About this file

Amend 002

View the file

Other files for this federal contract opportunity

Other files attached to 27 & 34 Road Reconditioning, newest first.
File Type Posted
27_and_34_Amendment_0001.pdf PDF
Road_27_Construction_Plan.doc DOC document
Road_34_Construction_Plan.doc DOC document
Solicitation_SF_1442.doc DOC document
Fire_Plan.doc DOC document
Wage_Decision.doc DOC document
Vicinity_Map.pdf PDF
Specifications.doc DOC document
Typical_Construction_Signs_17x11.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE
PAGE OF PAGES
1
1
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
4. REQUISITION/PURCHASE REQ. NO.
5. PROJECT NO. (If applicable)
Amendment 002
6/21/2016
6. ISSUED BY
CODE
7. ADMINISTERED BY (If other than Item 6)
CODE

USDA Forest Service Central California Acquisition Service Area Tahoe National Forest

631 Coyote Street

Nevada City, CA 95959

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code)
(X)
9A. AMENDMENT OF SOLICITATION NO.

FORMCHECKBOX

AG-9JGP-S-16-0112

9B. DATED (SEE ITEM 11)

5/20/2016

FORMCHECKBOX

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE
FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FORMCHECKBOX

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers FORMCHECKBOX is extended, FORMCHECKBOX is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS, IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. (TO BE FILLED OUT BY THE CONTRACTING OFFICER)

(X)
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN

THE CONTRACT ORDER NO. IN ITEM 10A.

FORMCHECKBOX

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

FORMCHECKBOX

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

E. IMPORTANT: Contractor FORMCHECKBOX is required to sign this document and return 1 copy to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.

Extend the response date to July 6th, 2016 at 2PM. If you have already submitted you may resubmit a revised proposal prio to the new response date, otherwise we will evaluate as previously submitted.

-Caltrans Specification for 1 3/4 inch minus aggregate is acceptable, please submit with proposal your source for aggregate.

Period of performance on the contract is changed from 60 calendar days to 100 calendar days.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Matthew Gagnon, Contracting Officer
15B. CONTRACTOR/OFFEROR
15C. DATE SIGNED
16B. UNITED STATES OF AMERICA
16C. DATE SIGNED
6/21/2016

(Signature of person authorized to sign)

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

30-105
STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Amendment 001 Callecat Release

2016 Callecat Release, AG-9JGP-S-16-0102, Pre-bid Tour5/10/2016

The pre-bid tour is intended to assist offerors with locating the work sites and answering questions regarding the technical specifications. Attendance is not mandatory in order to bid. The pre-bid tour does not relieve the offeror of the responsibility to make as much site visitation as may be necessary in order to make a firm fixed price offer.

Itinerary

Sites visited: 110-8, 110-13, 112-8, 113-15, & 113-10

Q & A from COR notes:

Q1) Section J refers to Exhibit A (Application Coverage for Foliar Herbicide). Where is it?

A1) Exhibit A will be added to the solicitation file downloads available on the FBO website. Please refer to Exhibit A for illustration of the amount of coverage that will be required on all target vegetation. The solicitation does not specify the total amount of herbicide to be applied. It is the responsibility of the offeror to determine how much herbicide will be needed in order to meet the acceptable coverage shown in Exhibit A on all target vegetation in the treatment areas.

Q2) What vegetation must be sprayed?

A2) Target vegetation under this contract will consist of all woody brush species.

Q3) So grasses and forbs do not need to be sprayed?

A3) Correct.

Q4) What is the alternate performance period?

A4) The alternate performance period shown in Section F is September 15th through October 15th. It is anticipated that the restrictions on work shown in Section C.5 – especially those regarding stage of vegetation growth and limited operating periods – may preclude completion of some portion of the work during the primary performance period of June 1st through June 22nd. All work must be completed during the primary performance period if possible, and any remaining work must be reattempted during the alternate performance period.

Q5) Some places the brush is growing right through the tree limbs. What should I do?

A5) All target vegetation must be treated, and a directed spray technique must be used to avoid tree damage. Directed spray entails using an appropriate angle and direction of spray in order to avoid herbicide contact with the tree crown. It may also require manipulating the limbs of the trees and brush in order to separate them. Please refer to the solicitation for the definition of tree damage. As long as tree damage remains within acceptable levels, washdown water packs as described in the technical specifications will not be required.

Q6) Do I have to spray bearclover?

A6) Bearclover (Chamaebatia foliolosa) will not be considered target vegetation under this contract.

Q7) Some brush is very tall. What should I do?

A7) All target vegetation must be treated, and worker safety must be maintained. Coordination between workers will be necessary. In some cases brush may be bent over in order to be treated, and longer spray wands may be desirable.

Q8) How many of the Item 1 acres were precommercially thinned recently?

A8) Seventy-five of the Item 1 acres were precommercially thinned last year.

Q9) There are a number of small stands in the 1-5 acre range. If workers still have herbicide in their backpack sprayers when they finish one stand, can it be transported to the next stand in the backpacks?

A9) If workers are walking to the next stand, they may carry herbicide down the road in the backpacks. If workers will be transported by vehicle to the next stand, the remaining herbicide must be secured for transport. Typically, this means it must be put back into the batch tank.

Q10) There is currently very little vegetation resprouting in the Item 2 stands. When will these units be ready to treat?

A10) At this time, it is apparent that Item 2 vegetation will not be ready to treat in June. Offerors may assume that these stands will need to be treated during the alternate performance period.