Airfield Paving Section 01 Specifications_4-29-2020.pdf
PDF 608 KB Posted
- Attached to
- Draft Solicitation - $400M Airfield Paving Construction MATOC Federal contract opportunity
- Solicitation number
- W9128F20R0062
About this file
This draft solicitation is for an indefinite delivery/indefinite quantity multiple award task order contract for airfield paving construction services. The total ceiling value of the contract is $400 million. The solicitation is seeking proposals from contractors to perform airfield paving construction projects at various locations within the United States. Contractors will compete for both design-bid-build and design-build task orders. Task orders will have period of performance ranging from one to five years. The NAICS code for this procurement is 237990 and it is unrestricted. Questions regarding the draft solicitation are due by October 8, 2020 and must be submitted through the PROJNET system.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Combined Air Field Paving Specs for Sample Project.pdf | ||
| AIRFIELD PAVING MATOC SAMPLE PROJECT.pdf | ||
| W9128F20R0062-Draft RFP-400M_Airfield Paving Construction MATOC.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Airfield Paving MATOC, NWD W9128F20R0062
SECTION 01 30 00.24 Page 1
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 30 00.24
OTHER ADMINISTRATIVE AND SPECIAL REQUIREMENTS
07/19
PART 1 GENERAL
1.1 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE
1.2 CONTRACTOR SUPPLY AND USE OF ELECTRONIC SOFTWARE FOR PROCESSING
CONSTRUCTION WAGE RATE REQUIREMENTS STATUTE CERTIFIED LABOR
PAYROLLS
1.3 BASIS FOR SETTLEMENT OF PROPOSALS (MAR 2009)
1.4 COMPLETION OF WORK
1.5 CONTRACTOR PERFORMANCE EVALUATIONS
1.6 MANPOWER REPORTING
1.7 LIQUIDATED DAMAGES-CONSTRUCTION
1.8 ANTITERRORISM (AT)/OPERATIONS SECURITY (OPSEC) PROVISIONS
1.9 COMPUTING COMPLETION DATES FOR NON-WORK PERIOD
1.10 ORDER OF WORK
1.11 OFFUTT AIR SHOW/OPEN HOUSE
1.12 GENERAL REQUIREMENTS
1.13 MISSION DELAY DAYS
1.14 CONTRACT DRAWINGS AND SPECIFICATIONS
1.14.1 SETS FURNISHED
1.14.2 SETS FURNISHED
1.14.3 REPRODUCTION AND DISTRIBUTION
1.14.4 NOTIFICATION OF DISCREPANCIES
1.14.5 OMISSIONS
1.15 SUBMITTALS
1.16 CONCURRENT CONSTRUCTION
1.17 TELEPHONE SERVICE
1.18 PAYMENT
1.18.1 PROMPT PAYMENT ACT
1.18.2 PAYMENT FOR MATERIALS DELIVERED OFFSITE
1.18.3 CONTRACTOR PAYROLL RECORD
1.19 AVAILABILITY OF UTILITY SERVICES
1.20 AVAILABILITY OF UTILITY SERVICES (for Denver area task orders)
1.21 UTILITY SERVICE INTERRUPTIONS
1.21.1 Advance Notice
1.21.2 Overtime Work by Base Operating and Maintenance (O&M)
Personnel
1.21.3 Buried Utilities
1.22 DIGGING PERMITS AND ROAD CLOSINGS
1.23 QUANTITY SURVEYS
1.24 VARIATIONS IN ESTIMATED QUANTITIES - SUBDIVIDED ITEMS
1.25 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER
1.26 IOWA SALES AND USE TAX
1.27 INSURANCE REQUIRED
1.28 SECURITY REQUIREMENTS
1.28.1 Contractor's Employee Identification
1.28.2 Entry Requirements
SECTION 01 30 00.24 Page 2
1.28.3 F.E. Warren AFB Entry Requirements
1.28.4 Fort Carson Entry Requirements
1.28.4.1 AT/OPSEC
1.28.4.2 Real ID Act
1.28.4.3 Foreign Nationals (FN)
1.28.5 Fort Carson Installation Access Control Card
1.28.6 Visitor Day Pass
1.28.7 Vehicle Registration Requirements and Documentation
1.28.7.1 General Requirements
1.28.7.2 Authorized Access Points (Cantonment Area)
1.28.7.2.1 Commercial Vehicle Access
1.28.7.3 Types of Vehicles
1.28.7.4 Motor Vehicle Operator Access Documentation
1.29 CONTRACTOR PERSONNEL
1.30 CONTRACTOR QUALITY CONTROL (CQC)
1.31 NONDOMESTIC CONSTRUCTION MATERIALS
1.32 DAILY WORK SCHEDULES AND WEEKLY COORDINATION MEETINGS
1.33 AS-BUILT DRAWINGS
1.34 SIGN
1.35 GOVERNMENT-FURNISHED PROPERTY
1.36 ACCOMMODATIONS FOR GOVERNMENT INSPECTORS
1.37 LABORATORY BUILDING
1.38 SPECIAL INSTRUCTIONS FOR PROGRESS CHARTS
1.39 ASBESTOS AND LEAD
1.40 PARTNERING
1.41 PROFIT
1.42 EXTENDED OVERHEAD [For Life Cycle Cost task orders only]
1.43 OVERHEAD
1.44 LABOR CONDITIONS APPLICABLE TO TEMPORARY FACILITIES
1.45 DRAWING SCALES
1.46 WAGE RATE APPLICATION
1.46.1 Building Schedule
1.46.2 Heavy and Highway Schedule
1.46.3 Highway Schedule
1.46.4 Heavy Schedule
1.47 FEDERAL HOLIDAYS
1.48 BASE HOURS
1.49 UPKEEP OF ROADWAYS WITHIN A MILITARY INSTALLATION [For Ellsworth
AFB task orders at a minimum]
1.50 GPS SURVEY OF AS-BUILT UTILITY LINES/POINTS [For Buckley AFB task orders]
PART 2 NOT USED
PART 3 EXECUTION
3.1 APPENDIX A- CONTRACT DOCUMENT DISTRIBUTION LIST
3.2 F.E. WARREN AFB ID CARD APPLICATION
ATTACHMENTS:
Appendix A - Contract Document Distribution List
Utility Outage Guidance: FC Reg 420-19 and Request Form: FC FORM 420-E
Project Sign Details
SECTION 01 30 00.24 Page 3
General Wage Decision Nos. will be provided in each task order.
