Reconstruction Plans

View the file

Other files for this federal contract opportunity

Other files attached to McClain Road Reconditioning, newest first.
File Type Posted
Amendment_0002.pdf PDF
McClain_Amendment_0001.pdf PDF
Special_Project_Specifications_299.rtf RTF text file
Special_Project_Specifications_176.doc DOC document
McClain_1442_Soicitation.doc DOC document
FS_Specifications.doc DOC document
Wage_Determination.doc DOC document
Drawings_ _Maps.pdf PDF
Fire_Plan.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Reconstruction Plans

Road Number: Yuba County Road, Y-124

Backslope, 0. 75:1

Road Name: McClain Road Fillslope, 1.50: 1

Minimum Traveled Way = 14’ Feet

Station Description of work M.P.

0.00 BEGIN PROJECT – Intersection with Yuba County’s Garden Valley Road. Begin Yuba County Road Y-124, begin clearing left and right, begin blading and shaping native surface road, begin placing 0.33’ x 14’ ¾” minus aggregate surface course.

0.035 Reconstruct rolling dip and 30’ leadoff ditch.

0.097 Reconstruct rolling dip and 30’ leadoff ditch.

0.129 Reconstruct rolling dip and 30’ leadoff ditch.

0.157 Spur road right to old landing, keep open.

0.181 Spur road right to old landing, keep open.

0.210 Spur road left with galvinized gate, keep open and protect gate.

0.255 Reconstruct rolling dip and 20’ leadoff ditch.

0.285 Reconstruct rolling dip and 20’ leadoff ditch.

0.313 Reconstruct rolling dip and 30’ leadoff ditch.

0.337 Reconstruct rolling dip and 30’ leadoff ditch.

0.357 Reconstruct rolling dip and 30’ leadoff ditch.

0.375 Brush and clean existing culvert inlet and outlet.

0.379 Reconstruct rolling dip and 20’ leadoff ditch.

0.383 Spur road left, keep open.

0.409 Reconstruct rolling dip and 30’ leadoff ditch.

0.438 Reconstruct rolling dip and 20’ leadoff ditch.

0.513 Spur road right to old landing, keep open.

0.569 Reconstruct rolling dip and 10’ leadoff ditch.

0.593 Drainage, install rock low water crossing 30’L x 16’ W x 1’ D, 3“ minus drain rock, place geotextile fabric around the drain rock then apply 30’L X 14’ W x 0.33’D aggregate surface course over the geotextile fabric.

0.628 Spur road right, keep open.

0.638 Reconstruct rolling dip and 40’ leadoff ditch.

0.702 Reconstruct rolling dip and 10’ leadoff ditch.

0.733 Reconstruct rolling dip and 20’ leadoff ditch.

0.760 Existing culvert, remove and replace with 24” x 34’ culvert, brush and clean 100’ of roadside ditch ahead right. Clean and brush leadoff ditch for 15’ on left side of road.

0.774 Spring on the left edge of traveled way, grade and slope road to drain spring left.

0.806 Reconstruct rolling dip and 30’ leadoff ditch.

0.826 Drainage, install rock low water crossing 30’L X 16’W x 1’D, 3” minus drain rock place geotextile fabric around drain rock then apply 30’L x 14’W x 0.33’D aggregate surface course over the geotextile fabric.

0.836 Reconstruct rolling dip and 20’ leadoff ditch.

0.870 Spur road left, keep open..

0.889 Reconstruct rolling dip and 20’ leadoff ditch.

0.905 Drainage crossing from spur road right, construct roadside ditch to mile post 0.916.

0.916 Reconstruct rolling dip, place 5’L x 14’W x 0.50’D, 3” drain rock in the bottom of of the rolling dip, reconstruct 20’ leadoff ditch.

0.942 Construct rolling dip and 15’ leadoff ditch. Begin ripping traveled way to one foot deep, grade road and compact with water and vibratory roller.

0.970 Reconstruct rolling dip and 15’ leadoff ditch, end ripping, grading, and compacting traveled way to one foot deep.

1.012 Reconstruct rolling dip and 10’ leadoff ditch. Brushing to light condition ahead.

1.038 Reconstruct rolling dip and 10’ leadoff ditch.

1.065 Reconstruct rolling dip and 20’ leadoff ditch, begin reconstructing roadside ditch rt.

1.090 Reconstruct rolling dip and 20’ leadoff ditch, spur road left, keep open, brush and clean existing culvert inlet and outlet, end reconstructing roadside ditch right.

1.144 Spur road right, keep open.

1.154 Reconstruct rolling dip and 10’ leadoff ditch.

1.185 Spur road left, keep open..

1.227 Centerline large drainage with 6’ diameter culvert, working. Backfill 8’diameter pot hole in road surface with native material from road surface and compact w/water.

1.245 Reconstruct rolling dip and 10’ leadoff ditch.

1.256 Spur road right, keep open.

1.280 Reconstruct rolling dip and 15’ leadoff ditch.

1.302 Reconstruct rolling dip and 15’ leadoff ditch.

1.337 Reconstruct rolling dip and 15’ leadoff ditch.

1.356 Reconstruct rolling dip and 15’ leadoff ditch.

1.400 Reconstruct rolling dip and 15’ leadoff ditch. Begin ripping traveled way to two feet deep, grade, and compact with water and vibratory roller.

1.441 Continue ripping traveled way to two feet deep, grade and compact with water.

1.486 Continue ripping traveled way to to feet deep, grade and compact with water.

1.515 Same as mile post 1.441 & Remove existing culvert, replace with 24”x 32’ culvert.

1.565 Continue ripping traveled way to two feet deep, grade and compact with water.

1.598 Continue ripping traveled way to two feet deep, grade and compact with water.

1.663 Same as mile post 1.441, reconstruct rolling dip and 15’ leadoff ditch.

1.705 Spur road right, keep open, end ripping, grading, and compacting the traveled way.

1.763 Construct rolling dip and 20’ leadoff ditch left.

1.778 Reconstruct rolling dip and 20’ leadoff ditch.

1.806 Spur road left, keep open.

1.926 Intersection with Forest Service Road 47, end clearing left and right, end blading and shaping road, end placing 0.33” x 14’ ¾” minus aggregate surface course, end project.

Note: Roadside clearing limits shall be to the top of the backslope and toe of the fillslope on both sides of the traveled way. Clearing shall include trees up to 6” dbh. Trees larger than 6” dbh, shall be limbed to a clear to a height of 14’ minimum. Clearing height is 14’ minimum.

The clearing width at all roadside ditches shall be to the top of the backslope.

Clearing limits for brushing all leadoff ditches is 12’as shown on the drawings. Brush from the leadoff ditches may be cut and placed at the outlet to the leadoff ditch as an energy dissipater with brush not to exceed 18” height above the ground.

Clearing shall be accomplished by either hand clearing then processing the brush material through a chipper or by a roadside brushing machine designed specifically for roadside brushing and approved by the Contracting Officer’s Representative. Chips shall be sidecast evenly and not piled.

Tree limbs shall be cut back as close to the bole of the tree as practicable.

All road reconstruction work shall be approved in writing by the Contracting Officer’s Representative prior to the placement of the aggregate surface course.

State Forest Project Number Project Name Sheet Number CA Tahoe Y-124 McClain Road