Road_Package.pdf

PDF 4 MB Posted

Attached to
2016 Gap Fire - Burned Area Emergency Response Federal contract opportunity
Solicitation number
AG-9AC7-S-17-0011
Issued by
Department of Agriculture Forest Service R5-Pacific Southwest Region

About this file

1. Road Package

View the file

Other files for this federal contract opportunity

Other files attached to 2016 Gap Fire - Burned Area Emergency Response, newest first.
File Type Posted
CA9.pdf PDF
PAL_Fire_Plan_030613_(3).pdf PDF
AG-9AC7-S-17-0011.pdf PDF
SF_24_BID_BOND.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ken Bigelow

Ken Kellogg

Jeff Marzel

Christine Frisbee

LOCALITY MAP

NO SCALE

ITEM

NO

DESCRIPTION

METHOD OF

MEASURE

-MENT

PAY

UNIT

46N55

ROAD NO. & TOTALS

CQ LS ALL ALL

ALL ALLLSQ LS

2.21 5.40DQ MILE

ALL ALL

ALL ALL

2.84 1.88

46N60FH 12 46N50 47N77

ALL

ALL

15101 MOBILIZATION

30304 ROADBED RECONDITIONING, RESTORE DRAINAGE, GRADE ROAD, PULL

DITCH (WHERE APPLICABLE), REINFORCE OUTSLOPE (WHERE APPLICABLE)

15754 SOIL EROSION & POLLUTION CONTROL

AQ EA 0 0 0 0 1

60605 FLARED END SECTION

LSQ LS ALL ALL ALL ALL ALL

60701 CLEAN/RECONDITIONING/REPAIR EXISTING DRAINAGE STRUCTURES

AQ EA 0 0 0 24 0

20420D DRAINAGE EXCAVATION, TYPE IV ROLLING DIP, CLASS LB (LOWBOY MOD)

AQ EA 7 0 0 0 0

60452 DROP INLET COVER, TYPE A

6.60

AQ LF 6 4 0 0 0

60403 DROP INLET ASSEMBLY W/ COVER TYPE A

AQ EA 26 40 0 0 0

20420C DRAINAGE EXCAVATION, TYPE IV ROLLING DIP, CLASS L (LOWBOY)

AQ EA 0 0 9 0 38

20420B DRAINAGE EXCAVATION, TYPE I ROLLING DIP, CLASS M (LOG TRUCK)

AQ EA 0 2 0 0 0

20420A DRAINAGE EXCAVATION, TYPE I ROLLING DIP, CLASS L (LOWBOY)

AQ EA 0 0 3 0 18

20420E DRAINAGE EXCAVATION, TYPE IV ROLLING DIP, CLASS M (LOG TRUCK)

60211A 24"Ø CORRUGATED METAL PIPE, 0.079-IN THICKNESS FOR STL, METHOD (A) AQ LF

250 210 0 0 30

AQ EA 0 1 0 0 0

63308 REMOVING & RESETTING STEEL GATE SYSTEM (TO INCLUDE POSTS)

DQ CY 0 700 0 70 0

20401 EXCAVATION, PLACEMENT METHOD (B), COMPACTION (B)

DQ CY 5 180 0 30 60

25101 MACHINE PLACED RIPRAP, CLASS III, COMMERCIAL SOURCE *NOT PART OF

ROLLING DIP*

60211B 48"Ø CORRUGATED METAL PIPE, 0.109-IN THICKNESS FOR STL, METHOD (A) AQ LF

0 0 0 0 60

METAL PIPE, PIPE ARCHES OR ARCHES

SECTION 602 OR 605 604 605 621 251

C O

R R

U G

A T

I O

N S

Ø

C M P

Ø

C M P

Ø

C M P

E L

B O

W

B R

A N

C H

O N

N

E N

D

S

E C

T I O

N

I N

L E

T

R

I S

E R

P I P

E

I N

L E

T

P R

E F

A B

R I C

A T

E D

R A

I N

S F

G R

A N

U L

A

F

I L

L E

R

M A

T E

R I A

L

C

Y

I N

C H

I N

C H

I N

C H

I N

C H

A N

C H

S

T A

K E

G E

O T

E X

T I L

E

SIZE

Ø

C M P

Ø

C M P

Ø

C M P

Ø

C M P

D E

B R

C

K

T

Y P

E

TYPE

PREFAB DRAIN

CORR. METAL SPILLWAY RIPRAP

REMARKS

VIII V III SY

SITE

MILE POST

ROAD NO.

NOTES:

1. QUANTITIES ON THIS SHEET ARE BASED ON DESIGN DATA ONLY

& ARE SUBJECT TO ADJUSTMENTS BEFORE & DURING

CONSTRUCTION TO SUIT FIELD CONDITIONS.

ABBREVIATIONS:

Al = ALUMINUM ALLOY Fe = GALVANIZED STEEL CMP = CORRUGATED METAL PIPE

SPP = STRUCTURAL PLATE PIPE SPPA = STRUCTURAL PLATE PIPE ARCH SPA = STRUCTURAL PLATE ARCH

PP = PERFORATED PIPE CMPA = CORRUGATED METAL PIPE ARCH CSBC = CORRUGATED STEEL BOX CULVERT

SIZE TYPE NO TYPE

CU. YDS.

C L

A S

S

C L

A S

S

C L

A S

S

I N

L E

T

A S

S E

M B

L Y

FLUME OUTLET

PIPE

Ø

C M P

Ø

C M P

Ø

C M P

Ø

C M P

0.14FH 12

0.16

0.23

0.37

0.39

0.60

0.66

0.77

0.86

0.92

0.94

0.99

1.11

1.20

1.28

1.35

1.40

1.55

1.62

1.70

1.77

1.83

3010 CONSTRUCT TYPE IV ROLLING DIP, INSTALL DROP INLET (DI)

6020 CONSTRUCT TYPE IV ROLLING DIP, INSTALL RELIEF CMP

A

A 3010 CONSTRUCT TYPE IV ROLLING DIP, INSTALL DROP INLET (DI)

