This combined synopsis and solicitation requests proposals for dockside repairs aboard the USCGC Bertholf. The Coast Guard seeks services including ship repair and associated support work. Offerors must provide pricing for base and optional contract line items. Proposals are due by March 13, 2020 with award anticipated on or around March 23, 2020. Work must be completed within 54 days of the vessel's availability starting March 23, 2020. This is a 100% small business set-aside requiring registration in SAM.gov. Offerors should inspect the cutter and become familiar with work locations and potential interferences. Proposals must include key details like a project plan, schedule, and certifications. Insurance and standard clauses are provided in attachments.

View the file

Other files for this federal contract opportunity

Other files attached to USCGC BERTHOLF DOCKSIDE REPAIRS, newest first.
File Type Posted
BERTHOLF DS FQ2 FY20 Supplies-Services .xlsx XLSX spreadsheet
SF30 - Amendment 00001.pdf PDF
ATT 5 - GOVERNMENT PROPERTY REPORT.pdf PDF
ATT 3-COMBINED SYNOPSIS SOLICITATION CONTINUATION.pdf PDF
ATT 2 - SCHEDULE OF SUPPLIES_SERVICES.pdf PDF
ATT 4 - NOTICE OF FILING PROTESTS.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USCGC BERTHOLF (WMSL 750)

SPECIFICATION FOR DOCKSIDE REPAIRS

FY2020

Developed By: Jason P Stonehouse

(Rev-2, 05 March 2020)

USCGC BERTHOLF (WMSL-418) DOCKSIDE AVAILABILITY FY2020

ii (Rev-2)

TABLE OF CONTENTS

Revisions Record .......................................................................................................................................... iv Consolidated List of References ................................................................................................................. vii Consolidated List of Government-furnished Property ............................................................................... xvi Consolidated List of Critical Inspection Items ......................................................................................... xvii Principal Characteristics .......................................................................................................................... xviii General Requirements WORK ITEM 1: Tanks (Ballast), Clean and Inspect-Delete WORK ITEM 2: Tanks (Ballast), Preserve “Partial”-Delete WORK ITEM 3: Tanks (Potable Water), Clean and Inspect-Delete WORK ITEM 4: Tanks (Potable Water), Preserve “Partial” -Delete WORK ITEM 5: Tank Sounding Tube, Replace-Delete WORK ITEM 6: High Purity Water Tank, Clean and Inspect-Delete WORK ITEM 7: Temporary Services, Provide – Home Pier-Delete WORK ITEM 8: Tanks (Grey Water), Clean and Inspect-Delete WORK ITEM 9: Tanks (Grey Water), Preserve “Partial”-Delete WORK ITEM 10: Tank Level Indicators (Grey Water Tanks) and sounding Tube, Remove-Delete WORK ITEM 11: Tank Level Indicator (Grey Water Tanks), Install-Delete WORK ITEM 12: Tank (Vacuum Collection Holding), Clean and Inspect-Delete WORK ITEM 13: Tank (Vacuum Collection holding), Preserve, Partial-Delete WORK ITEM 14: VCHT Pump Discharge Check Valve, Renew-Delete WORK ITEM 15: Sewage Piping Chemically Clean, Flush and Repair-Delete WORK ITEM 16: Sewage Shore Tie, Modify-Delete WORK ITEM 17: Refrigeration Unit Flex Hose Assemblies, Renew WORK ITEM 18: Fuel Oil Purifier Flexible Hoses, Renew-Delete WORK ITEM 19: Bow Thruster Flexible Hoses, Renew-Delete WORK ITEM 20: Incinerator Flexible Hoses, Renew WORK ITEM 21: Anchor Windlass Flexible Hoses, Renew-Delete WORK ITEM 22: Tenting, Provide WORK ITEM 23: Surfaces, Preserve-Delete WORK ITEM 24: Sea Painter Boom, Install-Delete WORK ITEM 25: Deck Covering (Slip-Resistant), Renew-Delete WORK ITEM 26: Helo Hangar Door Curtain Assembly, Preserve (100 %) WORK ITEM 27: Sideport Shell Door, Preserve-Delete WORK ITEM 28: Deck Drain Piping, Renew-Delete WORK ITEM 29: QAATD/QAWTD, Replace (NSC1)-Remaining WORK ITEM 30: Ship Service Diesel Generator, Exhaust Piping, Commercial Clean-Delete WORK ITEM 31: Circuit Breakers(Draw Out), Inspect and Test-Delete WORK ITEM 32: Cargo Handling Elevator, Annual Inspection and Test,Perform-Delete WORK ITEM 33: Forward and Aft Capstans, Annual Maintenance-Delete WORK ITEM 34: Dual Point Davit ,Biennial Maintenance, Perform WORK ITEM 35: Folding Boom Cranes, Biennial Maintenance, Perform-Delete WORK ITEM 36: Incinerator Clean, Inspect and Test WORK ITEM 37: Deck Preservation-Delete WORK ITEM 38: Deck Covering (Polymeric), Renew WORK ITEM 39: Firemain Piping, Renew WORK ITEM 40: Galley Grease Fire Extinguishing System, Inspect and Test WORK ITEM 41: Gas Turbine Module Fixed CO2 Fire Extinguishing System, Inspect and Test WORK ITEM 42: Heptafluoropropane (HFP) Fire Extinguishing System, Inspect and Test iii (Rev-2)

WORK ITEM 43: Water Mist Fire Extinguishing System, Inspect and Test WORK ITEM 44: Tanks (Water Mist), Preserve “Partial”-Delete WORK ITEM 45: Ventilation Damper, Repair WORK ITEM 46: Carriage Winch, Overhaul-Delete WORK ITEM 47: Stern Launch and Recovery Lights, Install-Delete WORK ITEM 48: Dewatering Pumps (P-6) Stowage Rack Fabricate and Install-Delete WORK ITEM 49: Towline Platform, Modify-Delete WORK ITEM 50: Portable Brow Storage, Relocate-Delete WORK ITEM 51: Mast Darken Ship Switches (Watertight Door and Scuttle), Install-Delete WORK ITEM 52: Small Boat Receptacles, Replace-Delete WORK ITEM 53: General Welding, Provide-Delete WORK ITEM 54: Plate and Stiffener Renewal-Delete iv (Rev-2)

REVISIONS RECORD

This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.