F.E. Warren AFB ID Card Application
-- End of Section Table of Contents --
SECTION 01 30 00.24 Page 4
SECTION 01 30 00.24
OTHER ADMINISTRATIVE AND SPECIAL REQUIREMENTS
07/19
General Wage Decision Nos. will be provided in each task order.
1.1 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE
Note: Copies of each regional schedule may be obtained through the following Internet site:
http://www.publications.usace.army.mil/USACEPublications/EngineerPamphlets.aspx.
Currently the "Construction Equipment Ownership and Operating Expense Schedule" can be accessed on page 12-13 of 15 of the afore indicated URL.
Standard Form 1411 is no longer a current form. The Contracting Officer may require submission of cost or pricing data in the format indicated in Table 15-2 of FAR 15.408, specify an alternative format, or permit submission in the contractor’s format. Information other than cost or pricing data may be submitted in the contractor’s own format unless the use of a specific format is prescribed elsewhere in this contract.
(a) This clause does not apply to terminations. See paragraph: Basis for Settlement of Proposals below and FAR Part 49.
(b) Allowable cost for construction and marine plant and equipment in sound workable condition owned or controlled and furnished by a Contractor or subcontractor at any tier shall be based on actual cost data for each piece of equipment or groups of similar serial and series for which the Government can determine both ownership and operating costs from the Contractor's accounting records. When both ownership and operating costs cannot be determined for any piece of equipment or groups of similar serial or series of equipment from the Contractor's accounting records, costs for that equipment shall be based upon the applicable provisions of EP 1110-1-8, "Construction Equipment Ownership and Operating Expense Schedule," Region to be specified in each task order. Working conditions shall be considered to be average for determining equipment rates using the schedule unless specified otherwise by the Contracting Officer. For equipment not included in the schedule, rates for comparable pieces of equipment may be developed using the formula provided in the schedule.
For forward pricing, the Schedule in effect at the time of negotiations shall apply. For retrospective pricing, the Schedule in effect at the time the work was performed shall apply.
(c) Equipment rental costs are allowable, subject to the provisions of
FAR 31.105(d)(ii) and FAR 31.205-36. Rates for equipment rented from an organization under common control, lease-purchase arrangements, and http://www.publications.usace.army.mil/USACEPublications/EngineerPamphlets.aspx
SECTION 01 30 00.24 Page 5 sale-leaseback arrangements will be determined using the schedule, except that actual rates will be used for equipment leased from an organization under common control that has an established practice of leasing the same or similar equipment to unaffiliated lessees.
(d) When actual equipment costs are proposed and the total amount of the pricing action exceeds the small acquisition threshold (SAT), the contracting officer shall request the contractor to submit either certified cost or pricing data, or partial/limited data as appropriate.
The data shall be submitted on Standard Form 1411, Contract Pricing Proposal Cover Sheet.
1.2 CONTRACTOR SUPPLY AND USE OF ELECTRONIC SOFTWARE FOR PROCESSING
CONSTRUCTION WAGE RATE REQUIREMENTS STATUTE CERTIFIED LABOR PAYROLLS
(a) The Contractor is encouraged to use a commercially-available electronic system to process and submit certified payrolls electronically to the Government. The requirements for preparing, processing and providing certified labor payrolls are established by the Wage Rate Requirements statute.
(b) If the Contractor elects to use an electronic payroll processing system, then the Contractor shall be responsible for obtaining and providing for all access, licenses, and other services required to provide for receipt, processing, certifying, electronically transmitting to the Government, and storing weekly payrolls and other data required for the Contractor to comply with the Wage Rate Requirements statute. When the Contractor uses an electronic payroll system, the electronic payroll service shall be used by the Contractor to prepare, process, and maintain the relevant payrolls and basic records during all work under this construction contract and the electronic payroll service shall be capable of preserving these payrolls and related basic records for the required 3 years after contract completion. If the Contractor chooses to use an electronic payroll system, then the contractor shall obtain and provide electronic system access to the Government, as required to comply with the Wage Rate Requirements over the duration of this construction contract.
The access shall include electronic review access by the Government contract administration office to the electronic payroll processing system used by the contractor.
