Response_to_Evaluation_Factors.docx

DOCX document 18 KB Posted

Attached to
Ridge Stewardship Federal contract opportunity
Solicitation number
AG-9JGP-S-15-9005
Issued by
Department of Agriculture Forest Service R5-Pacific Southwest Region

About this file

Form Response to Evaluation Factors

View the file

Other files for this federal contract opportunity

Other files attached to Ridge Stewardship, newest first.
File Type Posted
amendment_1_Ridge.docx DOCX document
7-SUMMARY.pdf PDF
5-SUMMARY.pdf PDF
6-SUMMARY.pdf PDF
Ridge_Stewardship1to3_20150714.pdf PDF
RIDGE-Appendix_D_Drawings.pdf PDF
Ridge__IRSC_Solicitation.docx DOCX document
Ridge_Appendix_C_RoadMaint.doc DOC document
Ridge_Appendix_B_Tree_Measurement.docx DOCX document
Ridge_Stewardship_Map.pdf PDF
Davis_Bacon_Wage_Determination.docx DOCX document
Service_Contract_wage_determination.docx DOCX document
Ridge_Appendix_D_-_SUPPLEMENTAL_SPEC.docx DOCX document
Ridge_Appendix_A.docx DOCX document
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RIDGE STEWARDSHIP PROJECT

FORM FOR RESPONSE TO TECHNICAL CRITERIA

(Attach additional pages as requested/needed) Name of the firm submitting proposal:

i. Past Performance What contracts has your firm performed which are similar in scope, magnitude, and complexity to this project? (You need not list more than 5.)

Name of Project
Type of Project
Scope/magnitude
Company/firm for which the work was done.
Completion Date

Whom may we contact concerning your performance on the projects listed above? (If reference is for a subcontractor or key person, identify which subcontractor/key person is referenced.)

Name
Address
Phone
FAX
e-mail
Project(s)

ii. Technical Approach If yours is a new firm or has no directly relevant experience, how do you propose to acquire the expertise to perform the contract? (e.g., subcontracting arrangements [list subcontractors and their experience], hiring experts [list supervisory personnel and their experience])

a) How extensive was your site visit for this project? (e.g., ‘didn’t visit;’ ‘drove by some areas;’ ‘walked each acre’; ‘know the area well’)

b) What did the site visit reveal about the comparative difficulty of the project—e.g., the problems that are likely to be encountered during performance?

c) How many and what types of workers will be assigned to the project?

d) What equipment will you use for this project?

e) What is your plan for safety at the job site(s)? Submit a separate Safety Plan, addressing, among other things, a communications plan, egress of injured workers, a traffic control plan for roads, and protection of the public and Government personnel.

f) What sequence of work are you planning to ensure timely completion of the project? (i.e., what areas or work processes will be done first? next? last?)

g) What contracts do you currently have scheduled to which you will need to commit resources during the period for the performance of this project?

Name of Project
Type of Project
Work performed for
Phone
Completion Date

h) Quality Control Plan

1.) Provide a narrative or an attachment describing what you plan to do for a quality control plan for the service items (See Schedule B.1).

2.) Provide a narrative or an attachment describing what you plan to do for a quality control plan for the timber/product removal items (See Schedule B.2).

iii. Supervision

Key Personnel
Expertise
Years of Experience

Overall project manager

SUBMIT A SEPARATE DOCUMENT. For the key personnel submit a resume with references (organization, contact person and phone number).

iv. Utilization of Local Workforce and Small Businesses

a) List the address of your permanent place of operation.

b) List the addresses for permanent places of operations and small business size status of all of the subcontractors you plan to use on this contract.

Subcontractor
Expertise
Address
Is this firm a small business?

c) Address how you plan to utilize the local workforce, local small businesses and small business wood product mills.

File details come from the government source that posted it. Updated .