DATE REV# WORK

ITEM#

CHANGES MADE

04 Feb 20 1 2 Updated Title, Removed “Optional”

04 Feb 20 1 4 Updated Title, Removed “Optional”

04 Feb 20 1 9 Updated Title, Removed “Optional”

04 Feb 20 1 13 Updated Title, Removed “Optional”

04 Feb 20 1 44 Updated Title, Removed “Optional”

04 Feb 20 1 53 Updated Title, Removed “Optional”

04 Feb 20 1 54 Updated Title, Removed “Optional”

05 Mar 20 2 1 Deleted Work Item

05 Mar 20 2 2 Deleted Work Item

05 Mar 20 2 3 Deleted Work Item

05 Mar 20 2 4 Deleted Work Item

05 Mar 20 2 5 Deleted Work Item

05 Mar 20 2 6 Deleted Work Item

05 Mar 20 2 7 Deleted Work Item

05 Mar 20 2 8 Deleted Work Item

05 Mar 20 2 9 Deleted Work Item

05 Mar 20 2 10 Deleted Work Item

05 Mar 20 2 11 Deleted Work Item

05 Mar 20 2 12 Deleted Work Item

05 Mar 20 2 13 Deleted Work Item v (Rev-2)

05 Mar 20 2 14 Deleted Work Item

05 Mar 20 2 15 Deleted Work Item

05 Mar 20 2 16 Deleted Work Item

05 Mar 20 2 18 Deleted Work Item

05 Mar 20 2 19 Deleted Work Item

05 Mar 20 2 21 Deleted Work Item

05 Mar 20 2 22 Tenting Provide: Updated 1.1, Table 1 and 3.1.7

05 Mar 20 2 23 Deleted Work Item

05 Mar 20 2 24 Deleted Work Item

05 Mar 20 2 25 Deleted Work Item

05 Mar 20 2 27 Deleted Work Item

05 Mar 20 2 28 Deleted Work Item

05 Mar 20 2 30 Deleted Work Item

05 Mar 20 2 31 Deleted Work Item

05 Mar 20 2 32 Deleted Work Item

05 Mar 20 2 33 Deleted Work Item

05 Mar 20 2 35 Deleted Work Item

05 Mar 20 2 37 Deleted Work Item

05 Mar 20 2 43 Water Mist Fire Extinguishing System, Inspect And Test:

Updated 3.1.5

05 Mar 20 2 46 Deleted Work Item

05 Mar 20 2 47 Deleted Work Item

05 Mar 20 2 48 Deleted Work Item

05 Mar 20 2 49 Deleted Work Item

05 Mar 20 2 50 Deleted Work Item

05 Mar 20 2 51 Deleted Work Item

05 Mar 20 2 52 Deleted Work Item vi (Rev-2)

05 Mar 20 2 53 Deleted Work Item

05 Mar 20 2 54 Deleted Work Item

NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.

vii (Rev-2)

CONSOLIDATED LIST OF REFERENCES

The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.

All Coast guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.

COAST GUARD DRAWINGS

A TEAM: DELETE NON APPLICABLE DRAWINGS

Coast Guard Drawing 418A WMSL 801-001, Rev -, Booklet of General Plans Coast Guard Drawing 418A-WMSL-100-001, Rev , General Arrangements (ASC100001) Coast Guard Drawing 418A-WMSL-100-006, Rev -, Inboard and Outboard Profiles Coast Guard Drawing 418A-WMSL-512-001, Rev -, HVAC System Diagram Coast Guard Drawing 418A-WMSL-526-001, Rev -, Weather Deck Drains Diagram Coast Guard Drawing 418A-WMSL-528-001, Rev -, Plumbing and Interior Deck Drain Diagram Coast Guard Drawing 418A-WMSL-530-001, Rev -, Potable Water System Diagram Coast Guard Drawing 418A-WMSL-540-001, Rev -, Fuel Oil Diagram Coast Guard Drawing 418A-WMSL-593-002, Rev -, Sewage System Diagram Coast Guard Drawing 418A-WMSL-801-001, Rev -, Booklet of General Plans Coast Guard Drawing 418A-WMSL-801-001, Rev, Booklet of General Plans (ASC801001) Coast Guard Drawing 418A-WSL-593-002, Rev -, Sewage System Diagram Coast Guard Drawing 750 WMSL-100-001, Rev L, General Arrangements (ASC100001) Coast Guard Drawing 750 WMSL-169-001, Rev E, Helo Hangar Door Installation (ASC169001) Coast Guard Drawing 750 WMSL-572-002, Rev D, Elevator Arr & Instl (ASC572002) Coast Guard Drawing 750-WMSL - 259-004, Rev -, Main Prop Dsl / Ss Dsl Gen Air Intake / Exhaust

System Description (ASC259002-02) Coast Guard Drawing 750-WMSL-085-003, Rev A, Compartment Areas & Volumes NSC 1 & NSC 2

(Only) (ASC085012) Coast Guard Drawing 750-WMSL 100-039, Rev L, Unit 3140 Structure Mn Dk to 01 Lvl - Fr 64 to Fr 76

(ASC100314)

Coast Guard Drawing 750-WMSL-100-043, Rev K, Unit 3240 - Main Deck to 01 Level - Fr 76 to Fr 82

(ASC100324)

Coast Guard Drawing 750-WMSL-100-050, Rev J, Unit 4230 Structure - Mast (ASC100423) Coast Guard Drawing 750-WMSL-100-059, Rev C, Topside Configuration (NSC 1 SRD) (AS1100004) Coast Guard Drawing 750-WMSL-100-516, Rev A, Topside Configuration (NSC 1 SRD) Coast Guard Drawing 750-WMSL-167-005, Rev B, Side Port Door Installation & Details (ASC167005) Coast Guard Drawing 750-WMSL -167-503, Rev A, Structural Door List Coast Guard Drawing 750-WMSL- 593-027, Rev D, Sewage System Unit 2120 viii (Rev-2)

Coast Guard Drawing 750-WMSL 635-001, Rev -, Thermal & Acoustic Insulation (ASC635001) Coast Guard Drawing 750-WMSL 635-002, Rev K, Insulation Arr & Details Thermal, Acoustic, & Fire

(ASC635002)

Coast Guard Drawing 750-WMSL-259-003, Rev G, Main Prop Dsl / Ss Dsl Gen Air Intake / Exhaust

Diagram (ASC259002) Coast Guard Drawing 750-WMSL-085-004, Rev B, Tank Capacity Curves (WMSL 750 ONLY)

(ASC085013)

Coast Guard Drawing 750-WMSL-100-013, Rev K, Unit 1210 Structure - Innerbottom To 1st Platform -

