Atch_1_Specifications_.pdf
PDF 6 MB Posted
- Attached to
- MIMI Replace Delta 01 LCF Fire Alarm System Federal contract opportunity
- Solicitation number
- 140P6323Q0012
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Atch_3_Site_Visit_Sign_In_0001.pdf | ||
| Sol_140P6323Q0012_Amd_0001.pdf | ||
| Atch_2_Drawings_0001.pdf | ||
| Atch_1_Specifications_2-22-23_0001.pdf | ||
| Atch_2_Experience_Questionnaire.xls | XLS spreadsheet | |
| Atch_3_Wage_Determination_SD_SD20230022.pdf | ||
| Sol_140P6323Q0012.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MIMI PMIS 257 291
Replace Delta-01 Fire Alarm System
MINUTEMAN MISSILE
NATIONAL HISTORIC SITE
DELTA-01 LAUNCH CONTROL FACILITY
REPLACE DELTA-01 FIRE ALARM SYSTEM
PMIS 256291
PROJECT SPECIFICATIONS
NATIONAL PARK SERVICE
January 18, 2022
TABLE OF CONTENTS
I. TABLE OF CONTENTS
II. DIVISION 1 – GENERAL REQUIREMENTS ………………………………………………………3
III. SECTION 283111 – INTELLIGENT, ADDRESSABLE, AND WIRELESS FIRE ALARM AND
DETECTION SYSTEM
IV. REFERENCES
V. MATERIAL SUBMITTALS
VI. DRAWINGS
VII. SITE PHOTOGRAPHS
VIII. SITE MAP……………………………………………………………………………………………….97
DIVISION 1 – GENERAL REQUIREMENTS
II. DIVISION 1 SHORT FORM GENERAL REQUIREMENTS
PART 1 – GENERAL
ITEM 1 - DESCRIPTION OF WORK
1.1 Background: Delta-01 Launch Control Facility was constructed in 1962-63, is a one-story ranch-style Launch Control support building and the Vehicle Heated Storage Building are constructed of prefabricated steel and situated on concrete foundations The underground Launch Control Center is concrete vault located thirty-two feet below ground.
Current System Description: There are multiple fire alarm systems serving these facilities. Each bedroom in the LCF is equipped with a 120VAC powered smoke alarm. These smoke alarms are not monitored nor tied into any fire alarm control unit. An Edwards brand spot-type heat detector is located in the corridor between the two bathrooms. The model number is unknown, but some documentation obtained indicates that it may be tied to the Ademco FASCU described below. A couple of rooms and the attic space have old style gold colored dome-type rate- of-rise heat detectors in them. It is unknown whether these are still connected to any of the active fire alarm systems in the building. There is a Gamewell Flexalarm radio-based fire alarm system with associated bells located in the Security Office of the LCF. This system is no longer in service. While none of the components listed in this paragraph are required to continue to provide life safety or property protection, they are considered a part of the historic fabric of the building and must be preserved.
The majority of the LCF and Garage are protected by a 1995 vintage Ademco Vista-128FB combination fire alarm and security control unit. The main control panel for this system is located in the Telephone Equipment Room of the LCF and includes a newer Honeywell user interface annunciator with keypad, a built-in digital alarm communicator transmitter (DACT), a built-in power supply for fire alarm notification appliances, separate additional power supplies for security system components, and several zone extender cards to provide addresses to non-addressable devices. The DACT is connected to two separate plain-old telephone system (POTS) lines to accommodate relaying active signal information to the Pennington County Emergency Services Communications Center in Rapid City, SD.
With the exceptions of the LCF Attic space, the Garage Fire Pump Room, and the Garage Furnace Closet, complete area smoke detection is provided throughout both structures via spot-type addressable Ademco 5192SD photoelectric smoke detectors. Non-addressable Chemtronics 604 spot-type fixed-temperature heat detectors provide full coverage of the LCF Attic space. The Garage main bay is protected by non-addressable Chemtronics 601 spot-type combination rate-of-rise/fixed-temperature heat detectors in addition to the smoke detectors mentioned previously. The Garage Furnace Closet is no longer protected by any automatic initiating device, but the junction box and wiring where a heat detector was previously installed remain visible. Manual pull stations (either Ademco 5140MPS-1 or Honeywell S464A1003-2 model) are located near every exterior exit door from both structures with the exception of the Telephone Equipment Room in the LCF. These manual pull stations are considered a part of the historic fabric of the structures and must be preserved. Fire evacuation occupant notification is achieved through System Sensor Model P2475 horn-strobes located in the main sections of each building. These horn-strobes are powered by the Ademco fire alarm and security control unit. All strobes are 75cd. addressable spot-type photoelectric smoke detector protecting the Fire Pump Room in the Garage, and a Siemens addressable manual pull station near the Fire Pump Room exterior exit door. A single exterior weatherproof Gentex horn-strobe on the side of the Garage is powered by this system. This FACU sends alarm, trouble, and supervisory signals
DIVISION 1 – GENERAL REQUIREMENTS
to the Ademco FASCU for monitoring purposes; it is not equipped with its own DACT or other reporting means.
