Atch 1_Rqmt Doc_DRMS Circulators.pdf

PDF 612 KB Posted

Attached to
High Power RF Circulators Federal contract opportunity
Solicitation number
FA9101-21-Q-2007
Issued by
Department of the Air Force Materiel Command Test Center

View the file

Other files for this federal contract opportunity

Other files attached to High Power RF Circulators, newest first.
File Type Posted
Atch 2_FAR_DFARS_AFFARS Prov and Clauses.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Requirements Document

FOR

National Radar Cross Section Test Facility (NRTF)

Dynamic RCS Measurement System (DRMS)

RF Circulator(s)

26 Jan 21

TABLE OF CONTENTS

1. INTRODUCTION

2. DELIVERY

3. PROJECT SCHEDULE

4. TECHNCAL INTERCHANGE AND ACCEPTANCE

5. REQUIRED DOCUMENTS

6. CONTRACTOR CONTACT INFORMATION

1. INTRODUCTION

The US Air Force, National Radar Cross-Section Test Facility (NRTF) is pursuing a multi-phase development of an S-Ku band Tier IV Dynamic RCS Measurement System (DRMS) at White

Sands, NM to augment the current Tier III RAMS facility. The DRMS will use dedicated High

Power (HP) RF Circulators per radar band and per polarization. The Contractor’s shall meet the minimum requirements stated in the Requirements Document and appendices 1-4.

S-Ku Band DRMS Circulator Specifications TR#01-09

The Requirements Document and the associated technical appendices is to provide the requirements to define the HP RF Circulators necessary to meet DRMS requirements. The DRMS system will initially procure a total of 12 circulators, three per band with the option to purchase two additional spare Circulators (two per band) and replacement Circulators, as needed, up to a maximum of 20 total HP Circulators on this acquisition.

2. DELIVERY

Delivery requirements for the HP Circulators are as follows:

1. 12 HP Circulators: No later than Mar 31, 2022.

2. Option 1 (Date of award to 24 months), Eight (8) spare HP Circulators: Due no later than 12 months after exercise of the option.

3. PROJECT SCHEDULE

The Contractor shall provide a complete milestone schedule that denotes major activities, demonstrations and acceptance testing.

4. TECHNCAL INTERCHANGE AND ACCEPTANCE

The contractor shall conduct the following reviews:

Kick-off/ Technical Interchange Meeting (TIM)

Mid-Term Program Management and Progress Meeting

Acceptance Test (performed at Factory)

Assembly Drawings

Technical Theory, Operation and Maintenance Training and Manuals

These meeting shall be conducted in a format of the Contractor’s choosing and shall cover the overall technical approach, constraints, methods and techniques being examined, performance metrics and results.

5. REQUIRED DOCUMENTS

The Contractor shall provide performance to plan status reports and schedule updates to the AF

Project Manager per the frequency in Table 5-1. All documents are subject to Government acceptance and approval.

Acceptance testing will be performed at the vendor’s facility or factory. The Offeror shall notify the government representative 30 days prior to AT event to allow for government personnel or a government representative to be present.

Table 5.1 Reporting Requirements

6. CONTRACTOR CONTACT INFORMATION

Upon notice of award, the Contractor shall provide the Contracting Officer and the Government

Project Manager the names and contact information (address, phone number, and email) of a minimum of two (2) Contractor representatives, preferably the contracting agent and project leader.

Any changes in the contact information will immediately be updated by the Contractor as they occur during the duration of this contract and be provided to the Contracting Officer and the

Government Project Manager.

Document Format Frequency

Project Status

Report

MS Word document or email Quarterly

Milestone Schedule MS Project, Word, or Excel file

Updated Quarterly

AT Results MS Word 30 days post milestone

Assembly

Drawings

IGES, DXF, or DWG

Compatible

30 days post AT

Operations and

Maintenance

Manuals

Word or PDF 30 days post AT

Requirements: Specification Description Specification Compliance Pass/Fail

S-001 Frequency Range (GHz): 4-8 S-002 Peak Power (kW): 14 S-003 Average Power (kW): 0.85 S-004 Maximum PRF (kHz): 100 S-005 Duty Cycle (%): >=6 S-006 Pulse Width (µsec): >=12 S-007 Isolation (dB): >=15

S-008 VSWR: <=2.0:1

S-009 I/O Conn's: WRD-350

C - Band

S-001 Frequency Range (GHz): 2-4 S-002 Peak Power (kW): 14 S-003 Average Power (kW): 0.85 S-004 Maximum PRF (kHz): 100 S-005 Duty Cycle (%): >=6 S-006 Pulse Width (µsec): >=12 S-007 Isolation (dB): >=15

S-008 VSWR: <=2.0:1

S-009 I/O Conn's: WRD-200

S - Band

S-001 Frequency Range (GHz): 8-12 S-002 Peak Power (kW): 14 S-003 Average Power (kW): 0.85 S-004 Maximum PRF (kHz): 100 S-005 Duty Cycle (%): >=6 S-006 Pulse Width (µsec): >=12 S-007 Isolation (dB): >=15

S-008 VSWR: <=2.0:1

S-009 I/O Conn's: WR-90

X - Band

S-001 Frequency Range (GHz): 12-18 S-002 Peak Power (kW): 14 S-003 Average Power (kW): 0.85 S-004 Maximum PRF (kHz): 100 S-005 Duty Cycle (%): >=6 S-006 Pulse Width (µsec): >=12 S-007 Isolation (dB): >=15

S-008 VSWR: <=2.0:1

S-009 I/O Conn's: WR-62

Ku - Band

Atch 1.1, Appendices 1-4.pdf
S-Band
C-Band
X-Band
Ku-Band