3010 CONSTRUCT TYPE IV ROLLING DIP

7525 CONSTRUCT TYPE IV ROLLING DIP, RIPRAP INLET, RELIEF CMP

INSTALL DROP INLET LID ONLY

3010 CONSTRUCT TYPE IV ROLLING DIP, INSTALL DI LIDA

A

6020 INSTALL DI LID + ED @ CMP OULETA

3010 CONSTRUCT TYPE IV ROLLING DIP

3010 CONSTRUCT TYPE IV ROLLING DIP

3010 CONSTRUCT TYPE IV ROLLING DIP, INSTALL DIA

3010 CONSTRUCT TYPE IV ROLLING DIP, INSTALL DIA

INSTALL DROP INLET LID, CONSTRUCT TYPE IV ROLLING DIPA

INSTALL DROP INLET LID ONLYA

6020 CONSTRUCT TYPE IV ROLLING DIP, INSTALL RELIEF CMP

6020 CONSTRUCT TYPE IV ROLLING DIP, INSTALL RELIEF CMP

3010 CONSTRUCT TYPE IV ROLLING DIP

INSTALL DROP INLET LID ONLYA

INSTALL DROP INLETA

6020 CONSTRUCT TYPE IV ROLLING DIP, INSTALL NEW 24"Ø CMP50

3010 CONSTRUCT TYPE IV ROLLING DIP

3010 CONSTRUCT TYPE IV ROLLING DIP

FH 12

FH 12

FH 12

FH 12

FH 12

FH 12

FH 12

FH 12

FH 12

FH 12

FH 12

FH 12

FH 12

FH 12

FH 12

FH 12

FH 12

FH 12

FH 12

FH 12

FH 12

1.91FH 12 3010 CONSTRUCT TYPE IV ROLLING DIP

1.43 3010 CONSTRUCT TYPE IV ROLLING DIPFH 12

1.49 3010 CONSTRUCT TYPE IV ROLLING DIPFH 12

0.50 3010 CONSTRUCT TYPE IV ROLLING DIP

0.57 3010 CONSTRUCT TYPE IV ROLLING DIP

FH 12

FH 12

AA

C O

R R

U G

A T

I O

N S

Ø

C M P

Ø

C M P

Ø

C M P

E L

B O

W

B R

A N

N

N

E N

D

S

E C

T I O

N

I N

L E

T

R

I S

E R

P I P

E

I N

L E

T

P R

E F

A B

R I C

A T

A

I N

S F

G R

A N

U L

L

L E

R

M A

T E

R I A

L

C

Y

I N

C H

I N

C H

I N

C H

I N

C H

A N

C H

A

K E

G E

O T

E X

T I L

E

SIZE

Ø

C M P

Ø

C M P

Ø

C M P

Ø

C M P

D E

B R

C

K

T

Y P

E

TYPE

PREFAB DRAIN

CORR. METAL SPILLWAY RIPRAP

REMARKS

VIII V III SY

SITE

MILE POST

ROAD NO.

NOTES:

1. QUANTITIES ON THIS SHEET ARE BASED ON

DESIGN DATA ONLY & ARE SUBJECT TO

ADJUSTMENTS BEFORE & DURING

CONSTRUCTION TO SUIT FIELD CONDITIONS.

ABBREVIATIONS:

Al = ALUMINUM ALLOY Fe = GALVANIZED STEEL CMP = CORRUGATED METAL PIPE

SPP = STRUCTURAL PLATE PIPE SPPA = STRUCTURAL PLATE PIPE ARCH SPA = STRUCTURAL PLATE ARCH

PP = PERFORATED PIPE CMPA = CORRUGATED METAL PIPE ARCH CSBC = CORRUGATED STEEL BOX CULVERT

SIZE TYPE NO TYPE

CU. YDS.

C L

A S

S

C L

A S

S

C L

A S

S

I N

L E

T

A S

S E

M B

L Y

FLUME OUTLET

PIPE

46N60 0.12

Ø

C M P

Ø

C M P

Ø

C M P

Ø

C M P

3010 CONSTRUCT TYPE IV ROLLING DIP

0.19

0.30

0.39

0.43

0.55

0.59

0.66

0.86

0.92

1.01

1.08

1.27

1.38

1.44

1.55

1.66

1.77

2.70

3.20

3.85

3.87

3010 CONSTRUCT TYPE IV ROLLING DIP

3010 CONSTRUCT TYPE I ROLLING DIP

3010 CONSTRUCT TYPE IV ROLLING DIP

6020 CONSTRUCT TYPE IV ROLLING DIP, INSTALL ED @ CMP OUTLET

3010 CONSTRUCT TYPE IV ROLLING DIP

3010 CONSTRUCT TYPE IV ROLLING DIP

6020 CONSTRUCT TYPE IV ROLLING DIP, INSTALL ED @ CMP OUTLET

3010 CONSTRUCT TYPE IV ROLLING DIP, INSTALL DROP INLETA

6020 CONSTRUCT TYPE IV DIP, INSTALL 24"CMP + ED @ EXIST CMP70

6020 CONSTRUCT TYPE IV DIP, INSTALL DI @ INLET & ED @ OUTLETA

6020 CONSTRUCT TYPE IV DIP, INSTALL 24"CMP + ED @ EXIST CMP40

3010 CONSTRUCT TYPE IV ROLLING DIP

3010 CONSTRUCT TYPE IV ROLLING DIP

6020 CONSTRUCT TYPE IV DIP, INSTALL DI @ INLET & ED @ OUTLETA

6020 CONSTRUCT TYPE IV DIP,REPLACE 5' CMP, INSTALL DI + ED10

3010 CONSTRUCT TYPE IV DIP, INSTALL DI @ INLETA

3010 CONSTRUCT TYPE IV ROLLING DIP

12040 CONSTRUCT TYPE IV ROLLING DIP, REMOVE & RIPRAP DAM

18060 CONSTRUCT TYPE IV ROLLING DIP, REMOVE & RIPRAP DAM

3010 CONSTRUCT TYPE IV ROLLING DIP

3010 CONSTRUCT TYPE IV ROLLING DIP

46N60

46N60

46N60

46N60

46N60

46N60

46N60

46N60

46N60

46N60

46N60

46N60

46N60

46N60

46N60

46N60

46N60

46N60

46N60

46N60

46N60

1.92

2.04

2.14

2.20

MAINTAIN EXISTING CMP, CLEAN OUT CATCH BASIN

3010 CONSTRUCT TYPE IV ROLLING DIP

3010 CONSTRUCT TYPE IV ROLLING DIP

INSTALL DROP INLET LID, CONSTRUCT TYPE IV ROLLING DIPA

FH 12

FH 12

FH 12

FH 12

3.90

3.98

4.00

4.05

4.12

3010 CONSTRUCT TYPE IV ROLLING DIP

3010 CONSTRUCT TYPE I ROLLING DIP

3010 CONSTRUCT TYPE IV ROLLING DIP

3010 CONSTRUCT TYPE IV ROLLING DIP

3010 CONSTRUCT TYPE IV ROLLING DIP

METAL PIPE, PIPE ARCHES OR ARCHES

SECTION 602 OR 605 604 605 621 251

C O

R R

U G

A T

I O

N S

Ø

C M P

Ø

C M P

Ø

C M P

E L

B O

W

B R

A N

N

N

E N

D

S

E C

T I O

N

I N

L E

T

R

I S

E R

P I P

E

I N

L E

T

P R

E F

A B

R I C

A T

A

I N

S F

G R

A N

U L

L

L E

R

M A

T E

R I A

L

C

Y

I N

C H

I N

C H

I N

C H

I N

C H

A N

C H

A

K E

G E

O T

E X

T I L

E

SIZE

Ø

C M P

Ø

C M P

Ø

C M P

Ø

C M P

D E

B R

C

K

T

Y P

E

TYPE

PREFAB DRAIN

CORR. METAL SPILLWAY RIPRAP

REMARKS

VIII V III SY

SITE

MILE POST

ROAD NO.

