Appendix C.pdf
PDF 228 KB Posted
- Attached to
- McKinley Stewardship IRSC Federal contract opportunity
- Solicitation number
- 129JGP20R4010
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| McKinley IRSC Site Visit Docs.zip | ZIP file | |
| Appraisal Summary.pdf | ||
| McKinley Stewardship IRSC Cruise.pdf | ||
| 129JGP20R4010 - Amendment 1.pdf | ||
| McKinleyStewardship_ContractMap022820.pdf | ||
| Wage Determination 1977-0727.pdf | ||
| McKinleyStewardship_ServiceWork22720.pdf | ||
| Experience Questionnaire.docx | DOCX document | |
| Fire Plan.pdf | ||
| 129JGP20R4010.pdf | ||
| Appendix A.pdf | ||
| Appendix B.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Appendix C Road Maintenance Requirements
Road Segments
Termini Miles Pre Haul During Haul Post Haul From To T803 T807 T806 T803
45N28-SEG 1 0.00 0.27 0.27 P -- P P
45N28-SEG 2 0.27 2.64 2.37 -- -- P P
45N28-SEG 3 2.64 7.52 4.88 -- -- P P
45N39 0.00 6.05 6.05 P -- P P 45N41 0.00 4.10 4.10 P P P P
45N53- SEG 1 0.00 2.34 2.34 P P P P
45N53- SEG 2 2.34 3.00 0.66 P P P P
45N53- SEG 3 3.00 6.67 3.67 P P P P
45N53X 0.00 0.11 0.11 -- -- P P 45N08X 0.00 1.80 1.80 -- -- P P
Road Maintenance T - Specifications
Specification Number
Applicable Items Specification Title
T-800 √ Definitions
T-801 Slide and Slump Repair
T-802 Ditch Clearing
T-803 √ Surface Blading
T-804 Surfacing Repair
T-805 Drainage Structures
T-806 √ Dust Abatement
T-807 √ Roadside Vegetation
T-808 Miscellaneous
T-809 Water Bars
T-810 Barriers
T-811 Surface Treatment
SPECIFICATION T-800 DEFINITIONS
Wherever the following terms or pronouns are used in Specifications T-801 through T-811, the intent and meaning shall be interpreted as follows:
800-1.1 - Agreement. Maintenance projects require a mutually acceptable method to resolve the problems which arise when incompatible situations arise between drawings and specifications and actual conditions on the ground to allow orderly and satisfactory progress of the maintenance.
These specifications have been developed in anticipation of those problem areas and have provided that such changes will be by Agreement.
It is intended that drawings and specifications will govern unless "on-the-ground" conditions warrant otherwise, when specifications call for "Agreement", "agreed", or "approval" such Agreement or approval shall be promptly confirmed in writing.
800-1.2 - Annual Road Maintenance Plan. A plan prepared by various users of one or several roads. The plan is an Agreement on maintenance responsibilities to be performed for the coming year.
800-1.3 - Base Course. Material used to reinforce Subgrade or, as shown on drawings, placed on Subgrade to distribute wheel loads.
800-1.4 - Berm. Curb or dike constructed to prevent Roadway runoff water from discharging onto embankment slope.
800-1.5 - Borrow. Select Material taken from designated borrow sites.
800-1.6 - Crown, Inslope, and Outslope. The cross slope of the Traveled Way to aid in drainage and traffic maneuverability.
800-1.7 - Culverts. A conduit or passageway under a road, trail, or other obstruction. A culvert differs from a bridge in that it is usually entirely below the elevation of the Traveled Way.
800-1.8 - Drainage Dip. A dip in the Traveled Way which intercepts surface runoff and diverts the water off the Traveled Way. A Drainage Dip does not block the movement of traffic.
800-1.9 - Drainage Structures. Manufactured structures which control the runoff of water from the Roadway including Inslope, overside drains, aprons, flumes, downdrains, downpipes, and the like.
800-1.10 - Dust Abatement Plan. A table which lists the road, dust palliative, application rates, and estimated number of subsequent applications.
