Atch 1 - Repair Compressor 71 Rotor SOW.pdf

PDF 898 KB Posted

Attached to
C71 Rotor Refurbishment Federal contract opportunity
Solicitation number
FA9101-22-Q-0035
Issued by
Department of the Air Force Materiel Command Test Center

View the file

Other files for this federal contract opportunity

Other files attached to C71 Rotor Refurbishment, newest first.
File Type Posted
FA9101-22-Q-0035-C71 Rotor Refurb- Combined Synopsis.pdf PDF
Atch 2 - FAR_DFARS_AFFARS.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

15027-21-001A

IRA-5632

SOW NO. 15027-21-001A

7 May 2021

STATEMENT OF WORK

FOR

REPAIR COMPRESSOR 71 ROTOR

ARNOLD ENGINEERING DEVELOPMENT COMPLEX

ARNOLD AIR FORCE BASE, TENNESSEE 37389-9998

DISTRIBUTION STATEMENT A

Approved for Public Release

Distribution Unlimited

IRA‐5632

DISTRIBUTION STATEMENT A

Approved for Public Release: Distribution Unlimited

IRA-5532 Table of Contents-1

Table of Contents

1. SCOPE

1.1 Scope

1.2 Background

2. APPLICABLE DOCUMENTS

2.1 Government Documents

2.2 Non-Government Documents

3. REQUIREMENTS

3.1 General

3.2 Condition Assessment

3.3 Repair and Replacement Work

3.4 Factory Testing and Balancing

3.5 Acceptance Testing

3.6 Submittals

Appendix A – Submittal Procedure

Appendix B - Figures

Approved for Public Release: Distribution Unlimited

IRA-5532 Page -1

1. SCOPE

1.1 General:

A. Work consists of inspecting, rebuilding and testing a rotor for an Allis Chalmers V-303S compressor. The scope of work includes: 1) a full inspection upon receipt of the disassembled rotor, with a report listing replacement parts identified on the drawings, along with materials and fabrication plan, and all additional recommendations to restore the rotor to OEM operational condition; 2) Additional recommended work will be considered over and above work and may be authorized, upon approval by the Government; 3) Fabrication of known parts; and 4) Re-assembly, testing and balancing of the rotor, packaging and delivery back to Arnold

AFB, TN.

1.2 Background:

A. The following rotor history was pieced together from historical records.

Since the rotor was not tracked by serial number, some information may not be accurate. Manufactured in 1999 by AC Compressor, with design modified by AC from lock nuts to hold the seal sleeves in place to purely an interference fit. Installed in 2000. The rotor failed and was damaged in 2005 by shaft seal sleeves “walking” axially outward and impacting the shoulder seal. The rotor was disassembled and inspected 2006 and was placed in the warehouse 2010.

1.3 Compressor Nameplate Data:

Allis Chalmers Model V303S compressor with barrel casing

Serial Number 5114

3-wheel rotor, enclosed impellers backward bladed welded construction

Weight of rotor approx 496lb

12063 rpm, 2320 cfm design inlet volume

2.2 rated pressure ratio

Max Inlet Pressure – 865 psia, Max Discharge Pressure - 1600 psia

Max inlet temperature – 120F, Max discharge temperature - 350F

Approved for Public Release: Distribution Unlimited

IRA-5532 Page -2

1.4 Parts list (partial) - reference Allis Chalmers Drawing 16-532-270

Dwg Item number

Part

3) Impeller shaft Government furnished

4) Impellers - Qty 3 Government furnished

6) Shaft Sleeve – Qty 2 Government furnished

8) Balance Piston - integral to shaft Government furnished

10) Shoulder Sleeve Contractor to provide

11) Seal Sleeve – Qty 2 Government furnished

13) Locknut LH Contractor to provide

14) Locknut RH Contractor to provide

20) Locknut LH Government furnished

21) Locknut RH Government furnished

26) Thrust Collar Contractor to provide

27) Thrust Collar Locknut Contractor to provide

No coupling hubs or spool piece will be shipped with the rotor. The coupling will not be available for inspections, assembly or balancing with rotor.

