APSP LRU PWS 12 April 2022.pdf

PDF 689 KB Posted

Attached to
F-16 APSP LRU Repair Federal contract opportunity
Solicitation number
FA8251-22-R-0014
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

View the file

Other files for this federal contract opportunity

Other files attached to F-16 APSP LRU Repair, newest first.
File Type Posted
FA825123R0014_______0004.pdf PDF
FA825122R0014_______0003.pdf PDF
FA825122R0014_____0002.pdf PDF
FA825122R0014____0001.pdf PDF
APSP LRU PWS 1 SEP 2022.pdf PDF
Repair Data List.pdf PDF
Transportation.pdf PDF
WageDetermination.pdf PDF
Special Packaging Instructions.pdf PDF
FA825122R0014 APSP Repair.pdf PDF
CombinedCDRLsA001toA005 B001toB002.pdf PDF
Packaging.pdf PDF
IUID Marking Info.pdf PDF
RQR.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

416th Supply Chain Management Squadron

DEPARTMENT OF THE AIR FORCE

Ogden Air Logistics Center (OO-ALC) AFMC

Hill AFB, UT 84056-5609

PERFORMANCE WORK STATEMENT (PWS)

PURCHASE REQUEST NO.

FD2020-21-00319

ESSENTIAL REPAIR FOR:

Advanced Programmable Signal Processor

NSN: 1270-01-396-3088WF, PN 783R300G01

Dated: 12April 2022

EQUIPMENT TYPE: F16 C/D

PWS for the Essential Repair of Advanced Programmable Signal Processor

PR: FD2020-2100319-00 2 V1, 11 April 2022

Contents

1.0 SCOPE

1.1 Work Compliance

1.2 Maintenance

1.3 Special Testing

1.4 Function

1.5 Rework Testing

1.6 Modification and Reliability

1.7 Survivability

1.8 Non-Essential Service

1.9 Repair Turn-around Time (TAT)

1.10 Clarification Statement

2.0 DEFINITIONS AND ACRONYMS

3.0 REPORTING AND DATAREQUIREMENTS

3.1 Commercial Asset Visibility Air Force (CAV AF) End Item Report

3.2 Contract Depot Maintenance (CDM) Production Report

3.3 Annual Government Property Physical Inventory Report

3.4 Maintenance Data Collection Reporting

3.5 IUID Marking Activity/Verification Report

3.6 Contractor Manpower Equivalent Reporting

3.7 Safety and Health

3.8 Counterfeit Protection Program

4.0 SECURITY AND FOREIGNDISCLOSURE

4.1 DD Form 254

4.2 Destructive Notice

4.3 Per Export Control Limitations

4.4 Uses and Safeguarding of Information

5.0 GOVERNMENTPROPERTY

5.1 Government Furnished Property

5.2 Government Furnished Equipment

5.3 Government Furnished Material

6.0 COUNTERFEIT PREVENTION PLAN (CPP) REQUIREMENT

6.1 Counterfeit Prevention Plan…………………………………………………………………12

6.2 At a minimum………………………………………………………………………………..12

6.3 Applicability………………………………………………………………………………….12

6.4 Definitions……………………………………………………………………………………12

6.5 Parts Availability and Use of Parts Brokers……………………………………………….12

6.6 Procurement Policies………………………………………………………………………...…..13

6.7 Risk Assessment……………………………………………………………………………...…..13

6.8 Detection and Avoidance Responsibilities…………………………………………………...…13

6.9 Testing and Verification……………………………………………………………………....…13

6.10 Configuration Identification and Traceability……………………………………………

6.11 Counterfeit Notification and Reporting……………………………………………………

6.12 Counterfeit Prevention Training……………………………………………………………...13

PR: FD2020-2100319-00 3 V1, 11 April 2022

7.0 ITEM UNIQUE IDENTIFICATION (IUID) MARKING (IAW AFMCI 20-104Para. 3.12)

8.0 GENERAL WORKREQUIREMENTS

8.1 Standard Repair

8.2 Out of Scope (OOS)

8.3 Configuration

8.4 Technical Data

8.5 Cleaning, Corrosion Control and Treatment

8.6 Electrostatic Discharge (ESD)

8.7 Quality

8.8 Receiving Inspection

8.9 Handling

8.10 Shipping

8.11 Non-Destructive Inspection (NDI)

8.12 Warranty of Work

8.13 Condemnation and Disposition

8.14 Product Quality Discrepancy Report (PQDR)

8.15 Environmental Stress Screening (ESS) Requirements

8.16 Diminishing Manufacturing Sources and Material Shortages (DMSMS) Program/Electronic Parts

Screening

9.0 SPECIFIC WORKREQUIREMENTS

9.1 Inspection

9.2 Disassembly

9.3 Repair

9.4 Spares and Repair Parts

9.5 Update

9.6 Correction of Deficiency (COD) and Engineering Change Proposals (ECP)

9.7 Finishing

9.8 Marking

9.9 Can Not Duplicate (CND)/ Retest Okay (RTOK) Conditions

9.10 Acceptance Testing

10.0 SERVICE SUMMARY

10.1 WAWF/Material Inspection and Receiving Reports

10.2 Defense Repair Information Logistics System(DRILS)

10.3 Product Quality Discrepancy Report(PQDR)

10.4 CAV AF

11.1 Applicable Government Documents

NON-GOVERNMENT PUBLICATIONS:

PR: FD2020-2100319-00 4 V1, 11 April 2022

1.0 SCOPE.

This Performance Work Statement (PWS) establishes the minimum work requirements for essential repair of the following F-16 C/D recoverable end item; Advanced Programmable Signal Processor (APSP), National

Stock Numbers (NSN) and Part Numbers are listed in Section 5, to a serviceable “A” condition. The repair processes used by the Contractor shall bring service life back to the reconditioned end items that would resemble the originally manufactured item. The end items shall be restored to a nearly new condition, but not necessarily cosmetically new in a facility owned and/or operated by the Contractor.

