Atch 1 Statement of Work (SOW) SHIL SPECIFICATIONS FOR ASPHALT PAVING.pdf
PDF 235 KB Posted
- Attached to
- ASPHALT PAVING -ROAD & PARKING AREA Federal contract opportunity
- Solicitation number
- 140P5220Q0049
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P5220Q0049.pdf | ||
| Atch 2 DOL Wage Determination TN20200147.gov.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK FOR ASPHALT PAVING & ASPHALT OVERLAY
1. SUMMARY OF WORK: The maintenance work to be performed under this contract shall consist of furnishing all materials, tools, equipment, and labor necessary for all work pertaining to the surfacing with asphaltic concrete the road and parking area at Rea Springs, which is approximately 15,000 square feet. Note: There will be two (2) bid options for this work: One (1) is to place asphaltic concrete on the parking area at the park Education Center, which is approximately 11,200 square feet. Two (2) is to place asphaltic concrete on the pull-out on Eastern-Corinth road at Tour Stop #10, which is approximately 1,700 square feet. Contractor shall be responsible for all measurements.
No striping of roads or parking areas will be necessary.
2. LOCATION and INFORMATION: The site of work is located at Shiloh National Military Park at 1055 Pittsburg Landing Road, Shiloh Tennessee 38376. A site visit is recommended. Contact at the park is Randy Martin, phone number is 731-689-5275.
3. SURFACE PREPARATION: The Contractor shall be responsible for the preparation of asphalt areas including removal and replacement of sub-grade and surface failures. The Contractor shall be required to perform minor sub-grade repair that results before or during the paving process. Currently these areas have a good gravel base that has been used for years, so compaction of area is sufficient. However, more gravel for base improvements may be necessary. The Contractor shall be responsible for grading and leveling before base coat of asphalt is applied.
4. MONITORING OF TRAFFIC: The contractor shall work with the park to best utilize area during paving operations. Public access can be suspending or rerouted during project work.
5. RIGHT-OF-WAY: Upon completion, the contractor shall leave the area free from surplus asphaltic concrete from the paving operation or from cleaning of paving machine, and/or any other debris associated with the paving operation. It will be the responsibility of the contractor to restore any items (i.e. curbs, sidewalks, driveways, shrubbery, utility facilities, etc.) within the area damaged due to the paving process.
6. TRAFFIC CONTROL: The work shall be carried out at all times in a manner causing a minimum interference with park staff or visitors. The contractor shall provide necessary barricades and warning signs. The contractor shall barricade or divert traffic from all asphaltic concrete laid until it is cooled for a sufficient period of time to prevent scuffing or flushing of the asphalt surface wherever possible. The contractor shall post "no parking" signs (in areas determined ), at least 24 hours prior to commencement of paving operations. It shall be the contractors responsibility to coordinate with the park to ensure all vehicles are removed and prevented from entering the work site.
7. UTILITIES TO BE MARKED: The contractor shall work with park staff to mark and record each utility opening or manhole which is affected by paving materials. Any utility facility which is broken or damaged by the contractor shall be replaced entirely at the contractors cost.
8. PAVING FULL DEPTH PAVING: After areas of gravel are ready to pave, a two to three inch base coat of a Tennessee DOT approved mix design , such as 411 Grading E, pavement mixture shall be applied before overlaying of asphalt.
9. ASPHALT APPLICATION: TN DOT approved mix design of 411 Grading D or E will be used. Depth of overlay will be 2 to 2 ½ inches. The contractor shall arrange his/her paving to provide hot joints wherever possible. Where it is necessary to leave a cold joint, the edge will be squared vertically and horizontally and compacted. When matching a cold joint, the contractor will paint the joint with emulsion prior to paving. Asphalt laid adjacent to gutter lines shall meet the existing grade unless the engineer waives this requirement. All building entries shall have asphalt laid in such a way as to prevent bumps or dragging.. Turn-out paving shall be allowed as indicated by the park or his/her representative. Furthermore, the approaches to all buildings shall be excavated and tapered away in order to facilitate a smooth transition between the full-depth pavement and concrete aprons. Proper use of rollers and hand compaction will be utilized around building aprons or rock walls.
