Attach_2_Drawings_KSCC 16-1601.pdf
PDF 3 MB Posted
- Attached to
- KSCC 16-1601 REPAIR LIGHTNING PROTECTION SYSTEM - TEL-IV Federal contract opportunity
- Solicitation number
- FA252120B0019
About this file
This solicitation is for the repair of the lightning protection system at the TEL-IV facility on Kennedy Space Center in Florida. The scope of work includes demolishing three guyed wire towers in an environmentally sensitive area and installing a new air terminal based lightning protection system over identified facilities. A site visit is scheduled for August 18, 2020 and bids are due by September 9, 2020. The Department of the Air Force Space Command is the issuing agency. Contractors will be responsible for removing the existing towers and recycling components, as well as demolishing foundations and underground utilities. The new system will include air terminals, conductors, and grounding components.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment FA252120B00190002 SF 30.pdf | ||
| SJRWMD exemption.pdf | ||
| Attach_6_DB_WD_FL20200001_14Aug2020.pdf | ||
| Solicitation Amendment FA252120B00190001 SF 30.pdf | ||
| Solicitation - FA252120B0019 (1).pdf | ||
| Attach_5_Green_Procurement_Form.pdf | ||
| Attach_3__Question_Template.docx | DOCX document | |
| Attach_4_ CECC_Form_3052.xls | XLS spreadsheet | |
| Attach_7_45_SFS_Badge_Request_Form.pdf | ||
| Attach_1_Technical Specs_KSCC 16-1601.pdf | ||
| Attach_6_DB_WD_FL2020001_03JUL2020.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
04141
LAUNCH PAD 2
04210
LAUNCH PAD 1
81907
EQUIPMENT PAD
81908
EQUIPMENT PAD
99999
SLAB
13/31-32
ACTIVE
13/31-2
ACTIVE
50305-1
OPERATIONAL
13/31-4
ACTIVE
01375-1
ACTIVE
13/31-1
ACTIVE
01375-2
ACTIVE
HELIPAD #11
LIMITED
49620-1
ABANDONED
49623-1
ABANDONED
49624-1
ABANDONED
49625-1
ABANDONED
90326
SAMUEL C PHILLIPS PKWY
WAREHOUSE RD
P O
S E
ID
O
N A
V E
P O
S E
ID
O
N A
V E
WAREHOUSE RD
S P
R
IN
T R
D
S
P
R
IN
T
R
D
S
P
R
IN
T
R
D
S
P
R
IN
T
R
D
S
P
R
IN
T R
D
PERIG
EE R
D
PER
IG
EE R
D
PER
IG
EE R
D
G
O
O
SE L
N
BASIN
D
R
B A
S
IN
D
R
MERCULES RD MERCULES RD
MERCULES RD
B A
S
IN
D
R
B A
S
IN
D
R
B
A
S
IN
D
R
B
A
S
IN
D
R
B
A
S
IN
D
R
B
A
S
IN
D
R
B
A
S
IN
D
R
S PETROL RD
S P
ETRO
L R
D
S PETROL RD
S PETROL RD
S PETROL RD
S PETROL RD
S PETROL RD S
P
E
TR
O
L
R
D
S P
E T
R O
L R
D
SEXTANT ST
SEXTANT ST
B A
IT
S
T
B A
IT
S
T
SNARK CIRCLE
SNARK CIRCLE SNARK CIRCLE
SNARK CIRCLE SNARK CIRCLE
S N
A R
K C
IR
C
L E
M A
C A
R D
M A
C A
R D
M A
C A
R D
M A
C A
R D
M A
C A
R D
M
A
C
A
R
D
M
A
C
A
R
D
M
A
C
A
R
D
M
A
C
A
R
D
M A
C A
R D
SAFETY RD SAFETY RD SAFETY RD
S
A
F
E
T
Y
R
D
S
A
F
E
T
Y
R
D
S
A
F
E
T
Y
R
D
S
A
F
E
T
Y
R
D
SAFETY RD
S
A
F
E
T
Y
R
D
S A
F E
T Y
R D
B
U
M
P
E
R
R
D
PIER RD
PIER RDPIER RDPIER RD
PIER RD
PIER RDPIER RD
PIER RDPIER RD
PIER RD
PIER RD PIER RD PIER RD
PIER RD
PIE
R
R
D
PIE
R R
D
PIE
R R
D
PIE
R R
D
PIE
R R
D
P
IE
R
R
D
PIE
R R
D
PIE
R
R
D
PIE
R
R
D
PIE
R R
D
PIE
R
R
D
PIE
R
R
D
PIE
R
R
D
PIE
R R
D
S
A
M
U
E
L
C
P
H
IL
L
IP
S
P
K
W
Y
S A
M U
E L C
P H
IL
L
IP
S P
K W
Y
S
A
M
U
E
L
C
P
H
IL
L
IP
S
P
K
W
Y
S
A
M
U
E
L
C
P
H
IL
L
IP
S
P
K
W
Y
S
A
M
U
E
L
C
P
H
IL
L
IP
S
P
K
W
Y
S
A
M
U
E
L
C
P
H
IL
L
IP
S
P
K
W
Y
S
A
M
U
E
L
C
P
H
IL
L
IP
S
P
K
W
Y
S
A
M
U
E
L
C
P
H
IL
L
IP
S
P
K
W
Y
S
A
M
U
E
L
C
P
H
IL
L
IP
S
P
K
W
Y
S
A
M
U
E
L
C
P
H
IL
L
IP
S
P
K
W
Y
S
A
M
U
E
L
C
P
H
IL
L
IP
S
P
K
W
Y
S
A
M
U
E
L
C
P
H
IL
L
IP
S
P
K
W
Y
S
A
M
U
E
L
C
P
H
IL
L
IP
S
P
K
W
Y
S
A
M
U
E
L
C
P
H
IL
L
IP
S
P
K
W
Y
S
A
M
U
E
L
C
P
H
IL
L
IP
S
P
K
W
Y
S
A
M
U
E
L
C
P
H
IL
L
IP
S
P
K
W
Y
S
A
M
U
E
L
C
P
H
IL
L
IP
S
P
K
W
Y
S
A
M
U
E
L
C
P
H
IL
L
IP
S
P
K
W
Y
S
A
M
U
E
L
C
P
H
IL
L
IP
S
P
K
W
Y
S
A
M
U
E
L
C
P
H
IL
L
IP
S
P
K
W
Y
S
A
M
U
E
L
C
P
H
IL
L
IP
S
P
K
W
Y
S
A
M
U
E
L
C
P
H
IL
L
IP
S
P
K
W
Y
S
A
M
U
E
L
C
P
H
IL
L
IP
S
P
K
W
Y
S
A
M
U
E
L
C
P
H
IL
L
IP
S
P
K
W
Y
S
A
M
U
E
L
C
P
H
IL
L
IP
S
P
K
W
Y
S
A
M
U
E
L
C
P
H
IL
L
IP
S
P
K
W
Y
S
A
M
U
E
L
C
P
H
IL
L
IP
S
P
K
W
Y
S
A
M
U
E
L
C
P
H
IL
L
IP
S
P
K
W
Y
S A
M U
E L C
P H
IL
L
IP
S P
K W
Y
S A
M
U E
L C
P H
IL
L
IP
S P
K W
Y
S A
M U
E L C
P H
IL
L
IP
S P
K W
Y
S A
M U
E L C
P H
IL
L
IP
S P
K W
Y
S A
M U
E L C
P H
IL
L
IP
S P
K W
Y
S A
M U
E L C
P H
IL
L
IP
S P
K W
Y
S A
M
U E
L C
P H
IL
L
IP
S P
K W
Y
S A
M
U E
L C
P H
IL
L
IP
S P
K W
Y
S
A
M
U
E
L
C
P
H
IL
L
IP
S
P
K
W
Y
S
A
M
U
E
L
C
P
H
IL
L
IP
S
P
K
W
Y
S
A
M
U
E
L
C
P
H
IL
L
IP
S
P
K
W
Y
S
A
M
U
E
L
C
P
H
IL
L
IP
S
P
K
W
Y
S
A
M
U
E
L
C
P
H
IL
L
IP
S
P
K
W
Y
S
A
M
U
E
L
C
P
H
IL
L
IP
S
P
K
W
Y
S
A
M
U
E
L
C
P
H
IL
L
IP
S
P
K
W
Y
S
A
M
U
E
L
C
P
H
IL
L
IP
S
P
K
W
Y
S
A
M
U
E
L
C
P
H
IL
L
IP
S
P
K
W
Y
S
A
M
U
E
L
C
P
H
IL
L
IP
S
P
K
W
Y
S
A
M
U
E
L
C
P
H
IL
L
IP
S
P
K
W
Y
S A
M
U E
L C
P H
IL
L
IP
S P
K W
Y
S
A
M
U
E
L
C
P
H
IL
L
IP
S
P
K
W
Y
S
A
M
U
E
L
C
P
H
IL
L
IP
S
P
K
W
Y
S
A
M
U
E
L
C
P
H
IL
L
IP
S
P
K
W
Y
S
A
M
U
E
L
C
P
H
IL
LI
P
S
P
K
W
Y
X X
X
X
X
X
X X
X
XXXXX
X
X
X
X X
X
ET
X
X
X X
X
X
X
X
DRAWING INDEX
Sheet Number Sheet Title
GENERAL
G-001
COVER SHEET - LOCATION MAP, PROJECT AREA AND DRAWING INDEX
STRUCTURAL
SD-001 STRUCTURAL NOTES AND ABBREVIATIONS
SD-101 TEL-IV STRUCTURAL SITE PLAN - DEMOLITION
SD-201 TEL-IV STRUCTURAL TOWER ELEVATIONS & PLANS - DEMOLITION
ELECTRICAL
E-001
ELECTRICAL NOTES, LEGEND AND ABBREVIATIONS
ED-101 TEL-IV LIGHTNING PROTECTION SITE PLAN - DEMO
E-101 TEL-IV LIGHTNING PROTECTION SITE PLAN - NEW
E-102 TEL-IV LIGHTNING PROTECTION PLAN - MAIN BLDG - NEW
E-103 TEL-IV LIGHTNING PROTECTION PLAN - PUMP HOUSE - NEW
E-501 ELECTRICAL DETAILS
SCALE:
LOCATION MAP
NONE
PROJECT
AREA
KENNEDY SPACE CENTER
CAPE CANAVERAL, FLORIDA
TRUE
NORTH
NORTH
PLAN
KSCC 16-1601
REPAIR LIGHTNING PROTECTION
SYSTEM, TEL-IV
BASE OPERATIONS:
COMMUNICATIONS:
PROJECT MANAGER:
CHIEF, ENGINEERING FLIGHT:
USER:
SAFETY:
SECURITY FORCES:
ATO:
OTHER:
ENVIRONMENTAL:
FIRE:
A
P
P
R
O
V
E
D
G-001
G
B
O G
I A
T Z
I D
I S
L
C
O L E
M A
N
C O
V E
R
S
H E
E T
L
O C
A T
I O
N
M
A P
P
R O
J E
C T
A R
A
N D
R A
W I N
G
I N
D E
X
C
H
A R
T N
E T
T
K S
C
F
G
B
E A
R D
R E
P A
I
G
H T
N I N
G
P
R O
T E
C T
I O
N
S Y
S T
E M
T
E L
I V
K S
PERMIT(S)/ENVIRONMENTAL ACTIONS
REQUIRED PRIOR TO CONSTRUCTION
ERP/STORMWATER
ERP/WETLANDS/DREDGE & FILL
FDEP/DRINKING WATER
FDEP/DOM. WASTE WATER ARCHEO./HISTORICAL
SURVEY/WILDLIFE
OTHER
NONE
FDEP/IND. WASTE WATER
IRP
FDEP/FUEL TANK
NOI/SWPPP
ASBESTOS
NOTE: IF IT IS SUSPECTED THAT ANY HAZARDOUS MATERIAL NOT
IDENTIFIED ON THESE DRAWINGS IS REQUIRED TO BE DISTURBED IN
ORDER TO PERFORM THE CONTRACT WORK, LEAVE MATERIAL
UNDISTURBED AND IMMEDIATELY INFORM THE CONTRACTING OFFICER.