1.1 Work Compliance.

All work performed by the Contractor shall comply, In-Accordance-With (IAW), with the Instructions and Technical Data requirements contained in this PWS and Section 11. Additional work discovered after award of contract that is not covered by the contract will be negotiated and approved by the

Contracting Officer (CO) through the Administrative Contracting Officer (ACO) prior to work being started.

1.2 Maintenance.

It is the intent of the Government under this contract that the Contractor will induct funded end item(s)

(for the purpose of this contract, end item is defined as the NSN listed under each Contract Line Item

Number (CLIN), and repair that end item and subcomponents. Items are to be repaired to a serviceable operating condition. Increases or decreases in work, which impact the maintenance facility or the

Government, will be sent through the ACO/CO for negotiation and approval, prior to beginning work.

1.3 Special Testing.

The Contractor shall not design, develop or manufacture tooling or test equipment of a specialized nature as a requirement under this work specification without the express direction of the CO through the ACO.

1.4 Function.

The functional capabilities for which the end item was designed shall not be changed, modified, or altered unless such changes are directed by this work specification and authorized by the OO-ALC

Program Manager.

1.5 Rework Testing.

If an item is returned for rework, as a result of a Product Quality Discrepancy Report (PQDR) more than one time in any 12 month period, then a limited Environmental Stress Screening (ESS) will be required before returning the item in serviceable condition. The Contractor will coordinate actions with the

Government engineering authority should this occur. Any tests that will be excluded as part of this effort will have prior written approval from the engineering authority through the appropriate Government

Contracting Official.

PR: FD2020-2100319-00 5 V1, 11 April 2022

1.6 Modification and Reliability.

The Contractor shall expend no effort under this PWS for additional engineering design or development of the items or components; however, suggested reliability or maintainability improvements are welcomed.

1.7 Survivability.

The Contractor will return the recoverable end items to the original specifications of the item, except as noted in the applicable engineering change orders. The Contractor shall perform an acceptance test and checkout of each completed end item to assure serviceability prior to presentation to the Government.

1.8 Non-Essential Service.

This effort is considered a Non-Mission Essential Service. According to Department of Defense

Instruction (DODI) 1100.22, it is determined that the Contractor will not be required to provide services during crisis unless otherwise directed by an authorized Government representative. The Contractor will contact the CO for instructions concerning services if a crisis situation occurs.

1.9 Repair Turn-around Time (TAT)

The repair TAT for this asset is 60 days After Receipt of Asset. This TAT is controlled by a stop clock. The stop clock is invoked when any of the following occur:

a. Awaiting Over and Above work funding.

b. Work stoppage waiting for customer direction for a proposed condemned asset. Stoppage begins at contractor submittal of notification and terminates upon receipt of requested direction.

c. Non-availability of serviceable GFE.

d. Non-availability of Government Quality Assurance personnel.

e. Non-availability of Government source provided parts (MILSTRIP) which authorized.

f. DMS material.

g. Awaiting material.

1.10 Clarification Statement.

NSN Stock classes change frequently. The item itself does not change. When the stock class changes but the NIIN does not change, treat the CLIN as the same item.

PR: FD2020-2100319-00 6 V1, 11 April 2022

2.0 DEFINITIONS AND ACRONYMS.

ACRONYM OR

PHRASE

DEFINITION

AT Acceptance Test: The functional and operational tests performed on the end- item to ensure that all performance standards are satisfactorily met to restore the end-item to a serviceable condition.

ACO Administrative Contracting Officer

BER Beyond Economical Repair

CALIBRATION A comparison between two instruments, one of which is a standard of higher accuracy, to detect and correlate or adjust any variation in the accuracy of the instrument or equipment item being compared or tested.

CAV AF Commercial Asset Visibility Air Force. This is the end item production reporting system for Contractor repairs and GFM transactions.

CCA Circuit Card Assembly

CDRL Contract Data Requirements List

CND Can Not Duplicate

CO Contracting Officer

CONDEMN A normally repaired item which, due to the extent of required work process, has been deemed uneconomical to make serviceable.

COMPONENT Individually replaceable part, lowest level of repair.

DD FORM

13481A

Department of Defense (DoD) form required to be created and attached on all

Government Property being shipped from the Contractor’s facility IAW DLM 4000.251

(ref most current amendment or replacement).

DISASSEMBLE To remove the components that make up the end-item in accordance with disassembly instructions IAW OEM Technical Data.

DoD Department of Defense

DRILS Defense Repair Information Logistics System

ESS Environmental Stress Screening

GFE Government Furnished Equipment

GFP Government Furnished Property

GFM Government Furnished Material

IAW In Accordance With

IUID Item Unique Identification – The program was an initiative incorporated by the

Government to improve the tracking of assets during transit, operation, storage, and repair. This program was implemented to provide an easier means for the Contractor and DoD to track unique assets through electronically scanning the asset tag which identifies the item.

MICAP Mission Capability

NSN National Stock Number

OEM Original Equipment Manufacturer- SCI

PQDR Product Quality Discrepancy Report

PR: FD2020-2100319-00 7 V1, 11 April 2022

PMS Production Management Specialist: That individual who develops and prepares the

Contract Maintenance Purchase Request (PR) package, and is the program manager for the duration of the contract. PMS, as used in this document, refers to the production manager, office, and phone indicated on the title page of the Appendix A.

QAR Quality Assurance Representative

RECOVERABLE An unserviceable item that can have maintenance performed to restore it to a serviceable condition.

RTOK Retest Okay

SERVICEABLE Capable of meeting the requirements and performing the function for which it was designed or modified and meets all test requirements established by this work specification and the Technical Data cited in the PWS.