Fr 10 to Fr 22 (ASC100121) Coast Guard Drawing 750-WMSL-100-017, Rev K, Unit 1310 Structure - Innerbottom to 1st Platform -

Fr 22 to Fr 35 (ASC100131) Coast Guard Drawing 750-WMSL-100-021, Rev E, Unit 2100 Structure - Inner Bottom - Fr 35 to Fr 44

(ASC100210)

Coast Guard Drawing 750-WMSL-100-025, Rev K, Unit 2140 Structure - Main Dk to 01 Lvl - Fr 35 to Fr

44 (ASC100214)

Coast Guard Drawing 750-WMSL-100-031, Rev J, Unit 2300 Structure - Inner Bottom - Fr 52 to Fr 64

(ASC100230)

Coast Guard Drawing 750-WMSL-100-037, Rev G, Unit 3120 Structure - 1st Platf to 2nd Dk - Fr 64 to

Fr 76 (ASC100312) Coast Guard Drawing 750-WMSL-100-040, Rev L, Unit 3210 Structure - Inner Bot to 1st Platform - Fr

76 to Fr 88 (ASC100321) Coast Guard Drawing 750-WMSL-100-045, Rev J, 2nd Dk to Main Dk - FR 82 to Aft (ASC100333) Coast Guard Drawing 750-WMSL 100-52, Rev C, Unit 4320 Structure 02 Lvl and Above - FR 48 to FR

53 (ASC100432)

Coast Guard Drawing 750-WMSL-100-059, Rev C, Topside Configuration (NSC 1 SRD) (AS1100004) Coast Guard Drawing 750-WMSL-100-060, Rev C, General Arrangements NSC 3 ONLY (AS3100001) Coast Guard Drawing 750-WMSL-100-061, Rev A, Inboard and Outboard Profile (AS3100002) Coast Guard Drawing 750-WMSL-100-061, Rev A, Inboard and Outboard Profile Coast Guard Drawing 750-WMSL-100-082, Rev A, General Arrangements NSC 4 ONLY (AS4100001) Coast Guard Drawing 750-WMSL-100-082, Rev A, General Arrangements NSC 4 ONLY (AS4100001) Coast Guard Drawing 750-WMSL-100-083 Rev A, General Arrangements NSC5 & Follow(AS5100001) Coast Guard Drawing 750-WMSL-100-090 Rev, General Arrangements NSC7 & Follow Coast Guard Drawing 750-WMSL-100-35, Rev K, Unit 2340 Structure - Main Deck to 01 Level - FR 52 to FR 64 (ASC100234) Coast Guard Drawing 750-WMSL-100-528, Rev C, Structural Mods Iwo New Aft Folding Cranes

(BERTHOLF/WAESCHE)

Coast Guard Drawing 750-WMSL-101-004, Rev G, C & A, First Platform (ASC101004) Coast Guard Drawing 750-WMSL-167-001, Rev B, Manhole List Installation and Fabrication Details

Ship Wide (ASC167001) Coast Guard Drawing 750-WMSL-167-001, Rev J, Manhole List Installation and Fabrication Details Ship

Wide (ASC167001) Coast Guard Drawing 750-WMSL-167-002, Rev D, Structural Door List, Ship Wide Hulls 4911 and 4912

Only (ASC167002) Coast Guard Drawing 750-WMSL-167-006, Rev D, Structural Door List, Ship Wide Hulls 4913 and

Follow (AS3167003) ix (Rev-2)

Coast Guard Drawing 750-WMSL-167-007, Rev C, Hatch & Scuttle List Ship Wide, NSC 3 and Follow.

(AS3167003)

Coast Guard Drawing 750-WMSL-167-501, Rev -, Manhole List, Installation and Fabrication Details, Ship Wide (ASC167001)

Coast Guard Drawing 750-WMSL-167-502, Rev C, Hatch & Scuttle List, Ship Wide (ASC167003) Coast Guard Drawing 750-WMSL-186-500, Rev -, P-6 PUMP CANISTER RACK Coast Guard Drawing 750-WMSL-186-501, Rev B, Sea Painter Boom Installation Details Coast Guard Drawing 750-WMSL-202-19, Rev A, Tank Level & Alarm Indication Sys Cable Running

Sheets (CRS) (ASC202018) Coast Guard Drawing 750-WMSL-259-011, Rev D, Main Engine Combustion Air Intake & Exhaust Arr, Dets & L/M Below 2nd Deck (ASC259009) Coast Guard Drawing 750-WMSL-259-013, Rev B, Main Engine Combustion Air Intake & Exhaust Arr, Dets & L/M 2nd Deck Up - 02 Lvl (ASC259011) Coast Guard Drawing 750-WMSL-259-014, Rev C, Main Engine Combustion Air Intake & Exhaust

Supports, Dets & L/M 2nd Deck Up - 02 Lvl (ASC259012) Coast Guard Drawing 750-WMSL-259-019, Rev G, Incin & Dg Intake & Combu.stion Exhaust Arr, Dets

& L/M, 2nd Dk - 02 Lvl (ASC259017) Coast Guard Drawing 750-WMSL-259-020, Rev D, Incin & Dg Intake & Combustion Exhaust Sup, Dets

& L/M 2nd Deck - 02 Lvl (ASC259018) Coast Guard Drawing 750-WMSL-300-024, Rev -, Unit 2240 - Main Dk FR 44 to FR 52 Arr of Elect Eq Coast Guard Drawing 750-WMSL-300-13, Rev C, Unit 1330 2nd DK-FR 22 TO FR 35 Arrangement Of

Electrical Equipment (ASC300133) Coast Guard Drawing 750-WMSL-300-58, Rev C, Unit 3130 2nd DK - FR 64 TO FR 76 Arrangement Of

Electrical Equipment (AS3300313) Coast Guard Drawing 750-WMSL-303-002, Rev D, Coordination of Protective Devices (ASC303004) Coast Guard Drawing 750-WMSL-320-016, Rev F, Power Sys Deck Plan - 01 Level (ASC320009) Coast Guard Drawing 750-WMSL-320-038, Rev B, Electrical One Line Diagram (AS1320001) (750

ONLY)

Coast Guard Drawing 750-WMSL-320-40, Rev B, Electrical One Line Diagram (ASC320001C) Coast Guard Drawing 750-WMSL-320-510, Rev P, Electrical One LINE Diagram (ASC320001) Coast Guard Drawing 750-WMSL-320-511, Rev F, Power Sys Deck Plan-Second Dk, Aft of FR 52