10. WEATHER LIMITATIONS: Bituminous mixtures shall not be placed (1) when either the air temperature or the temperature of the surface on which the mixture is to be placed is below 40 degrees F. (2) on any wet or frozen surface or (3) when weather conditions prevent the proper handling or finishing of the mixture, as determined by the park or his/her designated representative. Mixture shall not be placed during inclement weather.
11. TACK COAT APPLICATION: Tack coat shall be an anionic emulsified asphalt.
Immediately prior to paving, a tack coat shall be applied to the clean surface at a rate of
0.10 to 0.20 gallons per sq. yd. Pools of primer material remaining on the surface after application shall be removed. All traffic not essential to the work shall be kept off the tack coat. Care shall be taken when applying the tack coat to prohibit the spray from adhering to any objects other than the surface to be paved. The contractor shall be held responsible for removing tack coat from such objects. The contractor shall apply tack coat only to those areas which he/she will resurface each day.
12. LEVEL OR WEDGE COURSE: Not anticipated since no asphalt exist. However after base coat if needed it may be necessary at various locations as prescribed by the park or his/her agent. All level or wedge courses shall be placed in such a manner that their joints are staggered with the wearing course. Level or wedge course thickness will vary from 0 to 1 1/2" depending on the depth of the depressed area. In areas where more than 1 1/2" of level or wedge are required, additional lifts will be used. The contractor shall arrange his/her paving to provide hot joints wherever possible. Where it is necessary to leave a cold joint, the edge will be squared vertically and horizontally and compacted. When matching a cold joint, the contractor will paint the joint with emulsion prior to paving.
Depth of the wearing course shall be 1" to 2 1/4" depending upon surface conditions.
Asphalt laid adjacent to gutter lines shall meet the existing grade unless the park waives this requirement. All aprons and intersections shall have asphalt laid in such a way as to prevent bumps or dragging. Turn-out paving at intersections shall be allowed as indicated by the park or his/her representative. Furthermore, the approaches to all concrete-decked arpons shall be milled to a minimum of 2”, unless this compromises the integrity of the base, and tapered away in order to facilitate a smooth transition between the overlay and the apron. Such milling expenses shall be included in the bid amount.
13. MILLING: No milling initially required.
14. INSPECTION: Inspection of all work will be by park employees or a designated representative.
15. GENERAL: This Contract shall be based upon payment by the Contractor of wage rates based on the Davis Bacon Act.
16. MATERIALS, WORKMANSHIP, AND EQUIPMENT: Whenever not explicitly described in these specifications, all materials, workmanship, and equipment used in carrying out the work shall be of the best of the respective grades and qualities. The contractor shall at all times provide adequate supervision and sufficient labor and equipment for prosecuting the work to full completion in the manner and within the time required by the contract.
a. Workmen. All workmen must have sufficient skill and experience to perform properly the work assigned to them. Any foreman or workman employed by the contractor or by any subcontractor who, in the opinion of the contracting officer, does not perform his work satisfactorily and in a skillful manner or is disrespectful, intemperate, disorderly, or otherwise objectionable, shall, on the written request of the contracting officer, be removed immediately by the contractor or subcontractor employing such person and he shall not be employed again on any portion of the work without the written consent of the contracting officer.
b. Equipment. All equipment used on the work shall be of sufficient size and in good mechanical condition so as to meet the requirements of the work and to produce a satisfactory quality of work. The contracting officer may order the removal, and require replacement of any unsatisfactory equipment. Should the contractor fail to furnish suitable and sufficient equipment for the satisfactory prosecution of the work, the contracting officer may withhold payment of estimates which are or may become due, or may suspend the work until such equipment has been provided.