Approved for Public Release: Distribution Unlimited

IRA-5532 Page -3

2. APPLICABLE DOCUMENTS

2.1 Government Documents:

2.1.1 Drawings

A. Allis Chalmers Drawings

1. Compressor Parts List 16-523-270 (obsolete, does not depict actual configuration).

2. Compressor Assembly Drawing 16-532-487 (obsolete, does not depict actual configuration).

3. Shaft Conformance 16-532-485-001.

4. Rotating Assembly Drawing 16-532-491-502.

2.2 Non-Government Documents:

2.2.1 American Petroleum Institute (API):

A. API Std 617-14 Axial and Centrifugal Compressors and Expander-compressors.

B. API Std 687-15 Rotor Repair.

3. REQUIREMENTS

3.2 General:

3.2.1 The Government will ship the disassembled rotor to the Contractor’s facility and the Contractor shall be responsible for return transportation of the rotor as a complete assembly.

3.2.2 The Contractor shall be responsible for all inter-facility transport needed to complete machining, assembly, balancing or any other provisions in this SOW.

3.2.3 The Government reserves the right to witness all factory testing, visual inspections, and balancing. The Contractor shall notify the Government a minimum of five working days prior to any factory testing, inspections or balancing.

3.2.4 Work shall be done in accordance to API Std 687. API Std 617 will be the reference for any issues outside the scope of API Std 687. Exceptions to API Std 687 and/or this SOW shall be submitted and approved by the Government before repair.

3.2.5 Drawings have been provided for reference only. Known modifications to C71 that are not identified on the Allis Chalmers drawings are as follows:

Approved for Public Release: Distribution Unlimited

IRA-5532 Page -4

A. Item (12) shaft labyrinth seal has been modified from carbon insert cone to bronze labyrinth with teeth on stationary and smooth sleeve on rotating.

B. Item (19) shoulder seal has been modified from KH carbon rider to aluminum labyrinth with teeth on stationary and smooth shaft on rotating.

C. Item (43) 4 pad tilting bearing has been changed out to a KMC flexure pivot.

D. Item (38) Waldron gear coupling has been changed out to a Bendix 67E410-1143.

E. Item (25) Kingsbury JHN-5 has been modified to a JHJ-5.

3.3 Condition Assessment:

3.3.1 Upon arrival to the Contractor’s facility, the rotor parts shall be inspected and documented in accordance with API Std 687. All inspection results shall be recorded and submitted to the Government. The tests shall include, but are not limited to, the following:

A. Receiving inspection.

B. Phase I inspection in accordance with API Std 687 and applicable to a disassembled rotor.

C. Phase II inspection in accordance with API Std 687.

3.3.2 Submit a condition assessment report. The report shall include:

A. Findings of the inspections. Document with photographs and test results.

B. An itemized list and fabrication plan for parts identified on the drawings and herein. Include the proposed materials, certification/standard and datasheets for all parts to demonstrate they will meet the operational conditions provided in the nameplate data.

C. Over and Above Work: Other recommendations for repairs to restore the rotor to OEM operational condition. Include an itemized list of recommended repairs and costs. Do not proceed with work without Government approval.

3.3.3 Approximate proximity probe location is included in Appendix A, Fig 1. Probe area shall be protected from damage during rotor repair and reassembly.

Provide plan for achieving required surface finish and combined electrical and mechanical runouts over enough journal area to account for location uncertainty.

Approved for Public Release: Distribution Unlimited

IRA-5532 Page -5

3.4 Repair and Replacement Work:

3.4.1 Prior to fabrication of all components, submit material selection and material certification demonstrating that material will meet the operational conditions provided in the nameplate data.

3.4.2 Design, manufacture and install new threaded retaining rings to hold the seal sleeves and rotor components in place. (Parts 13 and 14). Submit design and drawings to Government for approval prior to manufacturing. Manufacture of parts to size and tolerance done in accordance to rotor service, supplied assembly drawings where applicable, API 687 and industry best practices.