(ASC320006)

Coast Guard Drawing 750-WMSL-320-511, Rev G, Power Sys Deck Plan-Second Dk, Aft of FR 52

(ASC320006)

Coast Guard Drawing 750-WMSL-320-512, Rev G, Power Sys Deck Plan - Main Dk, Aft of FR 52

(ASC320008)

Coast Guard Drawing 750-WMSL-320-535, Rev G, Power Sys Deck Plan - 02 Level and Above

(ASC320010)

Coast Guard Drawing 750-WMSL-320-562, Rev E, Power Sys Deck Plan - 01 Level Coast Guard Drawing 750-WMSL-320-563, Rev B, Small Boat Receptacle Modification Wiring Diagram Coast Guard Drawing 750-WMSL-320-566, Rev -, Electrical Installations Iwo New Aft Folding Cranes

(BERTHOLF ONLY)

Coast Guard Drawing 750-WMSL-330-025, Rev C, Lighting Sys List of Feeders & Mains (ASC330014) Coast Guard Drawing 750-WMSL-330-025, Rev C, Lighting System List of Feeds and Mains

(ASC330014)

x (Rev-2)

Coast Guard Drawing 750-WMSL-330-511, Rev F, Lighting System Deck Plan 02 Level and ABOVE Coast Guard Drawing 750-WMSL-331-501, Rev B, Stern Launch/Recovery System Lighting

Modifications Coast Guard Drawing 750-WMSL-485-001, Rev L, Sleeves – Pipe Structure Penetration (SP485000) Coast Guard Drawing 750-WMSL-501-002, Rev E, Machinery Arrangements (ASC501001) Coast Guard Drawing 750-WMSL-501-004, Rev D, Misc Independent Tanks Design and Details and

L/M (ASC501004)

Coast Guard Drawing 750-WMSL-505-006, Rev D, List of Hoses (ASC505006) Coast Guard Drawing 750-WMSL-506-006, Rev C, Ovrflw / Airescapes / Sounding Tubes - Unit 1210

(ASC506121-AE)

Coast Guard Drawing 750-WMSL-506-008, Rev C, Overflow / Air Escapes / Sounding Tubes Unit 1220

(ASC506122-AE)

Coast Guard Drawing 750-WMSL-506-009, Rev B, Overflow / Air Escapes / Sounding Tubes - Unit

1230 (ASC506123-AE)

Coast Guard Drawing 750-WMSL-506-010, Rev B, Overflow / Air Escapes / Sounding Tubes - Unit

1240 (ASC506124-AE)

Coast Guard Drawing 750-WMSL-506-011, Rev D, Overflow / Air Escapes / Sounding Tubes - Unit

1310 (ASC506131-AE)

Coast Guard Drawing 750-WMSL-506-012, Rev B, Ovfl / Air Escapes / Sounding Tubes Unit - 1320

(ASC506132-AE)

Coast Guard Drawing 750-WMSL-506-013, Rev C, Overflow / Air Escapes / Sounding Tubes - Unit

1330 (ASC506133-AE)

Coast Guard Drawing 750-WMSL-506-027, Rev D, Ovrflw / Airescapes / Sounding Tubes - Unit 3110

(ASC506311-AE)

Coast Guard Drawing 750-WMSL-506-028, Rev E, Overflow / Airescapes / Sounding Tubes Unit 3120

(ASC506312-AE)

Coast Guard Drawing 750-WMSL-506-029, Rev D, Overflow / Air Escapes & Sounding Tubes Unit

3130 (ASC506313-AE)

Coast Guard Drawing 750-WMSL-506-512, Rev -, Ferrous Sounding Tube Replacement A & D Coast Guard Drawing 750-WMSL-508-001, Rev C, Piping and Machinery Insulation Schedule and L/M

(ASC508001)

Coast Guard Drawing 750-WMSL-512-034, Rev B, Vent & Air Cond Arr Mn Dk Unit 2340

(ASC512234)

Coast Guard Drawing 750-WMSL-516-001, Rev E, A/C & Refrigeration Piping Diagram (ASC516001) Coast Guard Drawing 750-WMSL-520-001, Rev H, Seawater Cooling System Diagram (ASC520001) Coast Guard Drawing 750-WMSL-521-024, Rev D, Firemain Unit 2330 (ASC521233-FM) Coast Guard Drawing 750-WMSL-526-030, Rev A, Weather Deck Drains Unit 4220 (ASC526422-WD) Coast Guard Drawing 750-WMSL-528-007, Rev D, Plumbing and Interior Dk Drains and Vent Sys - Unit

1220 (ASC528122-PD)

Coast Guard Drawing 750-WMSL-528-008, Rev C, Plumbing & Interior Dk Drains and Vent Sys - Unit

1230 (ASC528123-PD)

Coast Guard Drawing 750-WMSL-528-023, Rev E, Plumbing & Interior Dk Drains and Vent Sys - Unit

2330 (ASC528233-PD)

Coast Guard Drawing 750-WMSL-530-003, Rev B, Potable Water Systems Schematic (ASC530013) Coast Guard Drawing 750-WMSL-530-019, Rev E, Potable Water Unit 3120 (ASC530312-PW) xi (Rev-2)

Coast Guard Drawing 750-WMSL-556-008, Rev D, Anchor Windlass Hydraulic Diagram (ASC556005) Coast Guard Drawing 750-WMSL-556-015, Rev E, Bow Thruster Hpu Diagram (ASC556009) Coast Guard Drawing 750-WMSL-556-019, Rev D, Misc. Hydraulic Piping Unit 1240 (ASC556124-HY) Coast Guard Drawing 750-WMSL-582-001, Rev D, Anchoring, Mooring, and Towing Arrangement

(ASC582001)

Coast Guard Drawing 750-WMSL-582-002, Rev A, Mooring and Towing Arrangement (ASC582002) Coast Guard Drawing 750-WMSL-582-002, Rev G, Mooring and Towing Arrangement (ASC582002) Coast Guard Drawing 750-WMSL-582-500, Rev -, Jack Stay Padeye Installation Coast Guard Drawing 750-WMSL-582-502, Rev A, Alternate Towline Platform 3 Segments

Arrangement & Details Coast Guard Drawing 750-WMSL-583-004, Rev D, Stern Launch & Recovery Arrangement & Coast Guard Drawing 750-WMSL-583-004, Rev G, Stern Launch/Recovery Arrangement & Details

(ASC583004)