HEAVY METALS
YES NO
LEAD
PCB
NOT
VERIFIED
HAZARDOUS MATERIALS
F
K S
C C
F
L U
S A
F
T
H
C
I V
I L
E
N G
I N
E E
R
S
Q U
A D
R O
N
S
B
U I
T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
SHEET
IDENTIFICATION
C O
N T
R A
O
F
A
R A
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A n g i n e e r i n g I n c
L L
E N
E A
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
An O ne id a N at io n Co m pa ny
TEL IV SITE
FAC
N6-2296
E. CRISAFULLI RD
A
U
D
O
B
SCALE:
ENLARGED PROJECT AREA
NONE
TRUE
NORTH
NORTH
PLAN
TOWER #1
TOWER #2
TOWER #3
X K
S C
C
R e p a i r
T e l
V o w e r s D
W G
G d w g
M
R/R REMOVE & REPLACE
NOTED
PLATE
L
PL/P
PERIMETERPERIM
TEL-IV TOWER DEMOLITION NOTES, KSC
GENERAL STRUCTURAL NOTES & DESIGN CRITERIA:
D-1: APPLICABLE BUILDING CODES;
- 'INTERNATIONAL BUILDING CODE (IBC), 2018 EDITION'.
- 'UNITED FACILITIES CRITERIA (UFC) 3-301-01 STRUCTURAL ENGINEERING'.
- 'FLORIDA BUILDING CODE (FBC), 2017 EDITION'.
- 'FLORIDA EXISTING BUILDING CODE (FEBC), 2017 EDITION'.
D-2: WIND: ASCE 7-10 WITH THE FOLLOWING PARAMETERS:
V_ult = 160 mph (ULTIMATE 'LRFD' GUST), EXPOSURE 'D', RISK FACTOR = III.
DURING CONSTRUCTION / DEMOLITION USE A MINIMUM OF V_ult = 110 mph FOR
STRESS AND STABILITY CALCULATIONS IF/AS REQUIRED. ALL ELEMENTS SHALL BE
CONSIDERED 'COMPONENTS AND CLADDING' (NOT 'MWFRS'), INCLUDING
CONNECTIONS.
D-3: THE CONTRACTOR SHALL SUBMIT ALL 'DELEGATED ENGINEER' RELATED
SIGNED AND SEALED DRAWINGS AND CALCULATIONS TO THE CONTRACTING
OFFICER OR THEIR DESIGNEE FOR REVIEW AND APPROVAL PER UFC 3-301-01,
'STRUCTURAL ENGINEERING', SECTION 2-1.1.1 1603.2. THE CONTRACTING OFFICER
SHALL EXECUTE THE REQUIREMENTS OF UFC 301-01.
D-4: THESE DRAWINGS ARE BASED ON THE FOLLOWING LEGACY DRAWINGS THAT
MAY BE MADE AVAILABLE THROUGH THE CONTRACTING OFFICE (C.O.) IN PDF
FORMAT.
- NOTE THAT THE LEGACY DRAWINGS SHALL NOT BE ASSUMED TO BE 'AS BUILT';.
- PAN AM WORLD SERVICES, AEROSPACE DIVISION ETR PROJECT, PA NO. 87-1036
- "INSTALL LIGHTNING PROTECTION", "TEL-IV, FACILITY 95150 - N6-2296"
- DRAWING 'CAN-9350,' 9 SHEETS, DATED JULY 1, 1987
- THE CONTRACTOR SHALL INDEPENDENTLY FIELD VERIFY ALL EXISTING
DIMENSIONS AND CONDITIONS PRIOR TO PERFORMING ANY WORK.
GENERAL:
G-1: THE GENERAL CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS AND
DIMENSIONS BEFORE THE START OF CONSTRUCTION, AND SHALL PROVIDE ALL
MEASURES NECESSARY TO PROTECT THE EXISTING FACILITIES, STRUCTURES,
UTILITIES, AND ALL PERSONS ON SITE DURING CONSTRUCTION. HE SHALL
SUPERVISE, COORDINATE AND DIRECT THE WORK AND BE RESPONSIBLE FOR ALL
CONSTRUCTION.
G-2: THE GENERAL CONTRACTOR SHALL COORDINATE ALL EXISTING CONDITIONS
AND THE WORK OF ALL TRADES ITEMS WHICH MAY AFFECT THE DEMOLITION
WORK AND EXISTING ADJACENT FACILITIES, STRUCTURES AND UTILITIES.
G-3: ALL NOTES, DETAILS AND SECTIONS SHOWN ON THE DRAWINGS ARE
INTENDED TO BE TYPICAL UNLESS OTHERWISE NOTED AND SHALL BE CONSTRUED
TO APPLY TO ANY OTHER SIMILAR SITUATION ELSEWHERE ON THE PROJECT
EXCEPT WHERE A DIFFERENT DETAIL IS SHOWN.
SUBMITTALS:
SU-1: PRIOR TO PERFORMING ANY WORK, THE GENERAL CONTRACTOR SHALL
SUBMIT FOR REVIEW ALL REQUIRED SUBMITTALS AND DEMOLITION DRAWINGS
AND CALCULATIONS AS REQUIRED CLEARLY SHOWING ADEQUATE DETAILS TO
VERIFY INTENT AND REQUIRED DETAILS. THE GENERAL CONTRACTOR SHALL
VERIFY THAT ALL SUBMITTALS SHALL BE INDEPENDENTLY 'CHECKED' AND
COORDINATED WITH ALL OTHER RELATED ITEMS AND TASKS PRIOR TO
FORWARDING TO THE CONTRACTING OFFICER FOR REVIEW.
SU-2: CONTRACTOR SHALL NOT PROGRESS WITH ANY WORK WITHOUT FULL
REVIEW AND APPROVAL OF ALL RELATED SUBMITTALS, DEMOLITION DRAWINGS
AND/OR CALCULATIONS AS INDICATED AND REQUIRED. ALL WORK DONE AS SUCH
SHALL BE CONSIDERED 'AT RISK' AND NO ADDITIONAL COSTS AND SHALL NOT BE
CAUSE FOR ANY ADDITIONAL COSTS OR TIME EXTENSIONS BEING GRANTED BY
THE GOVERNMENT. THE CONTRACTING OFFICER OR THE E.O.R. SHALL NOT BE
PLACED IN A COMPROMISING SITUATION TO ACCEPT ANY SUCH WORK DUE TO
COST AND/OR SCHEDULE CONCERNS.
SU-3: COORDINATE SUBMITTALS PRIOR TO SUBMISSION AS REQUIRED.
UNCOORDINATED SUBMITTALS MAY CAUSE DELAYS IN SCHEDULE AND RETURNING
OF SHOP DRAWINGS. SUBMITTALS THAT ARE SUBMITTED 'UNCHECKED', OR THAT
ARE NOT 'SIGNED AND SEALED' IF REQUIRED, SHALL BE GROUNDS FOR IMMEDIATE
REJECTION.