800-1.11 - Lead-off Ditches. A ditch used to transmit water from a Drainage Structure or Drainage Dip outlet to the natural drainage area.
800-1.12 - Material. Any substances specified for use in the performance of the work.
800-1.13 - Prehaul Maintenance. Road maintenance work which the Purchaser determines must be accomplished to maintain the roads to a satisfactory condition commensurate with the Purchaser's use, provided Purchaser's Operations do not damage improvements under B6.22 or National Forest resources and hauling can be done safely.
This work will be shown in the Annual Road Maintenance Plan as provided in 800-1.2.
Prehaul Maintenance work the Purchaser elects to perform will be in compliance with the Road Maintenance T- Specifications.
800-1.14 - Roadbed. The portion of a road between the intersection of Subgrade and sideslopes, excluding that portion of the ditch below Subgrade.
800-1.15 - Road Maintenance Plan. A table which shows applicable road maintenance specifications to be performed by Purchaser on specific roads.
800-1.16 - Roadside. A general term denoting the area adjoining the outer edge of the Roadway.
800-1.17 - Roadway. The portion of a road within the limits of excavation and embankment.
800-1.18 - Shoulder. That portion of Roadway contiguous with Traveled Way for accommodation of stopped vehicles, for emergency use, and lateral support of base and Surface Course, if any.
800-1.19 - Slide. A concentrated deposit of Materials from above or on backslope extending onto the Traveled Way or Shoulders, whether caused by mass land movements or accumulated ravelling.
800-1.20 - Slough. Material eroded from the backslope which partially or completely blocks the ditch, but does not encroach on the Traveled Way so as to block passage of traffic.
800-1.21 - Slump. A localized portion of the Roadbed which has slipped or otherwise become lower than that of the adjacent Roadbed and constitutes a hazard to traffic.
800-1.22 - Special Project Specifications. Specifications which detail conditions and requirements peculiar to the individual project.
800-1.23 - Subgrade. Top surface of Roadbed upon which Base Course or Surface Course is constructed. For roads without Base Course or Surface Course, that portion of Roadbed prepared as the finished wearing surface.
800-1.24 - Surface Course. The Material placed on Base Course or Subgrade primarily to resist abrasion and the effects of climate. Surface Course may be referred to as surfacing.
800-1.25 - Surface Treatment Plan. A table which lists the roads and surface treatments to be applied.
800-1.26 - Traveled Way. That portion of Roadway, excluding Shoulders, used for the movement of vehicles.
800-1.27 - Turnouts. That portion of the Traveled Way constructed as additional width on single lane roads to allow for safe passing of vehicles.
800-1.28 - Water Source. A place designated on the Road Maintenance Map for acquiring water for road maintenance purposes.
800-1.29 - Waterbar. A dip in the Roadbed which intercepts surface runoff and diverts the water off the Roadway.
A Waterbar is not designed to be traversable by logging trucks.
SPECIFICATION T-803 SURFACE BLADING
DESCRIPTION
1.1 Surface blading is keeping a native or aggregate Roadbed in a condition to facilitate traffic and provide proper drainage. It includes maintaining the Crown, Inslope or Outslope of the Traveled Way, Turnouts, and Shoulder;
repairing Berms; blending approach road intersections; and cleaning bridge decks, Drainage Dips, and Lead-off Ditches.
REQUIREMENTS
3.1 Surface blading shall be performed before, during, and after Purchaser's use as often as necessary to facilitate traffic and proper drainage.
3.2 The surface blading shall preserve the existing cross-section. Surface irregularities shall be eliminated and the surface left in a free-draining state and to a smoothness needed to facilitate traffic. Surface Material which has been displaced to the Shoulders or Turnouts shall be returned to the Traveled Way. The blading operation shall be conducted to prevent the loss of surface Material and to provide for a thorough mixing of the Material being worked.
3.3 Water, taken from Water Sources designated on Contract Area Map, shall be applied during blading if sufficient moisture is not present to cut, mix, or compact the surface Material.