Both buildings are fully protected by nitrogen purged dry-pipe sprinkler systems fed from a dedicated diesel engine driven fire pump pulling water from an aboveground fiberglass reinforced plastic water storage tank located in the Garage. Since the scope of this project was focused on the operation, evaluation, and repair of the fire alarm systems in the buildings, these fire suppression systems were not specifically evaluated for code compliance.
In 2018, a project was completed to modify the existing fire suppression systems in both buildings. As a part of that project, a new Siemens Cerebrus Model FC922 addressable fire alarm control unit was installed in the Fire Pump Room in the Garage. This FACU is used to monitor valve supervisory switches, waterflow switches, air/nitrogen pressure switches, and fire pump system operations related to the automatic sprinkler systems serving the buildings. This FACU is also used to monitor a Siemens Cerebrus Model OP921. Heat detectors on the western two-thirds of the LCF Attic space are not securely mounted to their backboxes and are dangling from their wires. If these devices are to remain in service, they should be re-affixed to their backboxes.
Code Compliance and Historical Structure: The LCF is classified as a Business occupancy under NFPA 101, Section 3.3.198.3. It is not required to be equipped with a fire alarm or detection system by NFPA 101, Section 38.3.4.1. The Garage is classified as a Storage occupancy under NFPA 101, Section 3.3.198.15. It is not required to be equipped with a fire alarm or detection system by NFPA 101, Section 42.3.4.1. However, one of the primary goals of the NPS is the preservation of historic structures, materials, and collections. In support of this goal, Reference Manual 58: Structural Fire Management, Chapter 7: Fire Protection for Historic Structures, promotes the use of fire detection and suppression systems to provide early warning and suppression of potentially devastating fire conditions. In this vein, it is recommended that smoke detection be maintained throughout the structures. Since sprinkler protection is also provided throughout both buildings, there is no need to maintain active heat detectors as a part of the fire alarm system, as their response would parallel the activation of the sprinklers in the same space. Consideration should be given to replacing the existing heat detectors in the combustible LCF Attic space with smoke detectors to provide an enhanced level of protection in the event that a fire begins within that space. Consideration should also be given to installing a smoke detector in the Garage Furnace Closet to provide full area protection of both buildings.
Manual pull stations throughout the facility are mounted such that their operating mechanism is greater than 48 inches above the finished floor and are not in compliance with NFPA 72, Section 17.5.6.
However, as previously mentioned, these manual pull stations are considered to be a part of the historic fabric of these structures and must be preserved. Since the manual pull stations are not so far out of compliance that they are unusable and having two manual pull stations next to each other at different heights could be confusing in the event of an emergency, it is recommended that approval be obtained from the AHJ and they be left as installed.
NFPA 72, Section 17.15.9.4, requires manual pull stations to be located within five feet of each exit doorway on each floor. The existing fire alarm system is not in compliance with this provision due to the lack of a manual pull station at the exterior exit door from the Telephone Equipment Room in the LCF. It is recommended that an additional manual pull station be installed within five feet of the exterior exit door from this room.
Occupant notification is lacking in the utility rooms of the LCF and the Fire Pump Room of the Garage.
Additional horns or horn-strobes should be installed in these spaces to ensure code compliant notification coverage in accordance with NFPA 72, Section 18.4.
DIVISION 1 – GENERAL REQUIREMENTS
NFPA 72, Section 26.6.4.2.4.1(4), only permits DACTs to utilize two separate telephone lines to constitute the dual transmission means required if there are no other technologies available at the protected premises. Since there are both cellular phone service and non-government internet service available at this facility, a second technology should be chosen for use as a second means of transmission if a DACT will continue to be utilized as the primary means of reporting for the system.
NFPA 72, Section 10.4.7, requires that abandoned fire alarm equipment be removed, and that it be marked “not in service” until it is removed. However, this is counter to the preservation of historic fabric goal of the NPS. Due to the use and historic nature of this facility, it is recommended that AHJ approval be obtained and this code provision not be enforced.
A majority of aboveground fire alarm wiring observed was installed in ½-inch electrical metallic tubing (EMT) or ½-inch flexible metallic tubing (FMT). Some of the FMT lengths appeared to exceed the maximum permissible length of six feet as prescribed by NFPA 70, Article 360.12. As modifications are made to the system moving forward, any FMT in excess of six feet in length should be modified to comply with NFPA 70 requirements. Any new EMT added or replaced should also be verified to comply with the maximum fill requirements of NFPA 70, Chapter 9, Table 1.
1.2 Work Covered by the Contract Documents:
A.Project Location: Delta-01 Launch Control Facility is located at 24301 200th 6th Avenue, Phillip, SD 57567. Exit 127 off Interstate 90, ½ mile north of the overpass.
B.Work consists of: Replacing the current Ademco fire alarm and security control unit (FASCU) which was installed in 1995 and will no longer call-out to the Pennington County Emergency Services Communications Center in Rapid City, SD. Remove the Siemens fire alarm control unit (FACU) installed as part of a 2018 fire suppression system project. Create a junction box for all the associated wiring from the Siemens panel, all wiring runs to the 1995 FASCU for reporting to the monitoring station, installing new smoke detectors, and installing a new, addressable, non-voice, non-proprietary/open-source fire alarm control unit.