ACRONYM OR

PHRASE

DEFINITION

PWS Performance work statement

SRU Shop Replaceable Unit

UPDATE To bring an end-item up to the latest acceptable Government approved configuration without changing its original form, fit or functional capability.

USAF United States Air Force

PR: FD2020-2100319-00 8 V1, 11 April 2022

3.0 REPORTING AND DATAREQUIREMENTS.

Reporting and data requirements shall be provided in the Contract Data Requirements List (CDRL), DD Form

1423-1. The Contractor shall prepare and submit the following records, forms, or reports in support of this work effort.

3.1 Commercial Asset Visibility Air Force (CAV AF) End Item Report.

Refer to the CAV AF Statement of Work for technical requirements/considerations, responsibilities, and reporting requirements of the CAV AF system. IAW CDRL A001 (DI-MGMT-81838) and Data Item

Description (DID).

i. DD Form 1348-1A, Single Line Item Release/Receipt Document. The Contractor shall use DD Form 1348-1A as the shipping document for shipment transactions of all end items. The DD Form 1348- 1A will be initiated and printed in the CAV AF system. If CAV AF is down, then a manual DD 1348-1A may be utilized, updating CAV one business day. It is imperative that the contractor in completing the DD Form1348-1A perpetuate some information from the incoming shipping document DD Form 1348-1A for each item received and for all outgoing shipments. Additionally, the contractor shall annotate the DD Form 1348-1A to include the contract number. This is IAW DLM 4000.25-1, directives listed in the contract, or can be as directed by the ACO, PCO, DCMA, PMS or CAV AFPOC.

ii. The purpose of CAV AF is to maintain asset visibility and accountability throughout the repair process, update asset condition and balance to Air Force Supply Systems, reports financial and inventory balances, and feeds production and unit repair costs to the maintenance and budgeting systems.

3.2 Contract Depot Maintenance (CDM) Production Report.

The Contractor shall report monthly by contract delivery order on all applicable categories, totals and on hand balances, providing all listed DID requirements for each repair location, including Sub- Contractor facilities, if applicable, for the contracts maintenance occurrence actions during the reporting period IAW CDRL A002 (DI-

PSSS-81995A).

3.3 Annual Government Property Physical Inventory Report.

The Contractor shall provide an Annual Government Property Physical Inventory Report IAW CDRL A003 (DI-

MGMT-80441D).

i. The Contractor shall conduct an annual 100% physical inventory over the course of a year’s time of each

NIIN as not to impede maintenance operations. Upon completion of all NIIN’s 100% physical inventory, the

Contractor shall provide the AF Government inventory listing of the result of all AF GFP in the Contractor’s possession.

3.4 Maintenance Data Collection Reporting.

Serial Number tracking by the Contractor is REQUIRED for all received end items. The Contractor shall document all maintenance actions involving maintenance with the disassembly, cleaning, inspection, maintenance and replacement of repaired end items. The Contractor shall load maintenance data to the Defense Repair

Information Logistics IAW CDRL A004 (DI-MISC-82003/T).

PR: FD2020-2100319-00 9 V1, 11 April 2022

3.5 IUID Marking Activity/Verification Report.

i. For components that have been repaired only, check that components requiring UID mark IAW MIL-

STD-130N have supplemental label/tags installed and that they can be verified IAW applicable drawings.

The supplemental UID mark shall be placed adjacent to or near existing label not to cover any existing marking.

ii. The Contractor shall provide a report detailing all IUID marking activity. The IUID marking activity reports will be provided as requested by DCMA and/or provided via an electronic copy through Wide

Area Workflow (WAWF) and F-16C/D end item Program Manager IAW CDRL A005

(DIMGMT-81804A) and Section 7 of this PWS.

3.6 Contractor Manpower Equivalent Reporting.

The Contractor shall report ALL Contractor labor hours (including Sub-Contractor labor hours) required for performance of services provided under this contract for the repair of all items previously listed via a secure data collection site. The Contractor is required to completely fill in all required data fields at https://www.sam.gov . User manuals are available at the Contractor Manpower Reporting Application

(CMRA) link IAW CDRL A006.( DI-FCNL-80912A/T)

3.7 Safety and Health.

While performing work under this contract the Contractor shall comply with all applicable federal, state and local regulations regarding occupational safety and health. The Contractor shall notify the Contracting

Officer (CO), within eight (8) hours of any damage to Government Property where the dollar value exceeds

$500,000.00 and within two workdays, for any damage to Government Property less than

$500,000.00 during the execution of the contract. Mishap notifications shall contain, as a minimum, the following information:

i. Contract, Contract Number, Name and Title of Person(s) reporting.

ii. Date, Time and exact location of accident/incident.

iii. Brief Narrative of accident/incident (Events leading to accident/incident).

iv. Cause of accident/incident, if known.

v. Estimated cost of accident/incident (material and labor to repair/replace).

vi. Nomenclature of equipment and personnel involved in accident/incident.

vii. Corrective actions (taken or proposed).

viii. Other pertinent information.

