RFI_Responses.pdf

PDF 77 KB Posted

Attached to
Truckee District Office Generator Project Federal contract opportunity
Solicitation number
AG-9JGP-S-17-0147
Issued by
Department of Agriculture Forest Service R5-Pacific Southwest Region

About this file

Responses to request for information.

View the file

Other files for this federal contract opportunity

Other files attached to Truckee District Office Generator Project, newest first.
File Type Posted
Site_Visit_Sign_In_Sheet.pdf PDF
Solicitation.docx DOCX document
Attach_07_Wage_Determination.docx DOCX document
Attach_04_Panels_-_Main,E1,E1(2),H1,_H1(2),_lighting_locations.pdf PDF
Attach_01_Generator_specs.pdf PDF
Attach_03_Panel_E2_location.pdf PDF
Attach_06_TKRD_Asbuilt_elec_site_plan.pdf PDF
Attach_02_Transfer_switch_specs.pdf PDF
Attach_05TKRD_asbuilt_office_panel_schedules.pdf PDF
Attach_08_Capability_and_Past_Performance.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Descope Items; Please Verify

1) Generator concrete slab. Yes

2) Option for back up propane gas supply to generator. Yes

RFI’s

1) KTR is required to locate and mark all utilities with in the project limits via USA. YES

2) KTR is required to only install gas trench and piping, all sizing will be specified by Government and equipment must meet sizing requirement. No ( verified by contractor plumbing discipline with consultation with Southwest gas)

3) KTR is required to supply underground conduit and feeders from generator to pull box east side of building in landscape area and only feeders from pull box to MDP‐1. (Yes)

4) All life safety systems be required to be connected to generator power (Yes)

5) KTR required to install conduit and feeders to specified panels from MDP‐1 or are conduits in place and feeder only required (Yes)

6) KTR required to connect Radio Room panel E3 to generator power. (Yes)

7) Is the outside closet large enough to accommodate the ATS with full clearance? (Contractor to

Verify with ATS supplier that proper clearance product is available for the closet space designated for location)