NOTES:

1. QUANTITIES ON THIS SHEET ARE BASED ON

DESIGN DATA ONLY & ARE SUBJECT TO

ADJUSTMENTS BEFORE & DURING

CONSTRUCTION TO SUIT FIELD CONDITIONS.

ABBREVIATIONS:

Al = ALUMINUM ALLOY Fe = GALVANIZED STEEL CMP = CORRUGATED METAL PIPE

SPP = STRUCTURAL PLATE PIPE SPPA = STRUCTURAL PLATE PIPE ARCH SPA = STRUCTURAL PLATE ARCH

PP = PERFORATED PIPE CMPA = CORRUGATED METAL PIPE ARCH CSBC = CORRUGATED STEEL BOX CULVERT

SIZE TYPE NO TYPE

CU. YDS.

C L

A S

S

C L

A S

S

C L

A S

S

I N

L E

T

A S

S E

M B

L Y

FLUME OUTLET

PIPE

46N60 4.14

Ø

C M P

Ø

C M P

Ø

C M P

Ø

C M P

3010 CONSTRUCT TYPE IV ROLLING DIP

4.24

4.33

4.41

4.51

4.57

4.67

4.76

4.90

4.97

5.04

5.16

5.22

5.24

5.28

5.34

3010 CONSTRUCT TYPE IV ROLLING DIP

3010 CONSTRUCT TYPE I ROLLING DIP

3010 CONSTRUCT TYPE IV ROLLING DIP

46N60

46N60

46N60

46N60

46N60

3010 CONSTRUCT TYPE IV ROLLING DIP

3010 CONSTRUCT TYPE IV ROLLING DIP

6020 CONSTRUCT TYPE IV ROLLING DIP, INSTALL RELIEF CMP

3010 CONSTRUCT TYPE IV ROLLING DIP

3010 CONSTRUCT TYPE IV ROLLING DIP

3010 CONSTRUCT TYPE IV ROLLING DIP

3010 CONSTRUCT TYPE IV ROLLING DIP

3010 CONSTRUCT TYPE IV ROLLING DIP

3010 CONSTRUCT TYPE IV ROLLING DIP

3010 CONSTRUCT TYPE IV ROLLING DIP

3010 CONSTRUCT TYPE IV ROLLING DIP

3010 CONSTRUCT TYPE IV ROLLING DIP

46N60

46N60

46N60

46N60

46N60

46N60

46N60

46N60

46N60

46N60

46N60

46N60

46N60

46N60

46N60

46N55 0.11

0.56

2.02

2.04

2.18

3010 CONSTRUCT TYPE IV ROLLING DIP

3010 CONSTRUCT TYPE IV ROLLING DIP

3010 CONSTRUCT TYPE I ROLLING DIP

3010 CONSTRUCT TYPE I ROLLING DIP

3010 CONSTRUCT TYPE I ROLLING DIP

46N55

46N55

46N55

46N55

2.28

2.32

2.38

2.41

2.48

3010 CONSTRUCT TYPE IV ROLLING DIP

3010 CONSTRUCT TYPE I ROLLING DIP

3010 CONSTRUCT TYPE I ROLLING DIP

3010 CONSTRUCT TYPE I ROLLING DIP

3010 CONSTRUCT TYPE I ROLLING DIP

46N55

46N55

46N55

46N55

46N55

METAL PIPE, PIPE ARCHES OR ARCHES

SECTION 602 OR 605 604 605 621 251

C O

R R

U G

A T

I O

N S

Ø

C M P

Ø

C M P

Ø

C M P

E L

B O

W

B R

A N

N

N

E N

D

S

E C

T I O

N

I N

L E

T

R

I S

E R

P I P

E

I N

L E

T

P R

E F

A B

R I C

A T

A

I N

S F

G R

A N

U L

L

L E

R

M A

T E

R I A

L

C

Y

I N

C H

I N

C H

I N

C H

I N

C H

A N

C H

A

K E

G E

O T

E X

T I L

E

SIZE

Ø

C M P

Ø

C M P

Ø

C M P

Ø

C M P

D E

B R

C

K

T

Y P

E

TYPE

PREFAB DRAIN

CORR. METAL SPILLWAY RIPRAP

REMARKS

VIII V III SY

SITE

MILE POST

ROAD NO.

NOTES:

1. QUANTITIES ON THIS SHEET ARE BASED ON

DESIGN DATA ONLY & ARE SUBJECT TO

ADJUSTMENTS BEFORE & DURING

CONSTRUCTION TO SUIT FIELD CONDITIONS.

ABBREVIATIONS:

Al = ALUMINUM ALLOY Fe = GALVANIZED STEEL CMP = CORRUGATED METAL PIPE

SPP = STRUCTURAL PLATE PIPE SPPA = STRUCTURAL PLATE PIPE ARCH SPA = STRUCTURAL PLATE ARCH

PP = PERFORATED PIPE CMPA = CORRUGATED METAL PIPE ARCH CSBC = CORRUGATED STEEL BOX CULVERT

SIZE TYPE NO TYPE

CU. YDS.