CENTER TO CENTER
CP CATHODIC PROTECTION
FV FIELD VERIFY
C.O. CONTRACTING OFFICER
I.O.Z. INORGANIC ZINC
EXISTINGEXIST
ASTM AMERICAN SOCIETY OF TESTING
AMERICAN INSTITUTE OF STEEL AISC
E.O.R. ENGINEER OF RECORD
FAR SIDEFS
FOOT/FEET
GAUGE
FOOTING
GALVANIZED
HEIGHT
HORIZONTAL
INCH
INTERIOR
GENERAL CONTRACTOR
INT
IN
GC
HORIZ
HT
GALV
GA
FTG
FT
FLOOR
EACH
EACH END
EACH FACE
ELEVATION
DRAWING
ENGINEER
EXISTING
EACH WAY
ELECTRICAL/ELECTRIC
EQUAL SPACED
EW
FL
EX
ELEC
ENG
EQ
EL
DWG
EA
EF
EE
WITH
WITHOUT
WORKING POINT
WEIGHTWT
WP
W/O
W/
STEEL
SYMMETRICAL
TOP & BOTTOM
TOP OF
TOP OF CONCRETE
TOP STEEL
THICK
TYPICAL
UNLESS OTHERWISE
VERTICAL
THK
VERT
UON
TYP
T/S
T/C
T/
T & B
SYM
STL
CONSTRUCTION
MATERIALS
L
COLUMN
CONCRETE
CONSTRUCTION
CONTINUOUS
COORDINATE
CONNECTION
DIAMETER
DOWN
CUBIC YARDCY
DN
DIA
CONN
COORD
CONT
CONST
CONC
COL
BASE PLATE
BOTTOM OF
BUILDING
BEAM
BOTTOM
BEARING
CHANNEL
CC
CLEAR/CLEARANCE
CENTER LINE
C
CL
CH
BRG
BOT
BM
BLDG
B.PL
B/
ANCHOR BOLTS
ADDITIONAL
APPROVED
AMERICAN CONCRETE INSTITUTE
ABOVE FINISH FLOOR
ARCHITECTURAL, ARCHITECT
AMERICAN WELDING SOCIETY
STRUCTURAL ABBREVIATION LIST
ADD'L
ARCH
APP'D
AWS
AFF
ACI
AB
PLATFORMPLATF
POUNDS/SQUARE FOOT
POUNDS/SQUARE INCH
REINFORCED WITH
REFERENCE
REINFORCING
REQUIRED
SCHEDULE
SIMILAR
SPACING
SPECIFICATIONS
SQUARE
REQD
SQ
SPECS
SP
SIM
SCH
REINF
REF
R/W
PSI
PSF
MECHANICAL
MINIMUM
MISCELLANEOUS
METAL
NOT IN CONTRACT
NEAR SIDE
NOT TO SCALE
ON CENTER
OPENINGOPNG
OC
NTS
NS
NIC
MTL
MISC
MIN
MECH
JOINT
LENGTH
LOW POINT
MANUFACTURER
MAXIMUMMAX
MANUF
LP
LGTH
JT
TOWER DEMOLITION AND DECONSTRUCTION SCOPE:
TD-1: THE FOLLOWING ITEMS ARE TO BE DEMOLISHED AND DECONSTRUCTED AS
FOLLOWS;
A) ONE (1) APPROXIMATELY 180' TALL GUYED TOWER 'N6-2296X'.
B) TWO (2) APPROXIMATELY 170' TALL GUYED TOWERS; 'N6-2296Y' AND
'N6-2296U'.
C) ONE (1) OVERHEAD DRAPED CATENARY LIGHTNING PROTECTION SYSTEM AND
ASSOCIATED GROUNDING WIRES AND HARDWARE.
D) ASSOCIATED ABOVE GROUND UTILITIES.
E) TOWER AIRCRAFT OBSTRUCTION LIGHT SYSTEMS (ALL NOT OPERATIONAL)
FOR ALL THREE (3) TOWERS.
F) CONCRETE FOUNDATION SYSTEMS FOR ALL THREE (3) TOWERS.
G) UNDERGROUND AND ABOVEGROUND ELECTRICAL AND GROUNDING UTILITIES
DIRECTLY ASSOCIATED WITH ALL THREE (3) TOWERS.
TD-2: REFER TO THE STRUCTURAL PLAN AND ELEVATION DRAWINGS FOR
ADDITIONAL INFORMATION ON THE THREE EXISTING TOWERS. NO DETAILED OR
SPECIFIC 'AS BUILT' SHOP DRAWING INFORMATION IS AVAILABLE ON THE TOWERS,
BUT ARE ALL BELIEVED TO BE MANUFACTURED BY 'ROHN'.
TD-3: THE CONTRACTOR SHALL SUBMIT STRUCTURAL DEMOLITION DRAWINGS AND
CALCULATIONS SIGNED AND SEALED BY A PROFESSIONAL STRUCTURAL
ENGINEER (PE) REGISTERED IN THE STATE OF FLORIDA FOR REVIEW AND
APPROVAL PRIOR TO PERFORMING ANY DEMOLITION RELATED WORK. AS A
MINIMUM THE DRAWINGS AND CALCULATIONS SHALL SPECIFICALLY ADDRESS
THE FOLLOWING ISSUES;
A) THE SEQUENCING OF ALL ITEMS TO BE REMOVED
B) THE STABILITY OF ALL REMAINING TOWER ELEMENTS AT ALL TIMES AND
SEQUENCES DURING THE TOWER DEMOLITION PROCESS.
C) THE EFFECT OF IMBALANCED FORCES AND LOADS ASSOCIATED WITH
REMOVAL OF PARTS OF THE OVERHEAD CATENARY SYSTEM AND THE EFFECT
ON ALL TOWERS INCLUDING TOWER STRESSES AND STABILITY. NOTE THAT
THE 'AS BUILT' DETAILS OF THE CATENARY SYSTEM INCLUDING CABLE SIZES,
PLAN GEOMETRY AND CABLE DRAPE ARE UNKNOWN AND MUST BE FIELD
VERIFIED BY THE CONTRACTOR PRIOR TO SUBMITTING TOWER DEMOLITION
PLAN AND CALCULATIONS. CALCULATIONS SHALL CLEARLY SHOW THE
ANTICIPATED CATENARY LOADS AND EFFECTS AND SEQUENCING OF PARTIAL
SYSTEM REMOVAL/DEMOLITION.
D) REFER TO THE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS AND
LIMITATIONS INCLUDING FREE FALL TOWER HEIGHT.
E) AT NO POINT SHALL ANY EXISTING ABOVE GROUND OR UNDERGROUND
FACILITIES OR UTILITIES BE PLACED AT RISK OF DAMAGE DUE TO TOWER
DEMOLITION OR ANY RELATED ACTIVITIES.
F) THE LIFE, HEALTH AND SAFETY OF ALL WORKERS, INDIVIDUALS AND OTHER
PERSONS ON PROPERTY.
G) NO DAMAGE TO EXISTING BUILDINGS, STRUCTURES, EQUIPMENT, FACILITIES,
UTILITIES OF ANY KIND ETC.
TD-4: THE REPLACEMENT LIGHTNING PROTECTION SYSTEM SHALL BE FULLY
INSTALLED, TESTED, ACCEPTED AND OPERATIONAL PRIOR TO THE START OF ANY
TOWER DEMOLITION OR RELATED ACTIVITIES. THE CONTRACTOR SHALL
DEMOLISH IN THE FOLLOWING ORDER. THE DEMOLITION SEQUENCE SHALL
GENERALLY BE AS FOLLOWS
A) REMOVAL OF THE OVERHEAD CATENARY SYSTEM.
B) REMOVAL AND TEMPORARY RELOCATION OF NON-STRUCTURAL ELEMENTS
LOCATED ON THE TOWER.
C) REMOVAL OF TOWER SEGMENTS STARTING AT THE TOP MOVING
DOWNWARDS INCLUDING ASSOCIATED GUY WIRES AND RELATED HARDWARE.
D) REMOVAL OF THE MAIN GUY WIRE ANCHOR RODS AND ENCASEMENT SYSTEM
E) REMOVAL OF THE FOUNDATION SYSTEMS AS NOTED.
TD-5: THE AREA SURROUNDING THE TOWERS AND ASSOCIATED GUY WIRE
ANCHORS, ESPECIALLY ON THE EAST SIDE OF THE FACILITY, HAVE BEEN
IDENTIFIED AS A WETLANDS AREA. THE PERMITTING AND REGULATORY
REQUIREMENTS THROUGH THE SJRWMD AND ACOE FOR DEMOLITION IMPACTS TO
WETLANDS SHALL BE ADDRESSED BY THE CONTRACTOR AS PART OF THE
CONSTRUCTION.
A) THE CONTRACTOR SHALL COORDINATE WITH THE 45 CES/CEIE TO ADDRESS
ALL REQUIREMENTS.
B) IF DEWATERING IS REQUIRED AS PART OF THE DEMOLITION ACTIVITIES, THE
IMPACTS AS NOTED ABOVE TO WETLANDS SHALL BE ADDRESSED BY THE
CONTRACTOR.
C) A DEWATERING PLAN SHALL BE SUBMITTED AS PART OF THE CONTRACT, IF
REQUIRED, SO THAT THE LOCATION AND METHOD OF DEWATERING CAN BE
REVIEWED AND SITE IMPACTS IDENTIFIED.
FOUNDATION FILL:
FF-1: FILL ALL AREAS WHERE EXISTING FOUNDATIONS HAVE BEEN DEMOLISHED
AND REMOVED WITH APPROVED FILL AS FOLLOWS. BACKFILL WITH COMPACTED
CLEAN SAND PLACED IN `6" MAX. HIGH LIFTS, OR OTHER ALTERNATE APPROVED
AND COMPACTED STRUCTURAL BACKFILL AS APPROVED BY THE C.O.
FF-2: DEWATER EXCAVATIONS AS REQUIRED TO OBTAIN REQUIRED COMPACTION
AND SLOPE STABILITY. SEE NOTE 'TD-5' ABOVE FOR ADDITIONAL DEWATERING
REQUIREMENTS. IN THE EVENT THAT THE SUBGRADE BECOMES UNSTABLE
BECAUSE OF EXCESSIVE MOISTURE CONTENT, CRUSHED STONES, OR A BASE OF
CLEAN GRAVEL OR SAND WILL BE PLACED AS REQUIRED BY THE C.O. UNTIL THE
SUBBASE HAS STABILIZED AND IS ACCEPTABLE TO THE C.O.