Coast Guard Drawing 750-WMSL-583-504, Rev E, Stern Launch & Recovery Arrangement & Details Coast Guard Drawing 750-WMSL-583-511, Rev -, Oth-IV Sea Painter Coast Guard Drawing 750-WMSL-593-009, Rev B, Sewage System Schematic (ASC593020) Coast Guard Drawing 750-WMSL-593-011, Rev -, Solid Waste System Schematic Coast Guard Drawing 750-WMSL-593-039, Rev -, Bilge & Oil Pollution Control Unit 2240 Coast Guard Drawing 750-WMSL-593-506, Rev A, Sewage Shore Tie Mods Coast Guard Drawing 750-WMSL-600-034, Rev F, FAB & Instl Of Hull Outfit Design, Unit 3240 Coast Guard Drawing 750-WMSL-600-042, Rev D, FAB & Instl Of Hull Outfi Design, Unit 4310 Coast Guard Drawing 750-WMSL-612-001, Rev A, Fab & Instl of Exterior Rails, Stanchions & Life

Lines (ASC612001) Coast Guard Drawing 750-WMSL-612-001, Rev K, FAB & Instl of Exterior Rails, Stanchions & Life

Lines (ASC612001) Coast Guard Drawing 750-WMSL-623-003, Rev A, Ship’s Brow, and Arrangement & Details Coast Guard Drawing 750-WMSL-623-504, Rev -, Ship’s Brow, and Relocation Coast Guard Drawing 750-WMSL-635-001, Rev -, Thermal & Acoustic Insulation (ASC635001) Coast Guard Drawing 750-WMSL-635-002, Rev C, Insulation Arr & Details Thermal, Acoustic, & Fire

(ASC635002)

Coast Guard Drawing 750-WMSL-635-002, Rev K, Insulation Arr & Details Thermal, Acoustic, & Fire

(ASC635002)

Coast Guard Drawing 750-WMSL-635-02, Rev H, Insulation Arr & Details Thermal, Acoustic, & Fire

(ASC635002)

NAVSEA Drawing 167-7379842, Rev A, Procedure & Welding Sequence for Non-Ballistic, Watertight

& Airtight Quick Acting or Individually Dogged Personnel Doors NAVSEA Drawing 803-2145532, Rev B, Indicator/Indicating System Liquid Level Application/Selection

Guide NAVSEA Drawing 803-6397268, Rev B, Doors Watertight, Quick Acting Arrangement NAVSEA Drawing 804-1385781, Rev E, Hangers, Pipe, For Surface Ship NAVSEA Drawing 804-5773931, Rev A, Acoustic & Thermal Insulation for Compartments Installation

Details NAVSEA Drawing 804-5959214, Rev-, Piping Insulation - Installation Details NAVSEA Drawing 804-5959308, Rev -, Lifeline System, Kevlar Assembly and Testing xii (Rev-2)

NAVSEA Drawing 810-1385880, Rev D, Fittings, Copper-Nickle Alloy, Slip-on Sleeve for Brazing, Arc, or Gas Welded 200 PSI at 150°

NAVSEA Dwg 803-1385828, Rev P, Nozzles AFFF and Washdown System

COAST GUARD PUBLICATIONS

American Society for Nondestructive Testing (ASNT), Recommended Practice No. SNT-TC-1A, 2016, Personnel Qualification and Certification in Nondestructive Testing American Society for Nondestructive Testing (ASNT), Standard No. ANSI/ASNT CP-189-2016, 2016, ASNT Standard for Qualification and Certification of Nondestructive Testing Personnel American Welding Society, AWS D1.2-96, 1996, Structural Welding Code, Steel Coast Guard Commandant Instruction (COMDTINST) M10360.3 (Series), Coatings and Color Manual Coast Guard Commandant Instruction(COMDTINS) M10360.3 (series), Coatings and Color Manual Coast Guard Technical Publication (TP) 7018, SWBS 234, May 2007, Main Gas Turbine (MGT) - Model

7LM2500-SB-MLG10 - Installation Instructions Coast Guard Technical Publication (TP) 7019, SWBS 234, May 2019, Main Gas Turbine (MGT) - Model

7LM2500-SB-MLG10 - Description, Troubleshooting, Diagrams & Scheduled Maintenance Coast Guard Technical Publication (TP) 7062, SWBS 167, Jun 2007, Sideport Shell Door and Portable

Ladder - Model D-WK-868 Coast Guard Technical Publication (TP) 7065, SWBS 582, Jun 2007, Forward & Aft Capstan - Model

20834 Coast Guard Technical Publication (TP) 7097, SWBS 555, Jun 2007, Fire Protection System - Model

FM-200 - Design, Installation, Operation & Service Manual Coast Guard Technical Publication (TP) 7108A, SWBS 573, Mar 2016, Stores Elevator - Model 20833 Coast Guard Technical Publication (TP) 7118, SWBS 555, Jun 2007, Carbon Dioxide Fire Protection

System - Series 70 Coast Guard Technical Publication (TP) 7141, SWBS 555, Jun 2007, ULTRA FOG High Pressure

Sprinkler Systems Coast Guard Technical Publication (TP) 7165A, SWBS 324, Nov 2018, Ship Service Switchboards 1s, 2s, 3s & 1sp Shore Power - Operation, Maintenance & Installation - Volume 1 Coast Guard Technical Publication (TP) 7166A, SWBS 324, Nov 2018, Ship Service Switchboards 1s, 2s, 3s & 1sp Shore Power - Operation, Maintenance & Installation - Volume 2 Coast Guard Technical Publication (TP) 7167, SWBS 324, Oct 2007, Ship Service Switchboards 1s, 2s, 3s & 1sp Shore Power - Operation, Maintenance & Installation - Volume 3 Coast Guard Technical Publication (TP) 7170, 20-SEP-07, Incinerator - Type Atlas 600 S WS Coast Guard Technical Publication (TP) 7170, SWBS 593, May 2013, Incinerator - Type Atlas 600 S WS

& Diesel oil Tank - Type 600 - Installation, Operation & Maintenance Manual Coast Guard Technical Publication (TP) 7181, 02-OCT-07, Helo-Hangar Doors Coast Guard Technical Publication (TP) 7184, SWBS 593, Oct 2007, Vacuum Sewage System –

Operation, Maintenance & Parts List Coast Guard Technical Publication (TP) 7348A, 20-MAR-11, Small Boat Retrieval System Equipment