1. Disconnect all wiring from the Ademco Vista-128FB fire alarm and security control unit located in the Telephone Equipment Room. Separate wiring serving fire alarm devices and appliances from wiring serving security devices and appliances. Pull security related wiring back to, and leave coiled in, the existing tan colored terminal cabinets in the Telephone Equipment Room. Leave security devices and appliances as-is throughout the buildings.
2. Demolish the Ademco Vista-128FB fire alarm and security control unit, associated Honeywell annunciator, integral DACT, and integral power supply. Demolish the existing Siemens Cerebrus Model FC922 fire alarm control unit located in the Fire Pump Room.
Demolish all other existing Ademco and Siemens fire alarm system devices and appliances.
3. Protect existing non-addressable manual pull stations in place (they will be returned to service and are considered a part of the historic fabric of the building). Protect existing gold colored dome shaped rate-of-rise type heat detectors in place (they will not be returned to service but are considered a part of the historic fabric of the building).
Disconnect power from existing 120VAC smoke alarms and the heat detector in the hallway near the bathrooms, but protect these devices in place as they are considered a part of the historic fabric of the building. Protect the existing Gamewell Flexalarm radio-based fire alarm control unit and associated bells in place as they are considered a part of the historic fabric of the building.
4. Existing fire alarm system wiring and conduit may be re-used as described below;
demolish any unused fire alarm system wiring and conduit.
5. Disconnect power from existing smoke alarms and the heat detector in the hallway near the bathrooms. This will reduce the risk of electrical shock and electrical fire associated
Kohlhapp, Kevin Removal I think should say installation? Please clear this up.
DIVISION 1 – GENERAL REQUIREMENTS
with these aging devices.
6. Add a manual pull station within five feet of the exterior exit door from the Telephone
Equipment Room in the LCF. If a new FASCU is provided, put this device on its own new zone; if the Siemens FACU is expanded to monitor the entirety of both buildings, or if a new addressable FACU is provided to monitor the entirety of both buildings, provide an addressable device compatible with that system.
7. Add notification appliances in the utility support rooms of the LCF and the Fire Pump Room in the Garage to provide full coverage of both buildings. These appliances can be added to their own new circuits, as both control units are only currently using one of their two notification appliance circuits. Alternatively, these appliances could be added onto the existing notification appliance circuits as long as calculations prove that there will not be too much voltage drop. If the Siemens FACU is expanded to provide coverage of both facilities, then calculations should be performed to verify that a separate power supply will not be required based upon voltage drop in each circuit.
8. Replace existing heat detectors in the LCF Attic space with smoke detectors. While it is generally not ideal to locate smoke detectors within unconditioned spaces such as attics, if the goal is to ensure early warning of any potential fire in the structure, then smoke detectors are the best way to accomplish this goal. It is unknown whether there is adequate capacity on any of the existing addressable polling loops for the FASCU, and the heat detectors are all currently wired to the same zone in the FASCU. If a new FASCU is provided and there is not capacity on the polling loops, non-addressable smoke detectors could be used with the existing wire and would report as a single zone for the entire attic as the heat detectors currently do. If the Siemens FACU is expanded to serve both buildings, or if a new addressable FACU is provided to serve both buildings, there would not be any capacity issues adding these smoke detectors as individually addressed devices to the signaling line circuit. Alternatively, an aspirating smoke detection system could be installed in lieu of spot- type smoke detectors. This would allow for the electronics portions of the detector to be located within the conditioned part of the building and would simplify the annual testing of the device. The initial cost of installing the aspirating smoke detection system would be higher than using spot-type smoke detectors, but the lifetime maintenance cost should be lower.
9. Demolish the existing heat detectors in the Garage.
10. Install a smoke detector in the Garage Furnace Closet where a heat detector was previously installed. While it is generally not ideal to locate smoke detectors within unconditioned spaces such as this furnace closet, if the goal is to ensure early warning of any potential fire in the structure, then smoke detectors are the best way to accomplish this goal.
11. Obtain documented AHJ approval to leave the existing manual pull stations in service at their installed heights, even though they are not compliant with NFPA 72 mounting provisions. Maintain this documentation for presentation during future Fire Protection Conditions Assessments or other audits where this deficiency may again be noted.
12. Obtain documented AHJ approval to leave the existing abandoned fire detection and alarm system components in place without “not in service” signs on them. Maintain this documentation for presentation during future Fire Protection Conditions Assessments or other audits where this deficiency may again be noted.
13. Provide a new, addressable, non-voice, non-proprietary/open-source fire alarm control unit to serve the entirety of both buildings. Locate the new control unit in the Telephone Equipment Room. Ensure the control unit is capable of supporting all anticipated system initiating devices and notification appliances. Ensure the control unit is equipped with the ability to report alarm, trouble, and supervisory signals to the Pennington County Emergency Services Communications Center via a single POTS line and a non-government internet connection. Test these reporting system connections to ensure functionality. If a third reporting technology must be used due to the failure of one of the two preferred technologies, cellular reporting may be used. Regardless of which reporting
DIVISION 1 – GENERAL REQUIREMENTS
method is used, ensure that all applicable cybersecurity requirements of the NPS are met. Provide additional power supplies as necessary to power the notification appliances.