REQUIREMENTSREQTS
SD-001
R
B
A R
C A
N T
R
B
A R
C A
N T
S T
R U
C T
U R
A L
N
O T
B
R E
V I A
T I O
N S
C
H
A R
T N
E T
T
K S
F
G
B
E A
R D
R E
P A
G
H T
N I N
G
P
R O
T E
C T
I O
N
S Y
S T
E M
T
E L I V
K S
F
K S
C C
F
L U
S A
F
T
H
C
I V
G
I N
E E
R
S
Q U
A D
R O
N
I
T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
SHEET
IDENTIFICATION
C O
N T
R A
F
A
R A
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A n g i n e e r i n g I n c
L L E
N
E A
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
An O ne id a N at io n Co m pa ny
Richard Barcant, FL PE #35462
RKB & Assoc Inc., FBPE CA #8377
304 Oak St., Melbourne Beach, FL 32951
321-725-3989 rkbarcant@att.net
X K
S C
C
R e p a i r
T e l w e r s D
W G
S D d w g
X
X X
X X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
XXXXXXXXXXXXXX
X
X X
X X
X
X X X X X
B
A
N
A
V
E
R
X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
ANTENNA
TOWER #1
N6-2296U
ANTENNA
TOWER #2
N6-2296V
ANTENNA
TOWER #3
N6-2296Y
BANANA
RIVER
FACILITY
N6-2296
PARKING
LOT
RETENTION
N6-2296G
#N6-2296B / 95149
LIFT STATION
FFE= 6.95 FEET
STAIRS
N6-2296E
95154
N6-2296F
95156 E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
C
C
C
C
C
C
W
W
W
U
U
U
U
E
E
E
C
C
E
E
E
H
V
A
C
H
V
A
C
H
V
A
C
H
V
A
C
E
N6-2297
E
E
E
E
E
E
E
E
E
E
E
E
E
W W W W W W W W W W
W W W
12" RCP
INV. 2.29
SD SD
x
C
A T
H
S
E
I N
V
W W
W W
W W W
W W
W
E E
E E
E E
E
C
C
C
C
C
C
C
E
E
E
E
E
E E E
E
E
W W
W
W W
W W
W W
W
W W
W W
W W
W W
W
W W
W
W W
W W
W W
W W
W W
W
W W
W
W
W
W
W
W
W W
W W
C
C
C
C
C
C
E
E
E
E
E
E
E
E
C
C
C
C
C
E
X
X X
X X
X X
X X
X
X
W
W W
F W
F W
FW FW
FW
FW FW
FW
F W
F W
F W
FW
FW
FW
FW
F W
W W
W W
EE
E
E
E
E
E
E E
E
E
E
E E
E E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
SD SD SD
H B
MARL DRIVE
DIRT ROAD
36" HDPE
N6-2295
N6-2295A
P
V C
E
E
E
E
E
E
E
E
E
UGU
U G
U
U
G
U
U
G
U
U
G
U
UGU
UGU
U G
U
U G
U
U
G
U
U
G
U
U
G
U
UG
U
UG
U
UGU
UGU
U G
U
UGU UGU
UGU
UGU
UGU
U
G
U
UGU
UGU
U
G
U
U
G
U
UG
U
U
G
U
UGU
UGU
UGU
UGU
UGU
UGU
N6-2296V
SD SD
H V
A C
H V
A C
H V
A C
H V
A C
C
C
C
C
X
X
X
X
X
X
X
W
S F
S F
S F
S F
S F
S F
S F
S
F
SF
SF
S
F
SF
SF
SF
S F
X
X
X
X
X
X X
X
XXXX
X
X
B
A
N
A
V
E
R
X X
X
X
X
X
X
X
X
X
X X
X
XXXX
X
GATE
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
C
H
A R
T N
E T
T
K S
F
G
B
E A
R D
K S
R E
P A
G
H T
N I N
G
P
R O
T E
C T
I O
N
S Y
S T
E M
T
E L I V
F
K S
C C
F
L U
S A
F
T
H
C
I V
G
I N
E E
R
S
Q U
A D
R O
N
I
T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
SHEET
IDENTIFICATION
C O
N T
R A
F
A
R A
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A n g i n e e r i n g I n c
L L E
N
E A
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
An O ne id a N at io n Co m pa ny
TRUE
NORTH
NORTH
PLAN
TRUE
NORTH
NORTH
PLAN
SCALE:
SITE KEY PLAN
NONE
SCALE:
TEL IV STRUCTURAL SITE PLAN - DEMOLITION
1" = 50'
150'100'50'0'50'
GRAPHIC SCALE 1" = 50'
TYP
TYP
TYP
T E
L
R
U C
T U
R A
L
S
I T
E
P
L A
N
D E
M O
L I T
I O
N
SD-101
R
B
A R
C A
N T
R
B
A R
C A
N T
SD-201
SD-201
SD-201
FLAG NOTES:
1. DEMO EXISTING TOWER INCLUDING MAIN TOWER, GUY WIRES ETC. TYPICAL,
UON. SEE TEL-IV TOWER ELEVATIONS ON SHEET SD-201 FOR ADDITIONAL
INFORMATION.
2. DEMO EXISTING CATENARY LIGHTNING PROTECTION STATIC CABLE SYSTEM
ABOVE INCLUDING CABLES, CONNECTIONS ETC., TYPICAL. SEE TEL-IV
TOWER ELEVATIONS ON SHEET SD-201 FOR ADDITIONAL INFORMATION.
3. DEMO EXISTING MAIN TOWER FOUNDATION INCLUDING ANCHOR RODS, ETC.
TYPICAL. SEE TEL-IV TOWER ELEVATIONS ON SHEET SD-201 FOR
ADDITIONAL INFORMATION.
4. ABANDON EXISTING MAIN GUY WIRE FOUNDATIONS BELOW GRADE (3 PER
TOWER). DEMO MAIN GUY WIRE ANCHOR RODS, INCLUDING CONCRETE
ENCASEMENT AND 6" DIA PVC PIPE DOWN TO 24" BELOW GRADE , TYPICAL.
SEE TEL-IV TOWER ELEVATIONS ON SHEET SD-201 FOR ADDITIONAL
INFORMATION.
5. EXISTING ABOVE GROUND AND BELOW GROUND STRUCTURES, UTILITIES
AND FACILITIES INCLUDING FENCING SHALL REMAIN. PROTECT ALL EXISTING
AGAINST DAMAGE, ETC., AT ALL TIMES DURING THE CONSTRUCTION
PROCESS. SEE TEL-IV TOWER ELEVATIONS ON SHEET SD-201 FOR
ADDITIONAL INFORMATION.
6. FULL HEIGHT TOWER FALL AND MAX 60' RADIUS FALL REFERENCE LINES.
PROTECT ALL EXISTING FACILITIES, STRUCTURES, UTILITIES, ETC., AGAINST
DAMAGE, ETC., AT ALL TIMES DURING THE CONSTRUCTION PROCESS. SEE
TEL-IV TOWER ELEVATIONS ON SHEET SD-201 FOR ADDITIONAL
INFORMATION.
TYP
TYP
TYP
A
SD-201
B
SD-201
B
SD-201
GRASS AREACONCRETEASPHALT ROADWAY
LEGEND:
Richard Barcant, FL PE #35462
RKB & Assoc Inc., FBPE CA #8377
304 Oak St., Melbourne Beach, FL 32951
321-725-3989 rkbarcant@att.net
GENERAL NOTES:
1. NOTE ALL THREE TOWER FOUNDATIONS ARE LOCATED IN WETLANDS;
STORMWATER BEST MANAGEMENT PRACTICES MUST BE USED TO PROTECT
THESE SENSITIVE AREAS.
X K
S C
C
R e p a i r
T e l w e r s D
W G
S D d w g
VARIES
ABBREVIATION / KEY;
A = ABANDON IN PLACE
D = DEMO
E = EXISTING
N = NEW
R/R = REMOVE & REPLACE
F.V. = FIELD VERIFY
~2'-2"± F.V.
O
V E
R A
L L
~1'-6"± F.V.
T
Y P
SYM ABOUT
CENTERLINE
T Y
P
O
V E
R A
L L
VARIES
3 SETS OF TOWER
GUY WIRES TYP
GUY WIRE ANCHOR ROD (D)
MAIN GUY WIRE ANCHOR ROD
AND ENCASEMENT (D)
MAIN GUY WIRE
FOUNDATION (A)
MAIN TOWER FOUNDATION (D)
TOWER BASE PLATE (D)
AIRCRAFT
OBSTRUCTION
LIGHT (NOT
OPERATIONAL TYP)
SYM ABOUT
CENTERLINE
TOWER BASE PLATE (D)
3 SETS OF
TOWER GUY
WIRES TYP
TOWER GUY CONN
HARDWARE TYP
TOWER GUY CONN
HARDWARE (TYP)
48' 60'
GRAPHIC SCALE 1/16" = 1'-0"
12'12' 6' 0' 24' 36'
SUMMARY:
TOWER/FACILITY: N6-2296U & N6-2296Y
- APPROX OA TOWER HT: 170 ft
(EXCL APPURTENANCES)
- # SECTIONS: 17 each
- ~ HT/SECTION: 10 ft / each
- # GUYED TIERS: 5 each
- # GUYS/TIER; 3 each
- ROHN SERIES '55G'
SUMMARY:
TOWER/FACILITY: N6-2296V
- APPROX OA TOWER HT: 180 ft
(EXCL APPURTENANCES)
- # SECTIONS: 9 each
- HT/SECTION: 20 ft / each
W/ 25' BASE TIER
- # GUYED TIERS: 3 each
- # GUYS/TIER; 3 each
- ROHN SERIES 'CC'
DRAPED CATENARY
STATIC WIRE LIGHTNING
PROTECTION SYSTEM TYP
TYP
TYP
TYP
1 1
TYP
TYP
TYP BOLTED
SPLICE (E)
TYP BOLTED
SPLICE (E)
MAIN TOWER
FOUNDATION (D)
TYP
GC FIELD VERIFY TYP,
VARIES (N.T.S.);
LINE OF GUY
WIRES ABOVE (D)
LINE OF GUY
WIRES ABOVE (D)
LINE OF GUY
WIRES ABOVE (D)
GC FIELD VERIFY TYP,
VARIES (N.T.S.);
TYP
TYP
TYP
TYP
TYP
GRADE LINE GRADE LINE
CLIMB RAIL ONE
SIDE ONLY (E)
TAPERED TOWER
SECTION AT BASE TYP (D)
TAPERED TOWER
SECTION AT BASE TYP (D)
CLIMB RAIL ONE
SIDE ONLY (E)
APPROX GUY WIRE
VERTICAL SPACING TYP
APPROX GUY
WIRE VERTICAL
SPACING TYP
AIRCRAFT
OBSTRUCTION
LIGHT (NOT
OPERATIONAL TYP)
AIRCRAFT
OBSTRUCTION
LIGHT (NOT
OPERATIONAL TYP)
ANCHOR ROD &
ENCASEMENT (D)
MAIN GUY WIRE
FOUNDATION BELOW (A)
GUY WIRES &
CONN'S (D)
LINE OF GUY
WIRES ABOVE (D)
MAIN TOWER
FOUNDATION (D)
TYP
TYP
TYP
MAIN GUY WIRE
FOUNDATION BELOW (A)
ANCHOR ROD &
ENCASEMENT (D)
MAIN GUY WIRE
FOUNDATION (A)
MAIN GUY WIRE ANCHOR ROD
AND ENCASEMENT (D)
GUY WIRE ANCHOR ROD (D)
STATIC WIRE SCHEDULE
TOWER
1-2
HORIZ
LENGTH (')FROM/TO LEFT
REACTION (#)
RIGHT DIST 'A' (')
HORIZ
DIST 'B' (')
VERT SLOPE (%)
2-3
3-1
RIGHTLEFT
-31.01
-35.74
-34.52
13.7
33.0
18.2
13.3
27.6
15.7
B
'A'
LOW
POINT
STATIC WIRE INSTALLATION
TOWER #1: 175.5'
TOWER #3: 174.0'
TOWER #1: 5.0'
TOWER #3: 3.5'
TOWER #2: 3.6'
TOWER #3: 3.5'
TOWER #2: 184.1'
TOWER #3: 174.0'
T O
W E
R
T O
W E
R
T O
W E
R
T
Y P
NOTE:
1) ABOVE INFO TAKEN FROM REFERENCED LEGACY DRAWINGS.
