Att 1 Drawing and Att 2 SOW.pdf

PDF 518 KB Posted

Attached to
Towing Lines / Bridles Federal contract opportunity
Solicitation number
SPMYM3-20-Q-7046
Issued by
Defense Logistics Agency Land and Maritime

View the file

Other files for this federal contract opportunity

Other files attached to Towing Lines / Bridles, newest first.
File Type Posted
Comb Synopsis Solicitation 20-Q-7046.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT - 1 PAGE 1 OF 3

ATTACHMENT - 1 PAGE 2 OF 3

ATTACHMENT - 1 PAGE 3 OF 3

Emergency Towline Package SOW

Spec #: 2017-XX Rev: - Page 1 of 3

STATEMENT OF WORK

1. SCOPE

Title: Procurement of lines to facilitate the assembly of an Emergency Tow Package that consist of three separate lines made of high molecular weight polyethylene (HMPE) and covered with substantial chafe protection. Specific lines are listed below.

1. Forward Tow Hawser and Bridle (100-ft tow hawser with 30-ft bridle legs attached to either forward pair of shipboard cleats)

2. Breast off Line (150-ft breast off line)

3. Stern Line (130-ft Stern line intended to be warped around aft end of upper rudder)

1.1. Location of Work:

1.1.1. Topside; forward and aft cleats

1.1.2. Pierside

2. REFERENCES

2.1. NONE

3. REQUIREMENTS

3.1. All lines shall be spliced and fabricated in accordance with National Cordage Institute standards.

3.2. General Line Requirements:

3.2.1. 12x12 braided HMPE line - Plasma by Cortland Company; spliced and sleeved with Cortland Company's proprietary "SX" chafe sleeve

3.2.2. Plasma line colored purple

3.2.3. Chafe sleeve colored grey

3.2.4. Minimum spliced break strength: 291,000 lb.

3.2.5. Diameter: 1-5/8” +/- 1/8"

3.2.6. Maximum weight: 6.6lb/ft

3.2.7. Specific gravity less than 1.0 (floats)

3.2.8. Minimum stretch: 5% +/- 1% at break strength

3.2.9. Load Tested with working load limit tag attached; include line name on working load limit tag, i.e. FORWARD BRIDLE LEG ONE, FORWARD BRIDLE LEG TWO, FORWARD TOW HAWSER, FORWARD BREAST OFF LINE, and

AFT TOW HAWSER

3.2.10. Dimensionally compatible with 1-1/4” Ultrex synthetic shackles by Yale Cordage

ATTACHMENT - 2 PAGE 1 OF 3

Rev: - Page 2 of 3

3.3. Forward Bridle Requirements:

3.3.1. Two lengths total

3.3.2. 30-ft lengths each

3.3.3. 5-ft soft eyes on both ends; sx chafe sleeve by Cortland Company on each; sx chafe sleeve by Cortland Company on each eye and entire body; use one continuous piece of sx for eyes and body; all tails tucked and buried

3.4. Forward Tow Hawser Requirements:

3.4.1. 100-ft length total

3.4.2. 5-ft soft eyes on both ends; sx chafe sleeve by Cortland Company on each; sx chafe sleeve by Cortland Company on each eye and 35-ft down the body after each eye; use one continuous piece of sx for each eye and body segment (two sx lengths total); all tails tucked and buried

3.5. Forward Breast Off Line Requirements;

3.5.1. 150-ft length total

3.5.2. 5-ft soft eyes on both ends; sx chafe sleeve by Cortland Company on each; sx chafe sleeve by Cortland Company on each eye and 30-ft down the body from each eye; use one continuous piece of sx for each eye and body segment (two sx lengths total); all tails tucked and buried

3.6. Aft Tow Hawser Requirements:

3.6.1. 130-ft length total

3.6.2. 5-ft soft eyes; sx chafe sleeve by Cortland Company on each; sx chafe sleeve by

Cortland Company on each eye and entire body; use one continuous piece of sx for eye and body; all tails tucked and buried

3.8. Storage Box Requirements:

3.8.1. Insulated SAE plastic storage box & lid; 42 cubic feet; two boxes total

3.9. All components are required to be capable of withstanding UV and seawater exposure without degradation.

3.10. Government POC must be present to verify performance attributes, inspections, and load tests.

ATTACHMENT - 2 PAGE 2 OF 3

Rev: - Page 3 of 3

4. RESPONSIBILITIES

4.1. C230 of the PNSY is required to confirm that all products meet technical specifications prior to formal acceptance.

5. DELIVERY / RETURN

5.1. Any components that are delivered not in accordance with any above requirement shall be returned and replaced by the vendor. Code 230 of PNSY shall be present during acceptance of all material.

4.2. C230 of the PNSY is required to complete a technical conformance checklist for any items that do not match the above descriptions

ATTACHMENT - 2 PAGE 3 OF 3

01
02
05
06
07
08
04
03
01824001+ QA4 TX-CA-VA EMERGENCY TOWING LINES-BRIDLES - DQ.pdf
04
06
07
03

File details come from the government source that posted it. Updated .