Provide power to the control unit, power supplies, and communicator from a dedicated 20A circuit or circuits. Label the breaker(s) for this circuit(s) “FIRE ALARM” within the panelboard and provide breaker locks that are red in color for each circuit. Label each control unit, power supply, or communicator with the panelboard number, breaker number, and number of the room in which the panelboard is located. Provide secondary power to the fire alarm system via VRLA type batteries, sized to operate the system in standby mode for 24 hours followed by 5 minutes of alarm.
14. Provide new spot-type photoelectric smoke detectors in each location where an Ademco or Siemens smoke detector was previously located. Provide a new spot-type photoelectric smoke detector in the Garage Furnace Closet. Provide a new addressable manual pull station in the location where a Siemens manual pull station was located in the Fire Pump Room. Provide new monitor modules for each existing non-addressable manual pull station and sprinkler system interface device (valve supervisory switches, pressure switches, flow switches, etc.). Locate monitor modules in an accessible location that does not disturb or damage the historic fabric of the facility. Provide new addressable output modules for each existing relay/control module that was demolished, and as necessary to execute the required sequence of operations for the new fire alarm system.
Provide a new addressable manual pull station within five feet of the exterior exit door from the Telephone Equipment Room. Provide an aspirating smoke detection system to protect the entire attic space of the LCF. Locate the detector unit within a conditioned room of the building, preferably within the Telephone Equipment Room. Run aspirating smoke detector piping such that the end of line includes an inlet within the ground floor of the building such that testing can be accomplished without entering the attic space.
15. Provide new horns, strobes, or combination horn-strobes in each location where an Ademco or Siemens notification appliance was located. Provide new notification appliances in the utility rooms of the LCF and within the Fire Pump Room in the Garage to provide full building coverage. Ensure that strobe candela ratings and horn decibel ratings are adequate to meet the requirements of NFPA 72 for public mode notification.
16. Test each wire that is to be re-used to ensure integrity of the insulation and lack of shorts or ground faults. Do not re-use wire that is found to be damaged. Provide new wire as necessary for the system to function. Ensure any wire, whether new or re-used, is the proper size and type for the device or appliance to which it is connected, per the manufacturer’s recommendations. Validate that all conduits are the appropriate size for the wires to be routed through them, and do not exceed the maximum fill ratio specified by NFPA 70, Chapter 9, Table 1. Provide new conduits of a larger size for any sections that require them. Validate that all flexible metallic tubing utilized does not exceed a maximum of six feet in length.
17. Provide a documentation cabinet as described and defined in NFPA 72, Section 7.7.2.
Ensure all as-built drawings, product data sheets, O&M manuals, etc. are left in this box for the owner at the end of construction.
18. Coordinate with COR to obtain documented AHJ (NPS Regional Structural Fire Manager) approval to leave the existing manual pull stations in service at their installed heights, even though they are not compliant with NFPA 72 mounting provisions. Maintain this documentation for presentation during future Fire Protection Conditions Assessments or other audits where this deficiency may again be noted.
19. Coordinate with COR to obtain documented AHJ (NPS Regional Structural Fire Manager) approval to leave the existing abandoned fire detection and alarm system components in place without “not in service” signs on them. Maintain this documentation for presentation during future Fire Protection Conditions Assessments or other audits where this deficiency may again be noted.
C. All work will be performed under a single contract.
DIVISION 1 – GENERAL REQUIREMENTS
D.Period of performance: Work shall be completed within 90 calendar days of the start date provided on the Notice to Proceed. The period of performance is inclusive of 5 weather days.
ITEM 2 – PROTECTING EXISTING UTILITIES
2.1 Protecting Existing Utilities: Notify Contracting Officer (CO), Contracting Officer’s Representative (COR) and utility companies as required to request location services prior to and to coordinate any excavation/digging operations, and/or for demolition if within Scope of Work.
2.2 Contractor shall be responsible for locating and preventing damage to known utilities on site or indoors. If contractor damage occurs, alert CO and COR as soon as safely possible, and repair utility at no additional expense to the Government. If damage occurs to an unknown utility, contact CO and COR as soon as safely possible.
2.3 Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Government or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated below:
A. Notify CO and COR not less than two business days in advance of proposed utility interruptions.
B. Hours for Utility Shutdowns: Shutdowns shall not exceed 2 to 3 hours. Temporary provisions will be needed by the Contractor for periods longer than stated allowance or if required for critical systems as determined by COR.
ITEM 3 - CONTRACTOR’S USE OF PREMISES
3.1 Conduct of Operations: At all times the contractor shall conduct his operations in conformance with the rules and regulations promulgated by the Secretary of the Interior for the National Park Service, and applicable park rules and regulations prescribed by the Park Superintendent.
https://www.nps.gov/mimi/learn/management/superintendents_compendium.htm
A. No signs or advertisements (except those specified herein and as required for safety) shall be displayed on the construction site or within the park unless approved by the Contracting Officer.
B. Smoking is not permitted while on the historical grounds of Delta-01 Launch Control Facility.
C. Public Use of Site: Contractor shall at all times conduct operations to ensure the least inconvenience to the public.
3.2 On-site work hours: Work shall be generally performed during normal business working hours of 7 a.m. to 4 p.m., Monday through Friday, except when otherwise indicated.
