AG-9AC7-S-17-0058,_Amendment_2.pdf
PDF 176 KB Posted
- Attached to
- Mad River & Ruth Roofing Projects Federal contract opportunity
- Solicitation number
- AG-9AC7-S-17-0058
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_001_SF30_B__C.pdf | ||
| FINAL_PROJECT_SPECS_Version2.pdf | ||
| A1_Map_and_Pictures.pdf | ||
| 1._FINAL_PROJECT_SPECS.pdf | ||
| 2._Maps_&_Photos.pdf | ||
| 3._CA5_dvb,_010617.pdf | ||
| AG-9AC7-S-17-0058_Final.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
AG-9AC7-S-17-0058
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
9AC7
REDDING CA 96002
3644 AVTECH PARKWAY SUITE 180
R5 NO-CAL ACQ SERVICE AREA NCASA
USDA FOREST SERVICE
06/01/2017000002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
04/12/2017
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
MAD RIVER AND RUTH ROOFING PROJECTS, SIX RIVERS NATIONAL FOREST
This amendment extends the request for quotes due date till 6/8/2017 1300 PD and updates section C.4, C.6, and M of the solicitation. Remove and replace those sections with the attached document.
All other terms and conditions remain unchanged.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
PAUL M. WOOD
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
X 1
6/1/2017
Replace C.4 and C.6 with the following:
C.4 Contract Time
Start time is anticipated to begin July 5, 2017 with all items of work completed within 60 calendar days.
C.6 Contractor License Requirements
The Contractor shall hold a valid roofing contracting license in good standing for not less than the past 3 years. If roofing subcontractors are used the subcontractor shall also hold a valid roofing contracting license in good standing for not less than the past 3 years.
Replace Section M with the following:
SECTION M--EVALUATION FACTORS FOR AWARD
EVALUATION OF QUOTES
The Government will assess the acceptability of each quote on the basis of the following technical criteria:
(1) Technical Approach: Contractors must submit a detailed description of the following:
(a) Any information that indicates the extent to which the project site was visited, or information otherwise obtained about the site, including the results concluded.
(b) The resources (personnel and equipment) which are planned for use on the project, and how realistic that plan is given concurrent obligations. List any licensed subcontractors you plan to use.
(c) Your plan of work and, where applicable, estimated production rates.
(d) Your site-specific safety plan.
(e) Your approach towards installing specified roofing systems.
(f) Provide a copy of valid roofing license per C.6
(2) Relevant Experience: Relevant experience must be clearly demonstrated in the technical proposal and not left to speculation. Identify which projects you have successfully completed that you consider affords the evidence that proves your firm has the experience required to complete this project.
(3) Relevant Past Performance: Offerors shall submit references for at least three similar contracts but no more than 6. References shall provide a current point of telephone contact.
AWARD DETERMINATION
Award will be made to the quoter whose technical proposal is evaluated as acceptable and has the lowest evaluated price.
| SOW Revisions.pdf |
| Replace C.4 and C.6 with the following: |
| C.4 Contract Time |
| C.6 Contractor License Requirements |
| SECTION M--EVALUATION FACTORS FOR AWARD |
| EVALUATION OF QUOTES |
| AWARD DETERMINATION |
File details come from the government source that posted it. Updated .