3.4 On native surfaced roads, Material generated from backslope Sloughing, and ditch cleaning may be blended with the surface Material being worked. On aggregate surfaced roads this Material shall not be blended with Surface or Base Course Material unless agreed otherwise.
3.5 Roadway backslopes or Berms shall not be undercut, nor shall new Berms be established unless agreed otherwise.
Berms shall be repaired by placing Material, as needed to restore the Berm, to reasonably blend with existing line, grade, and cross-section.
3.6 Drainage Dips and Lead-off Ditches shall be cleaned and maintained to reasonably blend with existing line, grade, and cross-section.
3.7 Intersecting roads shall be bladed for a distance of 50 feet to assure proper blending of the two riding surfaces.
3.8 Rocks or other Material remaining on the Traveled Way after the final pass that are larger than 4 inches in diameter or are larger than the maximum size of imported surfacing shall be removed from the Traveled Way. The oversized Material shall be disposed of by sidecasting, unless shown otherwise on Sale Area Map. Sidecasting into streams, lakes, or water courses will not be permitted.
3.9 Material resulting from work under this specification shall not remain on or in structures, such as Culverts, overside drains, cattleguards, ditches, Drainage Dips, and the like.
3.10 Material resulting from work under this specification, plus any accumulated debris, shall be removed from bridge decks and the deck drains opened.
SPECIFICATION T-806 DUST ABATEMENT
1.1 This work shall consist of preparing Traveled Way and furnishing and applying Materials to abate dust.
MATERIALS
2.1 The roads requiring dust abatement, type of dust abatement Material to be used, the rates of application, and frequency of applications will be shown on Dust Abatement Plan. The Dust Abatement Plan may be changed by written Agreement.
2.2 Water. The locations of Water Sources are shown on Contract Area Map.
Operating Guidelines:
1. Operations are restricted to one hour after sunrise to one hour before sunset.
2. Pumping rate shall not exceed 350 gallons per minute.
3. The pumping rate shall not exceed ten percent of the stream flow.
4. Seek streams and pools where water is deep and flowing, as opposed to streams with low flow and small isolated pools.
5. Pumping shall be terminated when the tank is full. The effect of single pumping operations, or multiple pumping operations at the same location, shall not result in obvious draw-down of either upstream or downstream pools.
6. Each pumping operations shall use a fish screen. The screen face should be oriented parallel to flow for best screening performance. The screen shall be designed and used such that it can be submerged with at least one-screen-geight clearance above and below the screen.
7. Operators shall keep a log on the truck containing the following information:
a. Operator’s Name
b. Date
c. Time
d. Pump Rate
e. Filling Time
f. Screen Cleaned (Y or N)
g. Screen condition
h. Comments
i. Copy of completed logs will be mailed to:
Shasta-Trinity National Forest Attn: Hydrologist 3644 Avtech Parkway Redding, CA. 96002
Screen Construction Criteria:
1. Surface Area:
a. The total (unobstructed) surface area of the screen shall be at least 2.5 square feet, based on the upper limit of pumping of 350 gpm. Larger surface areas are recommended where debris buildup is anticipated, and where stream depth is adequate to keep the screen submerged at approximately middepth.
2. Screen Mesh:
a. Screen Mesh must be in good repair and present a sealed, positive barrier effectively preventing entry of the “design fish” into the intake. The design fish in this case is an immature (20-30mm) salmon or steelhead fry.
b. The screen mesh size shall be: round openings – maximum 3/32 inch diameter (.09 inch)
c. Square openings – maximum 3/32 inch diagonal (.09 inch)
d. Slotted openings – maximum 1/16 inch width (.07 inch)
3. Screen Design:
a. Water drafting screens maybe off-the-shelf products, but they are often custom-made devices appropriate to the scale and duration of pumping operation. To keep the screen supported and correctly positioned in the water column, adjustable support legs are advised. Screen geometry can be configured either as rectangular or cylindrical, e.e. as a shallow “box-shape” or tubular.