3.4.3 Design, manufacture and install Drawing Item 26) - thrust collar and 27) thrust collar locknut. Submit design and drawings to Government for approval prior to manufacturing. Thrust collar runout and surface finish shall be in accordance with API 687. Manufacture of parts to size and tolerance done in accordance to rotor service, supplied assembly drawings where applicable, API 687 and industry best practices.

3.4.4 Design, manufacture and install Drawing Item 10) - shoulder sleeve. Shoulder sleeve shall be of the “flared inlet OD” design as shown in rotor drawing 16-532- 491-502. Submit design and drawing to Government for approval prior to manufacturing. Manufacture of parts to size and tolerance done in accordance to rotor service, supplied assembly drawings where applicable, API Std 687 and industry best practices.

3.4.5 Over and Above Work: After approval to proceed from the Government, perform repairs identified in the Inspection Report.

3.5 Final Assembly and Balancing:

3.5.1 Assemble all rotor components.

3.5.2 Perform component and staged low speed balance per API Std 687 and Drawing 16-532-491, Sht 1. Perform residual unbalance check (sensitivity check) in accordance with API 687 at the addition of the first rotor component and before the total rotor is removed from balance machine. Submit results to Government for approval.

3.5.3 Perform final runout checks and record of rotor, thrust collar, journals and proximity probe locations.

3.5.4 Include dimensional conformance and record of shaft and rotating assembly.

3.5.5 Perform at speed balance using mounted radial proximity probes 2 per bearing 90 deg apart in addition to velocity sensors. Balance overall values to .75 mils pk-pk at running speed, 1.5 mils pk-pk thru transients and .039 in/sec on bearing cap. Goal is overall vibs less than one mil at running speed installed in drive at

Approved for Public Release: Distribution Unlimited

IRA-5532 Page -6

AEDC. Submit results to Government for approval. Appendix B, Figure 2 shows typical vibration levels of operating rotor.

A. Record velocity and proximity probe submittal data consisting of, but not limited to:

1. 1X filtered runout/slow roll vibration values and phase

2. Runup/rundown bode’ of 1X filtered vibration data

3. Operating speed 1X filtered vibration levels and phase, initial and final balance

4. Balance weight additions and subtraction with location

5. Overall values at running speed and frequency characteristics of overall values

6. Comparison data between soft and stiff bearing supports

3.5.6 Perform and record overspeed test. Verify no change in final balance.

3.6 Packaging, Storage and Delivery:

3.6.1 The Contractor shall return the rotor as a complete assembly. Prepare rotor assembly for long term storage at Arnold AFB, TN.

3.6.2 Contractor shall crate rotor assembly for shipment and provide all supports, cribbing, tie downs, and weather protection to ensure safe transportation of the rotor. Prepare rotor assembly for long term storage; implementing industry standards for preservatives / anti-rust coating for metallic components in accordance with API Std 687, crate rotor assembly for safe shipment, and storage at AEDC.

3.6.3 The Contractor shall ship the assembly to Arnold AFB, TN and the Government will load and unload the rotor from the Contractor’s vehicle.

3.7 Acceptance Testing:

3.7.1 Upon delivery of the rotor back to Arnold AFB, TN, the Government will perform dimensional and runout checks. All values shall be comparable to or better than the OEM rotor drawings and inspection results, taking into account deviations due to temperature. The Government has the option to witness all acceptance testing.

3.8 Submittals: Provide all submittals in accordance with Appendix A and Table I below.

3.8.1 Submit as-built drawing of updated or addendum to 16-532-491-502 rotor drawing showing addition of threaded retaining rings for seal sleeves and any other configuration changes made under this repair. Provide drawing in digital (AutoCAD 2015 or earlier version and .pdf) and hard copy format.

3.8.2 Warranty:

Approved for Public Release: Distribution Unlimited

IRA-5532 Page -7

A. The Contractor shall furnish a two-year warranty on all materials and workmanship.

B. Warranty shall include transportation to and from the Contractor’s repair shop if warranty repairs cannot be accomplished in the field.