3.8 Counterfeit Protection Program.

Counterfeit Prevention Plan (CPP): Counterfeit Prevention Plan. The contractor shall adhere to counterfeit mitigation program IAW CDRL Exhibit B001. Specific guidance for Counterfeit Mitigation Plan is as follows:

Counterfeit Prevention Plan (CPP): Contractors that supply electronic parts or systems that contain electronic parts shall establish policies and procedures to avoid, detect, mitigate and disposition counterfeit electronic parts to prevent such parts from entering the USAF/DoD supply chain. These policies and procedures shall be documented in a CPP for submission and approval in accordance with Data Item Description (DID) DI-MISC-81832 (B001) and accomplished for all specified contract items. DI-MISC-81832 is applicable to Parts, Material and Processes

Selection (PMPS) associated with delivery of systems and assemblies to the USAF and DoD. The requirements established by DI-MISC-81832 also apply to electronics components procured in sustainment of such systems and assemblies. The requirements of the recently DoD-adopted SAE-AS5553, Aerospace Standard, Counterfeit

Electronics Parts; Avoidance, Detection, Mitigation, and Disposition shall also apply.

https://www.sam.gov/ http://www.ecmra.mil/ http://www.ecmra.mil/ 1512309115C Highlight

PR: FD2020-2100319-00 10 V1, 11 April 2022

If requested by the designated CO, the Contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by the Procuring Safety Office

4.0 SECURITY AND FOREIGNDISCLOSURE.

The Contractor shall ensure requirements for safeguarding classified information, materials, for obtaining and verifying personnel security clearances, for protecting Government Property and data are fulfilled.

4.1 DD Form 254.

DoD Contract Security Classification Specification, is REQUIRED for Advanced Programmable Signal

Processor (APSP), (NSN and PN is listed in Section 5).

4.2 Destructive Notice.

For classified documents, follow the procedures in DOD 5220.22-M, National Industrial Security Program

(NISPOM), Section 11 and DoD5200.1-R, Information Security Program Regulation. For unclassified, limited documents, destroy by any method that shall prevent disclosure of contents or reconstruction of the document.

4.3 Per Export Control Limitations.

Foreign Disclosure Restrictions IAW AFMAN 21- 149 and AFMCI 23-102 Do Apply.

4.4 Uses and Safeguarding of Information.

Information from the secure website is considered to be proprietary in nature when the contract number and

Contractor identity are associated with the direct labor hours and direct labor dollars. At no time will any data be released to the public with the Contractor name and contract number associated with the data.

5.0 GOVERNMENTPROPERTY.

All property owned or leased by the Government. Government Property includes Government Furnished Property

(GFP), Government Furnished Material (GFM), and Government Furnished Equipment (GFE). FAR Part 45.

5.1 Government Furnished Property.

GFP is property in the possession of, or directly acquired by, the Government and subsequently furnished to the

Contractor for performance of a contract. The GFP furnished to the Contractor is listed below under section

5.2(e).

a. Contractor shall notify the CO, within one (1) workday of any damages when the dollar value exceeds

$10,000.00 and within two (2) workdays for any damages less than $10,000.00 during the execution of the contract.

PR: FD2020-2100319-00 11 V1, 11 April 2022

b. When the Government owned asset is in the possession of the Contractor, the asset shall be accounted for, tracked and stored in a secure area where they are protected and handled in such a manner against all damages, weather, and foreign matter. Further, the Contractor shall secure the asset to prevent any damages, pilferages, or loss while in the Contractor’s possession IAW DoD 5200.1-R.

5.2 Government Furnished Equipment.

An all-inclusive term to define all types of equipment. It includes facilities, plant equipment, agency peculiar property, special tooling, and special test equipment. For the purpose of annually reporting dollar values on

Department of Defense (DOD) property in the custody of Contractors (DD Form 1662, DOD Property in the

Custody of Contractors), items must be categorized according to the specific FAR property definitions. GFE, if authorized on this contract, will be stated and identified in an attachment to this appendix or as another uniquely identified section as part of this contract. The Contractor will comply with the GFE related clauses in the basic contract. a. GFE will not be furnished by the Government.

b. Necessary ST/STE/SE will be furnished by the Contractor unless identified within the Appendix A or

Appendix B if applicable. If substitute ST/STE/SE are proposed for use in this effort, authorization must be obtained by the ACO/CO from the Program Manager (PM).

c. For authorization of GFE on this contract, the PMS is to contact the ALC Loan Control Officer for Government loan property authorization.

d. While the GFE is in the possession of the Contractor, it is the Contractor’s responsibility to provide routine maintenance and calibration of the GFE to ensure the GFE is returned to the Government in the same condition as when provided, less normal wear and tear. GFE will not be requisitioned until it is actually required and will be turned in when no longer required.

e. The contractor is granted rent free use of Government property accountable to contract

F42620-01-D-0076. And may use said GFE on a non-interference basis.

Contract Number Asset ID Description Part Serial Condition

F42620-01-D-0076 0000587.01 SYSTEM

BENCH

T/S

2134D54G01 0007 A

F42620-01-D-0076 0000555.00 PSP LRU

TEST SET

3426B13G02 83001 A

F42620-01-D-0076 0000744.00 PSP LRU

TEST SET

3426B13G03 84002 A

f. In the event the APSP LRU Test Station becomes unserviceable and is unavailable to perform acceptance test of a repaired APSP, the Contractor is authorized to perform acceptance test using the System

Test Bench.

PR: FD2020-2100319-00 12 V1, 11 April 2022

5.3 Government Furnished Material.

Government Property supplied to the Contractor, for incorporation into an end item to be delivered under the contract or which may be consumed in the performance of the contract. It includes, but is not limited to, raw and processed material, parts, components, and assemblies. GFM is also referred to as materials and direct materials under the terms of the contract.

a. GFM will not be furnished by the Government.

b. Any type of GFP, GFE, and GFM will always be returned or shipped utilizing a DD 1348-1A unless otherwise directed by Program Management or Hill Contracting individuals. This is the authorized shipping document so that the item can be properly identified upon Contractor’s return.

