Appendix A_Attach2_GULLY_INFILLED.pptx
PPTX presentation 234 KB Posted
- Attached to
- STEWARDSHIP - Dutch Hill IRSC Federal contract opportunity
- Solicitation number
- 12168120R4001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attach 2 DutchHill_MandatoryProjectService_Map_6232020.pdf | ||
| Appendix A_062920_JT.docx | DOCX document | |
| Attach 4 DutchHill_ContractAreaMap_6232020.pdf | ||
| Appendix B_062920_JT.docx | DOCX document | |
| Attach 1 Volume Table_Estimate.xlsx | XLSX spreadsheet | |
| Attach 3 DutchHill_Materials_Map.pdf | ||
| Attach 5 BidForm.pdf | ||
| Appendix A_Attach1_CULVERT_TYPICAL.pdf | ||
| Attach 6 SCA 1981-0213 Rev 53 021920.pdf | ||
| 1224H820R4001 Complete 070920.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GULLY INFILLED WITH SAPLING TO FULL SIZE TREES WITH BRANCHES
Embedded log to counter buoyancy Woody infill Existing ground
Backfilled trench
PERSPECTIVE VIEW OF WOODY MATERIAL GULLY INFILL WITH EMBEDDED LOG TIE DOWN
Embedded log check dam at end of infill for log retention Embedded log to counter buoyancy Woody infill in gully
Soil surface above gully Flow Direction
GULLY INFILLED WITH SAPLING TO FULL SIZE TREES WITH BRANCHES AND SOIL COVER
Soil from regraded bank Existing ground regraded bank and ground
Gully filled with woody materials and soil
Embedded log check dam at bottom of infill for log retention
SINGLE GULLY WOOD PLUG
GULLY MITIGATION STRATEGY
Rebar image1.png
File details come from the government source that posted it. Updated .