C. The warranty period shall begin on the date of the final acceptance of the rotor by the Government, which shall be the date the rotor passes the acceptance tests as described in the Acceptance Testing section of this document.

3.8.3 Required submittal summary table:

Table I. Required submittal.

No. Section Reference Submittal Description Due

3.3.1. A Receiving Inspection 15 working days after test

3.3.1. B Phase I Test Results 15 working days after test

3.3.1. C Phase II Test Results 15 working days after test

3.3.2 Condition Assessment Report 15 working days after

testing and inspection

3.3.3 Prox Probe Area Finishing Plan 15 working days after

testing and inspection

3.4.1 Material Selection and

Certification

Before parts or modifications are made

3.4.2 Threaded Retaining Rings, Before parts or

modifications are made

3.4.3 Thrust Collar and Thrust Nut Before parts or

modifications are made

3.4.4 Shoulder Sleeve Design

Proposal.

Before parts or modifications are made

3.4.5 Over and above work:

Inspection Report

Before parts or modifications made.

Approved for Public Release: Distribution Unlimited

IRA-5532 Page -8

No. Section Reference Submittal Description Due

3.5.2 Low Speed Balance Results

and Residual Imbalance Checks

14 days before rotor is to be high speed balanced

3.5.3 Final Runouts 14 days before rotor is to be

high speed balanced

3.5.4 Dimensional Conformance

Results

14 days before rotor is to be returned to AEDC

3.5.5 At Speed Balance Results 14 days before rotor is

returned to AEDC

3.5.6 Overspeed Results 14 days before rotor is

returned to AEDC

3.8.1 As-built drawings. 14 days before rotor is

returned to AEDC

3.8.2 Warranty Date of final acceptance

Appendix A para 1.2B

Summarized submittal listing with delivery dates

14 days after contract award

Approved for Public Release: Distribution Unlimited

IRA-5532 Appendix A -1

APPENDIX A

SUBMITTAL PROCEDURE

PART 1 GENERAL

1.1 DESCRIPTION OF REQUIREMENTS. This section specifies procedural requirements for non-administrative submittals, including but not limited to shop drawings, product data, manufacturer’s certificate, design data, calculations, and verifications, manufacturer’s instructions, manufacturer’s field service reports, samples, operation and maintenance manuals, and other miscellaneous work-related submittals. These submittals are required to amplify, expand, and coordinate other information contained in the contract. This section describes the type and content of submittals that may be required for this work. The required submittals are included in the Statement of Work.

Non-work-related submittals are addressed elsewhere in the contract rather than in the specification and may include items such as: contract progress schedule, permits, payment applications, performance and payment bonds, insurance certificates, and progress reports.

The Contracting Officer may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective sections of the Statement of Work.

1.2 SUBMITTAL PROCEDURE

A. Definition: For the purposes of this section, the term “Contractor” denotes the prime Contractor.

B. Listing: At the end of this section is a summarized listing of item submittals requiring approval for the work. The listing is included for the convenience of users of the contract documents. The listing may not be all inclusive and additional item submittals may be required. Within 14 calendar days after receiving contract award, Contractor shall submit a copy of the summarized submittal listing with calendar dates assigned to each item submittal indicating when submittal will be received by the Government. If contract requires a pre-construction conference, Contractor may submit completed submittal listing at the conference.

C. Risk: Do not proceed with the part of the work covered by an item submittal including purchasing, fabricating, and delivering until approval is received.

Machinery, equipment, material, and articles that do not have the required approval shall be installed or used at the risk of subsequent rejection. Any fabrication or other work performed in advance of the receipt of accepted item submittals and approvals shall be entirely at the Contractor’s risk and expense.

Approved for Public Release: Distribution Unlimited

IRA-5532 Appendix A -2

D. Transmittal Timing: Coordinate the preparation and processing of item submittals with the performance of the work. Prepare and transmit each item submittal to the Contracting Officer sufficiently in advance of the performance of related work and other applicable activities. Transmit related item submittals for the same unit of work so that processing will not be delayed by the Government's need to review submittals concurrently for coordination. No delay damages or time extensions will be allowed for time lost in late submittals.