Manual Coast Guard Technical Publication (TP) 7427, SWBS 651, Aug 2018, R-102 Restaurant Fire Suppression

System - Design, Installation, Recharge & Maintenance Manual Coast Guard Technical Publication (TP) 7525, 26-MAR-08, Cutter Information Book (CIB) - Auxiliary

Machinery (Vol. IV) xiii (Rev-2)

Coast Guard Technical Publication (TP) 7525, SWBS 086, May 2019, Cutter Information Book (CIB) - Auxiliary Machinery - Volume IV (Hull 750 ONLY)

Coast Guard Technical Publication (TP) 7615, SWBS 086, May 2019, Cutter Information Book (CIB) - Auxiliary Machinery - Volume IV (Hull 751 ONLY)

Coast Guard Technical Publication (TP) 7798, SWBS 541, Aug 2016, Fuel oil Treatment Plant (Purifier)

– Model DO

Coast Guard Technical Publication (TP) 7903, SWBS 583, Apr 2019, Aft Boat handling system –Model

FB90-28

Coast Guard Technical Publication (TP) 7946, 16-AUG-18, Incineration Plant - Installation, Operation, Maintenance & Spare Parts

Coast Guard Technical Publication (TP) 9618, SWBS 583, Nov 2018, Boat Davit - Models DDP11000CTS & SP2200 (S/N: 2328, 2329, 2332 & 2330, 2331, 2333) (HULLS: 750, 751 & 753)

General Requirements for Drawing Preparation MIL-PRF-1149, Jun 1998, Gasket Materials, Synthetic Rubber, 50 and 65 Durometer Hardness MIL-PRF-900, Mar 1991, Rubber Gasket Material, 45 Durometer Hardness

NOTE

OTHER REFERENCES

Surface Forces Logistics Center Standard Specification (SFLC Std Spec 6341), 2018, Install New Deck

Covering Systems Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0740, Jan 2018, Welding and

Allied Processes Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2018, General

Requirements Surface Forces Logistics Center Standard Specification 0085 (SFLC Std Spec 0085), 2018, Surface Forces Logistics Center Standard Specification 0450 (SFLC Std Spec 0450), 2018, Electrical

Power for Contractor Tools and Equipment Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2018, Welding and

Allied Processes Surface Forces Logistics Center Standard Specification 3020 (SFLC Std Spec 3020), 2018, Overhaul AC

Electrical Motors Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2018, Shipboard

Electrical Cable Test Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2018, Shipboard

Electrical Cable Removal, Relocation, Splice, Repair, and Installation Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2018, Auxiliary

Machine Systems Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2018, Requirements for Preservation of Ship Structures Surface Forces Logistics Center Standard Specification 6341 (SFLC Std Spec 6341), 2018, Install Interior

Deck Covering Systems Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), 2018, Temporary

Services Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), 2018, Temporary

Hull Accesses xiv (Rev-2)

OTHER REFERENCES

Air Capable Ship Aviation Facility Bulletin 1L (2009).

Allied Systems Drawing Number 68992, 2013, General Arrangement Allied Systems Drawing Number 70082, 2013, Installation Drawing Allied Systems Technical Manual 80-1020, 2018, Allied Marine Crane Models DDP11000CTS &

SP2200, S/N - 2313 & 2315, Allied Systems Company American National Standards Institute (ANSI/EASA) AR100, 2015, Recommended Practice for the

Repair of Rotating Electrical Apparatus American National Standards Institute/American Water Works Association (ANSI/AWWA) C652, 2002, Disinfection of Water-Storage Facilities American National Standards Institute/NSF International (ANSI/NSF) 61, 2008, Drinking Water System

Components - Health Effects American Society of Mechanical Engineers (ASME) A17.2, Guide for the Inspection of Elevators, Escalators and Moving Walks.

ASTM International (ASTM) D1330, 2004, Standard Specification for Rubber Sheet Gaskets ASTM International (ASTM) D1330-04, 2015, Standard Specification for Rubber Sheet Gaskets ASTM International (ASTM) F1836M, Reapproved 2007, Standard Specification for Stuffing Tubes, Nylon and Packing Assemblies (Metric) ASTM International (ASTM) F683-14, 2018, Standard Practice for Selection and Application of Thermal

Insulation for Piping and Machinery Code of Federal Regulations (CFR) Title 29, Part 1910, Jul 2017, Occupational Safety and Health

Standards Code of Federal Regulations (CFR) Title 29, Part 1915, 2018, Occupational Safety and Health Standards for Shipyard Employment Code of Federal Regulations (CFR) Title 29, Part 1915, Jul 2011, Occupational Safety and Health

Standards for Shipyard Employment Code of Federal Regulations (CFR) Title 40, Jul 2000, Protection of the Environment Engineering Change Notice, ECN DW/DO00930, Added Stowage for P-6 Pump International Standards Organization (ISO) 4406, 2017, Hydraulic Fluid Power - Fluids - Method for

Coding Level of Contamination by Solid Particles Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-58, 2018, Pipe

Hangers and Supports - Materials, Design, Manufacture, Selection, Application, and Installation MIL-A-22262, Mar 1996; Abrasive Blasting Media Ship Hull Blast Cleaning MIL-DTL-15024G, Mar 2018, General Specification for Plates, Tags, and Bands for Identification of

Equipment MIL-DTL-23549D (Notice 1), Feb 2007 Grease, General Purpose MIL-DTL-24640, Nov 2011 Cable, Electric, -20 TO +105 °C, 600 VOLTS, Lightweight, Multi-Pair, 18

AWG, TYPE 2XSW (Including Variation Type 2XSOW) MIL-DTL-24643, Oct 2009, Cables, Electric, Low Smoke Halogen-Free, For Shipboard Use, General

Specification for MIL-HDBK-291, Sep 1986, Cargo Tank Cleaning MIL-PRF-24176C, Oct 2004, Cement, Epoxy, Metal Repair and Hull Smoothing MIL-PRF-24613A, Nov 2007, Deck Covering Materials, Interior, Cosmetic Polymeric MIL-PRF-24667C, May 2008, Coating System, Non-Skid, for Roll, Spray, or Self-Adhering Application xv (Rev-2)

MIL-PRF-900, Mar 1991, Rubber Gasket Material, 45 Durometer Hardness MIL-STD-1627C, Sep 1994, Bending of Pipe or Tube for Ship Piping Systems MIL-STD-2003-2, Sep 2009, Electric Plant Installation, Standard Methods for Surface Ships &