b. The intake structure shall be designed to promote uniform velocity distribution at all external mesh surfaces. This can be accomplished with a simple internal baffle devise that distributes the flow evenly across the entire surface of the screen. In order to accomplish this, the designer needs to understand the hydraulic characteristics of these devices. There is a tendency for most of the intake water to enter the screen near the hose end, so a typical internal baffle would consist of a pipe (or manifolded set of pipes) which have variable porosity holes at predetermine spacing. We recommend starting near the hose end with approximately 5 – 10% average open area, and gradually increasing the porisity toward the length of the sceen. At a point where screen length exceeds three times the diameter of the suction hose, the baffling effect tends to diminish rapidly.
At this point the baffle porosity may approach 100%. A successful baffle system will functionally distribute flow to all areas of the screen. A poorly designed screen may result in high-velocity “hot spots”, which could lead to fish impingement on the screen face.
c. Hydraulic testing of prototype screen designs is recommended where the application is on-going and extensive.
4. Screen Structure:
a. The screen frame must be strong enough to withstand the hydraulic forces it will experience.
However, the structural frames, braces, and other elements that block the flow, change flow direction, or otherwise decrease the screen surface area should be minimized.
5. Screen Cleaning:
a. The screen shall be cleaned as often as necessary to prevent approach velocity from exceeding
0.33 feet per second. Operators should withdraw the screen and clean it after each use, or as necessary to keep screen face free of debris. Pumping should stop of screen cleaning when approximately fifteen percent or more of the screen area is occluded by debris. A suitable brush shall be on board the truck for this cleaning operation.
b. If the operator notes (1) impingement of any juvenile fish on the screen face or (2) entrainment of any fish through the screen mesh, he/she should stop operations and notify the Department of Fish & Game and/or NMFS hydraulic engineering staff:
National Marine Fisheries Service Engineering Section 777 Sonoma Avenue, Suite 325 Santa Rosa, CA 95404
(707) 575-6050
2.3 Dust abatement Materials shall meet the requirements of the following subsections of Forest Service Specifications for Construction of Roads and Bridges or attached Special Project Specifications.
Emulsified Asphalt 702 Blotter Material 703.12 Magnesium or Calcium Chloride Brine 723.01 Calcium Chloride Flake 723.02 Lignin Sulfonate 723.03
2.4 Testing of Materials. Certification and sampling of bituminous Materials lignin sulfonate, and magnesium chloride shall be in accordance with subsections 105.04 or 723.04 of Forest Service Specifications for Construction of Roads and Bridges.
REQUIREMENTS
3.1 General. Dust abatement Materials shall be applied to the road surface as necessary to control road surface loss, provide for road user safety, and minimize damage to adjacent resources.
3.2 Compaction. When the methods listed below specify compaction, Traveled Way shall be compacted by an 8 to 10 ton pneumatic, steel-wheeled or equivalent vibrating roller making 2 passes over the full Traveled Way and Shoulder width, unless compaction is not required on the Dust Abatement Plan.
3.3 Preparation to Dust Abatement Materials Other Than Water. The following applies to all methods of preparation:
Bituminous residue shall be scarified and pulverized to produce loosened Material not exceeding 4 inches in greatest dimension.
Traveled Way shall be bladed in accordance with T-803.
Prior to applying DO-6BA, DO-6PA, or DO-8, the top 2 inches of Traveled Way shall contain not less than 80 percent nor more than 120 percent of optimum moisture as determined by AASHTO T-99, Method C. Prior to applying other bituminous Material, Traveled Way shall have a moisture content between 1 and 3 percent.
If surface dusting prevents the bituminous Material from penetrating, a light application of water shall be applied just prior to applying the bituminous Material.
Lignin Sulfonate and magnesium chloride shall be applied when the top 1 inch of Traveled Way contains not less than 3 percent moisture, nor more than 120 percent of optimum moisture as determined by AASHTO T-99, Method C.
Moisture content will be determined in accordance with AASHTO T-217 OR T-239.
One or more of the following methods shall be used, as specified in the Dust Abatement Plan.
