Atch A - Specifications.pdf
PDF 226 KB Posted
- Attached to
- 50 GHz Vector Signal Generator Federal contract opportunity
- Solicitation number
- NB672060-25-01316
About this file
This document is a Requirements/Specification Document for a 50 GHz Vector Signal Generator solicited by the National Institute of Standards and Technology (NIST). The Superconducting Electronics Group requires one vector signal generator for quantum computing research, with specific technical requirements including frequency output greater than 50 GHz, maximum output power over +5 dBm, external I/Q modulation bandwidth >1GHz at 50 GHz, and the ability to extend to 100 GHz in a future purchase. The solicitation (Number NB672060-25-01316) is an unrestricted procurement under FAR 12.6 and 13.106, with a small business size standard of 750 employees, accepting new, used, or refurbished equipment meeting original equipment manufacturer (OEM) specifications.
Key procurement details include on-site inspection and acceptance within 7 business days, no specific training requirements, base manufacturer warranty acceptable, and electronic quotation submission to Contracting Officers Clifford Nicholson and Daniel Kent. Vendors must submit questions in writing no later than five calendar days after solicitation issuance, with responses to be included in a solicitation amendment. The shipping destination is NIST-Boulder at 325 Broadway, Boulder, CO 80305, and the procurement seeks a firm fixed price quotation for a single vector signal generator to support advanced quantum computing measurement and research capabilities.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFQ NB672060-25-01316 Amd 01_50 GHz Compact VSG.pdf | ||
| NB672060-25-01316 Amd 01 QnAs-1.pdf | ||
| Atch A - Specifications_Amd 01.pdf | ||
| RFQ NB672060-25-01316 50 GHz Compact VSG.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Requirements / Specification Document
TITLE: 50 GHz Vector Signal Generator
Requesting Laboratory / Division / Group:
Communications Technology Laboratory Radio Frequency Technology Division Superconducting Electronics Group (672.06)
General Statement of Need:
The Superconducting Electronics Group requires a vector signal generator for quantum computing research and measurement. These instruments are used to generate modulated high frequency pulses used to control quantum bits. Looking to future needs, the ability to extend the working frequency above 70 GHz is also desired.
Item Specifications and Quantities:
Item 1: Vector Signal Generator Quantity: 1 EACH Specifications: 1.1 New/Used/Refurbished to OEM specifications
1.2 Frequency output greater than 50 GHz
1.3 Maximum output power greater than +5 dBm
1.4 External I/Q modulation with bandwidth >1GHz at 50 GHz
1.5 Extendable to 100 GHz with later purchase
Procurement Support Information and Ancillary Services:
Section Requirements/Specifications
Planning Considerations ☒ N/A
☐ List any visits required to allow potential vendors to see site specific constraints.
[Explain Requirements.] ☐ US citizen required on-site (foreign nationals require pre-registration 30 days prior to visit.)
☐ Vendor Representative On-Site more than three (3) days.
☐ Other Considerations:
[List other considerations to ensure an accurate quote.]
Shipping & Delivery
Shipping Address:
☒ NIST-Boulder
☐ N/A ATTN: TBD
Mail Stop:
325 Broadway Boulder, CO 80305
☐ NIST-Gaithersburg
ATTN:
Mail Stop:
100 Bureau Dr Gaithersburg MD 20899
☐ [Alternate Shipping Address] Shipping Criteria:
☐ Partial Delivery Acceptable
☐ [Enter Shipping and Delivery information by item.] ☐ Direct Delivery to OU Building Required [Explain Need for Requirement]
Building /Room Number: [Enter Building/Room Number] ☐ Building has Loading Dock
Containerization Preference: [Enter Container Type] Other Requirements:
[List Any Other Requirement] Delivery Date Criteria:
☐ Delivery Shall Be Competed No Later Than:
Click or tap to enter a date.
☐ Delivery Shall Be Made No Earlier Than:
Click or tap to enter a date.
☐ Scheduled Deliveries:
Item Number Due Date
☐ Other:
[List Other Shipping, Delivery or Special Requirements.]
Electronic Media ☒ N/A
[Enter Electronic Media Requirements by Item.]
