Atch B - Experience Project Data Sheet.docx
DOCX document 39 KB Posted
- Attached to
- Optical Atomic Clock Federal contract opportunity
- Solicitation number
- 1333ND24QNB680240
About this file
This document is an Attachment B - Relevant Experience Project Data Sheet for a Request for Quotation (RFQ) for an Optical Atomic Clock requirement. The RFQ is being issued by the National Institute of Standards and Technology (NIST), Acquisition Management Division (AMD), Team E-Boulder.
The data sheet requests relevant project experience information from the offeror, including the project number, firm information, type of work (prime, subcontractor, etc.), contract details (number, title, location, award/completion dates, value), and a detailed description of the project's relevance to the current RFQ requirements. The RFQ has specific criteria for the type of experience to be submitted. The RFQ itself has a total award value but does not specify pricing terms. No information is provided about set-asides, incumbents, or other salient details.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Atch A - Instructions_Evalution Criteria_Basis for Award 240.docx | DOCX document | |
| RFQ.pdf | ||
| Atch C - Past Performance Questionnaire.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFQ ATTACHMENT B
RELEVANT EXPERIENCE PROJECT DATA SHEET
1. Project No. (check one) : |_| #1 |_| #2 |_| #3
2. Experience for: |_| Offeror |_| Joint-Venture |_| Other (Explain)
Firm Name:
Address:
Phone Number:
Point of Contact: Contact Phone Number:
3. Work Performed as: |_| Prime Contractor |_| Sub Contractor |_| Joint Venture |_| Other (Explain)
Percent of project work performed:
If subcontractor, who was prime (Name/Phone #):
4. Contract Number: Delivery/Task Order Number:
Title:
Location:
Award Amount:
Final Price:
5. Award Date (mm/dd/yy): Completion Date (mm/dd/yy):
6. Type of work: Experience submittal shall include all criteria as provided in the Specifications document for this requirement.
|_| Horizontal Dry Dilution Refrigerator |_| Other
7. Type of Contract/Task Order: (Check ALL that apply)
|_| Firm-Fixed Price |_| Cost/Time and Material |_| Other (explain):
8. Customer/Owner Name:
Point of Contact (POC): POC Phone Number:
FAX Number: POC E-mail address:
9. Provide a detailed description of the project and the relevancy to the project requirements of this RFQ
10. Other Information:
*Individual blocks on this form may be expanded; however, total length for each project data sheet shall not exceed: See Instructions.
File details come from the government source that posted it. Updated .