(c) The Contractor's provision and use of an electronic payroll processing system shall meet the following basic functional criteria:
(1) commercially available;
(2) compliant with appropriate Wage Rate Requirements statute payroll provisions in the FAR;
(3) able to accommodate the required numbers of employees and subcontractors planned to be employed under the contract;
(4) capable of producing electronic output of weekly payroll records that are capable of being uploaded into the Resident Management System (RMS);
(5) demonstrated security of data and data entry rights;
SECTION 01 30 00.24 Page 6
(6) ability to produce Contractor-certified electronic versions of weekly payroll data;
(7) ability to identify erroneous entries and track the data/time of all versions of the certified Wage Rate Requirements statute payrolls submitted to the government over the life of the contract;
(8) capable of generating a durable record copy, that is, a CD or DVD and PDF file record of data from the system database at end of the contract closeout. This durable record copy of data from the electronic Construction Wage Rate payroll processing system shall be provided to the Government during contract closeout.
(d) All Contractor-incurred costs related to the Contractor's provision and use of an electronic payroll processing service shall be included in the Contractor's price for the overall work under the contract. The costs for compliance with the Wage Rate Requirements statute by using electronic payroll processing services shall not be a separately bid or reimbursed item under this contract.
1.3 BASIS FOR SETTLEMENT OF PROPOSALS (MAR 2009)
Actual costs will be used to determine equipment cost for a settlement proposal submitted on the total cost basis under FAR 49.206-2(b). In evaluating a termination settlement proposal using the total cost basis, the following principles will be applied to determine allowable equipment costs:
(a) Actual costs for each piece of equipment, or groups of similar serial or series equipment, need not be available in the contractor's accounting records to determine total actual equipment costs.
(b) If equipment costs have been allocated to a contract using predetermined rates, those charges will be adjusted to actual costs.
(c) Recorded job costs adjusted for unallowable and unallocable expenses will be used to determine equipment operating expenses.
(d) Ownership costs (depreciation) will be determined using the contractor's depreciation schedule (subject to the provisions of FAR
31.205 11).
(e) License, taxes, storage and insurance costs are normally recovered as an indirect expense and unless the contractor charges these costs directly to contracts, they will be recovered through the indirect expense rate.
1.4 COMPLETION OF WORK
See Section 00 73 00 SUPPLEMENTARY CONDITIONS (SPECIAL CONTRACT
REQUIREMENTS), FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF
WORK (APR 1984).
SECTION 01 30 00.24 Page 7
1.5 CONTRACTOR PERFORMANCE EVALUATIONS
Federal Acquisition Regulation (FAR) Subpart 36.201(Evaluation of Contractor Performance) requires evaluation of the construction contractor's performance throughout the contract period of performance.
The United States Army Corps of Engineers (USACE) follows the procedures outlined in Engineering and Construction Bulletin 2014-13 to fulfill this FAR requirement. For construction contracts valued at or above $700,000.00, including all modifications, the USACE will evaluate Contractor's performance using the web-based Contractors Performance Assessment Reporting System (CPARS). After the USACE drafts an evaluation (interim or final), the Contractor will have the opportunity to access, review, comment and either concur or non-concur with the evaluation in the CPARS system for a period of 60 days. Access to the CPARS system requires either specific software called PKI certification (recommended method) or a username and password. The PKI certification is a Department of Defense recommendation and to provide security in electronic transactions. The certification software could cost approximately $110 - $125 per certificate per year and may be purchased from an External Certificate Authorities (ECA) vendor. Current information about the PKI certification process and contacting vendors can be found on the web site:
https://www.cpars.gov.
1.6 MANPOWER REPORTING
Contractors may direct technical questions to the "Send an Email" link at website or email contractormanpower@hqda.army.mil for current information on CMRA. Information regarding changes to the reporting process, when data should be entered, general policy information, how data is protected, and how to enter certain data can be found under the Frequently Asked Questions (FAQ) section at the CMRA website. Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2013.
The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the contractor will report ALL contractor manpower (including subcontractor manpower) required for performance of this contract. The contractor is required to completely fill in all the information in the format using the following web address: https://ecmra.mil (https://ecmra.army.mil). The required information includes: (1) Contracting Office, Contracting Officer, Contracting Officer's Technical Representative; (2) Contract number, including task and delivery order number; (3) Beginning and end dates covered by reporting period; (4) Contractor name, address, phone number, e-mail address, identity of contractor employee entering data; (5) Estimated direct labor hours (including sub-contractor); (6) Estimated direct labor dollars paid this reporting period (including sub-contractor); (7) Total payments (including subcontractor); (8) Predominant Federal Service Code(FSC) reflecting services provided by contractor (and separate predominant FSC for each sub-contractor if different); (9) Estimated data collection cost; (10) Organizational title associated with the Unit Identification Code (UIC) for the Army Requiring Activity (the Army Requiring Activity is responsible for providing the contractor with its UIC for the purposes of reporting this information; (11) Locations where contractor and sub-contractors perform the work (specified by zip code in the United States and nearest City, Country, when in an overseas location, using http://www.cpars.gov/ mailto:contractormanpower@hqda.army.mil
SECTION 01 30 00.24 Page 8 standardized nomenclature provided on website); (12) Presence of deployment or contingency contract language; and, (13) Number of contractor and sub-contractor employees deployed in theater this reporting period (by country). As part of its submission, the contractor will also provide the estimated total cost (if any) incurred to comply with this reporting requirement. Reporting period will be the period of performance not to exceed 12 months ending September 30 of each government fiscal year and must be reported by 31 October of each calendar year. "*
*Note: Information from the secure web site is considered to be proprietary in nature when the contract number and contractor identity are associated with the direct labor hours and direct labor dollars. At no time will any data be released to the public with the contractor name and contract number associated with the data. For internal Army analysis, the reports and queries from the database shall not contain proprietary data.
