ANFVRD_RedSpringsRestroom_SOW_2023.pdf

PDF 214 KB Posted

Attached to
Precast Cement Vault Toilet Federal contract opportunity
Solicitation number
1240LS23B0004
Issued by
Department of Agriculture Forest Service

View the file

Other files for this federal contract opportunity

Other files attached to Precast Cement Vault Toilet, newest first.
File Type Posted
ANFVRD_RedSpringsC.G._ScheduleofItems_2023 Solicitation.pdf PDF
Sol_1240LS23B0004.pdf PDF
ANFVRD_RedSpringsRestroom_Map_2022.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

0401 RAC Red Springs C.G. Restroom Replacement

1. Scope of Work

• Ashley National Forest, Vernal Ranger District, is planning to replace the restroom at Red Springs Campground with a double vault pre-cast concrete toilet.

2. Background

• Ashley National Forest, Vernal RD applied and was awarded funds from the Northern Utah Resource Advisory Committee, project # 21-0401-012.

3. Contractor Requirements

• Contractor will fabricate, deliver, off-load and set/assemble the new pre-cast concrete restroom buildings with vaults.

• Provide restrooms that meet the specifications according to the attached Schedule of Items, Region 4 Concrete Vault Toilet Order Forms.

• Toilet buildings must be fully accessible and must meet the design standard for naturally ventilated, odor free buildings.

• Pre-cast concrete buildings shall be delivered in a completed state with minimal fieldwork required to place and complete installation on the site. No painting except for touch-up may be complete at the site. No concrete work shall be allowed at the site as part of the building construction.

• Provide crane and crew to off-load and set the concrete vaults and concrete restrooms.

• Provide Contracting Officer Representative with specifications on site prep work to be done by the Forest Service.

4. Government Furnished

• Provide gravel bed and fill material per contractor specifications.

• Government will prepare the site for the contractor to offload and set structures.

• Provide site preparations to contractor specifications prior to delivery of cement vault restroom buildings.

• Finalize site landscaping after installation is completed.

5. Deliverables/Schedule

• Coordinate with Contracting Officer Representative (COR) to schedule deliveries.

• Deliveries acceptable as early as June 2023 and shall be finalized by October 2024.

• Deliveries accepted Monday – Friday (excluding Federal Holidays).

• Deliveries shall be delivered to locations shown on Schedule of Items.