6.0 COUNTERFEIT PREVENTION PLAN (CPP) REQUIREMENT.

Counterfeit Prevention Plan (CPP): Counterfeit Prevention Plan. The contractor shall adhere to counterfeit mitigation program IAW CDRL Exhibit B001. Specific guidance for Counterfeit Mitigation Plan is as follows:

6.1 Counterfeit Prevention Plan (CPP): Contractors that supply electronic parts or systems that contain electronic parts shall establish policies and procedures to avoid, detect, mitigate and disposition counterfeit electronic parts to prevent such parts from entering the USAF/DoD supply chain. These policies and procedures shall be documented in a CPP for submission and approval in accordance with Data Item

Description (DID) DI-MISC-81832 (B001) and accomplished for all specified contract items. DI-MISC-81832 is applicable to Parts, Material and Processes Selection

(PMPS) associated with delivery of systems and assemblies to the USAF and DoD.

The requirements established by DI-MISC-81832 also apply to electronics components procured in sustainment of such systems and assemblies. The requirements of the recently DoD-adopted SAE-AS5553, Aerospace Standard, Counterfeit Electronics

Parts; Avoidance, Detection, Mitigation, and Disposition shall also apply.

6.2 At a minimum, the CPP shall address:

6.3 Applicability. The Contractor shall identify all Business locations and programs to which the CPP applies. The CPP shall address materials, hardware, electronic parts, and procured assemblies.

6.4 Definitions. The Contractor shall utilize definitions per SAE-AS5553 to ensure consistency. Any contractor-derived definitions must be included in an appropriate

CPP appendix or annex. (Ref. SAE-AS5553, paragraph 3, 3.1, 3.2, 3.3, appendix H)

6.5 Parts Availability and Use of Parts Brokers. The Contractor shall not procure materials, systems, assemblies, sub-assemblies or parts from parts

Brokers when available from Original Manufacturers (OM) or their Authorized

Distributors. In cases where materials, systems, assemblies, subassemblies or parts are no longer available from the OM or their Authorized Distributors, procurement from Brokers may be authorized as defined by the Contractor’s policy and their CPP.

(Ref. SAE-AS5553, paragraph 4.1.1, 4.1.2.e., appendix A)

PR: FD2020-2100319-00 13 V1, 11 April 2022

6.6 Procurement Policies. The Contractor shall provide and implement policy directing development and implementation of business practices and procedures, and processes to prevent procurement of Counterfeit materials and parts. The Contractor shall identify the appropriate office(s), business units, functional organizations, and programs, who shall have responsibility for development, maintenance and implementation of the CPP. The CPP shall identify the specific roles and responsibility for each. (Ref. SAE-AS5553, paragraph 4.1.2, 4.1.3, appendix B, C, D)

6.7 Risk Assessment. The contract shall address the risk of using unknown sources and or unauthorized suppliers in the CPP. Application or technical risk assessments shall establish the effect that counterfeit parts may have on performance. Vendor or source of supply risk assessments shall establish the potential for obtaining counterfeit parts. Using any risk analysis tool acceptable to the Government, the

Contractor shall conduct a risk assessment based upon item characteristics and how likely it is that a counterfeit part will be received. The contractor shall identify and describe in the CPP how parts are selected for assessment and what risk is acceptable based upon the parts design, construction, material and functional requirements. As a minimum, analysis shall be completed for flagging high risk items, such as items that are obsolete, discontinued, rare, etc. The contractor shall require completion of a trade study, documented within the CPP, that shall facilitate determining whether

100% testing of parts procured from after-market sources is more cost effective than qualification or requalification of a manufacturer. (Ref. AS5553, paragraph 4.1.2, 4.1.3, appendix B, C, D)

6.8 Detection and Avoidance Responsibilities. The Contractor shall establish processes for the review and approval of contractor and applicable subcontractor systems for the detection and avoidance of counterfeit electronic parts and suspect counterfeit electronic parts, which processes shall be comparable to the processes established for contractor business systems under section 893 of the Ike Skelton

National Defense Authorization Act for Fiscal Year 2011 (Public Law 111–383; 124

Stat. 4311; 10 U.S.C. 2302 note). The Contractor shall flow down such requirements and processes to their subcontractors per ODASD Memo titled “Overarching DoD

Counterfeit Prevention Guidance”, dated 16 March 2012. (Ref. AS5553, paragraph

4.1.4, 4.1.5, appendix E)

6.9 Testing and Verification. The Contractor shall establish and accomplish testing and verification processes for items not received from an original equipment manufacturer, original component manufacturer, or authorized distributor that are identified as having high risk for counterfeit potential. These processes apply to prime contracts, and to subcontracts or suppliers below the prime contracts. The

Contractor shall provide a list of acceptable test facilities if the subcontractor or supplier does not have the capability to perform required testing. Submittal of

Certificates of Compliance indicating the parts are not counterfeit shall be acceptable for verification of testing. (Ref. AS5553, paragraph 4.1.4, appendix E)

PR: FD2020-2100319-00 14 V1, 11 April 2022

6.10 Configuration Identification and Traceability. The Contractor shall identify and control the configurations of all systems, assemblies, subassemblies and parts, and enable mechanisms to provide traceability of parts. The Contractor shall report to the Government when control of the configurations of all systems, assemblies, subassemblies and parts, and mechanisms to provide traceability of parts are not possible. The Contractor shall identify the specific systems, assemblies, subassemblies and parts beyond the Contractors’ control. The Contractor shall be responsible for detecting and avoiding the use or inclusion of counterfeit materials and parts, to include procured assemblies and subassemblies, in such products and shall be responsible for the rework or corrective action that may be required to resolve the use or inclusion of counterfeit materials and parts. The cost of counterfeit electronic parts and suspect counterfeit electronic parts and the cost of rework or corrective action that may be required to remedy the use or inclusion of such parts are not allowable costs under Department contracts , unless: a) the contractor has established a counterfeit avoidance/detection system approved by the

DoD, b) the counterfeit parts were procured from a DoD-accredited trusted supplier or provided as government property, and c) the contractor has provide timely notification to the government. (Ref. AS5553, paragraph 4.1.6, appendix F)

