Appendix_E_QASP.pdf
PDF 112 KB Posted
- Attached to
- BUFFALO FO JANITORIAL Federal contract opportunity
- Solicitation number
- 140L6223R0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Site_Visit_Record_0001.pdf | ||
| Questions_Addressed_0001.docx | DOCX document | |
| Performance_Work_Statement_Revised_0001.pdf | ||
| Sol_140L6223R0001_Amd_0001.pdf | ||
| Sol_140L6223R0001.pdf | ||
| Appendix_D_Annex_Floor_Plan.pdf | ||
| Appendix_B_Task_Checklist.pdf | ||
| Performance_Work_Statement.pdf | ||
| Appendix_C_Main_Office_Floor_Plan.pdf | ||
| Bid_Schedule.pdf | ||
| Appendix_A_Frequency_of_Operations.pdf | ||
| Subcontractor_Payment_Substantiation_Form_WY_1510-1.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date ___________________________________ Quality Assurance Surveillance Plan Inspected by ______________________________________________
DAILY TASKS (3X/WK) Comments Public Areas (Sec. 8.A) Date
Empty trash receptacles.
Sweep and/or vacuum entrances, floors & main corridors.
Clean main entry glass doors.
Clean and sanitize drinking fountains.
Dust horizontal surfaces.
Restrooms & Locker Rooms (Sec. 8.B.)
Empty trash receptacles.
Clean & sanitize all surfaces of basins, bowls and urinals.
Clean mirrors, faucets, sinks & countertops.
Sweep floors.
Refill dispensers.
Break Rooms (Sec. 8.C)
Empty trash receptacles. Replace liners.
Sweep floors.
Clean and sanitize countertops and sinks.
Clean and refill paper towel and hand soap dispensers.
General Office Space (Sec. 8.D.)
Empty trash receptacles.
Spot sweep and/or spot vacuum floors.
Dust horizontal surfaces that are visibly dirty.
WEEKLY TASKS (1X/WK) Comments Public Areas (Sec. 8.A)
Damp mop resilient floors in main entrances.
Sweep entry sidewalks within 10 ft. of doors & under mud mats.
Spot clean all wall surfaces within 70" of the floor.
Break Rooms (Sec. 8.C)
Damp mop floors.
Spot clean all wall surfaces within 70" of the floor.
General Office Space (Sec. 8.D.)
Vacuum secondary corridors & steps.
Spot clean all wall surfaces within 70" of the floor
S/U
S/U
S/U
S/U
Week 1 Week 2 Week 3 Week 4
S/U
S/U
Date Date Date Date
S/U
Use a second sheet if more than 4 weeks in a month.
Date ___________________________________ Quality Assurance Surveillance Plan Inspected by ______________________________________________
MONTHLY TASKS (1X/MO) Comments Public Areas (Sec. 8.A)
Empty cigarette butt canister.
Thoroughly dust furniture & fixtures.
Restrooms & Locker Rooms (Sec. 8.B.)
De-scale, clean & sanitize shower stalls. (Oct. 1 - Mar. 30) S/U Break Rooms (Sec. 8.C)
Wash inside & out of garbage cans used for food waste. S/U General Office Space (Sec. 8.D.)
Thoroughly dust furniture & fixtures.
Completely vacuum all carpeted areas.
Server Room (Sec. 8.E.)
Sweep and mop floors.
Empty trash receptacles.
Clean doors and windows.
Dust furniture & fixtures.
Twice Yearly Tasks (every 6 mos.)
All Areas
Clean convectors & light fixtures.
Dust walls within 70" from the floor, other vertical surfaces, & under surfaces.
Yearly Tasks (1x/yr) All Areas
Date
S/U
S/U
Date Date Date Date
Date Date Date Date
S/U
S/U
Comments
Date
Use a second sheet if more than 4 weeks in a month.
AppB
File details come from the government source that posted it. Updated .