Submarines (Equipment) MIL-STD-2003-3, Sep 2009, Electric Plant Installation, Standard Methods for Surface Ships &

Submarines (Penetrations) MIL-STD-22D (Notice 3), Mar 1991, Welded Joint Design MIL-STD-777F (w/CHANGE-2), Feb 2018, Schedule of Piping, Valves, Fittings, and Associated Piping

Components for Naval Surface Ships National Fire Protection Association (NFPA) 25, 2017 Edition, Standard for the Inspection, Testing, and

Maintenance of Water-Based Fire Protection Systems National Fire Protection Association (NFPA) 70E, 2018 Edition, Standard for Electrical Safety in the

Work Place Naval Sea Systems Command (NAVSEA) 0640-LP-111-4501, Apr 2012, NAVSEA OP 4 Rev 10, Ammunition And Explosives Safety Afloat Naval Ships' Technical Manual, Chapter 505, 2, Piping Systems, 12/1/2001 Schneider Electric Maintenance and Field Testing Guide for Masterpact NT and NW Circuit Breaker

Instruction Bulletin No. 0613IB1202 Aug 2015 The Society for Protective Coatings (SSPC) Paint Application Specification No. 1 (SSPC-PA Guide 1), 2004, Shop, Field, and Maintenance Painting of Steel The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2013, Power Tool Cleaning to Bare Metal The Society for Protective Coatings (SSPC) Surface Preparation Specification No.15 (SSPC-SP 15), 2004, Commercial Grade Power Tool Cleaning The Society for Protective Coatings (SSPC) Surface Preparation Specification No.2 (SSPC-SP 2), 2004, Hand Tool Cleaning The Society for Protective Coatings (SSPC) Surface Preparation Specification No.3 (SSPC-SP 3), 2004, Power Tool Cleaning The Society for Protective Coatings (SSPC) Surface Preparation Specification SSPC-SP 1, 2015 Solvent

Cleaning The Society for Protective Coatings (SSPC) Surface Preparation Specification SSPC-SP 11, 2013, Power

Tool Cleaning to Bare Metal The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation

Standard SSPC-SP 10 (WAB)/NACE WAB-2, 2015, Near-White Metal Wet Abrasive Blast Cleaning

The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 10/NACE No.2, 2007, Near-White Blast Cleaning.

The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 6 (WAB)/NACE WAB-3, 2015, Commercial Abrasive Blast Cleaning

The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 6 (WAB)/NACE WAB-3, Commercial Wet Abrasive Blast Cleaning

Water Mist Fire Extinguishing System Operational Test Plan-Ship Builder HII Test Plan xvi (Rev-2)

CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY

The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.

WORK

ITEM

MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED

COST

($/UNIT)

29 N 26”x66”x8” Quick

Acting Watertight Door, 15 psi, Steel, 10-

Dog, RH Swing (including associated frame/coaming and fitting) Painted w/

Powder Coating, White 17925

NAVSEA Dwg No. 803- 6397268 Rev. B, Assy 26-A

(NSN : 2040-00-912-5780)

2 ea. $8,800.00

29 N 26”x66”x8” Quick Acting Watertight

Door, 15 psi, Steel, 10- Dog, LH Swing

(including associated frame/coaming and fitting) Painted w/

Powder Coating, White 17925

NAVSEA Dwg No. 803- 6397268 Rev. B, Assy 25-A

(NSN : 2040-00-912-5779)

2 ea. $8,800.00

43 N Ultra Fog Sock Filters (Will be provided by the Cutter)

10011036 4 ea. $25.00

*Government-loaned property, which shall be returned to the vessel upon completion of the availability.

**New or refurbished equipment that the Government may provide for installation in place of existing equipment.

***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter xvii (Rev-2)

CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS

The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5 (Inspection report particulars)):

Work Item Title

17 Refrigeration Unit Flex Hose Assemblies, Renew

20 Incinerator Flexible Hoses, Renew

29 QAATD/QAWTD, Replace (NSC1)-Remaining

34 Dual Point Davit ,Biennial Maintenance, Perform

43 Water Mist Fire Extinguishing System, Inspect And Test xviii (Rev-2)

PRINCIPAL CHARACTERISTICS

418' WMSL

PHYSICAL

Length overall 418' 0" Length between perpendiculars 390' 0" Maximum beam 54' 0" Beam @ 01 level 47' 9-1/8" Depth (01 level @ side to baseline) 39' 2-3/4" 01 deck camber foredeck 1/4" in 1'-0" Minimum berth depth 20' 0" Height of highest projection Approximately 119' Draft, design 14.40' Design displacement 3925 long tons

MACHINERY

Two diesel engines MTU 20V, 20-cylinder 9,730 SHP each One gas turbine General Electric LM2500; 29,500 SHP Type of propulsion CODAG Electrical system 24 Volt DC Two controllable pitch propellers Rolls-Royce 5 blade, 14' 0" diameter; 229 RPM max Two reduction gears RENK One cross connect gear RENK

HULL

Hull material 5086 Aluminum HSLA-80 Steel ABS EH 36 Steel

ABS AH 36

Frame spacing FWD of FR 9 2' 3" FR 9 to FR 10 6' 9" FR 10 to FR 98 4' 1" FR 98 to FR 99 3'-8"

ELECTRICAL

Power Three 1360 kW, 450 V, 60 Hz, 3 Phase, 1800 RPM Caterpillar 3512B diesel engines with Baylor ship service generators Shore tie cable Seven MIL-C-24368/2 (NATO) shore power receptacles, 400 A each

TANK CAPACITIES

Diesel oil 220,359 gal Fresh water 12,454 gal JP-5 Fuel 35,182 gal

1 (Rev-2)

00000_0618_FLT

REC_00000_FLT_Commercial Project @ CG Facility (1212)

General Requirements

1. SCOPE

1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels.

1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and 'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.

2. REFERENCES

COAST GUARD DRAWINGS

None

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction(COMDTINS) M10360.3 (series), Coatings and Color Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2018, General

Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2018, Welding and

Allied Processes Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2018, Requirements for Preservation of Ship Structures

OTHER REFERENCES

None

3. REQUIREMENTS

3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.

NOTE

The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.

2 (Rev-2)

3.2 Contractor-provided fire watch personnel. The Contractor shall provide fire watch personnel and equipment.

3.3 Preservation requirements. The Contractor shall accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.

3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec 6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).

3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with COMDTINST M10360.3, Chapter 6 (Cutter and Boat Colors Exterior and Interior).