C L

A S

S

C L

A S

S

C L

A S

S

I N

L E

T

A S

S E

M B

L Y

FLUME OUTLET

PIPE

Ø

C M P

Ø

C M P

Ø

C M P

Ø

C M P

2.51 3010 CONSTRUCT TYPE I ROLLING DIP46N55

2.5646N55

2.7046N55

3010 CONSTRUCT TYPE I ROLLING DIP

3010 CONSTRUCT TYPE I ROLLING DIP

0.0646N50

0.08

0.33

0.37

0.41

0.54

0.56

0.62

0.68

0.79

0.81

0.84

0.90

0.93

1.00

1.13

1.15

0.46

MAINTAIN EXISTING DIP

MAINTAIN EXISTING CMP

3010 CONSTRUCT TYPE IV ROLLING DIP, MAINTAIN CMP

12040 CONSTRUCT TYPE IV ROLLING DIP, INSTALL ED @ CMP OUTLET

3010 CONSTRUCT TYPE IV ROLLING DIP

6020 CONSTRUCT TYPE IV ROLLING DIP, INSTALL ED @ CMP OUTLET

3010 CONSTRUCT TYPE IV ROLLING DIP

3010 CONSTRUCT TYPE IV ROLLING DIP

3010 CONSTRUCT TYPE IV ROLLING DIP

3010 CONSTRUCT TYPE IV ROLLING DIP, MAINTAIN CMP

3010 CONSTRUCT TYPE IV ROLLING DIP

3010 CONSTRUCT TYPE IV ROLLING DIP

3010 CONSTRUCT TYPE IV ROLLING DIP, MAINTAIN CMP

3010 CONSTRUCT TYPE IV ROLLING DIP

3010 CONSTRUCT TYPE IV ROLLING DIP, MAINTAIN CMP

3010 CONSTRUCT TYPE IV ROLLING DIP

3010 CONSTRUCT TYPE IV ROLLING DIP

3010 CONSTRUCT TYPE IV ROLLING DIP

46N50

46N50

46N50

46N50

46N50

46N50

46N50

46N50

46N50

46N50

46N50

46N50

46N50

46N50

46N50

46N50

0.3347N77

0.36

0.50

0.68

0.74

0.97

1.00

1.06

1.09

1.14

1.22

1.25

1.37

1.44

1.48

3010 CONSTRUCT TYPE IV ROLLING DIP

3010 CONSTRUCT TYPE IV ROLLING DIP

3010 CONSTRUCT TYPE I ROLLING DIP

3010 CONSTRUCT TYPE I ROLLING DIP

3010 CONSTRUCT TYPE IV ROLLING DIP

3010 CONSTRUCT TYPE IV ROLLING DIP

3010 CONSTRUCT TYPE IV ROLLING DIP

CONSTRUCT TYPE IV ROLLING DIP, INSTALL ED @ CMP OUTLET

CONSTRUCT TYPE IV ROLLING DIP, INSTALL ED @ CMP OUTLET

3010 CONSTRUCT TYPE I ROLLING DIP

3010 CONSTRUCT TYPE I ROLLING DIP

CONSTRUCT TYPE IV ROLLING DIP, INSTALL ED @ CMP OUTLET

6020 CONSTRUCT TYPE IV ROLLING DIP, INSTALL ED @ CMP OUTLET

3010 CONSTRUCT TYPE IV ROLLING DIP

3010 CONSTRUCT TYPE IV ROLLING DIP

47N77

47N77

47N77

47N77

47N77

47N77

47N77

47N77

47N77

47N77

47N77

47N77

47N77

47N77

1.25

1.40

1.41

1.45

1.48

METAL PIPE, PIPE ARCHES OR ARCHES

SECTION 602 OR 605 604 605 621 251

C O

R R

U G

A T

I O

N S

Ø

C M P

Ø

C M P

Ø

C M P

E L

B O

W

B R

A N

N

N

E N

D

S

E C

T I O

N

I N

L E

T

R

I S

E R

P I P

E

I N

L E

T

P R

E F

A B

R I C

A T

A

I N

S F

G R

A N

U L

L

L E

R

M A

T E

R I A

L

C

Y

I N

C H

I N

C H

I N

C H

I N

C H

A N

C H

A

K E

G E

O T

E X

T I L

E

SIZE

Ø

C M P

Ø

C M P

Ø

C M P

Ø

C M P

D E

B R

C

K

T

Y P

E

TYPE

PREFAB DRAIN

CORR. METAL SPILLWAY RIPRAP

REMARKS

VIII V III SY

SITE

MILE POST

ROAD NO.

NOTES:

1. QUANTITIES ON THIS SHEET ARE BASED ON

DESIGN DATA ONLY & ARE SUBJECT TO

ADJUSTMENTS BEFORE & DURING

CONSTRUCTION TO SUIT FIELD CONDITIONS.

ABBREVIATIONS:

Al = ALUMINUM ALLOY Fe = GALVANIZED STEEL CMP = CORRUGATED METAL PIPE

SPP = STRUCTURAL PLATE PIPE SPPA = STRUCTURAL PLATE PIPE ARCH SPA = STRUCTURAL PLATE ARCH

PP = PERFORATED PIPE CMPA = CORRUGATED METAL PIPE ARCH CSBC = CORRUGATED STEEL BOX CULVERT

SIZE TYPE NO TYPE

CU. YDS.

C L

A S

S

C L

A S

S

C L

A S

S

I N

L E

T

A S

S E

M B

L Y

FLUME OUTLET

PIPE

Ø

C M P

Ø

C M P

Ø

C M P

Ø

C M P

1.5946N50

1.61

1.62

1.67

1.86

3010 CONSTRUCT TYPE IV ROLLING DIP

3010 CONSTRUCT TYPE IV ROLLING DIP

MAINTAIN CMP

3010 CONSTRUCT TYPE IV ROLLING DIP

3010 CONSTRUCT TYPE IV ROLLING DIP

MAINTAIN CMP

MAINTAIN CMP

3010 CONSTRUCT TYPE IV ROLLING DIP

3010 CONSTRUCT TYPE IV ROLLING DIP

3010 CONSTRUCT TYPE IV ROLLING DIP

46N50

46N50

46N50

46N50

46N50

46N50

46N50

46N50

0.77 12040 CONSTRUCT TYPE IV ROLLING DIP, INSTALL 48"Ø CMP47N77 60

C O

R R

U G

A T

I O

N S

Ø

C M P

Ø

C M P

Ø

C M P

E L

B O

W

B R

A N

N

N

E N

D

S

E C

T I O

N

I N

L E

T

R

I S

E R

P I P

E

I N

L E

T

P R

E F

A B

R I C

A T

A

I N

S F

G R

A N

U L

L

L E

R

M A

T E

R I A

L

C

Y

I N

C H

I N

C H

I N

C H

I N

C H

A N

C H

A

K E

G E

O T

E X

T I L

E

SIZE

Ø

C M P

Ø

C M P

Ø

C M P

Ø

C M P

D E

B R

C

K

T

Y P

E

TYPE

PREFAB DRAIN

CORR. METAL SPILLWAY RIPRAP

REMARKS

VIII V III SY

SITE

MILE POST

ROAD NO.

NOTES:

1. QUANTITIES ON THIS SHEET ARE BASED ON

DESIGN DATA ONLY & ARE SUBJECT TO

ADJUSTMENTS BEFORE & DURING

CONSTRUCTION TO SUIT FIELD CONDITIONS.

ABBREVIATIONS:

Al = ALUMINUM ALLOY Fe = GALVANIZED STEEL CMP = CORRUGATED METAL PIPE

SPP = STRUCTURAL PLATE PIPE SPPA = STRUCTURAL PLATE PIPE ARCH SPA = STRUCTURAL PLATE ARCH

PP = PERFORATED PIPE CMPA = CORRUGATED METAL PIPE ARCH CSBC = CORRUGATED STEEL BOX CULVERT

SIZE TYPE NO TYPE

CU. YDS.

