5_Fiberboard_IRSC_Maps.pdf
PDF 1 MB Posted
- Attached to
- Fiberboard Stewardship IRSC Federal contract opportunity
- Solicitation number
- AG-9JGP-S-17-4011
About this file
Maps
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 1_Fiberboard_IRSC_FAC_87_RFP_Commercialv2_FINAL.docx | DOCX document | |
| 2_Fiberboard_IRSC_APPENDIX_A_19Dec16.docx | DOCX document | |
| 4_Fiberboard_IRSC_Appendix_C.pdf | ||
| 3_Fiberboard_IRSC_Appendix_B_Tree_Measurement_19Dec16.doc | DOC document | |
| 8_LTBMU_Wet_Weather_Operation_Agreement_IRSC_11Feb16.doc | DOC document | |
| 7_Fiberboard_IRSC_Fire_Plan_2016.docx | DOCX document | |
| 6_WD_77_forestry_related_CA_012016.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
L
L
L
L
L
L
L
L L
L L
L
L
L
L
")73
¬«28
16N77
Sh iva gir i R d
Olive Dr
Center St
Sil ve r P ine
Dr Ca rne lia n W oo ds Av e
Red Pine Ct Ceda r CtGreen Pine Ct
North Ridge Dr Ë
0 0.1 0.2 0.3 0.4 0.5 Miles
R.17E
T.1 6N
Unit: 16 Acres: 93
Hwy 267
1.25 miles
_Fiberboard Stewardship
L a k e T a h o e
Unit: 1016 Acres: 23
Unit: 14 Acres: 127
Unit: 26 Acres: 58
Unit: 11 Acres: 115
16N49
16N74
16N95
16N
16N74
16N73D
16N73C
16N73B
9 10
Watson Creek
Ownership US Forest Service State Other
Legend
Transportation NF System Road Highway Local Road
Water Waterbody
Trail
Perennial Stream
Project Area-416 Acres
Ephemeral Stream Intermittent Stream
Protected Activity Center 40 ft Contour
Temp Road
L Landing Tahoe Rim Trail
TRT
¬«431 ¬«267
£¤50 ¬«89
¬«28
¬«89
£¤50 ¬«89
¬«207
Project Area
£¤50
¬«28
Vicinity Map
(All streams-25 ft buffer off channel where needed)
(L
(L
(L (L
(L
(L (L
(L
(L
(L (L
N7
R.17E
T.1 6N
¬«11
€1
R
0 0.1 0.2 0.30.05 Miles
0 500 1,000 1,500 2,000 Feet
ADDENDA SHEET - Fiberboard Stewardship IRSC - Appendix B - Map 1 of 2
A
SMA
FIBERBOARD STEWARDSHIP
INTEGRATED RESOURCE SERVICE CONTRACT
CONTRACT AREA MAP
LAKE TAHOE BASIN MANAGEMENT UNIT
Placer County-CA
Ë
Fuel Model-G; Weather Station-Baron Landlines are Approximate
Unit 11 - Payment Unit 1 - 115 Acres Unit 26 - Payment Unit 2 - 58 Acres Unit 14 - Payment Unit 3 - 127 Acres
")73
¬«26
€2
¬«14
€3 16N77
R
R
R R
R
16N73D
16N73C
16N73BBoundary
LTBMU
Scale=1:12,000
8 9
Requirements Applicable to
CTL, ITM, TS, ENDL
DF
LOP
SEPM
Contract Area Streamcourses, Private Property, Paved Roads, Controlled Areas Improvements Contract Area-Hours of operation from 8:00 a.m. to 6:00 p.m.