17.CONTRACTOR TO BE PRESENT OR REPRESENTED: The contractor shall at all times either be personally present on the job site or be represented thereon by a responsible agent to be designated in writing by the contractor, who shall have full authority to act for him in all cases and carry out any instructions relative to the work which may be given by the contracting officer, either personally or through an authorized representative. The contractor's agent shall not be changed during the life of the contract without the written approval of the contracting officer.
18. LEGAL RESTRICTIONS AND PERMITS: The contractor is assumed to be familiar with, and at all times shall observe and comply with, all Federal, State, and local laws, park regulations, safety laws, building and construction codes, and ordinances and regulations in any manner affecting the conduct of the work.
The contractor shall procure, at his own expense, all necessary licenses and permits and shall give due and adequate notices necessary and incident to the due and lawful prosecution of the work.
Trucks and other heavy equipment shall be confined to the limits of the project parking areas and roads to and from the project. A special permit does not relieve the Contractor of liability for damage resulting from the moving of material or equipment.
Unless otherwise permitted, do not operate equipment or vehicles that exceed the legal load limits over new or existing structures, or pavements within the project. Half loads are expected on park roads.
19. PROTECTION AND RESTORATION OF PROPERTY: The contractor shall be responsible for the preservation from injury or damage, resulting directly or indirectly from the execution of the work, of all public and private property along and adjacent to the park. He shall use every precaution necessary to prevent damage to pipes, conduits, and other underground structures; also, all overhead structures such as wires, cables, etc.; and poles, trees, shrubbery and crops, within or outside of the right-of-way. Any utility lines damaged by the contractor shall be repaired at once at his expense.
All trails and roads adjacent to or intersecting the project shall be protected from damage.
When or where any direct or indirect damage or injury is done to public or private property by or on account of any act, omission, neglect, or misconduct in the execution of the work, or in consequence of the non-execution thereof, on the part of the contractor, he shall restore or have restored, at his expense, such property to a condition similar or equal to that existing before such damage or injury was done, by repairing, rebuilding, or otherwise restoring same, or he shall make good such damage or injury in some other acceptable manner.
The contractor shall save harmless the Government and all of its representatives from all suits, actions, or claims of any character brought on account of any injuries or damages sustained by any person or property in consequence of any neglect in safeguarding the work, or through the use of unacceptable materials in the work or on account of any act or omission by the said contractor or his employees, or from any suits, actions, or claims arising under the Workmen's Compensation laws or any other law, bylaw, ordinance, regulations, order, or decree. During the prosecution of the work, the contractor shall be responsible for any injury or damage to any person or property resulting from any act, omission, neglect, or misconduct in the manner or method of executing said work satisfactorily, or due to the non-execution of said work at any time, or due to defective work or materials, and said responsibility shall continue until the date of final inspection.
There shall be no personal liability upon the contracting officer or his designated representative or upon Government agents or Government employees for any act performed in the discharge of any duty imposed or the exercise of any power or authority conferred upon them, or within the scope of the contract, it being understood that in all such matters they act solely as agents and representatives of the Government.
20. CONTRACTOR'S PROTECTION: The contractor shall, during the continuance of work under this contract and also extra work in connection therewith, maintain liability insurance in sufficient amount to protect himself from any liability for damages for injury to any employees, the public or other persons, including any liability which may arise by virtue of any statute.
The policies shall be, in all respects, satisfactory to the contracting officer. Evidence that such insurance is in force shall be submitted immediately upon the signing of the contract, by either presenting the policies or the Liability Company's usual form of certificate for inspection. The policies and certificates shall certify, among other things, that the insurance will not be canceled or lapsed during the progress of the work covered by these specifications.
All insurance policies shall be issued only by companies authorized to do business under the laws of the state in which the work is to be accomplished, and copies of all policies shall be filed with the contracting officer before the work is started.
21. TIME FOR COMPLETION: The contractor shall complete the entire paving work within 60 calendar days after the date of Notice to Proceed.
22. AWARD WITHIN AVAILABLE FUNDING AND PAYMENT: The contractor shall provide a price to complete work as a whole. One lump sum payment will be made when all work is completed.