Attach 1- Statement of Work.pdf
PDF 16 KB Posted
- Attached to
- Heating Skid Repair for DDSP Federal contract opportunity
- Solicitation number
- SP3300-25-Q-0062
- Issued by
- Defense Logistics Agency Distribution
About this file
This Statement of Work outlines repair requirements for heat exchanging skids in Buildings 84 and 85. The document specifies repairs and upgrades for both buildings' systems.
For Building 84, the work includes replacing both controlling touch screens with new units and associated programming, installing a new Ethernet switch with required programming, and completing all necessary wiring and programming to make the system fully operational and reliable. Building 85 requires more extensive work, including replacing controllers on both sides, installing a new Ethernet switch, replacing both touch screen controllers, upgrading obsolete Honeywell controllers to newer versions with associated programming and wiring, and installing replacement air vents to replace failed units. All work must result in fully operational and reliable systems for both buildings. The contract opportunity indicates this is a limited competition requiring vendors to be authorized Maxi-Therm distributors/company partners, with NAICS code 238210 and PSC J059, being administered by the Defense Logistics Agency Distribution.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attach 2- Wage Determination 2015-4225 Rev 30 dtd 12.23.2024.pdf | ||
| CSS SP330025Q0062.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
Repair Building 84 and 85 Heat Exchanging skids
Building 84, known defects at this may include but not limited to replacing both of the controlling touch screens with new units, program as needed to operate the unit. Replacing the Ethernet switch with a new one and program as needed.
Complete all programming and wiring as necessary to complete the upgrade/repair the unit to make the system operable and reliable.
Building 85, known defects at this time may include but not limited to replacing the controllers (both sides). Replacing the Ethernet switch with new. Replace both of the touch screen controllers. Upgrade the Honeywell controllers with the newer version (old units are obsolete) program and wire for operation. Supply replacement air vents, old units have failed as well. Complete all wiring to both circuits within the unit and make the unit operable and reliable.