Special Erosion Prevention Measures-2 Acres
1.25 miles to Hwy 267
6 68
Carnelian Bay
A
A
A
SEPM
Legend Contract Area Boundary, BT.0
Cutting Unit Boundary, C.4
Payment Unit Number, Div AT, KT-CT3.5# ¬«1 Cutting Unit Number
Existing Road System, H.6 - H.10 16N55 Forest Service Road Number
Temporary Road, H.6 - H.10, GT6.3 Landing, GT 4.2.2, GT 6.4 Other Ownership, H.6
Protect Improvement, Gate, H.256 68
Protect Streamcourse, H.19, App. A, Table 7
DF Directional Felling, KT-GT.4.1# TS Treatment of Stumps, KT-GT.4.1# CTL Whole Tree Yarding, KT-GT.4.2#
ITM Individual Tree Marking, Div AT, KT-CT3.5# €1
Special Erosion Prevention Measures, H.18
R Road Restriction, H.7
SMA Special Measures Area, H.12
Protect Improvement, Powerline, H.25 Protect Improvement, Trail, H.25
ENDL Endlining, KT-GT.4.2# ò Protect Improvement,Survey Monument, H.11 ôL
Water Feature, App. A, Table 7 f
A Install Rock/Chip Apron, H.8, GT.6.7
Wildlife LOP, F.4, H.12
R
R R
R R
(L
(L
Sh iva gir i R d
Sil ve r P ine
Dr
Center St
Gr ee n P ine
Ct
N4
R.17E
T.1 6N
L a k e
L a k e
¬«28
0 0.1 0.2 0.30.05 Miles
0 500 1,000 1,500 2,000 Feet
ADDENDA SHEET - Fiberboard IRSC - Appendix B - Map 2 of 2
SMA
FIBERBOARD STEWARDSHIP
INTEGRATED RESOURCE SERVICE CONTRACT
CONTRACT AREA MAP
LAKE TAHOE BASIN MANAGEMENT UNIT
Placer County-CA
Ë
Fuel Model-G; Weather Station-Baron Landlines are Approximate
Unit 16 - Payment Unit 4 - 93 Acres Unit 1016 - Payment Unit 4 - 23 Acres
¬«16
€4
R
Scale=1:12,000
Requirements Applicable to
CTL, ITM, TS, ENDL
DF
LOP
SEPM
Contract Area Streamcourses, Private Property, Paved Roads, Controlled Areas Improvements Contract Area-Hours of operation from 8:00 a.m. to 6:00 p.m.
Special Erosion Prevention Measures-1 Acre
¬«1016
€4
N7
16N95
¬«14
16N
R
R
R
Ta ho e Ta ho e
R
6 68
Carnelian Bay
Watson Creek
SEPM
Legend Contract Area Boundary, BT.0
Cutting Unit Boundary, C.4
Payment Unit Number, Div AT, KT-CT3.5# ¬«1 Cutting Unit Number
Existing Road System, H.6 - H.10 16N55 Forest Service Road Number
Temporary Road, H.6 - H.10, GT6.3 Landing, GT 4.2.2, GT 6.4 Other Ownership, H.6
Protect Improvement, Gate, H.256 68
Protect Streamcourse, H.19, App. A, Table 7
DF Directional Felling, KT-GT.4.1# TS Treatment of Stumps, KT-GT.4.1# CTL Whole Tree Yarding, KT-GT.4.2#
ITM Individual Tree Marking, Div AT, KT-CT3.5# €1
Special Erosion Prevention Measures, H.18
R Road Restriction, H.7
SMA Special Measures Area, H.12
Protect Improvement, Powerline, H.25 Protect Improvement, Trail, H.25
ENDL Endlining, KT-GT.4.2# ò Protect Improvement,Survey Monument, H.11 ôL
Water Feature, App. A, Table 7 f
A Install Rock/Chip Apron, H.8, GT.6.7
Wildlife LOP, F.4, H.12
SMA
SMA
SMA
| Fiberboard Vicinity |
| Fiberboard_Units_11_14_26_IRSC_Map_1of2 |
| Fiberboard_Units_16_1016_IRSC_Map_2of2 |
File details come from the government source that posted it. Updated .