2) 'REACTION' SHOWN ABOVE IS VERTICAL, AND IS NOT THE HORIZONTAL
COMPONENT OF THE CABLE'S CATENARY FORCE THAT IS TO BE USED
IN TOWER STABILITY CALCULATIONS DURING CATENARY DEMOLITION.
DRAPED Ø
STATIC WIRE
APPROX GRADE EL. APPROX GRADE EL.
T O
W E
R
SD-201
SD-201
#FLAG NOTES:
1. EXISTING GUYED TOWERS TO BE DEMOLISHED AND REMOVED FROM
THE SITE, INCLUDING TOWER STRUCTURE, GUY WIRES, FOUNDATIONS
AND ALL NON STRUCTURAL UTILITIES, APPURTENANCES AND
ATTACHMENTS. RECYCLE ALL TOWER STRUCTURAL AND
NON-STRUCTURAL COMPONENTS TYP UON REFER TO SECTIONS,
NOTES AND SPECIFICATIONS FOR ADDITIONAL INFORMATION,
RESTRICTIONS AND REQTS. COORDINATE ALL DEMOLITION WORK AND
SCHEDULING WITH C.O. AND THE WORK OF ALL OTHER RELATED
TRADES TYPICAL.
2. EXISTING MAIN TOWERS CONCRETE FOUNDATIONS TO BE DEMOLISHED.
MAIN TOWER FOUNDATIONS ARE 3'-6" SQUARE x 4'-0" THICK W/ TOP/FTG
~6" ABOVE GRADE. EXISTING TOWER GUY WIRE FOUNDATIONS ARE TO
BE ABANDONED IN PLACE (6'-0"x4'-0"x2'-0" THICK W/ TOP/FTG 2' TO 4'
BELOW GRADE). DEMO THE MAIN GUY WIRE ANCHOR RODS ENCASED IN
CONCRETE AND PVC PIPES TO 24" BELOW GRADE TYP. REFER TO
SECTIONS, NOTES AND SPECIFICATIONS FOR ADDITIONAL INFORMATION,
RESTRICTIONS AND REQTS.
3. REMOVE ALL EXISTING UTILITIES ON EXISTING GUYED TOWERS TO BE
DEMOLISHED, INCLUDING TOWER STRUCTURE, GUY WIRES,
FOUNDATIONS AND ALL APPURTENANCES AND ATTACHMENTS. REFER
TO SECTIONS, NOTES AND SPECIFICATIONS FOR ADDITIONAL
INFORMATION, RESTRICTIONS AND OTHER REQTS. COORDINATE ALL
DEMOLITION WORK AND SCHEDULING WITH C.O. AND THE WORK OF ALL
OTHER RELATED TRADES.
4. DEMOLISH EXISTING DRAPED CATENARY LIGHTNING PROTECTION
SYSTEM. REFER TO SECTIONS, NOTES AND SPECIFICATIONS FOR
ADDITIONAL INFORMATION, RESTRICTIONS AND REQTS. COORDINATE
ALL DEMOLITION WORK AND SCHEDULING WITH C.O. AND THE WORK OF
ALL OTHER RELATED TRADES.
AIRCRAFT
OBSTRUCTION
LIGHT (NOT
OPERATIONAL TYP)
R
B
A R
C A
N T
R
B
A R
C A
N T
C
H
A R
T N
E T
T
G
B
E A
R D
U S
F
T
H
C
I V
I L
E
N G
I N
E E
R
S
Q U
A D
R O
N
I
T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
SHEET
IDENTIFICATION
C O
N T
R A
F
A
R A
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A n g i n e e r i n g I n c
L L
E N
E A
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
An O ne id a N at io n Co m pa ny
SEE OVERALL DEMO PLAN, DWG SD-101, FOR 'NORTH'
K S
R E
P A
G
H T
N I N
G
P
R O
T E
C T
I O
N
S Y
S T
E M
T
E L
I V
T E
L
R
U C
T U
R A
L
T
O W
E
V A
T I O
P L
A N
S
D
E M
O L
I T
I O
N
SD-201
K S
F
F
K S
C C
F
L
SCALE:
TOWER #2 - N6-2296V
NONE
A
SD-101
OVERALL TOWER FOUNDATION PLAN
SCALE:
TOWER #2 - N6-2296V
NONE
SD-101
SD-201
OVERALL TOWER FOUNDATION PLAN
SEE OVERALL DEMO PLAN, DWG SD-101, FOR 'NORTH'
SCALE:
TOWERS #1 & #3 - N6-2296U & N6-2296Y
NONE
B
SD-101
OVERALL TOWER FOUNDATION PLAN
SCALE:
TOWERS #1 & 3 - N6-2296U & N6-2296Y
NONE
SD-101
SD-201
OVERALL TOWER FOUNDATION PLAN
Richard Barcant, FL PE #35462
RKB & Assoc Inc., FBPE CA #8377
304 Oak St., Melbourne Beach, FL 32951
321-725-3989 rkbarcant@att.net
X K
S C
C
R e p a i r
T e l w e r s D
W G
S D d w g
ABBREVIATIONS:ELECTRICAL LEGEND
APPLIES TO ALL ELECTRICAL SHEETS; SOME SYMBOLS MAY NOT BE USED.
A - AMPERES, AMPS
AFG - ABOVE FINISHED GRADE
AHU - AIR HANDLING UNIT
AIC - AMPS INTERRUPTING CAPACITY
ATS - AUTOMATIC TRANSFER SWITCH
AUX - AUXILIARY
BATT - BATTERY (CABINET)
BFF - BELOW FINISHED FLOOR
BFG - BELOW FINISHED GRADE
BKR - BREAKER
C - CONDUIT
CAB - CABINET
CB - CIRCUIT BREAKER
CKT - CIRCUIT
CONC - CONCRETE
CTRL - CONTROL
CU - COPPER
DIA - DIAMETER
DISC - DISCONNECT
DWG - DRAWING
ECB - ENCLOSED CIRCUIT BREAKER
ELEC - ELECTRIC
EMT - ELECTRICAL METALLIC TUBING
EPSS - EMERGENCY POWER SUPPLY SYSTEM
EXH - EXHAUST
EXST - EXISTING
G/GEN - GENERATOR
GFCI - GROUND FAULT CIRCUIT INTERRUPTER
GND - GROUND
IAW - IN ACCORDANCE WITH
KCMIL - THOUSAND CIRCULAR MILS
KV - KILOVOLTS
KW - KILOWATT
LBS - LOAD BREAK SWITCH
MDP - MAIN DISTRIBUTION PANEL
MTS - MANUAL TRANSFER SWITCH
N/A - NOT APPLICABLE
NC - NORMALLY CLOSED
NIC - NOT IN CONTRACT
NO - NORMALLY OPEN
NTS - NOT TO SCALE
PNL - PANEL, PANELBOARD
PVC - POLYVINYL CHLORIDE
PWR - POWER
QTY - QUANTITY
REF - REFERENCE
RGS - RIGID GALVANIZED STEEL
SS - STAINLESS STEEL
SW - SWITCH
TMCB - THERMAL MAGNETIC CIRCUIT BREAKER
TYP - TYPICAL
UG - UNDERGROUND
UGC - UNDERGROUND COMMUNICATIONS
UGE - UNDERGROUND ELECTRICAL
UON - UNLESS OTHERWISE NOTED
UPS - UNINTERRUPTIBLE POWER SUPPLY
V - VOLTS
W - WATTS
XFMR - TRANSFORMER
BRANCH CIRCUIT CONDUIT RUN. ARROW INDICATES
HOME RUN, MINIMUM CONDUIT SIZE SHALL BE 3/4".
HOME RUNS LONGER THAN 100' SHALL USE #10
CONDUCTOR (MIN).
E x
C x
W x
E-001
G
B
O G
I A
T Z
I D
I S
L
C
O L
E M
A N
E L E
C T
R I C
A L
N
O T
E S
L E
G E
D
A B
B R
E V
I A
T I O
N S
C
H
A R
T N
E T
T
K S
F
G
B
E A
R D
K S
F
K S
C C
F
L U
S A
F
T
H
C
I V
G
I N
E E
R
S
Q U
A D
R O
N
I
T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
SHEET
IDENTIFICATION
C O
N T
R A
F
A
R A
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A n g i n e e r i n g I n c
L L E
N
E A
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
An O ne id a N at io n Co m pa ny
R E
P A
G
H T
N I N
G
P
R O
T E
C T
I O
N
S Y
S T
E M
T
E L I V
LP
EXOTHERMIC WELD FOR GROUNDING
GROUND ROD WITH BONDED CONNECTION POINT
LIGHTNING PROTECTION AIR TERMINAL
M = AIR TERMINAL ON MAST
A = AIR TERMINAL ATTACHED TO EXISTING SUPPORT
UNDERGROUND ELECTRIC CONDUIT - EXISTING
DOWN CONDUCTOR TO GROUNDING SOURCE
LIGHTNING PROTECTION CONDUCTOR
WATER LINE - EXISTING
UNDERGROUND COMMUNICATIONS CONDUIT - EXISTING
POLE MOUNTED LIGHT FIXTURE - EXISTING
F
FIRE WATER LINE - EXISTING
ELECTRICAL NOTES:
1. IT IS THE INTENT OF THESE CONTRACT DRAWINGS TO PROVIDE A COMPLETE
AND WORKABLE FACILITY.