E. Content: Each submittal shall be complete and in sufficient detail to allow ready determination of compliance with contract requirements. All submittals which are generic and list more information than is specifically required shall be marked to identify required information. Complete a material approval submittal and attach as cover sheet for each submittal.

Contractor may include multiple item numbers on a material approval submittal.

F. Language: All item submittals shall be written in English, including documents, notes on drawings, sketches, and/or samples, calculations, manuals, and all other instances of written text and communication.

G. Units: All item submittals shall be marked or show dimensions and values in the same units as specified in the contract documents.

H. Review Time: Allow sufficient time so that contract performance will not be delayed as a result of the time required to properly process submittals, including time for re-submittals, if necessary. Allow 14 calendar days for initial Government processing of each submittal. No extension of time will be authorized because of the Contractor's failure to transmit submittals to the Government sufficiently in advance of the work.

I. Contractor Certification: All submittals shall be carefully reviewed by an authorized representative of the Contractor prior to submission to the Government. Each submittal shall be dated, signed, and certified by the Contractor as being correct and in strict conformance with the contract documents. No consideration for review by the Government of any Contractor’s submittal will be made for any items which have not been so certified by the Contractor. All noncertified submittals will be returned to the Contractor without action taken by the Government, and any delays caused thereby shall be the total responsibility of the Contractor.

J. Deviations: Should any item submittals required by the contract documents show deviations from the contract requirement, the Contractor shall make specific mention of such deviations in the letter of transmittal, including stating cost effects, and product and system limitations which may adversely affect the work, in order that if acceptable, suitable action may be taken for proper adjustment of the contract; otherwise the Contractor will not be relieved of the responsibility for executing the work in accordance

Approved for Public Release: Distribution Unlimited

IRA-5532 Appendix A -3 with the contract documents and the approved submittals. Contractor shall clearly mark the proposed variation in all documentation and specifically point out deviations from contract requirements in transmittal letters. Failure to point out deviations may result in the Government requiring rejection and removal of such work at no additional cost to the Government. Deviations from contract requirements require Government approval and will only be considered when advantageous to the Government. When proposing deviations, deliver written request to the Contracting Officer, with documentation of the nature and features of the deviation and why the deviation is desirable and beneficial to the Government. If lower cost is a benefit, include an estimate of the cost savings. In addition to documentation required for deviation, include the submittal information required for the item. Allow an additional 14 calendar days beyond normal submittal review period for consideration by the Government of submittals with deviations.

K. Approved Submittals: The part of the work covered by the approved item submittal may proceed provided it complies with the requirements of the contract documents. Final acceptance will depend upon that compliance.

The term “Approved” shall only indicate that there is no exception taken to the submittal. Approval of the item submittal shall not be construed as a complete check, and indicates only that the general method or other information appears to meet the contract requirements. Approval does not relieve the Contractor of the responsibility for any error which may exist.

After item submittals have been approved by the Contracting Officer, no resubmittal for the purpose of substituting materials or equipment, or changes to any other information will be considered unless accompanied by an explanation of why a substitution or change is necessary.

L. Disapproved Submittals: Contractor shall correct disapproved item submittals and resubmit for approval within timeframe noted. If no date is given, Contractor shall submit corrected submittal within 14 calendar days.

If the Contractor considers any correction or notation on the returned submittal to constitute a change to the Contract Drawings, Statement of Work the Contractor shall notify the Contracting Officer.

M. Responsibility: The Government’s review of Contractor submittals shall not relieve the Contractor of the entire responsibility for the correctness of details and dimensions and conformance to the specifications. The Contractor shall assume all responsibility and risk for any mistakes and/or costs due to any errors in submittals.

N. Inconsistencies: If a conflict or inconsistency arises between an approved item submittal and the contract documents, the contract documents shall govern.

1.3 SPECIFIC SUBMITTAL DESCRIPTIONS AND REQUIREMENTS: Submittal requirements for individual units of work are specified in the applicable

Approved for Public Release: Distribution Unlimited

IRA-5532 Appendix A -4 specification section or Statement of Work (SOW). Except as otherwise indicated in the individual specification sections or SOW, comply with the following requirements for each type of submittal.