C L

A S

S

C L

A S

S

C L

A S

S

I N

L E

T

A S

S E

M B

L Y

FLUME OUTLET

PIPE

Ø

C M P

Ø

C M P

Ø

C M P

Ø

C M P

1.51

1.66

1.88

2.02

2.05

2.07

2.12

2.32

47N77 2.39

2.44

2.49

2.58

2.60

2.64

2.68

2.74

2.77

2.83

2.88

2.92

2.97

3.11

4.31

4.39

4.43

4.87

3010 CONSTRUCT TYPE I ROLLING DIP

3010 CONSTRUCT TYPE IV ROLLING DIP, INSTALL END SECTION118"

3010 CONSTRUCT TYPE I ROLLING DIP

3010 CONSTRUCT TYPE I ROLLING DIP

3010 CONSTRUCT TYPE I ROLLING DIP

3010 CONSTRUCT TYPE I ROLLING DIP

6020 CONSTRUCT TYPE IV ROLLING DIP, INSTALL ED @ CMP OUTLET

3010 CONSTRUCT TYPE IV ROLLING DIP

3010 CONSTRUCT TYPE I ROLLING DIP

3010 CONSTRUCT TYPE I ROLLING DIP

3010 CONSTRUCT TYPE I ROLLING DIP

3010 CONSTRUCT TYPE I ROLLING DIP

3010 CONSTRUCT TYPE I ROLLING DIP

3010 CONSTRUCT TYPE I ROLLING DIP

3010 CONSTRUCT TYPE I ROLLING DIP30

6020 CONSTRUCT TYPE IV ROLLING DIP, INSTALL 24"Ø CMP

6020 CONSTRUCT TYPE IV ROLLING DIP, INSTALL ED @ CMP OUTLET

3010 CONSTRUCT TYPE I ROLLING DIP

3010 CONSTRUCT TYPE I ROLLING DIP

3010 CONSTRUCT TYPE I ROLLING DIP

3010 CONSTRUCT TYPE I ROLLING DIP

3010 CONSTRUCT TYPE I ROLLING DIP

3010 CONSTRUCT TYPE I ROLLING DIP

3010 CONSTRUCT TYPE I ROLLING DIP

3010 CONSTRUCT TYPE I ROLLING DIP

3010 CONSTRUCT TYPE I ROLLING DIP

3010 CONSTRUCT TYPE I ROLLING DIP

4.24

47N77

47N77

47N77

47N77

47N77

47N77

47N77

47N77

47N77

47N77

47N77

47N77

47N77

47N77

47N77

47N77

47N77

47N77

47N77

47N77

47N77

47N77

47N77

47N77

47N77

C O

R R

U G

A T

I O

N S

Ø

C M P

Ø

C M P

Ø

C M P

E L

B O

W

B R

A N

N

N

E N

D

S

E C

T I O

N

I N

L E

T

R

I S

E R

P I P

E

I N

L E

T

P R

E F

A B

R I C

A T

A

I N

S F

G R

A N

U L

L

L E

R

M A

T E

R I A

L

C

Y

I N

C H

I N

C H

I N

C H

I N

C H

A N

C H

A

K E

G E

O T

E X

T I L

E

SIZE

Ø

C M P

Ø

C M P

Ø

C M P

Ø

C M P

D E

B R

C

K

T

Y P

E

TYPE

PREFAB DRAIN

CORR. METAL SPILLWAY RIPRAP

REMARKS

VIII V III SY

SITE

MILE POST

ROAD NO.

NOTES:

1. QUANTITIES ON THIS SHEET ARE BASED ON

DESIGN DATA ONLY & ARE SUBJECT TO

ADJUSTMENTS BEFORE & DURING

CONSTRUCTION TO SUIT FIELD CONDITIONS.

ABBREVIATIONS:

Al = ALUMINUM ALLOY Fe = GALVANIZED STEEL CMP = CORRUGATED METAL PIPE

SPP = STRUCTURAL PLATE PIPE SPPA = STRUCTURAL PLATE PIPE ARCH SPA = STRUCTURAL PLATE ARCH

PP = PERFORATED PIPE CMPA = CORRUGATED METAL PIPE ARCH CSBC = CORRUGATED STEEL BOX CULVERT

SIZE TYPE NO TYPE

CU. YDS.

C L

A S

S

C L

A S

S

C L

A S

S

I N

L E

T

A S

S E

M B

L Y

FLUME OUTLET

PIPE

Ø

C M P

Ø

C M P

Ø

C M P

Ø

C M P

4.95

5.07

5.11

5.30

5.33

5.64

5.97

6.08

6.1047N77

6.24

6.49

6.52

6.54

6.57

3010 CONSTRUCT TYPE I ROLLING DIP

3010 CONSTRUCT TYPE I ROLLING DIP

3010 CONSTRUCT TYPE I ROLLING DIP

MAINTAIN CMP, CLEAN TREES & DEBRIS FROM CATCH BASIN

3010 CONSTRUCT TYPE IV ROLLING DIP

3010 CONSTRUCT TYPE I ROLLING DIP

3010 CONSTRUCT TYPE I ROLLING DIP

3010 CONSTRUCT TYPE I ROLLING DIP

3010 CONSTRUCT TYPE I ROLLING DIP

3010 CONSTRUCT TYPE I ROLLING DIP

3010 CONSTRUCT TYPE I ROLLING DIP

3010 CONSTRUCT TYPE I ROLLING DIP

3010 CONSTRUCT TYPE I ROLLING DIP

3010 CONSTRUCT TYPE I ROLLING DIP

47N77

47N77

47N77

47N77

47N77

47N77

47N77

47N77

47N77

47N77

47N77

H20 TRK

EXISTING CULVERT (IF APPLICABLE) CLEAN INLET & OUTLET AS NECESSARY

EXISTING CATCH BASIN. CLEAR ANY LOOSE DEBRIS, SEDIMENT

BUILDUP OR ANY POTENTIAL CULVERT OBSTRUCTIONS FROM

W/IN 10' RADIUS OF INLET. DE-WATERING IS REQUIRED

UNLESS OTHERWISE APPROVED BY THE ENGINEER

10'-0"

NOTE:

1. ALL SLASH SHALL BE DISPOSED OF ACCORDING TO SECTION

203.05(F) & IS INCIDENTAL TO SPECIFICATION 60701

2. CULVERT SHALL BE CLEANED IN PLACE SO THAT FLOW IS NOT

OBSTRUCTED FROM ENTERING, FLOWING THROUGH OR

EXITING THE CULVERT.

3. SEDIMENT REMOVED SHALL BE DISPOSED OF AT THE

DISPOSAL SITE DESIGNATED ON THE GROUND BY THE

ENGINEER.

4. COST OF REMOVAL & DISPOSAL OF MATERIAL SHALL BE

INCIDENTAL TO SPECIFICATION 60701

ROAD WIDTH

VARIES

VARIES

CLEAR ANY LOOSE DEBRIS, SEDIMENT

BUILDUP OR ANY POTENTIAL CULVERT OBSTRUCTIONS FROM

W/IN 10' RADIUS OF OUTLET UNLESS OTHERWISE APPROVED BY THE ENGINEER

10'-0"

NOTE: FINAL LOCATION

OF ALL RELIEF

CULVERTS TO BE

SLIGHTLY ADJUSTED BY

THE ENGINEER IN THE

FIELD TO OPTIMIZE

CATCHING OVERFLOW

OF PLUGGED CULVERTS

IN THE BASE OF THE

FILLS.

