ANNEX B EVAL FACTORS UPS PCOLA.docx

DOCX document 14 KB Posted

Attached to
PENSACOLA UPS SERVICE Federal contract opportunity
Solicitation number
N7027223Q0045
Issued by
Department of the Navy Naval Supply Systems Command

About this file

This document contains an annex for evaluating technical acceptability of offers submitted in response to solicitation number N7027223Q0045 for UPS service requirements at Pensacola, Florida issued by the Department of the Navy Naval Supply Systems Command. The annex lists 20 technical requirements for uninterruptible power supply systems to be evaluated on a compliant, non-compliant, or clarification required basis. Requirements include specifications for new and Eaton batteries, knowledge and experience levels of electricians and UPS technicians, and other unspecified requirements. Offerors are instructed to clearly state any requirements identified on their statement of work.

View the file

Other files for this federal contract opportunity

Other files attached to PENSACOLA UPS SERVICE, newest first.
File Type Posted
23Q0045 BNLS Redacted.pdf PDF
ANNEX A PWS.docx DOCX document
ANNEX C PRICE BREAKDOWN.xlsx XLSX spreadsheet
23Q0045 RFQ.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ANNEX B

TECHNICAL ACCEPTABILITY REVIEW

Contractor’s technical offer will be assessed based on the RFQ PWS/SOW identified technical requirements. The following will be applied for determination of acceptability:

Contractor Designation Number: _________________________________

#
Requirement
Compliant (C)
Non-Compliant (NC)
Requires Clarification

(RC)

1
New and Eaton Batteries
2
Knowledge and Experience
3
Level of Electrician Needed
4
Level of UPS Technician Needed

Requestor shall identify the factors on their PWS/SOW that will be used to evaluate technical acceptability of offers. Lines can be added or removed. All items identified shall be clearly stated on the PWS/SOW and be specific to the requirement, not a want but a bona-fide need for the services required.

File details come from the government source that posted it. Updated .