Response_to_Evaluation_Factors.docx
DOCX document 18 KB Posted
- Attached to
- Ridge Stewardship Federal contract opportunity
- Solicitation number
- AG-9JGP-S-15-9005
About this file
Form Response to Evaluation Factors
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| amendment_1_Ridge.docx | DOCX document | |
| 7-SUMMARY.pdf | ||
| 5-SUMMARY.pdf | ||
| 6-SUMMARY.pdf | ||
| Ridge_Stewardship1to3_20150714.pdf | ||
| RIDGE-Appendix_D_Drawings.pdf | ||
| Ridge__IRSC_Solicitation.docx | DOCX document | |
| Ridge_Appendix_C_RoadMaint.doc | DOC document | |
| Ridge_Appendix_B_Tree_Measurement.docx | DOCX document | |
| Ridge_Stewardship_Map.pdf | ||
| Davis_Bacon_Wage_Determination.docx | DOCX document | |
| Service_Contract_wage_determination.docx | DOCX document | |
| Ridge_Appendix_D_-_SUPPLEMENTAL_SPEC.docx | DOCX document | |
| Ridge_Appendix_A.docx | DOCX document |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RIDGE STEWARDSHIP PROJECT
FORM FOR RESPONSE TO TECHNICAL CRITERIA
(Attach additional pages as requested/needed) Name of the firm submitting proposal:
i. Past Performance What contracts has your firm performed which are similar in scope, magnitude, and complexity to this project? (You need not list more than 5.)
| Name of Project |
| Type of Project |
| Scope/magnitude |
| Company/firm for which the work was done. |
| Completion Date |
Whom may we contact concerning your performance on the projects listed above? (If reference is for a subcontractor or key person, identify which subcontractor/key person is referenced.)
| Name |
| Address |
| Phone |
| FAX |
| Project(s) |
ii. Technical Approach If yours is a new firm or has no directly relevant experience, how do you propose to acquire the expertise to perform the contract? (e.g., subcontracting arrangements [list subcontractors and their experience], hiring experts [list supervisory personnel and their experience])
a) How extensive was your site visit for this project? (e.g., ‘didn’t visit;’ ‘drove by some areas;’ ‘walked each acre’; ‘know the area well’)
b) What did the site visit reveal about the comparative difficulty of the project—e.g., the problems that are likely to be encountered during performance?
c) How many and what types of workers will be assigned to the project?
d) What equipment will you use for this project?
e) What is your plan for safety at the job site(s)? Submit a separate Safety Plan, addressing, among other things, a communications plan, egress of injured workers, a traffic control plan for roads, and protection of the public and Government personnel.
f) What sequence of work are you planning to ensure timely completion of the project? (i.e., what areas or work processes will be done first? next? last?)
g) What contracts do you currently have scheduled to which you will need to commit resources during the period for the performance of this project?
| Name of Project |
| Type of Project |
| Work performed for |
| Phone |
| Completion Date |
h) Quality Control Plan
1.) Provide a narrative or an attachment describing what you plan to do for a quality control plan for the service items (See Schedule B.1).
2.) Provide a narrative or an attachment describing what you plan to do for a quality control plan for the timber/product removal items (See Schedule B.2).
iii. Supervision
| Key Personnel |
| Expertise |
| Years of Experience |
Overall project manager
SUBMIT A SEPARATE DOCUMENT. For the key personnel submit a resume with references (organization, contact person and phone number).
iv. Utilization of Local Workforce and Small Businesses
a) List the address of your permanent place of operation.
b) List the addresses for permanent places of operations and small business size status of all of the subcontractors you plan to use on this contract.
| Subcontractor |
| Expertise |
| Address |
| Is this firm a small business? |
c) Address how you plan to utilize the local workforce, local small businesses and small business wood product mills.
File details come from the government source that posted it. Updated .