1.7 LIQUIDATED DAMAGES-CONSTRUCTION
See Section 00 73 00 SUPPLEMENTARY CONDITIONS (SPECIAL CONTRACT
REQUIREMENTS), FAR 52.211-12 LIQUIDATED DAMAGES-CONSTRUCTION (SEPT 2000).
1.8 ANTITERRORISM (AT)/OPERATIONS SECURITY (OPSEC) PROVISIONS
1. AT Level I Training
Contractor employees, to include subcontractor employees, requiring access to Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The Contractor shall submit certificates of completion for each affected Contractor employee and subcontractor employee, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website:
http://jko.jten.mil/courses/atl1/launch.html; or it can be provided by the RA ATO in presentation form which will be documented via memorandum.
2. Access and General Protection/Security Policy and Procedures
All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.
2b. for Contractors Who Do Not Require CAC, But Require Access To A Dod Facility Or Installation http://jko.jten.mil/courses/atl1/launch.html%3B
SECTION 01 30 00.24 Page 9
Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05 / AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative, as NCIC and TSDB are available), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
3. Not Used
4. Suspicious Activity Reporting Training (e.g. iWATCH, CorpsWatch, or See Something, Say Something)
The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after the completion of the training.
5. Contractor Employees Who Require Access to Government Information Systems.
Not Applicable
6. OPSEC Standing Operating Procedure/Plan
7. OPSEC Training
All new contractor employees will complete Level I OPSEC Training within 30 calendar days of their reporting for duty. Additionally, all contractor employees must complete annual OPSEC awareness training. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training.
OPSEC awareness training is available at the following websites:
https://www.iad.gov/ioss/ or http://www.cdse.edu/catalog/operations-security.html; or it can be provided by the RA OPSEC Officer in presentation form which will be documented via memorandum.
8. Information Assurance (IA)/Information Technology (IT) Training
9. Information Assurance (IA)/Information Technology (IT) Certification
Not Applicable
10. Not Used
11. Not Used http://www.iad.gov/ioss/ http://www.cdse.edu/catalog/operations-security.html%3B
SECTION 01 30 00.24 Page 10
12. Handling or Access to Classified Information.
13. Will be Escorted in Areas Where They May be Exposed to Classified and/or Sensitive Materials and/or Sensitive or Restricted Areas
If applicable, all contract employees, including subcontractor employees who are not in possession of the appropriate security clearance or access privileges, will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas.
14. Contractor Company to Obtain a Facility Clearance and Individual Clearances at the Appropriate Level
The Prime Contractor Company must have (or will have) a Facility Clearance (FCL) at the appropriate level (IAW the NISPOM DOD 5220.22-M and AR 380-49) prior to the start of the contract awarded period of performance.
Contractor personnel performing work under this contract must have the required security clearance, per AR 380-67, at the appropriate level at the start of the period of performance. Security Clearances and FCL requirements are required to be maintained for the life of the contract IAW the DD254 attached to the contract. If no FCL, the supporting Government Contracting Activity will sponsor the prime contract company in obtaining the FCL.
15. Pre-Screen Candidates using E-Verify Program
The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award.
16. Required Armed Security Guards
17. Threat Awareness Reporting Program (TARP) Training
All new contractor employees will complete annual Threat Awareness and Reporting Program (TARP) Training provided by a Counterintelligence Agent, IAW AR 381-12 . The contractor shall submit certificates of completion for each affected contractor and subcontractor employee(s) or a memorandum for the record, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training. Authorized webbased TARP training for CAC card holders is available at the following website: https://www.us.army.mil/suite/page/655474
1.9 COMPUTING COMPLETION DATES FOR NON-WORK PERIOD
Such periods will be defined, as applicable, in each task order.
1.10 ORDER OF WORK
An order of work will be specified, as applicable, in each task order.
http://www.uscis.gov/e-verify) http://www.us.army.mil/suite/page/655474
SECTION 01 30 00.24 Page 11
1.11 AIR SHOW/OPEN HOUSE
Work shall be scheduled so that there will be no construction during the 3 days (Friday, Saturday, and Sunday) of the air show and open house.
Construction sites shall be in safe and orderly condition with no open holes, materials neatly and safely stored, equipment properly secured, and all debris removed. Specific information will be included in the task order RFP.
1.12 GENERAL REQUIREMENTS
Record of Non-Applicability (RONA) or Information Required for General Conformity Review must be completed before project commencement. The Information Required for General Conformity Review Document is enclosed.
1.13 MISSION DELAY DAYS
A number will be shared, as applicable, in each task order.
1.14 CONTRACT DRAWINGS AND SPECIFICATIONS
1.14.1 SETS FURNISHED
The contractor shall be responsible for making copies of conformed specifications with amendments or changes incorporated. The bid drawings and specifications as amended shall be utilized in the performance of the work until CD-ROM or DVD-ROM containing the conformed specifications and contract drawings (i.e., bid drawings that have been posted with all amendment changes) is mailed or sent electronically to the Contractor.
See Appendix A for Document Distribution list. See paragraph below for contract drawing reproduction and distribution requirements. The work shall conform to the contract drawings, set out in the drawing index, all of which form a part of these specifications. The work shall also conform to the standard details bound or referenced herein.
1.14.2 REPRODUCTION AND DISTRIBUTION
The Contractor shall reproduce multiple legible hard copy sets (half-size English unless directed otherwise) of contract drawings from Government provided CD-ROM or DVD-ROM or sent electronically containing read-only Adobe.pdf file drawings. Within 14 calendar days after receipt of CD-ROM or DVD-ROM or electronically sent conformed specifications and drawings containing read-only Adobe.pdf drawing files, the Contractor shall provide legible hard copy drawing and conformed specification sets to the addressees contained in the Contract Document Distribution List for Project in Appendix A to this specification. The Government will process no progress payments prior to receipt of the legible contract drawings and conformed specification sets. After receipt and distribution of the legible hard copy drawing and conformed specification sets, the Government will provide the Contractor with a CD-ROM or DVD-ROM or sent electronically containing editable CAD file drawings (format defined in Section 01 78 39.00 24 AS-BUILT DRAWINGS)). The Contractor shall prepare as-built drawings as defined in Section 01 78 39.00 24 AS-BUILT DRAWINGS.
SECTION 01 30 00.24 Page 12
1.14.3 NOTIFICATION OF DISCREPANCIES
The Contractor shall check all CD-ROM or DVD-ROM or electronically sent drawing files furnished him immediately upon their receipt and shall promptly notify the Contracting Officer of any discrepancies. Dimensions marked on drawings shall be followed in lieu of scale measurements.
Enlarged plans and details shall govern where the same work is shown at smaller scales. All scales shown are based on a standard drawing size to be specified per task order. If any other size drawings are furnished or plotted the contractor shall adjust the scales accordingly. The Contractor shall also advise his sub-contractors of the above. The Contractor shall compare all drawings and verify the figures before laying out the work and will be responsible for any errors which might have been avoided thereby.
1.14.4 OMISSIONS
Omissions from the drawings or specifications or the misdescription of details of work which are manifestly necessary to carry out the intent of the drawings and specifications, or which are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work but they shall be performed as if fully and correctly set forth and described in the drawings and specifications.
1.15 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Equipment Room Drawings; G-RO.
1.16 CONCURRENT CONSTRUCTION
Construction work closely related to and/or located at the site of the work under a concurrent contract may be in progress simultaneously with work under this contract. The Contractor shall cooperate with others as necessary in the interest of timely completion of all work. In the event of interference, the Contracting Officer shall be notified immediately for resolution and his decision shall be final.
1.17 TELEPHONE SERVICE
Telephone service for Contractor facilities at most AF installations will be furnished to the Contractor at no cost except that all long distance calls
SECTION 01 30 00.24 Page 13 shall be placed with the Contractor's credit card.
information will be provided with the TO RFP.
1.18 PAYMENT
1.18.1 PROMPT PAYMENT ACT
Specific installation
Pay requests authorized in GENERAL CONDITIONS (CONTRACT CLAUSES) clause:
"Payments Under Fixed-Price Construction Contracts", will be paid pursuant to the clause, "Prompt Payment for Construction Contracts". Pay requests will be submitted on ENG Form 93 and 93a, "Payment Estimate-Contract Performance" and "Continuation". All information and substantiation required by the identified contract clauses will be submitted with the ENG Form 93, and the required certification will be included on the last page of the ENG Form 93a, signed by an authorized contractor official and dated when signed. The designated billing office is the Office of the Area Engineer.
1.18.2 PAYMENT FOR MATERIALS DELIVERED OFFSITE
a) Pursuant to Federal Acquisition Regulation (FAR) 52.232-5, Payments Under Fixed Price Construction Contracts, materials delivered to the contractor at locations other than the site of the work may be taken into consideration in making payments if included in payment estimates and if all the conditions of the General Provisions are fulfilled. Payment for items delivered to locations other than the work site shall be limited to:
(1) Materials required by the technical provisions; or
(2) Materials that have been fabricated to the point where they are identifiable to an item of work required under this contract; or
(3) Items specifically listed below.
(b) Payment for materials delivered off-site shall be made only after receipt of paid invoices listing the value of material and labor incorporated in the items along with a canceled check showing the prime contractor's title to the items delivered off site. Payment for materials delivered off-site shall be limited to the following items: List specific material items to be considered for payment when off-site delivery is made as appropriate per task order.
1.18.3 CONTRACTOR PAYROLL RECORD
Contractor shall be required to log payrolls for all their own employees and subcontractors utilizing ENG Form 3180. Each subcontractor requires a separate ENG 3180 for their payrolls. The Contractor shall maintain the ENG 3180, along with the payrolls, on site and available for review by the Contracting Officer's Representative. The ENG 3180's shall be updated weekly as payrolls are submitted. After making copies for their files, the Contractor is required to submit the originals of each week’s payrolls to the Resident Office. Before final payment, the Contractor shall provide the completed ENG 3180’s to the Contracting Officer's Representatives. If the Contractor has elected to use an electronic payroll system, as described in paragraph CONTRACTOR SUPPLY AND USE OF
ELECTRONIC SOFTWARE FOR PROCESSING CONSTRUCTION WAGE RATE REQUIREMENTS
STATUTE CERTIFIED LABOR PAYROLLS, the payroll inventory produced by the electronic payroll system will satisfy the requirements in this paragraph and FAR 52.222-8, Payrolls and Basic Records.
SECTION 01 30 00.24 Page 14
1.19 AVAILABILITY OF UTILITY SERVICES
(To be edited per task order) All reasonably required amounts of domestic water and electricity will be made available to the Contractor by the Government from existing system outlets and supplies. The Contractor shall, at his own expense, make all temporary connections and install distribution lines. The Contractor shall furnish to the Contracting Officer a complete system layout drawing showing type of materials to be used and method of installation for all temporary electrical systems.[ The Contractor shall make arrangements with the Using Service, through the Contracting Officer, as to the method of determining the amount of water and electricity to be used by him and the method of payment therefore.][ Meters shall be installed by the Contractor to determine the amount of[ water and] electricity used by him, and such utilities will be paid for by or charged to the Contractor.] All temporary lines shall be maintained by the Contractor in a workmanlike manner satisfactory to the Contracting Officer and shall be removed by the Contractor in like manner prior to final acceptance of the construction.
Normal quantities of electricity and water used to make final tests of completely installed systems will be furnished by the Government.
1.20 AVAILABILITY OF UTILITY SERVICES (Installations with Privatized Uitilities)
The Contractor shall arrange with the local utility company for electricity required by him for construction under this project and shall pay all costs in connection therewith. Reasonable amounts of domestic water will be made available to the Contractor by the Government from existing system outlets and supplies.[ The Contractor shall meter the amount of water used by him, and such amount of water will be paid for by or charged to the Contractor.] The Contractor shall, at his own expense, make all temporary connections and install distribution lines. The Contractor shall furnish to the Contracting Officer a complete system layout drawing showing type of materials to be used and method of installation for all temporary electrical systems. All temporary lines shall be maintained by the Contractor in a workmanlike manner satisfactory to the Contracting Officer and shall be removed by the Contractor in like manner prior to final acceptance of the construction. Normal quantities of electricity and water used to make final tests of completely installed systems shall be furnished by the Government.
1.21 UTILITY SERVICE INTERRUPTIONS
The Contractor shall submit written notification not less than 15 calendar days in advance of each interruption of each utility and communication service to or within existing buildings and facilities being used by others. No single outage will exceed 4 hours unless approved in writing.
The time and duration of all outages will be coordinated and approved with the Using Agency by the Contracting Officer. The Contractor may be required to submit a written notification on FC FORM 420-E within the advance notice time stated on the request form.
1.21.2 Overtime Work by Base Operating and Maintenance (O&M) Personnel
The normal working hours for Government O&M personnel whose services may be required for utility outages or similar services are from 7:00 a.m. to 3:30 p.m. Overtime work by Government O&M personnel due to Contractor delays in scheduled outages, interruptions of known utility services, or other negligent acts, shall be the responsibility of the Contractor. The Contractor shall pay the Government for such additional overtime costs at the existing overtime wage rates established for the Government personnel
SECTION 01 30 00.24 Page 15 involved.
1.21.3 Buried Utilities
The Contractor shall coordinate all excavation work including excavation for sign posts, fence posts, and utility poles with the Using Service Facilities Engineer and the telephone company prior to beginning work.
The Contractor shall coordinate and apply for dig permits for all excavations and shall be renewed every 30 days. Excavation will not be permitted without a digging permit. Digging permits typically only provide indications on where existing utilities are. The Contractor shall be responsible for locating all existing buried utilities affected by construction activities.
1.22 DIGGING PERMITS AND ROAD CLOSINGS
The Contractor shall allow 14 calendar days from date of written application to receive permission to dig and to close roads. Roads shall only be closed one lane at a time and vehicular traffic shall be allowed to pass through the construction area. Work on or near roadways shall be flagged in accordance with the safety requirements in Safety and Health Requirements Manual EM 385-1-1, which forms a part of these specifications. Work located along the alert force route shall not cause blockage and the Contractor shall maintain unobstructed access for alert force traffic at all times.
1.25 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER
a. This clause specifies the procedure for the determination of time extensions for unusually severe weather in accordance with the GENERAL CONDITIONS (CONTRACT CLAUSES) clause entitled "Default:
(Fixed-Price Construction)." In order for the Contracting Officer to award a time extension under this clause, the following conditions must be satisfied:
(1) The weather experienced at the project site during the contract period must be found to be unusually severe, that is, more severe than the adverse weather anticipated for the project location during any given month.
(2) The unusually severe weather must actually cause a delay to the completion of the project. The delay must be beyond the control and without the fault or negligence of the contractor.
b. The following schedule of monthly anticipated adverse weather delays is based on National Oceanic and Atmospheric Administration (NOAA) or similar data for the project location and will constitute the base line for monthly weather time evaluations. The contractor's progress schedule must reflect these anticipated adverse weather delays in all weather dependent activities.
MONTHLY ANTICIPATED ADVERSE WEATHER DELAY
WORK DAYS BASED ON (5) DAY WORK WEEK
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
(Numbers to be provided per task order)
c. Upon acknowledgment of the Notice to Proceed (NTP) and continuing throughout the contract, the contractor will record on the RMS daily CQC
SECTION 01 30 00.24 Page 16 report, any occurrence of adverse weather and resultant impact to normally scheduled work, within 24 hours of the event. Actual adverse weather delay days must prevent work on critical activities for 50 percent or more of the contractor's scheduled work day. Describe in the RMS daily CQC reports the critical path item that is being affected and provide the critical path activity number(s) from the current schedule. The COR must acknowledge and accept the agreed upon occurrence of each adverse weather delay in RMS for the delays to be considered as adverse weather delays.
At the end of each month, identify the number of actual adverse weather delay days that includes days impacted by actual adverse weather (even if adverse weather occurred in previous month), calculated chronologically from the first to the last day of each month, and recorded as full days.
If the number of actual adverse weather delay days exceeds the number of days anticipated in paragraph b. above, the Contracting Officer will convert any qualifying delays to calendar days, giving full consideration for equivalent fair weather work days, and issue a modification.
1.27 INSURANCE REQUIRED
In accordance with GENERAL CONDITIONS (CONTRACT CLAUSES) clause:
"Insurance Work on a Government Installation," the Contractor shall procure the following minimum insurance:
Type Amount
Workmen's Compensation and Employer's
Liability Insurance $100,000
General Liability Insurance $500,000 per occurrence
Automobile Liability Insurance Bodily injury $200,000 per person and
$500,000 per occurrence Property damage $ 20,000 per occurrence
(Coverages per FAR 28.307-2)
1.28 SECURITY REQUIREMENTS
1.28.1 Contractor's Employee Identification
The Contractor shall be responsible for furnishing to each employee and for requiring each employee engaged on the work to display such identification as may be approved and directed by the Contracting Officer. All prescribed identification shall immediately be delivered to the Contracting Officer, for cancellation upon release of any employees.
When the contract involves work in restricted security areas, only employees who are U.S. citizens will be permitted to enter. Proof of U.S.
citizenship is required prior to entry. When required by the Contracting Officer, the Contractor shall obtain and submit fingerprints of all persons employed or to be employed on the project.
1.28.2 Entry Requirements
Specific entry requirements will be included in each task order RFP, as appropriate.
1.28.2.1 F.E. Warren AFB Entry Requirements
The Contractor shall be required to submit the information shown on the attached ID Card Application on Contractor letterhead for each prime or
SECTION 01 30 00.24 Page 17 subcontractor employee requesting access to F.E. Warren AFB, Wyoming.
The information shall be typed and delivered to the F.E. Warren project office.
1.28.2.2 Fort Carson Entry Requirements
All personnel are required to show a Department of Defense (DOD) issued picture ID, Fort Carson Installation Access Control Card, to enter Fort Carson. Specific requirements and exceptions are outlined in the paragraphs below. AT/OPSEC and Real ID Act are additional requirements to other requirements listed herein.
Access restrictions to the base are listed in paragraph: Authorized Access Points below.
All personnel entering Fort Carson are subject to random vehicle searches IAW the Fort Carson Random Antiterrorism Measures Program (RAMP).
Motorcycle riders must comply with all Fort Carson requirements for use of appropriate safety equipment.
1.28.4.1 AT/OPSEC
See paragraph: ANTITERRORISM (AT)/OPERATIONS SECURITY (OPSEC) PROVISIONS above.
1.28.4.2 Real ID Act
Contractor is responsible to adhere to the Real ID Act, or any other DOD security requirement(s), when applying for access to the installation, for all prime and subcontracted employees. See https://www.dhs.gov/real-id-enforcement-brief for states with Real ID Act compliant driver's license and other identification requirements.
Personnel who present an ID from a state that is not in compliance and does not have an extension will need to provide a second form of valid photo ID along with their state ID. Acceptable form of ID to be used as a secondary ID are listed below:
U.S. Passport or Passport Card, PIV or PIV-I card issued by the Federal Government, Veterans Health Identification Card issued by the Department of Veterans Affairs, DHS "Trusted Traveler" cards (Global Entry, NEXUS, SENTRI, FAST), TWIC (Transportation Worker Identification Credential), Merchant Mariner Card issued by the DHS/U.S. Coast Guard, Driver's License issued by the U.S. Department of State, Border Crossing Card (Form DSP-150), U.S. Certificate of Naturalization or Certificate of Citizenship (Form N-550), U.S. Permanent Resident Alien Card (Form I-551), Native American Tribal photo ID, Current University/College ID card containing a photograph, name and expiration date.
Identification Card issued by a federal, State or Local Government agency provided it contains a photograph and biographic information such as name, date of birth, gender, height, eye color and address.
1.28.4.3 Foreign Nationals (FN)
Foreign Nationals (FN) are persons that are not U.S. citizens, INS Naturalized Immigrants, or do not possess a valid DOD Identification Card. The Contractor is responsible for any FN worker or visitor and ensures that that each FN worker or visitor possesses a valid Passport or valid INS Visa/paperwork on their person. No other identification will be accepted. FN workers or visitors are required to be under escort by a DOD Identification Card bearing Adult at all times. The Government will not http://www.dhs.gov/real-id-enforcement-brief
SECTION 01 30 00.24 Page 18 be responsible for providing escort services. Any FN workers and visitors are required to be processed through base security upon each entry to Fort Carson. The Government reserves the right to deny access to any FN worker or visitor that fails to comply with access procedures or does not have proper paperwork.
1.28.5 Fort Carson Installation Access Control Card
Contractor employees that do not have a valid CAC, retired military ID card, or military dependent ID card are required to obtain a Fort Carson Installation Access Control Card, which includes a photo. The following steps are required to obtain a Fort Carson Installation Access Control Card.
1) Contractor requests FC Form 2036-E Request for Fort Carson Installation Access Control Card from the COR and complete the form.
The form will not be accepted handwritten. It must be filled out electronically.
2) Contractor provides the completed form in PDF format electrically by email to the COR for approval and digital signature. The sponsor listed on FC Form 2036-E is required to be the Prime Contractor. As the sponsor, the Prime Contractor is responsible for 1) reviewing the FC Form 2036-E or correctness and completeness, 2) maintaining a list of personnel with Installation Access Control Cards for the project,
3) returning the Installation Access Control Cards with then they expire, and 4) collecting and returning Installation Access Control Cards when personnel are fired or quit.
3) The COR will verify need for Fort Carson access, digitally sign, and email back to the Contractor. Digitally Signed FC Form 2036-Es are valid for initial issuance of a pass for 60 days from the date it is signed by the certifying authority.
4) After receiving the digitally signed FC Form 2036-E, the Contractor employee shall print a copy and take it to the Visitor Center at Gate 1 (Bldg 6012) for NCIC III check. In addition to the printed digitally signed FC Form 2036-E, each contractor employee is required to bring an accepted ID, vehicle registration and proof of insurance, and be prepared to wait until while the NCIC III check is done.
Acceptable forms of ID include:
a. Valid state driver's license or identification card,
b. Locally issued installation badge and/or pass,
c. Valid U.S. passport,
d. DA Form 1602 (Civilian Identification and Gold Star Family, School District Employees ID (only until the installation has a local produced badge),
e. Transportation Security Agency (TSA) issued Transportation Worker Identification Credential (TWIC),
f. DD Form 2574, Armed Forces Exchange Services ID and Privilege,
g. Air Force (AF) Form 354, Civilian ID,
h. DD Form 1934, Geneva Convention ID card for Medical and Religious,
i. DD Form 2764, US DoD/Uniformed Services Civilian Geneva Convention ID, or
j. DD Form 489, Geneva Convention ID card for Civilians.
In most cases, a Fort Carson Installation Access Control Card with photo will be issued upon completion of the NCIC III check. The expiration date on the card will be for the duration of the contract or 365 days, whichever is less.
SECTION 01 30 00.24 Page 19
Possible reasons to be denied access under the NCIC III check include, but are not limited to: felony in the last 10 years, rape, child molestation, child pornography, and assault and Fire arm related crimes, and outstanding arrest warrants.
During the prescreening, if the contract employee fails the background check, they may be detained or not allowed on post based on the failure. If they have an active warrant, they will be detained and turned over to local law enforcement.
5) If access to Fort Carson is denied, contractor employee can submit a Fort Carson Access Control Denial Waiver Application. USACE will only endorse waiver applications under extenuating circumstances.
1.28.6 Visitor Day Pass
For Visitor access, use Gate 1 Visitor Center where the NCIC check will be done and a Day Pass issued. A State issued or other valid picture ID is required. This also applies to all those who have a valid ID, but have temporarily misplaced it.
1.28.7 Vehicle Registration Requirements and Documentation
1.28.7.1 General Requirements
Entry of motor vehicles onto the Fort Carson is a privilege permitted by the Installation Commander. This privilege may be revoked if the driver fails to comply with applicable Fort Carson regulations and requirements contained herein. NO ONE has the "right" to drive on a military installation, regardless of if military or civilian. In any cases not covered by Fort Carson regulations, the traffic laws of the State of Colorado will apply.
The Contractor insures that all incoming personnel (prime and subcontract) operating motor vehicles on Fort Carson are familiar with Colorado Motor Vehicle Revised Statute 42-4-310 (Requirements for the state emissions test).
1.28.7.2 Authorized Access Points (Cantonment Area)
Contractor employees (Prime and Subcontractor) with a Ft. Carson Installation Access Control Card or valid Department of Defense (DOD) issued photo identification card may enter through any of the access points listed below. The far left lane for Gates 1 and 3 are reserved for DOD ID card holders. Guests can easily access Gate #1 after obtaining a day pass at the Gate #1 Visitor Center. The Government reserves the right to conduct a 100 percent ID check at any time. Gate restrictions are listed below:
(1) Gate #1 - Nelson Boulevard - 24-hour access (two-way gate).
This is the main gate located Highway #115.
(2) Gate #2 - O'Connell Boulevard - when open (two-way gate).
(3) Gate #3 - Chiles Avenue - 24-hour access (for commercial vehicles)
(4) Gate #4 - Barkeley Avenue - 24-hour access (two-way gate)
(5) Gate #5 - Titus Boulevard (Golf Course) - when open (two-way gate)
(6) Gate #6 - Wilderness Road - when open (two way gate)
(7) Gate #20 - Specker Avenue - 24-hour access (two-way gate).
1.28.7.2.1 Commercial Vehicle Access
SECTION 01 30 00.24 Page 20
Commercial vehicles are required to use Gate #3 for access, where the NCIC check will be done in lane. One-time access will be granted.