AG-9JGP-S-17-0001_Amendment_2.pdf
PDF 170 KB Posted
- Attached to
- Owl Creek Culvert/Road Construction Federal contract opportunity
- Solicitation number
- AG-9JGP-S-17-0001
About this file
AG-9JGP-S-17-0001 Amendment 2
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AG-9JGP-S-17-0001_Amendment_3.pdf | ||
| Specifications_-_Drawings_-_Owl_Creek.Revsion.01.pdf | ||
| 27N98_26N23_Owl_USFS_Specification_FP-03.pdf | ||
| AG-9JGP-S-17-0001_Amendment_1.pdf | ||
| Specifications_-_Drawings_-_Owl_Creek.pdf | ||
| AG-9JGP-S-17-0001.pdf | ||
| Fire_Plan_-_Owl_Creek.doc | DOC document | |
| General_Decision_Number-_CA160009_10.28.2016__CA9.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
AG-9JGP-S-17-0001
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
9JGP
NEVADA CITY CA 95959
631 COYOTE STREET
R5 CENT-CAL ACQ SERV AREA CCASA
USDA FOREST SERVICE
11/04/2016000002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
11/04/2016
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment is to provide for the following:
1) The hour and date for receipt of offers is extended to 1/05/2017 at 1400.
2) Answers for questions submitted in response to the solicitation.
3) Attach USFS Specification FP-03 for construction of National Forest System Roads.
4) Revise the drawing set, changes are found on sheet 5 (M.P. 3.322 and M.P.
3.331) and sheet 38 (detail item number changed to 30307B).
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
CRAIG ERICSON
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
All other terms and conditions remain the same.
AG‐9JGP‐S‐17‐0001
Amendment 0002
AG‐9JGP‐S‐17‐0001
Owl Creek Culvert/Road Construction Questions & Answers
1. Question: Are the supplemental specifications for this project. Page 19 lists FSSS 704.13 and 705.02.
Answer: Yes, they have been posted to FBO with solicitation amendment 2.
2. Question: Aggregate is Surface Course 1" FS Gradation?
Answer: Aggregate conforms to section 703.05 (c) in FP‐03. Sheet 2, General notes, #9
3. Question: Item 60203 Culvert size, Schedule of Items is 60"equivalent or 66" x 51". Plan on pages 22 & 25 is 81" x 59". Which is correct?
Answer: New culvert is 81” x 59” arch cmp, as stated on the plans.
4. Question: What is the Gauge of the same pipe from question #3?
Answer: No gauge specified. Use 10 gauge
5. Question: Any spec on the air release valve located at the collection pond?
Answer: There is no good detail on the air release. The release was meant to be a manual 3/4” ball valve, installed downstream of the shut‐off in the valve box. When opened it would allow air to enter pipe and drain pipe into storage tank.
6. Question: Model number or size of Item 61101B Valve Box (Christy Valve box)?
Answer: The “Christy Valve Box” does not work at the water tank shut‐off.
I recommend the following correction: Cast iron valve box from Castings Inc., model VB Screw Type CI for 51”‐71”, with 15‐S 18# bottom, or approved equal.
7. Question: Is there any data available for the flow (CFS) of Owl Creek?
Answer: Non Given.
8. Question: Does each tank have a riser with lockable lid or is there just one?
Answer: Each tank has one riser and one iron lid, there are two tanks. Sheet 21, Note #11 should be shown at each riser but it is only noted on one riser. The tanks should be ordered with rings welded on lid and riser for a chain and lock.
AG‐9JGP‐S‐17‐0001
Amendment 0002
9. Question: Does each tank have a ladder?
Answer: Each tank should have one ladder. If the contractor decides to install two tanks joined by a pipe then each tank will have one ladder and there would be two ladders. If contractor installs one continuous tank then there would be one ladder.
Sheet 21
10. Question: Aggregate base on road 27N98 begins 14 foot width at station 153+75.36. Does this continue to EOP at station 288+02? if not where?
Answer: Aggregate on 14’ width begins at 153+75.36 and continues to END ALL WORK at 288+02.4.
11. Question: Roads 27N98 and 26N23 have no pay item or clearing/slash disposal typical or spec.
For the majority of the project it is not an issue but there is clearing/trees in the ditch line at some locations, specifically but not limited to station 157+ 34 to 155+ 50 and from 175+00 to 177+00 on road 27N98 and station 113+20 to 113+80 on road 26N23. There will also be dead fall/hazard trees to deal with. Should this be considered part of item 30307, Road Reconditioning? If so, how should the slash be treated?
Answer: Ditch and Road Reconditioning waste is disposed of under 204.14. 204.15 Acceptance calls for Clearing and removal of obstructions be evaluated under 201 and 203.
| AG-9JGP-S-17-0001 Amendment 2 |
| Questions and Answers |