6.11 Counterfeit Notification and Reporting. The Contractor shall report in writing to the Procuring Activity within 30 days of determining any end item, component, part, or material contained in supplies purchased by the Department of Defense, or purchased by a contractor or subcontractor for delivery to, or on behalf of, the

Department, contains counterfeit electronic parts or suspect counterfeit electronic parts for the purpose of investigation and notification of the Air Force Office of

Special Investigations (AFOSI). The Procuring Contracting Officer (PCO) shall coordinate reporting to the appropriate Program Management/Item Management, System Engineering Management, the AFMC Discrepant Materiel Reporting

Program (DMRP) Office in 406 SCMS/GULAB, and the AFOSI. Additionally, the

Contractor shall within the same 30 day period ensure all suspected or confirmed counterfeit items are entered into the Government-Industry Data Exchange Program

(GIDEP) system, which will serve as the DoD central reporting repository. (Ref.

AS5553, paragraph 4.1.7, appendix G)

6.12 Counterfeit Prevention Training. The Contractor shall provide appropriate training and shall require all personnel working procurement within their company, to include at a minimum their supply chain management specialists, receiving inspectors, and engineers, to complete said training. The Contractor shall determine the appropriate training required. Training may be developed in-house or may be other Industry accepted training. The CPP shall describe and list the training provided by the contractor to their personnel.

PR: FD2020-2100319-00 15 V1, 11 April 2022

7.0 ITEM UNIQUE IDENTIFICATION (IUID) MARKING (IAW AFMCI 20-104 Para. 3.12).

The Contractor shall replace damaged markings, identification, and decals. IUID markings are required for all end items and subcomponents to the end item IAW CDRL A005 (DIMGMT-81804A), and the

Technical Data listed in Section 11.

7.1 Each completed end-item will be permanently and legibly marked with the Contractor’s facility identification. This identification will display the name of the Contractor facility, date of maintenance and contract number. This identification can be by decalcomania, rubber stamp, or stencil. When using rubber stamp or stencil, use permanent, waterproof ink or paint of contrasting color; also, end-item identification plates shall reflect the latest configuration/update, i.e., National Stock Number, Part Number as applicable.

7.2 For items that do not have an IUID marking specifications the Contractor shall develop the marking specifications in accordance with the latest version ofMIL-STD-130N.

7.3 IUID markings currently in place on items undergoing repair shall be protected from damage or removal during repair. Ensure 2-D matrix IUID markings are readable per TO 00-25-260. Should IUID marking be rendered unreadable during repair, the Contractor shall notify the CO for determination.

7.4 IUID markings which will be potentially destroyed during repair due to technical direction (i.e. paint removal, sand blasting, etc.) shall be recorded prior to maintenance action and replaced with the same

UII as part of the repair action.

7.5 The Contractor shall submit the required and applicable data for legacy items to the DoD IUID

Registry per the data submission procedures at http://www.acq.osd.mil/dpap/pdi/uid/data_submission_information.html.

8.0 GENERAL WORKREQUIREMENTS.

The Contractor shall inspect, test, repair, update, reassemble, calibrate, and retest GFP IAW this PWS and all applicable Technical Data/Directives listed in Section 11.

8.1 Standard Repair.

A repair is defined as returning an item to service through correction of a failure or unserviceable condition that successfully passes Factory ATP or Repair ATP (as applicable) per supplier’s repair directive, processes and procedures.

A Standard Repair consists of no more than 2 repair cycles, or no more than 2 SRU repairs and has established Firm Fixed Prices. The level of repair will be limited to the efforts necessary to return a malfunctioned item to serviceable condition not necessarily new factory standards. Each LRU or Shop

Replaceable Unit (SRU) will be disassembled only to the extent necessary to accomplish the required repair work. Any unassociated defect that does not affect fit, form or function or effect to the repair may not require correction. Some examples of these conditions are:

i. Measling on printed circuit boards.

ii. Printed circuit board delamination or coating imperfections from previous activity in areas that do not affect fit and function.

iii. Discolored printed circuit boards and terminal boards.

iv. Discolored or faded handles and hardware, or interior/exterior cabinet, chassis, or cover surfaces. (Not applicable to equipment being restored).

v. Chipped components provided that the heretic seal or function is not affected.

vi. Work performed at other repair facilities unless the workmanship/material results in degradation of form fit, or function. (Not applicable to equipment being overhauled/refurbished or restored).

http://www.acq.osd.mil/dpap/pdi/uid/data_submission_information.html http://www.acq.osd.mil/dpap/pdi/uid/data_submission_information.html

PR: FD2020-2100319-00 16 V1, 11 April 2022

vii. Parts or components with illegible markings.

viii. Any other non-functional defect that will not be repaired as determined by the contractor’s cognizant Quality and

Test Engineers.

8.2 Out of Scope (OOS)

OOS repairs are repairs that require scope in excess of a standard repair. In the event an OOS is encountered

Northrop Grumman will submit a proposal for completion of an OOS repair; the customer may decide to fund the additional scope or request the item be returned as is. The following repairs shall be considered OOS:

a. Repairs that require in excess of two repair cycles

b. Repairs requiring greater than two SRU repairs

c. Minimum Buy Requirements-Any need of a replacement part that requires procurement resulting in unplanned cost such as minimum buy requirements, supplier NRE or other significant added cost shall by OOS of this contract unless required parts can be obtained via MIL-Strip

d. Previous repair by another entity-if any item returned for repair exhibits evidence of repair by another repair entity not listed on the Government’s approved source listing, as of date of award, will be considered OOS.

LRU’s repaired by AIS back shops which required SRU swapping will not be considered OOS under this paragraph.

8.3 Configuration.

The Contractor is authorized to induct all configurations of the end items listed in Section 5 IAW the quantities in the Delivery Order.