NOTE

Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes (provided in Chapter 6 of COMDTINST M10360.3) are strictly prohibited.

3.4 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740.

3.5 Environmental protection requirements. The Contractor shall adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:

3.5.1 USCG facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix B, Requirements for Environmental Protection at USCG Facilities, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.

3.5.1.1 USCG Generator status. The activity Generator Status for the Coast Guard Facility is 7690390037.

3.5.1.2 Plans and permits. The CG Facility has unit specific permits including the following:

• Spill Prevention Control and Countermeasures (SPCC) Plan: Unit has a SPCC Plan which requires certain unit-specific procedures be followed for the storage, inspection, and transfer of petroleum products in containers 55 gallons or greater.

• National Pollutant Discharge Elimination System (NPDES) Storm Water (SW) Permit: Unit has an NPDES SW permit which requires unit-specific procedures be followed for the storage and inspection of equipment and materials which may contribute contaminants to storm water discharges.

• Air Emission Permit: Unit has a Air Emission Permit which requires unit-specific procedures be followed for the emissions of VOCs and hazardous air pollutants.

3.5.2 Test and procedures. The Contractor shall be required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work shall be done by qualified laboratories; and where required by law, the laboratories shall be certified.

3.5.3 Regulatory notifications. The Contractor shall be responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, 3 (Rev-2) and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The Contractor shall submit copies of all regulatory notifications to the Contracting Officer and the local Facility Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications shall be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System (NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.

3.5.4 Environmental manager. The Contractor shall appoint in writing an Environmental Manager for the project, and shall be responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager shall ensure compliance with Hazardous Waste Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas;

ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the Environmental Records binder and required documentation, including environmental permits compliance and close-out.

3.5.5 HW disposal. Contractor shall comply with SFLC Std Spec 0000 Appendix B, Requirements For Environmental Protection At USCG Facilities for HW disposal, and ensure that waste removals are conducted during normal business hours (0800-1600) on Monday through Friday (excluding holidays).

3.5.6 Additional Requirements. The Contractor shall be aware of the following:

3.5.6.1 No Contractor or Subcontractor shall have the authority to sign a Hazardous Waste Manifest using the Coast Guard facility’s EPA Generator ID Number or remove contract generated hazardous waste from the Coast Guard facility without COR or KO-approval.

3.5.6.2 Local environmental regulations at the Government facilities may be more stringent. As with all environmental regulations, the Contractor shall prepare for and comply with local and state regulations.

3.5.6.3 Coast Guard facilities do not maintain Facilities Response Plans (FRPs) per 33 CFR 154. Contractor shall furnish the FRP when required for over-the-water liquids transfers to and from vessels, and is required for oil/fuel transfers to/from vessels for 250 barrels (10,500 gallons) or more.

3.6 Local Policy. None.

3.7 SFLC standard specification approved changes. The Contractor shall be aware that the following are approved changes to published SFLC 2018 Edition Standard Specifications and supersede published content:

3.7.1 Change to SFLC Std Spec 0000, paragraph 1.3. ‘Acronyms and term definitions’, page 5, “PCL (Paint Containing Lead)” definition replaced by, “Any paint or coating containing lead in excess of 0.009 percent by weight (1.0 mg/cm2 or 90 ppm). Lead Based Paint (LBP) is an interchangeable term with PCL.”

3.7.1.1 Change Std Spec 0000 paragraph 3.2.4.2.3(QP 1 inspector or tech rep duties) bullet, “Determine when applied coats have sufficiently cured for overcoating or for system service resumption (see paragraph 3.1.19 of SFLC Std Spec 6310 (Critical drying time requirements)).” to “Determine when applied coats have sufficiently

4 (Rev-2) cured for overcoating or for system service resumption (see paragraph 3.1.17 of SFLC Std Spec 6310 (Critical drying time requirements)).”

3.7.2 Change to Std Spec 5000, paragraph D2.2.1.1 bullet, "For running rigging, furnish class 6x37, uncoated, independent wire rope core (IWRC), right regular lay (RRL) wire rope or Dyform-18, rotation resistant wire rope," to "For running rigging, furnish class 6x36, uncoated, independent wire rope core (IWRC), right regular lay (RRL) wire rope or Dyform-18, rotation resistant wire rope."

3.7.2.1 Change to Std Spec 5000, page D-2, Table D-1 title from "DYFORM-18, 6X19 AND 6X37 IWRC RRL," to " DYFORM-18, 6X19 AND 6X36 IWRC RRL"

3.8 Work plan. The Contractor shall perform work on the following items 30 days before the end of contract availability:

• Galley Grease Fire Extinguishing System, Inspect and Test

• Gas Turbine Module Fixed CO2 Fire Extinguishing System, Inspect and Test

• Heptafluoropropane (HFP) Fire Extinguishing System, Inspect and Test

• Water Mist Fire Extinguishing System, Inspect and Test

4. NOTES

4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.

4.2 Condition Found Report Forms. Contractor shall use CG provided CFR form to submit all CFR’s. The CG will provide a copy of the electronic form before the arrival conference.

5 (Rev-2)

QA-1 - QUALITY ASSURANCE INSPECTION FORM

(PRESERVATION CHECKLIST)

VESSEL NAME HULL # WORK ITEM

WORK ITEM TITLE

LOCATION OF WORK (INCL. FRAME #’S) AREA (SQFT)

CHECKPOINT 1 – COATING SYSTEM COMPLIANCE

Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.

CHECKPOINT 2 - PAINT STORAGE

Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfgr.

CHECKPOINT 3 - AMBIENT CONDITIONS

Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).

Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).

Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfgr.

CHECKPOINT 4 - PRE-SURFACE PREPARATION

Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.

Verify equipment setup, blast media, and surface preparation methods match designated test coupon.

CHECKPOINT 5 - SURFACE PREPARATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).

Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.

Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).

CHECKPOINT 6 - PRIMER COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Verify proper mixing and stand-in (induction) times.

Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.

Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).

Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.

Brush out all runs, sags, drips, and puddles.

Perform visual inspection for holidays and other defects.

CHECKPOINT 7 – STRIPE COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).

CHECKPOINT 8 – TOP COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

Verify proper mixing and stand-in (induction) times, as applicable.

Verify wet film thickness at random, to prevent under or over application.

Brush out all runs, sags, drips, and puddles.

CHECKPOINT 9 – FINAL INSPECTION

Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.

Ensure that system cure is in accordance with manufacturer's recommendation for intended service.

Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.

For immersion coatings (including tank U/W body), record date and time of…