A. Work on Saturdays, Sundays, Federal holidays, early morning, or at night may not be performed without prior consent from the CO and COR. Submit requests for work outside of the stated normal business hours to the CO and COR for approval at least 48 hours in advance of the work.
DIVISION 1 – GENERAL REQUIREMENTS
The following Federal holidays are observed by the National Park Service:
New Year Day
Martin Luther King, Jr’s Birthday
Washington’s Birthday
Memorial Day
Juneteenth National Independence Day
Independence Day
Labor Day
Columbus Day
Veterans Day
Thanksgiving Day
Christmas Day
B. Note: Any of the above holidays falling on a Saturday will be observed on the preceding Friday; holidays falling on Sunday will be observed on the following Monday. The specific day that each holiday is recognized for each year can be found at the following site: Federal Holidays (opm.gov).
3.3 Contractor Use of Site:
A. General: Contractor shall have limited use of the site for construction operations. Limit use of premises to construction area as shown on site plan Do not disturb portions of Project site beyond areas in which the Work is indicated. Limited use is to the area inside of the security fence at Delta-01 Launch Control Facility and Garage Area.
B. Driveways and Entrances: Keep driveways, access roads, and entrances serving premises clear and available to Government, Government's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials. Schedule deliveries to minimize use of driveways and entrances.
C. Utilities
1. General: Cost or use charges for temporary facilities shall be included in the Contract Sum as required.
2. Water Service: Water from existing water system is available for use without metering and without payment of use charges. Provide connections and extensions of services as required for construction operations without any additional permit costs. Use resources wisely and minimize waste of water.
3. Electric Power Service: Electric power from existing system is available for use without metering and without payment of use charges. Provide connections and extensions of https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/#url=2022 https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/#url=2022
DIVISION 1 – GENERAL REQUIREMENTS
services as required for construction operations without any additional permit costs. Power may or may not meet your construction power tool requirements, provide generators if questionable. Use power in a resourceful manner and avoid excess power waste.
4. Waste Operation:
a. Toilets: Contractor provided for contracting personnel, portable toilet, no restroom facilities are on site. Coordinate with COR for approved location if not shown on attached site plan. The location of the portable toilet will be by the garage within the security fence at Delta-01 Launch Control Facility.
b. Waste Removal / Recycling: Contractor is responsible for removing all waste created by the project. Contractor shall recycle to the highest degree possible and empty dumpsters as necessary to avoid debris on site. Locate as shown on site plan or coordinated with COR.
D. Security and Protection facilities:
1. Environmental Protection: Provide protection, operate temporary facilities, and conduct construction in ways and by methods that comply with state and federal environmental regulations and that minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects.
2. Cleaning of Equipment: The Contractor shall ensure that prior to moving on to the Project Area, all equipment, is free of soil, seeds, vegetative matter, or other debris that could contain or hold seeds. Ensure that all equipment has been pressure washed and is free of exotic species prior to start-up of operations and moving of equipment to Project Area.
Equipment shall be considered free of soil, seeds, and other debris when a visual inspection does not disclose such material. Disassembly of equipment components or specialized inspection tools are not required.
3. Pest Control: Follow best practices to minimize attraction and harboring of rodents, roaches, and other pests and to perform extermination and control procedures at regular intervals so Project will be free of pests and their residues at project completion. Perform control operations lawfully, using environmentally safe materials.
3.4 Storage - Staging Areas:
A. Confine Storage of materials and equipment to the project staging area noted on the plans/aerial. Specific storage and staging area’s may be discussed at the preconstruction briefing.
3.5 Preservation of Historical Features: Delta-01 Launch Control Facility, Garage and Launch Control Center are all Listed Historical sites. All contents within the structure are museum collections and require the utmost care of protection while working around.
3.6 Hauling Restrictions: Contractor to verify path to site and meet state and county road requirements and height restrictions for all park work/access.
3.7 Housekeeping:
A. Keep project neat, orderly, and in a safe condition at all times.
The contractor can’t use the bathrooms in the building? If not then this is fine but if they can just say so.
DIVISION 1 – GENERAL REQUIREMENTS
1. Dispose of waste materials and recycling legally outside the park. The contractor shall not use park dumpsters
2. Address Recycling: Government goal is to salvage and recycle as much nonhazardous construction waste as possible. Use sustainable methods to extent possible during this project, recycling material as is probable with local means. Maintain accurate documentary records for submittal of all recycled materials used including fly ash and slag cement.
3.8 Occupancy Requirements for Buildings:
A. Existing Buildings:
1. Government Occupancy: Government will occupy the Elevator Room, Launch Control Center with active visitor tours, during construction during for the contract period.
Cooperate with Government during construction operations to minimize conflicts and facilitate Government usage. Perform the Work so as not to interfere with Government's day-to-day operations. Maintain existing exits, unless otherwise indicated.
a. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from the CO or COR.
b. Maintain existing building in a weather tight condition throughout construction period. Repair damage caused by construction operations. Protect building and its occupants during construction period.
B. New /Existing Buildings Unoccupied: NA
3.9 Photo Documentation: Contractor must provide existing condition, progress, and completion photos. All photos shall be in focus, show maximum range of depth of field general photo and then close up detail photo as needed. Shall be in JPEG digital form and submitted electronically by email and 8 mega pixels minimum within 7 days from time of taken or as approved by COR.