A. Shop Drawings: These are technical drawings and data specially prepared for this contract including fabrication and installation drawings, setting and seaming diagrams, and coordination drawings (for use on-site). Shop drawings include drawings, diagrams and schedules specifically prepared to illustrate some portion of the work, diagrams and instructions from a manufacturer or fabricator for use in producing the product and as aids to the Contractor for integrating the product or system into the project, or drawings prepared by or for the Contractor to show how multiple systems and interdisciplinary work will be coordinated. Information required on shop drawings includes dimensions, identification of specific products and materials which are included in the work, compliance with specified standards, and notations of coordination requirements with other work.

Provide special notations of dimensions that have been established by field measurements. Highlight, encircle, or otherwise indicate deviations from the contract documents on the shop drawings. Furnish one hard copy and one electronic copy in AutoCAD 2007 through 2015 drawing file format (.dwg).

The only permissible text font is ROMANS. Custom fonts and shapes are prohibited. The minimum allowable font size shall be 0.125-inch. The maximum allowable font size shall be 0.25-inch.

B. Product Data: This data includes standard printed information on manufactured products that has not been specially prepared for this contract, including manufacturers' product specifications illustrating size, physical appearance and other characteristics of materials, installation instructions, standard color charts, catalog cuts, illustrations, schedules, standard wiring diagrams, standard product operating and maintenance manuals, and samples of warranty language when the contract requires extended product warranties. General information required specifically as product data includes manufacturers' standard printed recommendations for application and use, compliance with recognized standards of trade associations and testing agencies, the application of their labels and seals (if any), special notation of dimensions which have been verified by way of field measurement, and special coordination requirements for interfacing the material, product, or system with other work. Furnish three hard copies and one electronic copy.

C. Samples: These are physical examples of work, including, swatches showing color, texture, and pattern, color-range sets, and units of work to be used for independent inspection and testing. Samples include fabricated or unfabricated physical examples of materials, equipment or workmanship that illustrate functional and aesthetic characteristics of a material or product and establish standards by which the work can be judged, color samples from the manufacturer’s standard line (or custom color samples if specified)

Approved for Public Release: Distribution Unlimited

IRA-5532 Appendix A -5 to be used in selecting or approving colors for the project, and field samples and mock-ups constructed on the project site to establish standards by which the ensuring work can be judged. This includes assemblies or portions of assemblies which are to be incorporated into the project and those which will be removed at conclusion of the work. Submit samples for the Contracting Officer's visual review of general kind, color, pattern, and texture for a final check of the coordination of these characteristics with other related elements of the work and for quality control comparison of these characteristics between the final sample submittal and the actual work as it is delivered and installed. Submit one each.

D. Design Data: Design data includes design calculations, mix designs, analyses or other data pertaining to a part of work. Refer to individual sections of the Statement of Work for required quantities, formats, and signatures or certifications required. Furnish three hard copies and one electronic copy.

E. Test Plans and Reports: Test plans shall include planned testing, including a description of the test, equipment and supplies needed, and step-by-step notation of test activities and tasks. Test reports include reports signed by an authorized official of a testing laboratory that a material, product or system identical to the material, product or system to be provided has been tested in accordance with the specified requirements. Testing shall have been within three years of date of contract award for the project. Reports also include findings of tests required to be performed by the Contractor on an actual portion of the work or prototype prepared for the project before shipment to the job site, findings of tests made at the job site or on a sample taken from the job site, investigation reports, daily logs and checklists, and final acceptance test and operational test procedures. Furnish three hard copies and one electronic copy of each such report required.

F. Certificates: These include statements printed on the manufacturer’s letterhead and signed by the responsible officials of the manufacturer of a product, system or material attesting that the product, system or material meets specification requirements. Certificates include documentation required of the Contractor, or of a manufacturer, supplier, installer or subcontractor through the Contractor, to further demonstrate the quality of orderly progressions of a portion of the work by documenting procedures, acceptability of methods or personnel qualifications. Examples include confined space entry permits, and text of posted operating instructions.

