| Existing Conditions | X | |||||||
| 21 | 09 29 00 2.1.1 | |||||||
| Gypsum Board | X | |||||||
| 22 | 09 90 00 1.5.4 | |||||||
| Indoor Air Quality for Panits & Primers | X | |||||||
| 23 | 09 90 00 1.7.1 | |||||||
| MSDS for Paints & Primers | X | |||||||
| 24 | 09 90 00 2.1 | |||||||
| Coatings | X | X | X | |||||
| 25 | 09 90 00 2.2 | |||||||
| Color Samples | X | |||||||
| 26 | 22 00 00 | |||||||
| Plumbing Products | X | X | ||||||
| 27 | 22 00 00 | |||||||
| Plumbing Fixtures | X | X | ||||||
| 28 | ||||||||
| 29 | ||||||||
| 30 | ||||||||
| 31 | ||||||||
| 32 | ||||||||
| 33 | ||||||||
| 34 | ||||||||
| 35 | ||||||||
| 36 | ||||||||
| 37 | ||||||||
| 38 | ||||||||
| 39 | ||||||||
| 40 | ||||||||
| 41 | ||||||||
| 42 | ||||||||
| 43 | ||||||||
| 44 | ||||||||
| 45 | ||||||||
| 46 | ||||||||
| 47 | ||||||||
| 48 | ||||||||
| 49 | ||||||||
| 50 |