A. Existing Condition Images:
1. Before starting construction, take color, dated, digital images of project site and adjacent property/roads/etc. that may be impacted by construction activity/traffic. Include existing items to remain or be salvaged from different vantage points and with context for location identification.
B. Construction Progress Images:
1. Document all sub-surface work/ trenches etc. prior to backfill with photos covering enough overall field view to show location and then zoom in for details. (Locations and dimensions shall also be noted on as built drawing set.)
2. Maintain organized index for photos with date, description, etc.
Kohlhapp, Kevin Will the building be open for tours during construction? If yes then this is fine but of not just say that and put and N/A behind Existin Buildings: and delete the rest of the text.
Kenneth Thompson Yes, tours are going on underground.
If you are closing the building during construction then this is fine but of it is going to be open then just add the N/A behind the title and delete the rest of the text.
DIVISION 1 – GENERAL REQUIREMENTS
3. Additional images as needed when questions or emergency situations occur. Submit within 24 hours.
C. Completion Images:
1. Document all completed work within scope of work.
2. Maintain organized index for photos with date, description, etc..
3. Additional images as needed when questions or emergency situations occur. Submit within 24 hours.
3.10 Fire and Life Safety:
A. As a minimum, conduct one weekly 15 minute "toolbox" safety meetings. These meetings shall be conducted by a foreman or supervisor and attended by all construction personnel at the worksite. Topics need to coincide with work scheduled for the following week. Document and submit meeting minutes to the CO and COR within one day after the meeting and document the meetings on the daily reports.
B. Comply with the requirements of NFPA 241 (Standard for Safeguarding Construction, Alteration, and Demolition Operations). Take all necessary precautions to prevent fire during construction. Provide adequate ventilation during use of volatile or noxious substances.
C. Store and handle hazardous materials in accordance with manufacturers and OSHA 29CFR1926 Subpart D requirements 1926 | Occupational Safety and Health Administration (osha.gov). Maintain readily available, on site, MSDS/Safety Data Sheets (SDS) for each chemical.
1. Immediately report all spills of hazardous materials to the CO, COR, and park.
2. Maintain a spill emergency response kit.
3. Train employees how to respond to a spill and use the emergency response kit.
ITEM 4 - COMMENCEMENT, PROSECUTION, AND COMPLETION
4.1 The Contractor shall commence work in accordance with the terms and conditions of the contract.
Contractor shall coordinate and incorporate long lead and delivery time items within the schedule.
ITEM 5 - EXAMINATION OF THE SITE
5.1 All bidders are urged to visit the job site and examine existing conditions before submitting bids.
Contractors will be accountable for understanding existing conditions. No cost changes for items viewable during site visit will be allowed.
ITEM 6 - ABBREVIATIONS
6.1 The list of abbreviations, standards and organizations which may be used in/referred within the Construction Specifications or Special Provisions, may be found linked from the listed page below. On the home page, follow the link under “Contracting and Procurement” labeled “NPS Reference Standards.” https://www.nps.gov/orgs/1671/do-business-with-us.htm
ITEM 7 - ACCIDENT PREVENTION
https://www.osha.gov/laws-regs/regulations/standardnumber/1926 https://www.osha.gov/laws-regs/regulations/standardnumber/1926 https://www.nps.gov/orgs/1671/do-business-with-us.htm
DIVISION 1 – GENERAL REQUIREMENTS
7.1 Description: The work of this section consists of establishing and implementing an effective accident prevention program (APP) and providing a safe environment for all personnel and visitors.
7.2 Submittals:
A. Accident Prevention (Safety) Plan (APP): Submit a site-specific accident prevention (safety) plan. The Plan shall be written to comply with OSHA and project requirements (a generic plan is not acceptable) including but not limited to the following:
1. Name and qualifications of responsible supervisor to carry out the program.
2. First aid and rescue procedures.
3. Training, both initial and continuing.
4. Outline of each phase of the work, the hazards associated with each major phase, and the methods proposed to provide for property protection and safety of the public, National Park Service personnel, and Contractor's employees. Identify the work included under each phase, with a Job Hazard Analysis (JHA)/Job Safety Analysis (JSA), etc. A sample JHA template may be provided upon request.
5. Planning for possible emergency situations, elevator failure, cave-ins, earthquake, explosions, fires, floods, power outages, slides, and windstorms. Such planning shall take into consideration the nature of construction, site conditions, and degree of exposure of persons and property.
6. Contractor to identify nearest location of medical facility for emergencies
7. Recognition that works will be performed in remote areas with limited communication or cell phone coverage if applicable.
8. Supplemental hazard specific plans may be required IAW 29 CFR 1926 or 1910.
B. Meeting and Inspection Reports: Safety Meetings: As a minimum, conduct 15 minute "toolbox" safety meetings. These meetings shall be conducted by a foreman and attended by all construction personnel at the worksite. Submit a report of safety meetings and inspections to CO and COR within one day after the meeting and document the meetings on the daily reports.
7.3 Qualification of Employees:
A. Ensure that employees are physically qualified to perform their assigned duties in a safe manner to include operators of vehicles and equipment. Provide operating instructions for all equipment.