NOTE: FINAL LOCATION OF ALL DIPS

TO BE SLIGHTLY ADJUSTED BY THE

ENGINEER IN THE FIELD TO

OPTIMIZE PREVENTING DIVERSION

OF WATER FROM THE

DRAW/DRAINAGE DOWN THE ROAD

& BACK INTO NATURAL CHANNEL

2"

1"

#4

#200

80-100 (±6)

64-94 (±6)

40-69 (±6)

31-54 (±6)

4.0-7.0 (±3)

NOTE: FINAL LOCATION OF ALL DIPS

TO BE SLIGHTLY ADJUSTED BY THE

ENGINEER IN THE FIELD TO

OPTIMIZE PREVENTING DIVERSION

OF WATER FROM THE

DRAW/DRAINAGE DOWN THE ROAD

& BACK INTO NATURAL CHANNEL

CTY ROAD 8F001

PROJECT LIMIT

REF JCT COUNTY ROAD 8F001

BEGIN RECONDITION

DRAINAGE STRUCTURES

BEGIN ROAD

RECONDITIONING

***AT THE CONTRACTOR'S DISCRETION, HAZARDOUS VEGETATION CAN BE BRUSHED/CLEAREDREMOVED BY THE CONTRACTOR IN ORDER TO PERFORM THE WORK. WORK ASSOCIATED W/ THIS VEGETATION SHALL BE INCIDENTAL TO THE WORK BEING PERFORMED***

GAP BAER

ROADS BASE PACKAGE

FOREST HIGHWAY (FH) 12 ROAD

MP 0.00

MP 0.66 REF 18"Ø CMP W/ DI, INSTALL

NEW DI LID, CONSTRUCT TYPE

IV ROLLING DIP RT

MP 0.14 REF 18"Ø CMP, MAINTAIN CMP

INSTALL DROP INLET,

CONSTRUCT TYPE IV ROLLING

DIP LT.

MP 0.16 REF 18"Ø CMP, MAINTAIN CMP

INSTALL DROP INLET,

CONSTRUCT TYPE IV ROLLING

DIP LT.

MP 0.23 REF 18"Ø CMP, MAINTAIN CMP,

CONSTRUCT TYPE IV ROLLING

DIP LT. INSTALL 24"Ø X 40'

RELIEF CULVERT

MP 0.37 REF 18"Ø CMP, MAINTAIN CMP

CONSTRUCT TYPE IV ROLLING

DIP RT.

MP 0.39 REF 18"Ø CMP, MAINTAIN CMP

CONSTRUCT TYPE IV ROLLING

DIP RT. ARMOUR CMP INLET,

INSTALL NEW 24"Ø X 40' RELIEF

CMP

MP 0.60 REF 18"Ø CMP W/ DI, INSTALL

NEW DI LID

MP 0.77 REF 18"Ø CMP W/ DI, INSTALL

NEW DI LID, INSTALL ENERGY

DISSIPATER @ CMP OUTLET

MP 0.86 CONSTRUCT TYPE IV ROLLING

DIP RT. REF BERM RT

MP 0.92 CONSTRUCT TYPE IV ROLLING

DIP RT.

MP 0.94 REF 18"Ø CMP, INSTALL DI,

CONSTRUCT TYPE IV ROLLING

DIP RT

MP 0.99 REF 18"Ø CMP, INSTALL DI,

CONSTRUCT TYPE IV ROLLING

DIP RT. BEGIN REINFORCE

INSLOPE. REF THRU CUT

MP 1.05 REF END THRU CUT. END

REINFORCE INSLOPE

MP 1.11 REF 18"Ø CMP W/ DI, INSTALL

NEW DI LID, CONSTRUCT TYPE

IV DIP RT

MP 1.20 REF 18"Ø CMP W/ DI, INSTALL

NEW DI LID

NOTE: ALL ROLLING DIPS ON THIS ROAD SHALL BE CLASS L (LOWBOY)

MP 0.57 CONSTRUCT TYPE IV ROLLING

DIP RT. REF BERM RT

MP 0.50 REF JCT LT JUST ABOVE MP,

W/ 18"Ø CMP W/ DI,

CONSTRUCT TYPE IV ROLLING

DIP RT TO PREVENT

OVERFLOW DIVERSION FROM

CMP OR ROAD ABOVE

MP 1.28 REF 18"Ø CMP, CONSTRUCT

TYPE IV ROLLING DIP RT

INSTALL NEW 24"Ø X 60' RELIEF

CMP, SKEW NEW CMP

MP 1.35 REF 24"Ø CMP, CONSTRUCT

TYPE IV ROLLING DIP RT.

INSTALL NEW 24"Ø X 60' RELIEF

CMP, SKEW NEW CMP

MP 1.40 REF 18"Ø CMP, CONSTRUCT

TYPE IV ROLLING DIP RT

MP 1.55 REF 18"Ø CMP W/ DI, INSTALL

NEW DI LID

MP 1.62 REF 18"Ø CMP, INSTALL NEW DI

MP 1.70 REF RUSTED & DAMAGED 18"Ø

CMP, INSTALL NEW 24"Ø X 50'

CMP, CONSTRUCT TYPE IV

ROLLING DIP RT

***AT THE CONTRACTOR'S DISCRETION, HAZARDOUS VEGETATION CAN BE BRUSHED/CLEAREDREMOVED BY THE CONTRACTOR IN ORDER TO PERFORM THE WORK. WORK ASSOCIATED W/ THIS VEGETATION SHALL BE INCIDENTAL TO THE WORK BEING PERFORMED***

GAP BAER

ROADS BASE PACKAGE

FOREST HIGHWAY (FH) 12 ROAD

MP 2.14 REF 18"Ø CMP W/ DI, INSTALL

NEW DI LID, CONSTRUCT TYPE

IV ROLLING DIP RT

MP 1.77 CONSTRUCT TYPE IV ROLLING

DIP RT.

MP 1.83 REF 18"Ø CMP, INSTALL NEW

DI, CONSTRUCT TYPE IV

ROLLING DIP RT

MP 1.82 REF JCT LT.

MP 2.21 REF PROJECT LIMIT

MP 1.92 REF CMP W/ TOWER DI,

MAINTAIN CMP, DI & CLEAN

OUT CATCH BASIN.

MP 1.94 REF JCT RT.

MP 2.04 REF 24"Ø CMP, CONSTRUCT

TYPE IV ROLLING DIP RT

MP 2.06 REF JCT RT.