2. DESIGN DRAWINGS ARE DIAGRAMMATIC AND DO NOT SHOW ALL OFFSETS,
BENDS, ELBOWS, OR OTHER SPECIFIC ELEMENTS THAT MAY BE REQUIRED
FOR PROPER INSTALLATION OF THE WORK. SUCH WORK SHALL BE VERIFIED
AT THE SITE. ADDITIONAL BENDS, OFFSETS, AND CONDUIT AS REQUIRED BY
VERTICAL AND HORIZONTAL EQUIPMENT LOCATIONS OR OTHER JOB
CONDITIONS, SHALL BE PROVIDED TO COMPLETE THE WORK AT NO
ADDITIONAL COST TO THE GOVERNMENT.
3. EXCEPT WHERE SHOWN IN DIMENSIONAL DETAIL, THE LOCATIONS OF
EQUIPMENT SHOWN ON PLANS ARE APPROXIMATE. SUCH ITEMS SHALL BE
PLACED TO ELIMINATE INTERFERENCE WITH OTHER EQUIPMENT. THE EXACT
LOCATIONS SHALL BE DETERMINED IN THE FIELD.
4. ALL WORK SHALL BE IN ACCORDANCE WITH THE 2017 EDITION OF THE
NATIONAL ELECTRICAL CODE (NFPA 70).
5. MATERIALS SHALL BE LISTED BY THE UNDERWRITER'S LABORATORIES, INC.
OR ANOTHER APPROVED/CERTIFIED TESTING LABORATORY. SHOULD PLANS
AND CODES CONFLICT, CONTACT THE CONTRACTING OFFICER. MAKE NO
CHANGES, EVEN IN CASE OF CONFLICT, WITHOUT FIRST OBTAINING THE
APPROVAL OF THE CONTRACTING OFFICER.
6. A GREEN, COPPER GROUND WIRE SHALL BE INSTALLED IN ALL CONDUIT
SYSTEMS AND SHALL BE BONDED TO ALL ENCLOSURES, BOXES, AND
EQUIPMENT. RECEPTACLES WITH GREEN WIRE SHALL BE BONDED TO BOX
THEN TO RECEPTACLE SUCH THAT REMOVAL OF RECEPTACLE DEVICE SHALL
NOT INTERRUPT GREEN WIRE BOND TO METALLIC BOX OR ENCLOSURE.
7. BONDING JUMPERS SHALL BE USED TO BOND CONDUIT TO ENCLOSURES,
BOXES, AND EQUIPMENT WHERE CONCENTRIC OR ECCENTRIC KNOCKOUTS
ARE USED.
8. THE INSTALLATION OF THE ELECTRICAL WORK SHALL BE COORDINATED WITH
THE WORK OF THE OTHER TRADES.
9. THE INSTALLATION SHALL BE ACCOMPLISHED BY WORKERS SKILLED IN THIS
TYPE OF WORK. THE INSTALLATION SHALL BE MADE SO THAT THERE IS NO
DEGRADATION OF THE DESIGNED FIRE RATINGS.
10. THE CONTRACTOR SHALL INSTALL HIS WORK IN SUCH A MANNER AND AT
SUCH A TIME AS WILL REQUIRE A MINIMUM OF CUTTING AND PATCHING OF
THE BUILDING STRUCTURE.
11. 'PROVIDE', AS USED HERE ON THE DRAWINGS, IS AN ALL-INCLUSIVE TERM
REQUIRING CONTRACTOR TO FURNISH, INSTALL, WIRE, AND CONNECT ALL
SPECIFIED EQUIPMENT AS WELL AS COMPONENTS, ACCESSORIES, WIRING,
AND MOUNTING HARDWARE TO INSURE THAT SPECIFIED EQUIPMENT
FUNCTIONS TO MEET SYSTEM(S) REQUIREMENTS.
12. WHERE NEW-TO-EXISTNG CONNECTIONS ARE INDICATED, THE CONTRACTOR
SHALL PROVIDE ALL MATERIALS (JUNCTION BOXES, CONDUIT, WIRE, AND
CONNECTIONS) AND LABOR REQUIRED TO MAKE THE CONNECTIONS.
13. UNLESS OTHERWISE NOTED, ALL POWER CIRCUIT CONDUCTORS SHALL BE
COPPER AND MINIMUM #12AWG. CONDUITS SHALL BE 3/4" MINIMUM.
14. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PROTECT
EXISTING UTILITIES FROM DAMAGE. THE CONTRACTOR SHALL BEAR ALL
EXPENSE FOR REPAIR OR REPLACEMENT OF THE UTILITIES OR OTHER
PROPERTY DAMAGED BY OPERATIONS IN CONJUNCTION WITH THE
COMPLETION OF THIS WORK.
15. ALL BOLTS, NUTS, WASHERS, ETC. USED FOR GROUNDING AND BONDING
CONNECTIONS SHALL BE COPPER. CONTRACTOR SHALL UTILIZE
CONNECTORS TO PREVENT GALVANIC ACTION.
16. CONDUITS SHALL BE SUPPORTED BY SUITABLE CLAMPS, HANGERS OR
STRAPS TO PROVIDE A RIGID INSTALLATION. CONDUIT SUPPORTS SHALL NOT
BE FASTENED OR ATTACHED TO OTHER PIPES. PERFORATED STRAP
HANGERS WILL NOT BE ALLOWED. EMPTY CONDUIT SHALL BE THOROUGHLY
SWABBED OUT WITH DRY SWAB TO REMOVE MOISTURE AND DEBRIS BEFORE
WIRE IS DRAWN IN. END OF CONDUIT SHALL BE TIGHTLY PLUGGED UNTIL
WIRE IS PULLED. NO CONDUIT SHALL BE LOCATED TO IMPAIR THE STRENGTH
OF STRUCTURAL MEMBERS. MAKE CHANGES IN DIRECTION OF RUNS WITH
SYMMETRICAL BENDS. MAKE FIELD MADE BENDS AND OFFSETS WITH HICKEY
OR CONDUIT BENDING MACHINE. DO NOT INSTALL CRUSHED OR DEFORMED
CONDUITS. AVOID TRAPPED CONDUITS. PREVENT PLASTER, DIRT, OR TRASH
FROM LODGING IN CONDUIT, BOXES, FITTINGS. FREE CLOGGED CONDUITS OF
OBSTRUCTIONS.
17. IN ACCORDANCE WITH NFPA 70, GROUND EXPOSED, NON CURRENT
CARRYING METALLIC PARTS OF ELECTRICAL EQUIPMENT, METALLIC
RACEWAY SYSTEMS, GROUNDING CONDUCTOR IN METALLIC RACEWAYS.
18. FASTEN CONDUITS TO SHEET METAL BOXES AND CABINETS WITH TWO
LOCKNUTS WHERE REQUIRED BY NFPA 70, WHERE INSULATED BUSHINGS ARE
USED, AND WHERE BUSHINGS CANNOT BE BROUGHT INTO FIRM CONTACT
WITH THE BOX; OTHERWISE, USE MINIMUM SINGLE LOCKNUT AND BUSHING.
LOCKNUTS SHALL HAVE SHARP EDGES FOR DIGGING INTO WALLS OF METAL
ENCLOSURE. INSTALL BUSHINGS ON ENDS OF CONDUITS, AND PROVIDE
INSULATING TYPE WHERE REQUIRED BY NFPA 70.
19. PROVIDE AND INSTALL AT WALL OR FLOOR PENETRATIONS A PERMANENT
FIRESTOP SYSTEM. THE SYSTEM SHALL CONSIST OF A WATER BASED
FIRESTOP COMPOUND AS THE FILL, VOID, OR CAVITY MATERIAL ALONG WITH
APPROPRIATE DAMMING MATERIAL (AS PER MANUFACTURER'S
INSTRUCTIONS). THE FIRESTOP COMPOUND SHALL NOT CONTAIN ANY
SOLVENTS, INORGANIC FIBERS, OR SILICONE COMPOUNDS AND SHALL NOT
REQUIRE HEAT TO ACTIVATE THE SEAL. THE FIRESTOP COMPOUND SHALL BE
ONE-PART MATERIALS, REQUIRING NO CRITICAL MIXING. THE PENETRATION
SEAL MATERIAL MUST BE UNAFFECTED BY MOISTURE AND MUST MAINTAIN
THE INTEGRITY OF THE FLOOR OR WALL ASSEMBLY FOR ITS RATED TIME
PERIOD WHEN TESTED IN ACCORDANCE WITH ASTM E84. THE SYSTEM SHALL
BE UL CLASSIFIED AND INSTALLED TO PROVIDE A 2 HOUR FIRE RATING. THE
PENETRATION FIRE STOP MATERIAL SHALL BE FLAME-SAFE FS1900 SERIES
COMPOUND AS MANUFACTURED BY GRACE CONSTRUCTION PRODUCTS OR
EQUAL.
20. REPAIR ALL DAMAGE TO GALVANIZED CONDUIT, BOXES, FITTINGS AND RIGID
STEEL FIELD CUT THREADS WITH COLD GALVANIZING SPRAY PAINT.
LIGHTNING PROTECTION GENERAL NOTES:
1. ALL WORK SHALL BE IN ACCORDANCE WITH THE 2017 EDITION OF NFPA 780
(STANDARD FOR THE INSTALLATION OF LIGHTNING PROTECTION SYSTEMS).
2. MATERIALS SHALL BE LISTED BY THE UNDERWRITER'S LABORATORIES, INC.
OR ANOTHER APPROVED/CERTIFIED TESTING LABORATORY.
3. THE INSTALLATION OF THE LIGHTNING PROTECTION SYSTEM SHALL BE
COORDINATED WITH THE WORK OF THE OTHER TRADES.
4. LIGHTNING PROTECTION INSTALLATION SHALL COMPLY WITH AFI 32-1065
(GROUNDING SYSTEMS) AND UFC 3-575-01 (LIGHTNING AND STATIC
ELECTRICITY PROTECTION SYSTEMS).
5. THE LIGHTNING PROTECTION SYSTEM SHALL BE INSPECTED BY A
COMMERCIAL, THIRD-PARTY INSPECTOR WHOSE SOLE WORK IS LIGHTNING
PROTECTION, AND SHALL BE CERTIFIED BY THIS THIRD-PARTY INSPECTOR AS
COMPLIANT WITH AFI 32-1065 AND NFPA 780, IN THAT PRIORITY ORDER. A UL
CERTIFICATION ON ITS OWN SHALL NOT BE ADEQUATE FOR ACCEPTANCE OF
ANY AIR FORCE PROJECT.