☐ Software ☐ Electronic Manuals ☐ License Key
[List Any Other Electronic Media Requirements] ☐ US Government Email Address for Software Delivery:
[Enter Address]
Installation
[Enter Installation Requirements by Item]
☐ Vendor Technician on Site ☐ Rigging ☐ Uncrating / Unpackaging ☐ Removal of Packaging Material ☐ Equipment Set Up ☐ Start-Up Services ☐ Turnkey Installation ☐ Other:
[Enter Details] NOTE: SME shall be the coordination POC.
Facility / Utility Considerations ☒ N/A
[List Site Specific Utility Considerations by Item] ☐ OFPM Work Order Numbers
[List Work Order Numbers]
☐ Power Available
Voltage: [Enter voltage] (V) Maximum Current: [Enter max current draw] (A) Phase: [Choose Phase]
Frequency: [Typically 60Hz] (Hz) NEMA Plug Type: [Enter Plug Type] (i.e.: NEMA L5-20P) Environment: [Choose Environment] Other Power Considerations:
[List Any Other Power Considerations.]
☐ Utility Connections:
[List Relevant Available Utilities, Pressure(s) and Flowrate(s).]
☐ Other Considerations:
[List Other Considerations to Ensure an Accurate Quote.]
Inspection and Acceptance ☐ N/A
[Inspection Requirements Per Item (Who, When, What, Where)] ☒ On-Site
☒ Acceptance Not Expected to Exceed 7 Business Days
☐ Acceptance Expected to Exceed 7 Business Days:
[Duration]
☐ Inspection and Acceptance Plan:
[Explanation]
☒ Other:
New/Used/Refurbished equipment meeting OEM specifications are acceptable
Training ☒ N/A
Training Requirements (Who, When, What, Where)
☐ Number of Trainees: [Enter Number of Trainees] ☐ On-Site
☐ Off-Site Location: [Enter Location(s)] Is Trainee Travel Required: [Choose Answer] Scope of Training ☐ Operation ☐ Maintenance ☐ Troubleshooting
☐ Safety ☐ Other [Enter Other Scope of Training Requirements] ☐ Training Materials to be Provided by Government:
[Describe Materials] ☐ Training Materials to be Provided by Vendor:
[Describe Materials] ☐ Other [Enter Other Training Requirements] NOTE: SME shall be coordination POC.
Warranty ☐ N/A
Base Manufacturer Warranty is acceptable Warranty Length: [i.e. 3 - Years] What is included?
☐ Labor ☐ Parts ☐ Travel ☐ Cost and Liability for Returns
☐ Other [Enter Other Requirements]
☐ 1 Option Period ☐ 2 Option Periods ☐ 3 Option Periods ☐ 4 Option Periods (Maximum)
Calibration
[Describe Calibration Requirements Per Item] Calibration Plan Length: [i.e. 3 - Years] What is Included?
☐ Labor ☐ Spare Parts ☐ Consumables
☐ Travel ☐ Cost and Liability for Shipment ☐ Software Updates ☐ Manuals
☐ Other [Enter Other Requirements] ☐ Requirements:
[Enter Requirements] (i.e.: On-Site Within 72 hours, etc.)
☐ 1 Option Period
Length: [i.e. 1 – Year / 6 - Months] ☐ 2 Option Periods
Maintenance
[Describe Maintenance Requirements Per Item] Maintenance Plan Length: [i.e. 3 - Years] What is Included?
☐ Labor ☐ Spare Parts ☐ Consumables
☐ Travel ☐ Cost and Liability for Shipment ☐ Software Updates ☐ Manuals
☐ Other [Enter Other Requirements] ☐ Requirements:
[Enter Requirements] (i.e.: On-Site Within 72 hours, etc.)
☐ 1 Option Period
Length: [i.e. 1 – Year / 6 - Months]
☐ 2 Option Periods
Government Furnished Material / Equipment ☒ N/A
List Any Government Furnished Material / Equipment Per Item] ☐ Samples for Testing
☐ Equipment which will leave Government Site
Description:
Serial Number:
NIST Property Number:
[Enter Description] [Enter Serial Number] [Enter NIST Property Number]
☐ Other: [Enter Other Details]
Travel
[Describe any Travel Requirements Per Item] ☐ Explain:
[Enter Justification / Requirement]
[Enter Other Requirements]
NOTE TO VENDOR: To the maximum extent possible, include travel requirement estimates as part of pertinent sections above (Installation, Maintenance, Repair, etc.). Otherwise, Travel will be a separate line item, reimbursable per the Federal Travel Regulation.
File details come from the government source that posted it. Updated .