B. Do not allow employees to work whose ability or alertness is impaired because of drugs, fatigue, illness, intoxication, or other conditions that may expose themselves or others to injury.
7.4 Accident Reporting: The Contractor shall report all accidents to the CO and COR as soon as safely possible and assist the CO and COR and other officials as required in the investigation of the accident.
7.5 First Aid Facilities: Provide access to facilities for the number of employees and appropriate to the hazards associated with the types of ongoing construction work at the site.
DIVISION 1 – GENERAL REQUIREMENTS
7.6 Emergency Instructions: Post telephone numbers and reporting instructions for ambulance, physician, hospital, fire department, and police in conspicuous locations at the work site.
7.7 Personal Protective Equipment (PPE): It is the Contractor's responsibility to require all those working on or visiting the site to wear necessary protective equipment at all times.
A. PPE must meet requirements of applicable ANSI standards. Selection shall conform to OSHA 29CFR 1926 Subpart E.
B. A hard hat use area shall be designated by the Contractor. The hard hat area shall be posted by the Contractor in a manner satisfactory to the Contracting Officer.
C. All PPE will be serviceable at all times. At a minimum, maintain 1 sets of PPE including hard hats and all other Accident Prevention Plan required equipment.
7.8 Hazardous Materials: It shall be the responsibility of all operators and contractors, functioning within the park to properly cleanup, mitigate and remediate if necessary, all unauthorized discharges of hazardous materials or non-hazardous chemical and biological products released from fleet and/or other support vehicles or stationary sources. Response shall be consistent with guidelines established by federal, state, and local regulations, and as outlined within the operator's Safety or Hazardous Materials Business Plan.
A. If a spill, leak, or other release occurs, the operator shall as soon as possible, without impeding cleanup, notify the National Park Service Emergency Dispatch.
ITEM 8 - PRECONSTRUCTION CONFERENCE
8.1 If the Contracting Officer decides to conduct a preconstruction conference, the successful offeror will be notified and will be required to attend. The Contracting Officer’s notification will include specific details regarding the date, time, and location of the conference, any need for attendance by subcontractors, and information regarding the items to be discussed. See Item 9.1C below.
ITEM 9 - SUBMITTALS
9.1 General Contracting Submittal Procedures:
A. General: Prepare and submit submittals required by individual Technical Specification Sections. Types of submittals are indicated in individual specific sections.
1. CM-16 Transmittal Form: All submittals shall be transmitted via electronic email using
National Park Service form CM-16 form. The form will be provided by the Contracting Officer. No action will be taken on a submittal item unless accompanied by the CM-16 transmittal form. Submit completed CM-16 forms to the CO and the COR
B. Submittal List: administrative required submittals are listed below in 9.1.C and does not include technical section submittal requirements included in each technical section.
C. Preconstruction Conference Submittal: Satisfactory evidence of liability insurance coverage and workman’s compensation, and any applicable bonds, must be submitted within 10
DIVISION 1 – GENERAL REQUIREMENTS
calendar days of Notice of Award. The following items shall be submitted a minimum of one week prior to the Preconstruction Conference. If all of these documents have not been received one week prior to the scheduled Pre-Construction Conference date, the conference will be cancelled, Notice to Proceed may not be issued, and the Contracting Officer will consider other contractual remedies. Work shall not commence until written Notice to Proceed has been issued. Contracting Officer will notify Contractor of tentative date for the Pre-Construction Conference:
1. Letter designating Project Superintendent.
2. Construction Schedule. (Must include shop drawings, procurement time including long lead time items, mobilization, trade work progression and completion at minimum.)
3. A comprehensive breakdown of the Schedule of Values.
4. Accident Prevention (Safety) Plan (see section 7 of this document).
5. A list of Subcontractors for this project.
6. Written statements from subcontractors certifying compliance with applicable labor
i. standard clauses (SF1413).
7. Quality Control Plan.
8. Indoor Air Quality (IAQ) Management Plan.
9. Historic Preservation Treatment Plan Submitted to COR NPS for review.
10. List of Required Construction Permits if required. Include the following information for each permit:
a. Name of Permit.
b. The Agency(ies) with Jurisdiction issuing the permit.
c. Information required from the Government to complete the permit application.
9.2 Project Shop Drawings, Product Data, and Samples: Contracting Officer will provide sample cover sheet and a list of required submittals is included in each technical specification or attached at the end of this document.
A. Shop Drawings: Indicate all coordinating materials and work impacting the installation coordination, connection details, anchorage requirements, hardware locations, and installation details and locations.
1. Submit Shop Drawings according to Part 9.1 of this section to include one digital file (.PDF or .TIF) and two full size hardcopy documents to COR.
B. Product Data: Provide component construction and specification data sheets, anchorage requirements and any other product specific data.
1. Submit Product Data according to Part 9.1 of this section to include one digital file (.PDF or .TIF) to COR.
C. Samples: Submit 2 color samples 4” x 6” minimum in size for all color and product selections.
Paint samples shall be actual paint finish drawdown for all project colors.
1. Submit Samples CM-16 Transmittal Form according to Part 9.1 of this section to include one digital file (.PDF or .TIF) and physical samples of actual material to COR.