6. AIR TERMINALS LOCATED AROUND THE PERIMETER OF THE BUILDING SHALL
BE WITHIN 24" OF THE ROOF EDGE.
7. PROVIDE COPPER CONDUCTORS, EXCEPT WHERE ALUMINUM CONDUCTORS
ARE REQUIRED FOR CONNECTION TO ALUMINUM EQUIPMENT.
BONDED CONNECTION POINT
GROUND TEST WELL - EXISTING
X K
S C
C
R e p a i r
T e l w e r s D
W G
E d w g
X X
X X
X X
X X
X X
X
X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
SD
x
SD
x
SD
x
SD
x
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
XXXXXXXXXXXXXXXXXXXXXXXXXXXXX
X
X
X
X X
X X
X X
X X
X
X X X X X X X X X X
B
A
N
A
V
E
R
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
F F
F F
F F F
F F
F F F
F F F
F
F F
F F
F F
F
F F
F F
F
F F
F F
F
F
F
E
X X
X
X
XXXX
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X X
X X
X X
X
X
N6-2297
X
X
X
E
E
E
E
E
N6-2296H
C
CH-2CH-1
N6-2296C
TAA-3C
E
L
E
V
A
T
B
A
Y
C
N6-2296T
N6-2295A
N6-2295
N6-2296G
N6-2296V
E L E
V A
T E
D
C
A B
A
Y
E
L
E
V
A
T
B
A
Y
N6-2296
N6-2296F
TAA-24A
N6-2296B
ED-101
G
B
O G
I A
T Z
I D
I S
L
C
O L
E M
A N
T E
L
G
H T
N I N
G
P
R O
T E
C T
I O
N
S
I T
E
P L A
N
D
E M
O
C
H
A R
T N
E T
T
K S
F
G
B
E A
R D
K S
R E
P A
G
H T
N I N
G
P
R O
T E
C T
I O
N
S Y
S T
E M
T
E L I V
F
K S
C C
F
L U
S A
F
T
H
C
I V
G
I N
E E
R
S
Q U
A D
R O
N
I
T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
SHEET
IDENTIFICATION
C O
N T
R A
F
A
R A
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A n g i n e e r i n g I n c
L L E
N
E A
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
An O ne id a N at io n Co m pa ny
TRUE
NORTH
NORTH
PLAN
FLAG NOTES:
1. REMOVE OBSTRUCTION LIGHTS (NOT SHOWN) FROM EXISTING CATENARY
TOWER. SINGLE LIGHT FIXTURE ON TOP OF TOWER, AND DOUBLE LIGHT
FIXTURE MIDWAY OF TOWER. REMOVE WIRING ASSOCIATED WITH
OBSTRUCTION LIGHTS. REFER TO STRUCTURAL DEMOLITION PLANS FOR
ADDITIONAL INFORMATION.
2. REMOVE EXISTING OBSTRUCTION LIGHTING POWER AND CONTROL
PEDESTAL. REMOVE CONTACTORS, PHOTOCELL, DISCONNECT SWITCHES,
TRANSFORMER, FLASHERS, PANELBOARD, CONDUIT AND WIRING. REMOVE
CONDUIT TO 6" BELOW GRADE AND FILL WITH GROUT. REMOVE ALL WIRING.
CONDUIT BELOW GRADE SHALL BE ABANDONED IN PLACE.
SCALE:
TEL IV LIGHTNING PROTECTION SITE PLAN - DEMOLITION
1" = 50'
150'100'50'0'50'
GRAPHIC SCALE 1" = 50'
GRASS AREACONCRETEASPHALT ROADWAY
LEGEND:
X K
S C
C
R e p a i r
T e l w e r s D
W G
E D d w g
X X
X
SD
x
SD
x
SD
x
SD
x
SD
x
SD
x
SD
x
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X X X X X X X X X X X X X X X X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X X X
E
X X
X X
X X
X
X
X
X X
X X
X X
X X
X X
X
X
X
X
X
N6-2297
X
X
X
X
X
X
X
X
X
E
E
E
E
N6-2296H
C
CH-2CH-1
N6-2296C
TAA-3C
G
G
G
G
G
G
E
L
E
V
A
T
B
A
Y
C
N6-2296T
E L E
V A
T E
D
C
A B
A
Y
E
L
E
V
A
T
B
A
Y
G
N6-2296
N6-2296F
TAA-24A
N6-2296B
E-101
G
B
O G
I A
T Z
I D
I S
L
C
O L E
M A
N
T E
L
G
H T
N I N
G
P
R O
T E
C T
I O
N
S
I T
E
P L
E W
C
H
A R
T N
E T
T
K S
F
G
B
E A
R D
K S
R E
P A
G
H T
N I N
G
P
R O
T E
C T
I O
N
S Y
S T
E M
T
E L
I V
F
K S
C C
F
L U
S A
F
T
H
C
I V
I L
E
N G
I N
E E
R
S
Q U
A D
R O
N
I L
T
D
A T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
SHEET
IDENTIFICATION
C O
N T
R A
F
A
R A
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A n g i n e e r i n g I n c
L L E
N
E A
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
An O ne id a N at io n Co m pa ny
TRUE
NORTH
NORTH
PLAN
GENERAL NOTE:
1. PROVIDE LIGHTNING PROTECTION TO TEL-IV SITE STRUCTURES.
SCALE:
TEL IV LIGHTNING PROTECTION SITE PLAN - NEW CONSTRUCTION
1" = 30'
FLAG NOTES:
1. EXISTING POLE MOUNTED LIGHT FIXTURE. PROVIDE NEW 24" ALUMINUM
AIR TERMINAL AND SUPPORT BASE. PROVIDE (2) CLASS I ALUMINUM
DOWN CONDUCTORS FROM AIR TERMINAL TO GROUND ROD. PROVIDE
(2) NEW 3/4" DIAMETER x 20' LONG COPPER GROUND ROD.
2. PROVIDE NEW 24" COPPER AIR TERMINALS AND SUPPORT BASE ON
EXISTING RADAR EQUIPMENT. ATTACH AIR TERMINAL TO RADAR
SUPPORT FRAME USING AN OFFSET MOUNT POINT, THOMPSON
LIGHTNING PROTECTION #678 OR EQUAL. COORDINATE MOUNTING
LOCATION WITH FACILITY MANAGER.
3. PROVIDE (2) NEW CLASS I ALUMINUM DOWN CONDUCTORS FROM AIR
TERMINAL TO (2) NEW GROUND RODS.
4. PROVIDE NEW CLASS I COPPER DOWN CONDUCTOR TO EXISTING
BUILDING GROUNDING COUNTERPOISE, SHOWN DIAGRAMMATICALLY.
PROVIDE UNSUPPORTED LENGTH OF CABLE AS REQUIRED TO SUPPORT
ANTENNA MOVEMENT. COORDINATE WITH FACILITY MANAGER.
5. PROVIDE NEW 24" COPPER AIR TERMINALS AND SUPPORT BASE ON
EXISTING HVAC EQUIPMENT.
90'60'30'0'30'
GRAPHIC SCALE 1" = 30'
TYPICAL
E-501
E-501
E-501
TYPICAL
GRASS AREACONCRETEASPHALT ROADWAY
LEGEND:
3 3
X K
S C
C
R e p a i r
T e l w e r s D
W G
E d w g
N6-2296F
N6-2297
X X
X X
X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
FACILITY
N6-2296
N6-2295
N6-2295A
N6-2296G
N6-2296V
N6-2296C
N6-2296H
X
X
X
X X
X X
X X
G
ROADWAY
ROADWAY
E L E
V A
T E
D
C
A B
A
Y
E
L
E
V
A
T
B
A
Y
G
LP
LP LP LP
LP LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP LP
LP LP
LP
LP
LP
LP
N6-2297
N6-2296H
N6-2296
LP
LP
LP
LP
LP
LP
M
A
M
A
E-102
G
B
O G
I A
T Z
I D
I S
L
C
O L
E M
A N
T E
L
G
H T
N I N
G
P
R O
T E
C T
I O
N
P
L A
N
M A
D
G
N
E W
C
H
A R
T N
E T
T
K S
F
G
B
E A
R D
K S
R E
P A
G
H T
N I N
G
P
R O
T E
C T
I O
N
S Y
S T
E M
T
E L I V
F
K S
C C
F
L U
S A
F
T
H
C
I V
G
I N
E E
R
S
Q U
A D
R O
N
I
T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
SHEET
IDENTIFICATION
C O
N T
R A
F
A
R A
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A n g i n e e r i n g I n c
L L E
N
E A
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
An O ne id a N at io n Co m pa ny
TRUE
NORTH
NORTH
PLAN
TRUE
NORTH
NORTH
PLAN
SCALE:
SITE KEY PLAN
NONE
SCALE:
N6-2296 FACILITIES - NEW CONSTRUCTION
1" = 20'
TEL IV LIGHTNING PROTECTION PLAN -
60'40'20'0'20'
GRAPHIC SCALE 1" = 20'
AREA OF WORK -
SHEET E-103
AREA OF WORK -
SHEET E-102
GENERAL NOTE:
1. PROVIDE LIGHTNING PROTECTION TO TEL-IV SITE STRUCTURES. REMOVE
ANY EXISTING LIGHTNING PROTECTION DEVICES AND DOWN CONDUCTORS
THAT ARE ABANDONED IN PLACE, DISCONNECTED, OR THAT DO NOT MEET
THE VALIDITY PERFORMANCE TESTING.
FLAG NOTES:
1. PROVIDE NEW 24" COPPER AIR TERMINALS AND SUPPORT BASE.
2. PROVIDE NEW CLASS I ROOF CONDUCTORS FOR THE LIGHTNING
PROTECTION SYSTEM.
3. PROVIDE NEW CLASS I COPPER DOWN CONDUCTOR FROM ROOF TO
GROUND ROD.
4. EXISTING POLE MOUNTED LIGHT FIXTURE. PROVIDE NEW 24" ALUMINUM
AIR TERMINAL AND SUPPORT BASE. PROVIDE (2) NEW CLASS I ALUMINUM
DOWN CONDUCTORS FROM AIR TERMINAL TO GROUND ROD. PROVIDE (2)
NEW 3/4" DIAMETER x 20' LONG COPPER GROUND RODS.