8.4 Technical Data.

The Contractor shall comply with the latest dated TOs and other directives used or issued during the time the work is being accomplished.

Note: No technical related issue in this document shall be construed as taking precedence over TOs and/or manufacturer drawings, and their accompanying documents and specifications for these end items.

8.5 Cleaning, Corrosion Control and Treatment.

The Contractor shall clean the end item thoroughly prior-to and after disassembly and maintain cleanliness during this maintenance effort. Accomplish corrosion control and treatment as required, using methods and materials IAW TO 1-1-689, TO 1-1-689, SAE-AS12500, MIL-HDBK-454A, and MIL-STD-1568D.

8.6 Electrostatic Discharge (ESD).

Proper ESD procedures shall be in place prior to contract award. The Contractor shall implement or maintain an ESD Control Program. IAW ANSI/ESD-S20.20-2014, ESD-TR20.20.

8.7 Quality.

The Contractor is responsible to ensure all-inclusive management of the quality control requirements are accomplished as outlined in the contract. This includes the establishment of viable quality control program, detail inspection programs, monitoring actions and effective corrective actions.

8.8 Receiving Inspection.

An inspection for proper identity, completeness, and obvious damage shall be performed on each end item upon its receipt at the Contractor’s facility. Any deficiencies found as a result of the inspection shall be brought to the attention of the end item Program Manager through the ACO/CO.

8.9 Handling.

The Contractor shall exercise care to prevent and damages, pilferage, or loss of GFP while it is in the

Contractor’s possession. The Contractor shall store all GFP in a secure area and provide protection against all adverse environment conditions. Reusable shipping containers, packaging, and crating material in which

PR: FD2020-2100319-00 17 V1, 11 April 2022 the GFP is received shall be handled with care.

8.10 Shipping.

Reusable shipping containers, packaging, and crating material in which the asset is received shall be handled with care. Reusable containers shall be stored for reuse, and configuration of the containers shall not be altered. All assets will always be returned or shipped utilizing a DD 1348-1A unless otherwise directed by the Government. DD 1348-1A is the authorized shipping document, not a DD250, so that the item can be properly identified.

8.11 Non-Destructive Inspection (NDI).

The Contractor shall accomplish Non-Destructive Inspection (NDI) by disassembly to the extent necessary to assure a definite acceptance or rejection of the suspected item or area. (Note: T.O. 33B- 1-1 provides examples of inspection methods and criteria).The Contractor shall accomplish inspections during the maintenance process while the item is accessible for the following:

a. Quality replacement parts.

b. Correct dimensions of replacement parts.

c. Correct type and quantity of parts and materials.

8.12 Warranty of Work.

The Contractor shall warranty their work IAW industry standards. The Contractor shall provide the terms of their warranty in their bid or proposal prior to contract award. Any rework that is done under warranty shall be at no addition cost to the Government.

8.13 Condemnation and Disposition.

Authorization shall be obtained from the ACO/CO through the end item Production Manager initially for the authorization request. Authorization will be obtained from the Equipment Specialist. The Contractor will be allowed to retain condemned units for cannibalization of spare parts. Condemnations will be established on a

Firm Fixed Price (FFP) CLIN.

8.14 Product Quality Discrepancy Report (PQDR).

If a GFP is received from the Contractor and at any time during the warranty period the asset becomes unserviceable the Government will initiate a PQDR and return the asset back to the Contractor. The

Contractor shall repair the GFP to serviceable condition at no additional cost to the Government. In addition, if an asset is returned for rework as a result of a PQDR more than 1 time in any 12 month period then the Contractor shall also conduct an ESS at no additional cost to the Government before returning the

GFP to serviceable condition. The Contractor shall coordinate actions with the CO and Production

Manager. Any tests that will be excluded as part of this effort will have prior written approval from the

Production Manager.

8.15 Environmental Stress Screening (ESS) Requirements.

The Contractor shall conduct an ESS test when the same serial number returns to repair less than 12 months from previous repair date IAW ESD-TR20.20and MIL-HDBK-344A. If this is within the Contractor’s warranty this will be at no cost to the Government.

8.16 Diminishing Manufacturing Sources and Material Shortages (DMSMS) Program/Electronic Parts

Screening.

DMSMS is the loss of resources, obsolescence and material need to build, maintain and operate warfighting equipment. If a Diminishing Manufacturing Sources (DMS) situation is identified, the

Contractor shall use reasonable efforts to manage the DMS item to ensure parts availability; however, the delivery period for any affected repairs shall no longer apply, nor shall any existing pricing apply to the

1512309115C Highlight

PR: FD2020-2100319-00 18 V1, 11 April 2022 extent adversely affected by the limited availability of the DMS item. If, as a result of DMS and/or vanished sources, If the Contractor is unable to procure a form/fit/functional part or component necessary to fulfill any of the requirements of this Contract, Contractor shall promptly notify the Customer to discuss any potential resolutions. The Customer and Contractor shall negotiate any potential resolution, including any adjustment to price and/or schedule. Should the Customer elect not to fund actions required to resolve the DMS situation, Contractor shall be relieved of any obligation to complete the affected Purchase Order requirements and the part returned in as is condition with payment at the full repair price.

The Contractor shall utilize an Electronics Parts Screening process that shall identify DMS for parts for the end item design. The Contractor shall be responsible for

Its Sub-Contractors' parts obsolescence awareness. The Contractor shall regularly check the Government

Industry Data Exchange Program (GIDEP) database for DMSMS items during all repair phases, and shall determine if any of these items are used in, or planned to be used in the end items...

PR: FD2020-2100319-00 19 V1, 11 April 2022

9.0 SPECIFIC WORKREQUIREMENTS.

The Contractor shall repair, update, inspect, reassemble, and test the reworked end-item and components and calibrate, if applicable, IAW T.O. 00-25-234 or other Government Approved Technical Data, and the

Technical Data listed in Section 11 as applicable.