Method 1. Compact Traveled Way and apply the dust abatement Material.
Method 2. Develop a layer of loose Material approximately 1 inch in depth for the full width of Traveled Way.
Apply the dust abatement Material to this loose Material and compact after penetration. If traffic makes maintenance of the loose Material difficult, 1 inch of the Material may be bladed into a windrow along the Shoulder.
The specified moisture content shall be maintained in the windrow and the top 1 inch of Traveled Way. The windrow shall be bladed to a uniform Material. When the dust abatement Material has penetrated, Traveled Way shall be compacted.
Method 3. Blade 1 inch of Material from Traveled Way into a windrow along the Shoulder. Maintain the specified moisture content in the windrow and the top inch of Traveled Way. Apply half the dust abatement Material. When the dust abatement Material has penetrated, the windrow shall be bladed to a uniform depth across dust abatement Traveled Way, and the remaining dust abatement Material shall be applied. Traveled Way shall be compacted.
Method 4. Develop a layer of loose Material approximately 2 inches in depth for the full width of Traveled Way.
Apply half the dust abatement Material to the loose Material. Blade the top 2 inches into a windrow along the Shoulder. Apply the remaining dust abatement Material to Traveled Way and the Berm. Spread the Berm evenly across Traveled Way and compact.
3.4 Preparation for Dust Abatement with Water. Traveled Way shall be prepared in accordance with Specification T-803 Surface Blading when required.
3.5 Application Tolerance. Dust abatement Materials other than water shall be applied within 0.05 gallons per square yard of the rate specified.
3.6 Mixing Requirements. DO-6BA, DO-6PA, and DO-8 shall be thoroughly circulated in the distributor within 1 hour of application.
3.7 Weather Limitations. Dust abatement Materials shall not be applied when it is raining.
Bituminous Material shall be applied when the surface temperature of Traveled Way is 50 degrees Fahrenheit or higher.
Lignin sulfonate and magnesium chloride shall be applied when the atmospheric temperature is 40 degrees Fahrenheit or higher.
3.8 Blotter Material. Blotter Material shall be spread in a sufficient quantity to prevent tire pickup.
Dust Abatement Plan (T-806) (7/01)
If water is used: Complete abatement once for each hauling day shall satisfy this requirement, except that when production exceeds 10 loads per operating day, water shall be applied to dusting roads through the day while hauling
2 Preparation method for water: Preparation shall be in accordance with the T-806 Dust Abatement Specification
Road Segment
Material Type or Grade
Application Rate Frequency of Subsequent Application
Prepration Method
Weight Volume Conversion
Factor Initial Subsequent
45N28-SEG 1 Water N/A N/A See #1 Above See #2 Above N/A
45N28-SEG 2 Water N/A N/A See #1 Above See #2 Above N/A
45N28-SEG 3 Water N/A N/A See #1 Above See #2 Above N/A
45N39 Water N/A N/A See #1 Above See #2 Above N/A
45N41 Water N/A N/A See #1 Above See #2 Above N/A
45N53- SEG 1 Water N/A N/A See #1 Above See #2 Above N/A
45N53- SEG 2 Water N/A N/A See #1 Above See #2 Above N/A
45N53- SEG 3 Water N/A N/A See #1 Above See #2 Above N/A
45N53X Water N/A N/A See #1 Above See #2 Above N/A
45N08X Water N/A N/A See #1 Above See #2 Above N/A
SPECIFICATION T-807 ROADWAY VEGETATION
1.1 This work includes removal of brush and trees from within the Roadway limits.
REQUIREMENTS
3.1 Vegetative matter within the Roadway which impedes vehicular travel or interferes with road maintenance operations, such as surface blading and ditch and culvert cleaning shall be removed. Downed timber meeting utilization standards shall be cut in appropriate lengths and decked along the Roadside in locations where the Traveled Way or sight distances will not be impaired.
3.2 Vegetative matter removed from the Roadway shall be treated by the specified method shown on Contract Area Map and/or as required by other slash treatment methods.