MP 2.20 REF 24"Ø CMP, CONSTRUCT

TYPE IV ROLLING DIP RT

NOTE: ALL ROLLING DIPS ON THIS ROAD SHALL BE CLASS L (LOWBOY)

MP 1.49 CONSTRUCT TYPE IV ROLLING

DIP RT.

MP 1.43 CONSTRUCT TYPE IV ROLLING

DIP RT.

MP 1.91 CONSTRUCT TYPE IV ROLLING

DIP RT.

REF CTY ROAD 8F001

BEGIN RECONDITION

DRAINAGE STRUCTURES

BEGIN ROAD

RECONDITIONING

***AT THE CONTRACTOR'S DISCRETION, HAZARDOUS VEGETATION CAN BE BRUSHED/CLEAREDREMOVED BY THE CONTRACTOR IN ORDER TO PERFORM THE WORK. WORK ASSOCIATED W/ THIS VEGETATION SHALL BE INCIDENTAL TO THE WORK BEING PERFORMED***

GAP BAER

ROADS BASE PACKAGE

46N60

MP 0.00

N

REF MIDDLE HORSE BRIDGE.

ALL EQUIPMENT CROSSING

BRIDGES SHALL BE HIGHWAY

LEGAL OR HAVE AN

INDIVIDUAL FOREST SERVICE

OVER-LOAD PERMIT FOR EACH

PIECE OF EQUIPMENT

MP 0.01

MP 0.12 REF 18"Ø CMP, CONSTRUCT

TYPE IV ROLLING DIP LT.

MP 0.19 REF 18"Ø CMP & GATE,

CONSTRUCT TYPE IV ROLLING

DIP LT. RELOCATE GATE &

GATE POSTS AS NEEDED TO

CONSTRUCT DIP. GATE

SYSTEM RE-LOCATION TO BE

PAID UNDER 63308

MP 0.30 CONSTRUCT TYPE I ROLLING

DIP LT.

N

MP 0.43 REF 18"Ø CMP, CONSTRUCT

TYPE IV ROLLING DIP LT.

INSTALL ENERGY DISSIPATER

@ CMP OUTLET

MP 0.55 REF 18"Ø CMP, CONSTRUCT

TYPE IV ROLLING DIP LT.

MP 0.39 REF 78"Ø CMP W/ BEVELED

INLET, CONSTRUCT TYPE IV

ROLLING DIP LT.

MP 0.59 REF 18"Ø CMP, CONSTRUCT

TYPE IV ROLLING DIP LT.

MP 0.66 REF 24"Ø CMP, CONSTRUCT

TYPE IV ROLLING DIP LT.

INSTALL ENERGY DISSIPATER

@ CMP OUTLET

MP 0.86 REF 18"Ø CMP, INSTALL NEW

DI, CONSTRUCT TYPE IV

ROLLING DIP RT

MP 0.92 REF 18"Ø CMP W/ DAMAGED

INLET, INSTALL NEW 24"Ø X 70'

RELIEF CMP, INSTALL ENERGY

DISSIPATER @ 18" Ø OUTLET,

CONSTRUCT TYPE IV ROLLING

DIP RT

MP 1.01 REF 18"Ø CMP, INSTALL NEW

DI, CONSTRUCT TYPE IV

ROLLING DIP RT. INSTALL

ENERGY DISSIPATER @ CMP

OUTLET. ALIGN DIP W/ DIP

BELOW

MP 1.08 REF 18"Ø CMP W/ DAMAGED

INLET, INSTALL NEW 24"Ø X40'

RELIEF CMP, INSTALL ENERGY

DISSIPATER @ 18" Ø OUTLET,

CONSTRUCT TYPE IV ROLLING

DIP RT

MP 1.27 REF 24"Ø CMP, CONSTRUCT

TYPE IV ROLLING DIP RT

MP 1.38 CONSTRUCT TYPE IV ROLLING

DIP RT

MP 1.44 REF 18"Ø CMP W/ DAMAGED

INLET, INSTALL NEW 24"Ø X 60'

RELIEF CMP, INSTALL ENERGY

DISSIPATER @ 18"Ø CMP

OUTLET, CONSTRUCT TYPE IV

ROLLING DIP RT

N

MP 1.55 REF 18"Ø CMP, INSTALL NEW

DI, INSTALL ENERGY

DISSIPATER @ CMP OUTLET,

CONSTRUCT TYPE IV ROLLING

DIP RT

NOTE: ALL ROLLING DIPS ON THIS ROAD SHALL BE CLASS L (LOWBOY)

***AT THE CONTRACTOR'S DISCRETION, HAZARDOUS VEGETATION CAN BE BRUSHED/CLEAREDREMOVED BY THE CONTRACTOR IN ORDER TO PERFORM THE WORK. WORK ASSOCIATED W/ THIS VEGETATION SHALL BE INCIDENTAL TO THE WORK BEING PERFORMED***

GAP BAER

ROADS BASE PACKAGE

46N60

N

N

N

MP 1.66 REF 18"Ø CMP, INSTALL NEW

DI, CONSTRUCT TYPE IV

ROLLING DIP RT

MP 1.77 REF 18"Ø CMP, CONSTRUCT

TYPE IV ROLLING DIP RT

MP 2.70 REF 18"Ø CMP, CONSTRUCT

TYPE IV ROLLING DIP RT

REMOVE FILL & 18"Ø IN CATCH

BASIN ABOVE CROSSING. SEE

DETAIL PAGE 21

MP 3.20 REF 24"Ø CMP, CONSTRUCT

TYPE IV ROLLING DIP RT

REMOVE FILL & 18"Ø IN CATCH

BASIN ABOVE CROSSING. SEE

DETAIL PAGE 22

MP 3.85 REF 18"Ø CMP, CONSTRUCT

TYPE IV ROLLING DIP LT.

MP 3.87 REF 18"Ø CMP, CONSTRUCT

TYPE IV ROLLING DIP LT.

MP 3.90 REF 18"Ø CMP, CONSTRUCT

TYPE IV ROLLING DIP LT.

MP 4.00 REF 18"Ø CMP, CONSTRUCT

TYPE IV ROLLING DIP LT.

MP 3.98 CONSTRUCT TYPE I ROLLING

DIP LT.

MP 4.05 REF 18"Ø CMP, CONSTRUCT

TYPE IV ROLLING DIP LT.

MP 4.12 REF 18"Ø CMP, CONSTRUCT

TYPE IV ROLLING DIP LT.

MP 4.14 REF 18"Ø CMP, CONSTRUCT

TYPE IV ROLLING DIP LT.

MP 4.24 REF 18"Ø CMP, CONSTRUCT

TYPE IV ROLLING DIP LT.

MP 4.33 REF 18"Ø CMP, CONSTRUCT

TYPE IV ROLLING DIP LT.

MP 4.41 REF 18"Ø CMP, CONSTRUCT

TYPE IV ROLLING DIP LT.

MP 4.51 REF 18"Ø CMP, CONSTRUCT

TYPE IV ROLLING DIP LT.