9.1 Inspection.

The Contractor shall accomplish a thorough inspection of each end-item, reusable or replacement component parts and materials (external and internal) for the following:

a. End item for loose or missing parts, materials and attaching hardware.

b. End item for dents, punctures, bent pins, cracked, wrinkled or misalign conditions that may cause chafing.

c. Component parts, material, and attaching hardware to determine serviceability, and conformance with the Technical Data.

d. Structural parts for dents, punctures, cracks, oversized holes, evidence of chafing, corrosion, and, deterioration.

9.2 Disassembly.

The Contractor shall disassemble each item only to the extent necessary to accomplish inspection, testing, fault isolation and maintenance IAW Technical Data listed in Section 11 as applicable and

Government Approved Contractor Technical Data.

Note: Serviceable precision matched or mated component parts shall be handled in a manner to ensure their reinstallation as a matched set.

9.3 Repair.

The repairs consist of repairing or replacing components and/or sub-assemblies. The reusable disassembled item components shall be used as replacement components for restoring the APSP to serviceable condition.

The sub-assemblies are not required to maintain the end item identification.

a. Maintenance and replacement of accessory and component parts shall be IAW this PWS, the Technical

Data cited in Section 11 and this PWS. In the event that a deviation from the Technical Data is required, an approval request in letter form shall be submitted to the Production Manager via e-mail to obtain approval or disapproval.

9.4 Spares and Repair Parts.

The Contractor will be allowed to retain condemned units for cannibalization of spare parts upon approval of the OO-ALC Production Manager. Upon completion of the contract, per existing disposal code assigned to the item, the Contractor shall dispose of parts retained for cannibalization.

a. Replacement parts and materials shall also be IAW Section 11. In the event that a deviation from the

Technical Data is required and the Contractor desires the use of a substitute part, an approval request in letterform shall be submitted to the ACO/CO, who will obtain the appropriate engineering office determination and respond accordingly.

PR: FD2020-2100319-00 20 V1, 11 April 2022

9.5 Update.

The Contractor shall update the GFP as outlined in TOs and other directives listed in Section 11. This shall be accomplished concurrently with the maintenance required by this PWS and shall be to the latest approved and supportable configuration however, functional capabilities for which the item was designed shall not be changed. Performance and reliability Class 2 Revision Notices will be incorporated as determined by the

Contractor. These Revision Notices will be incorporated under contract however, the functional capabilities for which the end-item was designed shall not be changed.

9.6 Correction of Deficiency (COD) and Engineering Change Proposals (ECP).

COD updates and improvement ECPs which are negotiated and funded separately, will be accomplished in accordance with the mutually agreed to schedules. Items will not be updated to the latest approved and supportable configuration specified in the contract under the following conditions:

a. Updates are not funded/authorized separately, e.g. spares not covered by the production COD clause.

b. Updates will not be required if the received configuration is compatible with configurations in use at the time of receipt and those updates are not required to satisfy update schedules which are bilaterally agreed to between the Contractor and the Government.

9.7 Finishing.

The Contractor shall replace damaged internal protective finish to the extent necessary to ensure serviceability and provide adequate protection IAW Government Approved Contractor Technical Data, and the Technical Data listed in Section 11.

a. External finishing of the end-item shall be accomplished only to the extent necessary to provide adequate protection, using high quality commercially available finish materials. Minor scratches are to be touched up or spot painted to provide necessary protection.

9.8 Marking.

Each completed end-item will be permanently and legibly marked with the Contractor’s facility identification. End-item identification plates shall reflect the latest configuration/update, i.e., National

Stock Number, Part Number as applicable.

PR: FD2020-2100319-00 21 V1, 11 April 2022

a. Check that components requiring an IUID mark, IAW MIL-STD-130, have supplemental label/tags installed and that they can be verified, refer to T.O. 00-25-260. The supplemental IUID mark shall be placed adjacent to or near existing label not to cover any existing marking. IAW CDRL A005 (DI- MGMT-81804A).

b. The Contractor shall replace damaged markings, identification, and decals as outlined per the applicable Technical Data, Government Approved Contractor Technical Data and MIL-STD-130.

9.9 Can Not Duplicate (CND)/ Retest Okay (RTOK) Conditions.

End Items deemed to be serviceable on initial inspection and subsequently pass Acceptance Test Procedures

(ATP) will not be repaired and will be considered to be end items that meet CND/RTOK conditions.

9.10 Acceptance Testing.

The Contractor shall perform an acceptance test and checkout of each completed end item to assure serviceability prior to presentation to the Government. Test and checkout shall be accomplished IAW the specifications found in

Section 11.

a. Upon satisfactory completion of final acceptance test, the Contractor shall cover and seal all port, vents and electrical connections/plugs with suitable caps to prevent entry of foreign matter or damage during handling and shipment. (NAS847)

b. All completed work shall be subject to acceptance inspection by Defense Contract Management Agency

(DCMA).

10.0 SERVICE SUMMARY.

10.1 WAWF/Material Inspection and Receiving Reports

The Contractor will report material handling/reporting requirements accurately by using WAWF/Material Inspection and

Receiving Reports

Receiving Reports in WAWF must have an accuracy rate of 98%

The Contractor will report material handling/reporting requirements completely by using the WAWF/ Material Inspection &

Receiving Reports.

Receiving Reports in WAWF must have a completeness rate of 100%.

The Contractor will perform workmanship inspections on all repaired items as identified on the Material Inspection & Receiving

Random Sampling inspections must pass with a

100% workmanship rate.

The Contractor will perform workmanship inspections on all repaired items as identified on the WAWF /Material Inspection &

Receiving Reports.

Process Proof Evaluations inspections must pass with a 100%…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .