Atch 2_SOW PSD Lighting Upgrades March 2023.doc
DOC document 66 KB Posted
- Attached to
- Lighting upgrades, Pocatello Federal contract opportunity
- Solicitation number
- 12639523Q0140
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Atch 1_federal construction wage rates_Bannock County.pdf | ||
| 12639523Q0140.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 2, 12639523Q0140
Statement of Work
For Construction Services March 20, 2023
1.0 Particulars:
1.1 Title: WS Pocatello Supply Depot Lighting Upgrades (Warehouse and Building Perimeter)
1.2 Location: 238 E. Dillon Street
Pocatello, Idaho 83201
1.3 Project Background: Pocatello Supply Depot (PSD) is located on the West side of Pocatello in a light industrial area near residential housing and Idaho State University, Pocatello Campus. The facility was constructed in the early 1930s.
The PSD manufactures and provides specialized materials and services which are not readily available from private commercial sources. These are typically products that are needed in such low quantities or at such infrequent intervals that commercial sources have shown little interest in providing them.
The existing light fixtures in the warehouse area and around the exterior building perimeter have reached the end of their useful life. A total of 48 light fixtures are needed for removal and replacement.
1.4 Scope of the project includes the following: USDA needs construction services to remove 35 existing high bay Mercury Vapor and Metal Halide light fixtures in the warehouse area, and to replace with energy efficient LED light fixtures. A total of 13 existing Metal Halide light fixtures around the exterior building perimeter need to be removed and replaced with 13 LED fixtures that are directed towards the ground to reduce light pollution and to conserve energy. Items that are unclear within this SOW shall be brought to the attention of the CO and the EPM for clarification.
1.5 Project Data: The following information is available for the Contractor’s use and compliance:
· USDA ARS 242.1 Facilities Design Standards:
http://www.afm.ars.usda.gov/ppweb/PDF/242-01M.pdf
· APHIS Environmental Protection Program:
http://inside.aphis.usda.gov/mrpbs/publications/ep_manual/downloads/environmental_protection_program.pdf
· Leadership in Energy & Environmental Design (LEED), USDA Departmental Regulation DR 5500-001 found at http://www.ocio.usda.gov/directives/doc/DR5500-001.pdf
· Preferred Biobased Products found at http://www.biopreferred.gov/ProposedAndFinalItemDesignations.aspx
· Recommended Recycled-Content Construction Material found at http://www.epa.gov/epawaste/conserve/tools/cpg/products/index.htm#construct
· Designated Green Products for Federal Procurement (see separate Excel Spreadsheet: All_Green_Products_07-09.xls).
· USDA Green Purchasing Affirmative Procurement Program: http://greening.usda.gov/gpapp08.pdf
· USDA Sustainable Buildings Implementation Plan
1.7 Attachments to this Statement of Work: The following attachments are provided for the Contractor’s use and compliance:
· USDA Guidance on Electric Metering.pdf
· All_Green_Products_07-09.xls
· USDA Sustainable Buildings Implementation Plan
2.0 Project Contacts:
2.1 APHIS Contracting Officer (CO):
Jim Roloff
USDA, APHIS, Acquisition Branch
250 Marquette Ave, Suite 410
Minneapolis, MN 55401
Tel. No.: (612) 590-7603
E-mail: James.G.Roloff@usda.gov
2.2 APHIS Contracting Officer’s Representative: (COR)
TBD
2.3 APHIS Engineering Project Manager (EPM):
Toni T Mitchell
USDA, APHIS, AAMD, ESB
4700 River Road, Unit 115 (3A-03-39)
Riverdale, MD 20737 - 1238
Tel. No.: (301) 851-2630
E-mail: Toni.T.Mitchell@usda.gov
2.4 APHIS Program Project Manager (PPM):
Patrick Darrow
Manager
USDA Pocatello Supply Depot
238 East Dillon Street Pocatello ID 83201-6623 Tel. No.: (208) 236-6920 ext 103 E-mail: pattrick.darrow@usda.gov
2.5 APHIS Security Anthony Perretta
Security Specialist
USDA/APHIS/Wildlife Services/National Wildlife Research Center
4101 Laporte Ave, Ft Collins, CO 80521
Tel. No.: (970) 266-6362
Cell No.: (970) 213-1775
E-mail: Anthony.perretta@usda.gov
2.6 APHIS Safety, Health, and Environmental Staff:
Eilyn Fabregas
APHIS Biosafety Program Manager
USDA, APHIS, MRPBS, EMSSD, ERCS
4700 River Road, Unit 124, Mail Stop 2A-02.36
Riverdale, MD 20737
Tel. No.: (301) 436-3117
Email: Eilyn.N.Fabregas@usda.gov
2.7 APHIS Safety, Health, and Environmental Staff
James McKee
OSHA Specialist
USDA, APHIS, ERCS, EMSSD
Room 2A-02.48
4700 River Road, Unit 124
Riverdale, MD 20737-1238
Phone: 301-436-3115
E-mail: James.E.Mckee@usda.gov
2.8 APHIS Safety, Health, and Environmental Staff
Elizabeth Roether
Environmental Program Manager
USDA, APHIS, EMSSD, ERCS
4700 River Road, Unit 124
Riverdale, MD 20737-1238
Tel. No.: (301) 436-3114
Email: Elizabeth.Roether@usda.gov
3.0 Scope of Services:
3.1 Preconstruction Phase: The Contractor shall provide all professional services necessary for the accomplishment of the contract project as described in this Statement of Work. If clarification is required for items identified in this SOW, it should be brought to the attention of the EPM. The Contractor shall provide Preconstruction Phase Services for the following tasks marked by an "X".
[X] Proposal with product data and construction schedule [X] Participate in the post award meeting
3.2 Construction Phase Services: Construction Services shall be performed as required by the rules, regulations, standards, codes, ordinances and laws of Local, State and Federal Governments and all other authorities that have legal jurisdiction over the site.
4.0 Project Requirements:
4.1 Field Investigation and Site Survey: The contractor shall coordinate, schedule, and conduct site investigations with the WS PPM.
4.2 Compliance with Building Codes: In accordance with Public Law 100-678, Federal Agencies must comply with National Building Codes, Local Building Codes, and Zoning Ordinances. The designer of record was required to comply with the appropriate Statutes governing the signing and sealing of engineering reports and drawings. Accordingly, final design drawings and specifications have been signed and sealed by Professional Architects and Engineers registered to practice in the state where the project is located. Project design complies with USDA Facilities Design Standards and with the requirements of Americans with Disabilities Act and be barrier free for the physically handicapped in accordance with ANSI A117.1 and the Uniform Federal Accessibility Standards.
4.3 Code Analysis: The Contractor shall submit a code analysis indicating compliance with applicable codes and environmental permitting. The topics for the code analysis are applicable codes, occupancy classifications, type of construction, fire resistance ratings, interior finishes, flame spread, and smoke develop ratings, egress, fire suppression, fire detection and alarm systems, combustible and flammable liquids, compressed gas storage, structural live loads and dead loads, wind loads, seismic design, frost depth, and sediment/erosion control.
5.0 Project Schedule:
The schedule provided indicates project requirements for each submission and review stage. It is provided for negotiation with the Contractor for setting contract time requirements for meeting contract submissions and construction deadlines. A minimum of 10 working days for review time will be required by the Government.
(Working days)
Proposal, Product Data and Construction Schedule
Award
Construction Period
30 days
Close out/Warranty
14 days
File details come from the government source that posted it. Updated .