DIVISION 1 – GENERAL REQUIREMENTS
D. For submittals specified above, forward submittals to Contracting Officer and COR at least 15 days before need for approval (depends on length of project).
E. After approving submittals, Contracting Officer and/or COR will return one copy to the Contractor. If submittals are not approved, Contracting Officer will return all copies to Contractor with reasons for rejection. Resubmit, identifying changes. Any work done before approval shall be at Contractor's own risk.
9.3 Approved Equals: If an item in this solicitation is identified as “brand name or equal” or lists more than 1 manufacturer, the description of the proposed item must reflect the characteristics and level of quality that will satisfy the Government’s needs as demonstrated by the salient physical, functional, or performance characteristics that “equal” products must meet and/or exceed that as specified in the solicitation or relevant specification.
A. For each item proposed as an “approved equal,” submit supporting data, including:
1. Drawings and samples as appropriate.
2. Comparison of the characteristics of the proposed item with that specified and with the salient characteristics provided.
3. Changes required in other elements of the work because of the substitution.
4. Name, address, and telephone number of vendor.
5. Manufacturer’s literature regarding installation, operation, and maintenance, including schematics for electrical and hydraulic systems, lubrication requirements, and parts lists.
Describe availability of maintenance service, and state source of replacement materials.
B. A request for approval constitutes a representation that Contractor:
1. Has investigated the proposed item and determined that it is equal or superior in all respects to that specified.
2. Will provide the same warranties for the proposed item as for the item specified.
3. Has determined that the proposed item is compatible with interfacing items.
4. Will coordinate the installation of an approved item and make all changes required in other elements of the work because of the substitution.
5. Waives all claims for additional expenses that may be incurred as a result of the substitution.
C. Approved Equals will be evaluated and approved/disapproved during the submittal process.
9.4 Schedule of Values: Submit the Schedule of Values a minimum of one week prior to the Preconstruction Conference for COR review. Schedule of Values shall include defined work line items with cost break downs including labor, material, and equipment for COR approval.
9.5 Progress Reporting: The initial Construction Schedule and Schedule of Values are required a minimum of one week prior to the Preconstruction Conference. After the Notice to Proceed is issued and after on-site work begins, progress will be documented via daily logs and by providing an updated Construction Schedule and Schedule of Values when requested, but minimally with each pay application. Submit digital copy electronically (PDF preferred) of all required documents.
DIVISION 1 – GENERAL REQUIREMENTS
Construction Schedules are normally in bar chart form and indicate estimated starting and completion dates for each part of the work. For a pay application to be reviewed and processed in a timely manner, the following information must either be submitted prior to or accompany submission of the pay application:
A. Daily/weekly progress reports during construction as part of the administration process.
B. Updated Schedule of Values: Breakdown each lump-sum item into component work activities used in the schedule, for which progress payments may be requested. The Schedule of Values will form the basis for payment. The work activities broken out within the schedule of values shall be integrated into and made a logical part of the construction baseline schedule submitted under this specification. The total costs for the component work activities shall equal the contract price for that lump-sum item. The Contracting Officer may request data to verify accuracy of dollar values. A sample Schedule of Values format may be provided upon request.
ITEM 10 – TEMPORARY SERVICES
10.1 It is the Contractor’s responsibility to provide temporary services, equipment, tools, and skilled labor as required for the chosen means and methods to perform the work in accomplishing this Contract.
ITEM 11 - PROJECT CLOSEOUT
11.1 Description: The work of this section consists of final cleanup, closeout submittals, final inspection procedures working toward Final Acceptance.
11.2 Cleaning: Remove all tools, equipment, surplus materials, and rubbish. Move attic stock to location coordinated with COR. At time of final inspection, project shall be thoroughly clean and ready for intended use. Inspector holds the right to reschedule if project is not ready for inspection.
11.3 Completion and Final Inspection: Contractor shall submit written certification of project completion and request a final inspection to the Contracting Officer and COR. The Contracting Officer or designee will make an inspection within 10 days of receipt of request or at a mutually agreeable time.
A. If the work is determined to be complete following the final inspection with minor comments, the COR will prepare and provide the Contractor a Punch List noting outstanding items to be addressed.
B. If the work is not determined to be complete following the final inspection, the Contracting Officer will notify Contractor in writing, stating reasons. Contractor, after completing the work according to the Contract Documents, shall resubmit completion and request a new final inspection. Re-inspection costs may be charged against the Contractor in accordance with the Inspection of Construction contract clause.
C. Contractor shall complete the Punch List within 30 calendar days, or a time directed by the
CO.
DIVISION 1 – GENERAL REQUIREMENTS
D. Once Contractor completes all items of work on the Punch List and all contractually required items are accepted, Contracting Officer will issue Letter of Final Acceptance of Work and request the final pay application.
E. If the Contractor fails to complete the work within the time frame, the Contracting Officer may correct the work with an appropriate reduction in contract price or charge for re-inspection costs in accordance with the Inspection of Construction contract clause.
F. Disposition of any permits and warranties required by the specifications in this section.
11.4 Final Acceptance of the Work: After all punch list deficiencies have been corrected, a Letter of Final Acceptance will be issued. A Release of Claims document must be executed and submitted to the Contracting Officer before final payment can occur.
11.5 Warranties
A. Construction…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .