9. Items of Work and Construction Details Items of work to be performed in conformance with this specification and the construction details therefore are:
a. Subsidiary Item, Construction Surveys
(1) In Section 5, Construction surveys, Method 2 shall apply.
(2) The contractor is not required to provide survey records at the completion of work.
(3) All surveys shall proceed from benchmarks, reference points and /or stakes set or established by the Government.
(4) In Section 3, Quality of Work, measurements for establishing the location of structures shall be to the nearest 0.1 foot or as determined in the field by the engineer.
(5) Separate payment will not be made for this item of work. Compensation of this item will be included in the payment for the appropriate bid item for Rock Riprap, Timber Headwall, Site Preparation, and Sand-Cement Bag Wall.
| Lamar Co EWP Corrected Spec 7.pdf |
| 1. Specifications: |
| Construction Specification 1—Clearing |
| 1. Scope |
| 2. Classification |
| 3. Protection of existing vegetation |
| 4. Marking |
| 5. Clearing |
| 6. Disposal |
| 7. Measurement and payment |
| 8. Items of Work and Construction Details |
| In Section 6, Disposal, all vegetative materials removed from the cleared areas shall be disposed of by methods listed in the contractor’s approved disposal plan. |
| All trees, snags, logs, brush, shrubs and stumps that are felled, detached, or otherwise dislocated in or near stream channels shall be moved to higher ground prior to the end of each workday. The Contractor is to take precaution, when temporarily sto... |
| All disposal methods including burning must be presented to the Contracting Officer in writing and approved by the Contracting Officer prior to the start of the work. The Contractor shall make necessary preliminary preparations of a burn site prior to... |
| No TCEQ permit is required for an open burn to dispose of brush and woody material. |
| Prior to starting a fire on a county authorized debris burn site, the Contractor shall notify the County Commissioner and the NRCS Construction Inspector of the time he plans to start burning and the site location/identification. |
| No burn pile shall be closer than 300 feet to a house or residence or closer than 200 feet to any structure. |
| Burn piles shall be set back a safe distance from the edge of a public road right-of-way. |
| Burn pile shall be at least 50 feet from a pipeline easement. |
| The Contractor shall consider wind direction when burning and prevent smoke from hindering traffic on a public roadway or highway. |
| No burn pile shall be located where it can cause damage to remaining healthy or standing trees. |
| All burn residues shall be removed from the burn site, properly disposed of and the area leveled and smoothed to the satisfaction of the Contracting Officer. Partially burned debris shall not be buried on the burn site. Trench or pit type burning wil... |
| a. Subsidiary Item, Clearing |
| (1) This item shall consist of all clearing and designated debris removal required within the limits of the work area, and as necessary to construct the works of improvement. |
| (2) Section 2 does not apply |
| (3) Section 4 does not apply. Trees currently standing and uninjured will remain unless interfering with the work. Erect trees to be removed shall be marked. |
| (4) Section 5 does not apply to trees within the marked areas except as noted above. |
| (5) Clearing for all culvert repairs, drainage crossings, and other structures will be limited to the minimum amount that allows for the safe completion of a particular project. Hand-clearing of vegetation will be used when practical. The use of trac... |
| (6) Separate payment will not be made for this item of work. Compensation for this item will be included in the payment for the appropriate bid item for Site Preparation. |
| Construction Specification 5—Pollution Control |
| 1. Scope |
| 2. Material |
| 3. Erosion and sediment control measures and works |
| 4. Chemical pollution |
| 5. Air pollution |
| 6. Maintenance, removal, and restoration |
| 7. Measurement and payment |
| 8. Items of Work and Construction Details |
| a. Subsidiary Item, Pollution Control |
| (1) Those portions of Section 3 of this specification related to seeding, mulching, sediment basins and waterways, shall not apply. |
| (2) In Section 5, Air pollution, firebreaks or guards are not shown on the drawings. |
| (3) The Contractor's written plan for pollution control shall be approved prior to the start of construction operations. Written plan shall at a minimum include proposed sequencing of operation to minimize duration and size of disturbed areas. |
| (4) Gasoline- and diesel- fueled field equipment must be inspected daily for signs of fuel or hydraulic leaks; such leaks must be repaired promptly and measures will be taken to prevent soil contamination. All hazardous materials related to constructi... |
| (5) Separate payment will not be made for this item of work. Compensation of this item will be included in the payment for the appropriate bid item for Rock Riprap, Timber Headwall, and Sand-Cement Bag Wall. |
| Construction Specification 7—Construction Surveys |
| 1. Scope |
| 2. Equipment and material |
| 3. Quality of work |
| 4. Primary control |
| 5. Construction surveys |
| 6. Staking |
| 7. Records |
| 8. Payment |
| 9. Items of Work and Construction Details |
| a. Subsidiary Item, Construction Surveys |
| (1) In Section 5, Construction surveys, Method 2 shall apply. |
| (2) The contractor is not required to provide survey records at the completion of work. |
| (3) All surveys shall proceed from benchmarks, reference points and /or stakes set or established by the Government. |
| (4) In Section 3, Quality of Work, measurements for establishing the location of structures shall be to the nearest 0.1 foot or as determined in the field by the engineer. |
| (5) Separate payment will not be made for this item of work. Compensation of this item will be included in the payment for the appropriate bid item for Rock Riprap, Timber Headwall, Site Preparation, and Sand-Cement Bag Wall. |
| Construction Specification 8—Mobilization and Demobilization |
| 1. Scope |
| 2. Equipment and material |
| 3. Payment |
| 4. Items of Work and Construction Details |
| a. Bid Item 1 - Mobilization and Demobilization |
| (1) The mobilization operation shall include but not be limited to the following item of work: |
| (a) The Contractor may utilize the existing city/county street right-of-way at the site locations for project staging and storage. The Contractor shall not block driveways or other access points to the roadway and shall not utilize right-of-way areas... |
| (b) The Contractor shall provide adequate protection to concrete or blacktop surfaces as to not damage the surface during construction. All road surfaces damaged by the Contractor shall be repaired at the Contractor’s time and expense. All repairs s... |
| (2) The demobilization operation shall include but not be limited to the following items of work: |
| (a) All debris, trash, tires, equipment, equipment parts, chains, cables, and other such items resulting from the construction operation shall be removed from the work site and disposed of by the contractor. |
| (b) All disturbed areas shall be bladed or smoothed to blend the area with the surrounding land surface. The bladed or smoothed surface shall be free of abrupt mounds, windrows, depressions or other irregularities that would prevent the safe operatio... |
| (c) All buildings, trailers, chain link fence, storage sheds, sanitary facilities and other such items shall be removed from the work site. |
| (d) All temporary fence and gaps shall be removed. Original fences shall be restored too equal or better then pre-construction conditions. |
| (e) Fence post in rock riprap shall be installed as designated on the drawings and specifications. |
(4) Item of work subsidiary to this bid item is Traffic Control as specified in Construction Specification 9.
| Construction Specification 9—Traffic Control |
| 1. Scope |
| 2. Traffic and access |
| 3. Storage of equipment and material in public streets |
| 4. Street closures, detours, and barricades |
| 5. General and specific references |
| 6. Measurement and payment |
| 7. Items of Work and Construction Details |
| a. Subsidiary Item, Traffic Control |
| (1) Where roads are to remain open, the Contractor shall provide a traffic control system that routes traffic through the construction area without excessive delay. These roads shall remain in a condition suitable for cars to pass through at all times... |
| (2) As a part of this item the Contractor shall furnish, install and maintain all barricades, warning signs, traffic control devices, etc. necessary to control traffic and provide for public safety. The Contractor's traffic control system shall compl... |
| (3) The Contractor's written plan for traffic control shall be approved prior to the start of construction operations. Written plan shall at a minimum include the area(s) or extents proposed for use at each site, duration of road closures, temporary ... |
(5) Separate payment will not be made for this item of work. Compensation of this item will be included in the payment for the bid item Mobilization and Demobilization.
| Construction Specification 11—Removal of Water |
| 1. Scope |
| 2. Diverting surface water |
| 3. Dewatering the construction site |
| 4. Dewatering borrow areas |
| 5. Erosion and pollution control |
| 6. Removal of temporary works |
| 7. Measurement and payment |
| 8. Items of Work and Construction Details |
| a. Subsidiary Item, Removal of Water |
| (1) This item shall consist of all operations necessary to accomplish the work defined in Section 1 of this specification. |
| (2) The Contractor's plan for dewatering the sites shall be approved prior to the start of construction operations on any site requiring dewatering. The plan shall at a minimum include the duration and size of necessary diversions, and contingency pl... |
| (4) Separate payment will not be made for this item of work. Compensation for this item will be included in the payment for the appropriate bid item for Site Preparation. |
| Construction Specification 13—Piling |
| 1. Scope |
| 2. Material |
| 3. Site preparation |
| 4. Protection of pile heads |
| 5. Piles, general |
| 6. Bearing piles |
| 7. Sheet piles |
| 8. Estimating bearing capacity |
| 9. Load tests |
| 10. Cutting off piles |
| 11. Defective piles |
| 12. Correcting surface heave |
| 13. Measurement and payment |
| 14. Item of Work and Construction Details |
| a. Subsidiary Item, Piling |
| (1) This item shall consist of furnishings and installing the piles for the timber headwalls as shown on the drawings. |
| (a) Section 2, Material does not apply. |
| (b) Pilings shall be one of the following materials: |
| (I) New steel pipe shall be either ASTM A53 10-inch diameter, schedule 40 or ASTM A252 grade 1, 10.750-inch outside diameter, 0.365-inch minimum wall thickness. |
| (II) New cold-formed steel structural tubing (seamless or welded) shall be ASTM A500 grade D, 10.750-inch outside diameter, 0.365-inch minimum wall thickness. |
| (III) New hot-formed steel structural tubing (seamless or welded) shall be ASTM A501 10.750-inch outside diameter, 0.365-inch minimum wall thickness. |
| (IV) New hot-formed low alloy structural tubing (seamless or welded) shall be ASTM A618 grade Ia, Ib, or II; round, 10.750-inch outside diameter, 0.365-inch minimum wall thickness. |
| (V) Used steel pipe or tubing shall have an outside diameter of 10.750-inch, minimum wall thickness of 0.365-inch, and weigh a minimum of 40 pounds per foot. Used steel pipe shall also be free of excessive rust pits and other flaws that would reduce t... |
| (c) After a pile has been installed to the required depth, it shall be field cut to no more than two inches above the finished top elevation of the headwall, unless otherwise indicated on the construction drawings. Holes required for the installation... |
| (d) Spacing of piles shall be a maximum of 3’– 4” (on center), or as indicated on the drawings. |
| (g) Separate payment will not be made for this item of work. Compensation for this item will be included in the payment for the bid items Timber Headwalls. |
| Construction Specification 21—Excavation |
| 1. Scope |
| 2. Classification |
| 3. Blasting |
| 4. Use of excavated material |
| 5. Disposal of waste materials |
| 6. Excavation limits |
| 7. Borrow excavation |
| 8. Overexcavation |
| 9. Measurement and payment |
| 10. Items of Work and Construction Details |
| Construction Specification 23—Earthfill |
| 1. Scope |
| 2. Material |
| 3. Foundation preparation |
| 4. Placement |
| 5. Control of moisture content |
| 6. Compaction |
| 7. Reworking or removal and replacement of defective earthfill |
| 8. Testing |
| 9. Measurement and payment |
| 10. Items of Work and Construction Details |
| Construction Specification 61—Rock Riprap |
| 1. Scope |
| 2. Material |
| 3. Subgrade preparation |
| 4. Equipment-placed rock riprap |
| 5. Hand placed rock riprap |
| 6. Filter or bedding |
| 7. Measurement and payment |
| (1) This item shall include furnishing and placing the rock riprap as shown on the drawings for Sites 1-02, 1-03, 1-05, 1-07, 1-08, 1-09. |
| (2) Rock for use as riprap shall comply with the requirement of Material Specification 523, Rock Type 2. |
| (3) In Section 2, Material, second paragraph, the Contractor provide written notice of proposed source of rock material to the contracting officer at least five (5) working days before delivery. |
| (4) Rock size requirements are shown on the construction drawings. Prior to delivery of rock to the construction site, the Contractor shall provide a certified gradation analysis from the rock quarry and other evidence satisfactory to the Engineer sh... |
| (5) Where rock riprap extends past property fence lines onto private property, a 2 ½ inch galvanized pipe post shall be placed in the rock riprap every 12 feet along the fence line. The pipe shall extend from 2 feet below the bottom surface of the ro... |
| (6) The estimated tonnage of rock riprap required for each of the sites is designated on the construction drawings. |
| (7) If, at the time the rock is delivered to the construction site, separation or segregation of the smaller rock fraction from the larger rock fraction has occurred, the rock shall be reworked as necessary to insure a reasonably uniform distribution ... |
| (8) Rock will be subject to additional testing beyond ASTM’s listed in Material Specification 523 when in judgment of the engineer, delivered rock has defects that may not have been detected by the specified laboratory tests. These defects may resul... |
| (9) Riprap delivery shall be made only during scheduled working hours and delivery tickets shall be furnished to the NRCS inspector for the Contracting Officer. |
| (10) In Section 7, Measurement and Payment, Payment Method 5 shall apply. |
| (11) Items of Work Subsidiary to this bid item are: |
| (a) Pollution Control, Construction Specification 5. |
| (b) Construction Surveys, Construction Specification 7. |
| (c) Contractor Quality Control, Construction Specification 94. |
| (d) Geotextile, Construction specification 95. |
| Construction Specification 83—Timber Fabrication and Installation |
| 1. Scope |
| 2. Material |
| 3. Workmanship |
| 4. Handling and storing material |
| 5. Painting |
| 6. Measurement and payment |
| 7. Items of Work and Construction Details |
| a. Bid Items #3 Site 1-01, #4 site 1-02, #6 Site 1-05, #7 Site 1-06, #8 Site 1-07, #9 Site 1-08, #10 Site 1-09, #11 Site 3-01, #12 Site 4-02; Timber Headwalls. |
| (1) This item shall consist of furnishing and installation of the structural timbers and pilings for the timber headwall including all nails, screws, bolts, fasteners, and other hardware necessary for the completion of the timber headwall as specified... |
| (2) Section 2, Materials, Material Specification 585 does not apply. Timber materials used for the walls shall be surface dried, treated, southern pine, SPIB Grade No. 2 or better and a nominal thickness of 3". They shall be CCA pressure treated mee... |
| (3) Section 3, Workmanship, (3rd) third paragraph, (2nd) second sentence does not apply. In addition, the (4th) fourth paragraph does not apply as written. Instead, after timber assembly, any unfilled holes shall be plugged with tightly fitting wood... |
| (4) Section 5 does not apply. |
| (5) Timber Joints: All timber butt-joints shall occur at a piling. No open or spliced joints will be accepted between pilings. To the extent practical, each timber shall span at least three pilings, and timber butt-joints shall be staggered so as t... |
| (6) Whalers: Used channel iron will be accepted provided it is free of rust, pits, and other flaws that would reduce the strength or durability of the whalers. Used channel iron shall be approved by the engineer prior to installation. Whalers shall ... |
| (7) Nailer bolts shall be counter sunk into nailer boards to a depth no greater than top of bolt head and so that headwall timbers will fit firmly against nailer boards. |
| (8) Cables shall be new, ¾-inch diameter steel cables with a minimum breaking strength of 52,000 lbs. force and a minimum modulus of elasticity of 20,000,000 psi. Cables shall meet the requirements of ASTM A603, however, the galvanization is not requi... |
| (9) Cables shall be connected to whalers by a 1-inch diameter shank forged eye bolt or a two part all thread with threaded forged eyelet. Eyelet shall use full thread depth and be tack welled to all thread. Cable ends shall be terminated on each end... |
| (10) Cables shall be installed with tension as approved by the engineer. |
| (11) In Section 6, Measurement and Payment, Method 2 shall apply. |
| (12) Items of work subsidiary to this bid item are: |
| (a) Pollution Control, Construction Specification 5. |
| (b) Construction Surveys, Construction Specification 7. |
| (c) Pilings, Construction Specification 13. |
| (d) Contractor Quality Control, Construction Specification 94. |
| (e) Geotextile, Construction Specification 95. |
| Construction Specification 94—Contractor Quality Control |
| 1. Scope |
| 2. Equipment and materials |
| 3. Quality control system |
| 4. Quality control personnel |
| 5. Post-award conference |
| 6. Records |
| 7. Reporting results |
| 8. Access |
| 9. Payment |
| 10. Items of Work and Construction Details |
| a. Subsidiary Item, Contractor Quality Control |
| (1) The burden of proof that work performed meets contract requirements rests upon the Contractor. Quality assurance inspections and tests by the Government are for the sole benefit of the Government. The use of such words as “as approved by the Eng... |
| (2) Quality Control is defined as a rigorous examination and inspection of construction materials, processes and operations to verify that the work being performed meets contract requirements and shall be performed by a qualified Inspector employed by... |
| (3) Quality control tests for moisture and density in the field shall not be required. |
| (4) The Contractor’s quality control system shall be provided in writing to the Contracting Officer, approved and operational before commencement of work. |
| (5) In Section 3, Quality control system, Method 1 shall apply with the exception that the identification of the quality control personnel and their duties and authorities shall be submitted to the contracting officer in writing within 10 calendar day... |
| (6) In Section 4, Quality control personnel, Method 1 shall apply. |
| (7) Separate payment will not be made for this item of work. Compensation of this item will be included in the payment for the appropriate bid item for Rock Riprap, Timber Headwall, and Sand-Cement Bag Wall. |
| Construction Specification 95—Geotextile |
| 1. Scope |
| 2. Quality |
| 3. Storage |
| 4. Surface preparation |
| 5. Placement |
| 6. Measurement and payment |
| 7. Items of Work and Construction Details |
| a. Subsidiary Item, Geotextile |
| (1) This item shall consist of furnishing, placing and securing geotextile in place prior to the placement of fill, sand-cement bags or rock as specified and shown on the construction drawings. |
| (2) In Section 2, Quality, geotextile shall be Class I non-woven fabric. |
| (3) In Section 5, Placement, the geotextile shall be placed as specified in Method 2 unless otherwise specified on construction drawings. The placement shall be approved by the Contractor Quality Control Inspector and NRCS Inspector immediately prior... |
| (4) Separate payment will not be made for this item of work. Compensation for this item will be included in the payment for the bid items, Rock Riprap, Timber Headwall, and Sand-Cement Bag Wall. |
| Construction Specification 420 – Site Preparation |
| 1. Scope |
| 2. Classification |
| 3. Excavation |
| 4. Earthfills |
| 5. Measurement and payment |
| a. The variation must exceed 10% more than the maximum quantity established for the class of site preparation and have a minimum contract value for the additional work in excess of $1,000.00. (The contract value is to be determined by dividing the lu... |
| b. It is the Contractor’s responsibility to submit proof that the estimated site preparation class in question exceeds the percentage and cost parameters in item (a) above. Proof will consist of applicable survey data or other measurements made by a ... |
| Site Preparation shall include the removal of existing culverts, headwalls, concrete, and concrete riprap as shown on the drawings or marked in the field. |
| Road surfacing material (gravel, asphalt, and oil sand) shall be stockpiled separate from other excavated materials. Stockpiled road surfacing material shall be placed after all other earthfill and earth backfill has been placed, including any additi... |
| The items of work subsidiary to Site Preparation are |
| a. Bid Item 13, Site Preparation Class A |
| b. Bid Item 14, Site Preparation Class B |
| d. Bid Item 16, Site Preparation Class D |
| Construction Specification 432 – Sand-Cement Bag Riprap |
| 1. Scope |
| 2. Materials |
| 3. Aggregate-cement mix |
| 4. Subgrade preparation |
| 5. Placement |
| 6. Measurement and payment |
| 7. Items of Work and Construction Details Items of work to be performed in conformance with this specification and the construction details therefore are: |
| a. Bid Items #5 Sand Cement Bag Wall, Site 1-04 |
| Material Specification 523—Rock for Riprap |
| 1. Scope |
| 2. Quality |
| Rock type 1 |
| Rock type 2 |
| 3. Methods of soundness testing |
| 4. Field durability inspection |
| 5. Grading |
| Material Specification 581—Metal |
| 1. Scope |
| 2. Structural steel |
| 3. Commercial or merchant quality steel |
| 4. Aluminum alloy |
| 5. Bolts |
| 6. Rivets |
| 7. Welding electrodes |
| 1. Scope |
| 2. Quality |
| 1. Scope |
| 2. Grading |
| 3. Quality of material |
| 4. Heartwood requirements |
| 5. Sizes |
| 6. Marking |