Certificates shall be dated after award of the project contract and clearly name the project. Furnish three hard copies and one electronic copy of each certificate required.

G. Manufacturer’s Instructions: Preprinted material describing installation of a product, system or material, including special notices and Material Safety Data sheets concerning impedances, hazards and safety precautions.

Furnish three hard copies and one electronic copy.

Approved for Public Release: Distribution Unlimited

IRA-5532 Appendix A -6

H. Manufacturer’s Field Reports: Documentation of the testing and verification actions taken by a manufacturer’s representative at the job site, in the vicinity of the job site, or on a sample taken from the job site, on a portion of the work, during or after installation, to confirm compliance with the manufacturer’s standards or instructions. The documentation shall be signed by an authorized official of a testing laboratory or agency and shall state the test results, and indicate whether the material, product, or system has passed or failed the test. Furnish three hard copies and one electronic copy.

I. Operation and Maintenance Data: Data furnished by the manufacturer, or the system provider, to the equipment operating and maintenance personnel, including manufacturer’s help and product line documentation necessary to maintain and install the equipment, and needed by operating and maintenance personnel for the safe and efficient operation, maintenance, and repair of the item. The data is intended to be incorporated in an operations and maintenance manual or control system. Furnish two hard copies and one electronic copy.

J. Final Design Drawings and Documentation: Final design documentation including drawings, specifications, estimates, and other required deliverables. Electronic documentation submitted shall include every associated component file of drawings and other documentation, including raster images, jpeg, tiff, Excel, and any related items required to view, modify, or manipulate the electronic files. Furnish a CD-ROM of all final design documentation, and drawings in AutoCAD 2007 through 2015 drawing file format (.dwg), to the Contracting Officer for approval prior to applying for final payment. The drawings shall be fully editable using AutoCAD software. In addition, drawings shall be delivered to clearly show the location and arrangement of all materials and equipment. The only permissible text font is ROMANS. Custom fonts and shape files are prohibited. The minimum allowable font size shall be 0.125-inch. The maximum allowable font size shall be 0.25-inch.

K. Record (As-Built) Drawings: Record drawings showing final configuration of work accomplished. Show all changes, additions, and deviations from the original contract drawings and documentation. If no changes occur, furnish certification to that effect. Drawings shall be redlined electronic drawings, unless waived by the Government, and shall accurately show as-built conditions during the progress of the job. Furnish drawings on a CD-ROM, in AutoCAD 2007 through 2015 format, including every associated component file of the drawings, including raster images, jpeg, tiff, Excel, and any related items required to view, modify, or manipulate the electronic files.

Submit to the Contracting Officer for approval prior to applying for final payment.

L. Miscellaneous Submittals: These are work-related, non-administrative submittals that do not fit in the previous categories, including the following:

Approved for Public Release: Distribution Unlimited

IRA-5532 Appendix A -7

1. Maintenance agreements. Furnish one hard copy and one electronic copy.

2. Survey data and reports. Furnish one hard copy and one electronic copy.

3. Project photographs. Furnish both hard copies and digital files.

4. Keys and other security protection devices.

5. Maintenance tools, spare parts, and overrun or maintenance stock.

Refer to individual sections of the specification for required quantities of spare parts, extra and overrun stock, maintenance tools and devices, keys, and similar physical units to be submitted.

6. Qualification certificates. Furnish one hard copy and one electronic copy.

7. Employee training certificates and documentation showing successful completion of training.

8. Documentation of percentage of recovered material content used during contract.

9. Contractor safety and work plans and schedules.

10. Warranties.

END OF APPENDIX A

Approved for Public Release: Distribution Unlimited

IRA-5532 Appendix B-1

APPENDIX B

FIGURES

Figure 1 – Approximate Proximity Probe Locations

Approved for Public Release: Distribution Unlimited

IRA-5532 Appendix B-2

Figure 2 – Vibration Levels of Operating Rotor

END OF STATEMENT OF WORK