5. PROVIDE NEW 3/4" DIAMETER x 20' LONG COPPER GROUND ROD.
6. THERE ARE EXISTING ABANDONED DOWN CONDUCTORS ATTACHED TO THE
SIDE OF THE BUILDING. THESE SHALL BE REMOVED TO 6" BELOW GRADE.
7. PROVIDE NEW 2" DIAMETER GALVANIZED STEEL PIPE, MINIMUM 3/32" THICK,
ATTACHED TO THE BUILDING WITH 36" AIR TERMINAL ON TOP. PIPE SHALL
BE MINIMUM 10' LONG AND EXTEND TO 4' ABOVE THE BUILDING. MAINTAIN 6'
SEPARATION FROM EXISTING ANTENNA AT THIS LOCATION.
8. ATTACH 36" AIR TERMINAL TO EXISTING RADAR SUPPORT FRAME.
TYPICAL
TYPICAL
TYPICAL
4 4
E-501
E-501
E-501
TYPICAL
6 TYPICAL
GRASS AREACONCRETEASPHALT ROADWAY
LEGEND:
E-501
E-501
E-501
E-501
X K
S C
C
R e p a i r
T e l w e r s D
W G
E d w g x E x E x
E x E x E x E x
E x E x E x E x E x E x E x E x E x E x E x E x E x E x E x E x E x E x E x E x E x E x E x E x E x E x E x E x E x E x E x E x
E x E x E x E x E x E x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
F F
F F
F F
F
F F
F F
F F
F F
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
Ex
Ex
Ex
Ex
Ex
Ex
Ex
Ex
Ex
Ex
Ex
Ex
Ex
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
X
X
X
X
X
X
X
X
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
Cx
C x
Cx
C x
Cx
C x
C x
C x
C x
Cx
C x
Cx
Cx
Cx
Cx
C x
Cx
Cx
Cx
Cx
Cx
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C xC x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
Cx
Cx
Cx
Cx
Cx
Cx
Cx
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
Ex
E x
Ex
Ex
E x
Ex
E x
Ex
E x
Ex
E x
Ex
E x
Ex
Ex
Ex
Ex
E x
Ex
E x
E x
E x
E x
E x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S S x
S S x
S S x
E
L P
L P
LP
LP
L P
LP LP
LP LP
L P
L P
L P
N6-2295
N6-2295A
N6-2296V
N6-2296G
LP LP
N6-2296F
N6-2297
X X
X X
X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
FACILITY
N6-2296
N6-2295
N6-2295A
N6-2296G
N6-2296V
N6-2296C
N6-2296H
E-103
G
B
O G
I A
T Z
I D
I S
L
C
O L
E M
A N
T E
L
G
H T
N I N
G
P
R O
T E
C T
I O
N
P
L A
N
P U
P
H
U
E W
C
H
A R
T N
E T
T
K S
F
G
B
E A
R D
K S
R E
P A
G
H T
N I N
G
P
R O
T E
C T
I O
N
S Y
S T
E M
T
E L I V
F
K S
C C
F
L U
S A
F
T
H
C
I V
G
I N
E E
R
S
Q U
A D
R O
N
I
T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
SHEET
IDENTIFICATION
C O
N T
R A
F
A
R A
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A n g i n e e r i n g I n c
L L E
N
E A
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
An O ne id a N at io n Co m pa ny
TRUE
NORTH
NORTH
PLAN
GENERAL NOTE:
1. PROVIDE LIGHTNING PROTECTION TO TEL-IV SITE STRUCTURES.
FLAG NOTES:
1. PROVIDE NEW 24" COPPER AIR TERMINALS AND SUPPORT BASE.
2. PROVIDE NEW CLASS I ROOF CONDUCTORS FOR THE LIGHTNING
PROTECTION SYSTEM.
3. PROVIDE NEW CLASS I COPPER DOWN CONDUCTOR FROM ROOF TO
GROUND ROD. PROVIDE SCHEDULE 80 PVC SLEEVE TO PROTECT DOWN
CONDUCTOR TO A MINIMUM OF 6' ABOVE FINISHED GRADE AND 6"
BELOW FINISHED GRADE.
4. PROVIDE NEW 3/4" DIAMETER x 20' LONG COPPER GROUND ROD.
5. AURAL WARNING SYSTEM. PROVIDE NEW 24" COPPER AIR TERMINAL
AND SUPPORT BASE. PROVIDE CLASS I COPPER DOWN CONDUCTOR
FROM AIR TERMINAL TO GROUND ROD. PROVIDE NEW 3/4" DIAMETER x
20' LONG COPPER GROUND ROD.
6. REMOVE EXISTING ROOF MOUNTED LIGHTNING PROTECTION SYSTEM
(NOT SHOWN) INCLUDING AIR TERMINALS, ROOF CONDUCTORS, DOWN
CONDUCTORS AND ASSOCIATED SUPPORTS.
SCALE:
PUMP HOUSE - NEW CONSTRUCTION
1" = 8'
TEL IV LIGHTNING PROTECTION PLAN -
TRUE
NORTH
NORTH
PLAN
SCALE:
SITE KEY PLAN
NONE
24'16'8'0'
GRAPHIC SCALE 1" = 8'
8'
TYPICAL
TYPICAL
CONCRETEASPHALT ROADWAY
TYPICAL
TYPICAL
TYPICAL
TYPICAL
TYPICAL
E-501
E-501
E-501
E-501
E-501
AREA OF WORK -
SHEET E-103
AREA OF WORK -
SHEET E-102
LEGEND:
X K
S C
C
R e p a i r
T e l w e r s D
W G
E d w g
3/4" x 20' CU CLAD
STEEL GND ROD
G G
24" MIN
SCALE:
GROUND ROD & AIR TERMINAL DETAILS
NONE
E-101
E-102
E-103
TYPICAL LIGHTNING PROTECTION
#2/0 BSD CU GND
CONDUCTOR
'CADWELD' TYPE
EXOTHERMIC WELD
EARTH
GROUNDING NOTES:
1. NEW #2/0 BARE COPPER CONDUCTORS SHALL BE BONDED TO THE NEW
GROUND ROD AND EXISTING BUILDING GROUNDING COUNTERPOISE.
2. GROUND CONNECTION BELOW GRADE SHALL BE EXOTHERMIC WELD TYPE.
ABOVE GROUND CONNECTIONS SHALL BE BOLTED TERMINAL OR CLAMP TYPE.
3. TOP OF GROUND RODS SHALL BE 24" BELOW GRADE. TEST AND RECORD
RESISTANCE OF EACH GROUND ROD PRIOR TO CONNECTING CABLES. TEST
PER SPEC SECTION 26 41 00 LIGHTNING PROTECTION SYSTEM.
24"
AIR TERMINAL
ADHESIVE TYPE
MOUNTING
BRACKET
ROOF CONDUCTOR
ADHESIVE CABLE SUPPORT
E-501
G
B
O G
I A
T Z
I D
I S
L
C
O L
E M
A N
E L E
C T
R I C
A L
D
E T
A I L S
C
H
A R
T N
E T
T
K S
F
G
B
E A
R D
K S
R E
P A
G
H T
N I N
G
P
R O
T E
C T
I O
N
S Y
S T
E M
T
E L I V
F
K S
C C
F
L U
S A
F
T
H
C
I V
G
I N
E E
R
S
Q U
A D
R O
N
I
T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
SHEET
IDENTIFICATION
C O
N T
R A
F
A
R A
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A n g i n e e r i n g I n c
L L E
N
E A
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
An O ne id a N at io n Co m pa ny
GROUND ROD AIR TERMINAL
LIGHTNING
PROTECTION
CONDUCTOR
SCALE:
DOWN CONDUCTOR & GROUND ROD DETAIL
NONE
E-101
E-102
E-103
TYPICAL LIGHT POLE AIR TERMINAL,
FINISHED GRADE
24" ALUMINUM AIR TERMINAL
EXISTING POLE
MOUNTED LIGHT
FIXTURE
TERMINAL CLAMP
TO TENON MOUNT
MINIMUM 24"
BFG, TYPICAL
PROTECT DOWN CONDUCTOR
WITH SCHEDULE 80 PVC MIN 6'
AFG & A MIN 6" BFG, TYPICAL
CLASS I ALUMINUM DOWN
CONDUCTOR; SECURED DOWN
CONDUCTOR AT 3' INTERVALS
EXISTING ALUMINUM LIGHT POLEPOLE MOUNTING BRACKET WITH ONE
ARM - SIMILAR TO UTILITY METALS
TO GND ROD
5/8" DIAMETER x 36"
COPPER AIR TERMINAL
SCALE:
TYPICAL AIR TERMINAL MAST DETAIL
NONE
E-102
STAINLESS STEEL U-BOLT
AIR TERMINAL SUPPORT -
THOMPSON OR EQUAL
STAINLESS STEEL VERTICAL
MOUNT POINT BASE
STAINLESS STEEL U-BOLT
CABLE SUPPORT -
THOMPSON OR EQUAL
CLASS I COPPER DOWN
CONDUCTOR
STAINLESS STEEL SPLICE -
THOMPSON OR EQUAL
TOP OF TOWER
GALVANIZED
STEEL PIPE MAST
18"
18"
BI-METAL CONNECTOR
TO GND ROD
X K
S C
C
R e p a i r
T e l w e r s D
W G
E d w g
| Sheets and Views |
| G-001 COVER SHEET - LOCATION MAP, PROJECT AREA AND DRAWING INDEX |
| SD-001 STRUCTURAL NOTES AND ABBREVIATIONS |
| SD-101 TEL-IV STRUCTURAL SITE PLAN - DEMOLITION |
| SD-201 TEL-IV STRUCTURAL TOWER ELEVATIONS & PLANS - DEMOLITION |
| E-001 ELECTRICAL NOTES, LEGEND AND ABBREVIATIONS |
| ED-101 TEL-IV LIGHTNING PROTECTION SITE PLAN - DEMO |
| E-101 TEL-IV LIGHTNING PROTECTION SITE PLAN - NEW |
| E-102 TEL-IV LIGHTNING PROTECTION PLAN - MAIN BLDG - NEW |
| E-103 TEL-IV LIGHTNING PROTECTION PLAN - PUMP HOUSE - NEW |
| E-501 ELECTRICAL DETAILS |
File details come from the government source that posted it. Updated .