MP 4.57 REF 18"Ø CMP, CONSTRUCT

TYPE IV ROLLING DIP LT.

MP 4.67 REF 18"Ø CMP, CONSTRUCT

TYPE IV ROLLING DIP LT.

INSTALL NEW 24"Ø X 40' RELIEF

CMP

MP 4.76 REF 18"Ø CMP, CONSTRUCT

TYPE IV ROLLING DIP LT.

MP 4.90 REF 18"Ø CMP, CONSTRUCT

TYPE IV ROLLING DIP LT.

MP 4.97 REF 18"Ø CMP, CONSTRUCT

TYPE IV ROLLING DIP LT.

MP 5.04 REF 18"Ø CMP, CONSTRUCT

TYPE IV ROLLING DIP LT.

***AT THE CONTRACTOR'S DISCRETION, HAZARDOUS VEGETATION CAN BE BRUSHED/CLEAREDREMOVED BY THE CONTRACTOR IN ORDER TO PERFORM THE WORK. WORK ASSOCIATED W/ THIS VEGETATION SHALL BE INCIDENTAL TO THE WORK BEING PERFORMED***

ROADS BASE PACKAGE

46N60

N

MP 5.16 REF 18"Ø CMP, CONSTRUCT

TYPE IV ROLLING DIP LT.

MP 5.22 REF 18"Ø CMP, CONSTRUCT

TYPE IV ROLLING DIP LT.

MP 5.24 REF 18"Ø CMP, CONSTRUCT

TYPE IV ROLLING DIP LT.

MP 5.28 REF 18"Ø CMP, CONSTRUCT

TYPE IV ROLLING DIP LT.

MP 5.34 REF 18"Ø CMP, CONSTRUCT

TYPE IV ROLLING DIP LT.

MP 5.40 REF PROJECT LIMIT

ROADS BASE PACKAGE

46N60 MP 2.70

FS ROAD 46N60 MP 2.70

DRAINAGE ABOVE

SEDIMENT DAM

DRAINAGE BELOW

SEDIMENT DAM &

ABOVE ROAD

SEDIMENT DAM

O

L

K

A

D

S

P

O

I

R

S

E

D

I E

M

N

T

DRAINAGE BELOW

ROAD

ROADS BASE PACKAGE

46N60 MP 3.20

FS ROAD 46N60 MP 3.20

DRAINAGE ABOVE

SEDIMENT DAM

DRAINAGE BELOW

SEDIMENT DAM &

ABOVE ROAD

SEDIMENT DAM

O

K

A

D

S

P

O

I

R

S

E

D

I E

M

N

T

DRAINAGE BELOW

ROAD

CTY ROAD 8D006

REF FS ROAD 46N55

BEGIN RECONDITION

DRAINAGE STRUCTURES

BEGIN ROAD

RECONDITIONING

***AT THE CONTRACTOR'S DISCRETION, HAZARDOUS VEGETATION CAN BE BRUSHED/CLEAREDREMOVED BY THE CONTRACTOR IN ORDER TO PERFORM THE WORK. WORK ASSOCIATED W/ THIS VEGETATION SHALL BE INCIDENTAL TO THE WORK BEING PERFORMED***

GAP BAER

ROADS BASE PACKAGE

46N55

MP 0.00

N

MP 0.56 REF CMP, CONSTRUCT TYPE IV

ROLLING DIP LT.

MP 0.11 REF CMP, CONSTRUCT TYPE IV

ROLLING DIP LT.

MP 2.02 CONSTRUCT TYPE I ROLLING

DIP LT.

MP 2.04 CONSTRUCT TYPE I ROLLING

DIP LT.

MP 2.18 CONSTRUCT TYPE I ROLLING

DIP LT.

MP 2.28 CONSTRUCT TYPE I ROLLING

DIP LT.

MP 2.32 CONSTRUCT TYPE IV ROLLING

DIP RT

MP 2.38 CONSTRUCT TYPE I ROLLING

DIP RT.

MP 2.41 CONSTRUCT TYPE I ROLLING

DIP RT.

MP 2.48 CONSTRUCT TYPE I ROLLING

DIP RT.

N

MP 2.70 CONSTRUCT TYPE I ROLLING

DIP RT.

MP 2.51 CONSTRUCT TYPE I ROLLING

DIP RT.

N

MP 2.84 REF PROJECT LIMIT

DO NOT DISTURB WATERBARS

BEYOND

MP 2.56 MAINTAIN LEAD OFF DITCH LT

PAY ITEM WILL BE UNDER

30304

NOTE: ALL ROLLING DIPS ON THIS ROAD SHALL BE CLASS M (LOG TRUCK)

REF JCT COUNTY ROAD

8F003/PVT ROAD RT

BEGIN RECONDITION

DRAINAGE STRUCTURES

BEGIN ROAD

RECONDITIONING

***AT THE CONTRACTOR'S DISCRETION, HAZARDOUS VEGETATION CAN BE BRUSHED/CLEAREDREMOVED BY THE CONTRACTOR IN ORDER TO PERFORM THE WORK. WORK ASSOCIATED W/ THIS VEGETATION SHALL BE INCIDENTAL TO THE WORK BEING PERFORMED***

GAP BAER

ROADS BASE PACKAGE

46N50

MP 0.00

N

MP 0.46 REF CMP, INSTALL ENERGY

DISSIPATER @ OUTLET,

CONSTRUCT TYPE IV ROLLING

DIP LT

MP 0.06 MAINTAIN EXISTING DIP LT.

MP 0.33 REF CMP, MAINTAIN CMP,

CONSTRUCT TYPE IV ROLLING

DIP LT.

MP 0.37 REF CMP, MAINTAIN CMP,

INSTALL ENERGY DISSIPATER

@ OUTLET, CONSTRUCT TYPE

IV ROLLING DIP LT.

MP 0.41 REF 18"Ø CMP, MAINTAIN CMP

CONSTRUCT TYPE IV ROLLING

DIP LT.

MP 0.81

MP 0.08 MAINTAIN EXISTING CMP.

MP 0.35 REF FS BOUND MARKER LT

MP 0.54 CONSTRUCT TYPE IV ROLLING

DIP LT

MP 0.56 CONSTRUCT TYPE IV ROLLING

DIP LT

MP 0.62 CONSTRUCT TYPE IV ROLLING

DIP LT

MP 0.68 REF CMP, REMOVE PERCHED

MATERIAL ABOVE CATCH

BASIN, CONSTRUCT TYPE IV

ROLLING DIP LT

MP 0.79 CONSTRUCT TYPE IV ROLLING

DIP LT

CONSTRUCT TYPE IV ROLLING

DIP LT

MP 0.84 REF CMP, CONSTRUCT TYPE IV

ROLLING DIP LT

MP 0.90 CONSTRUCT TYPE IV ROLLING

DIP LT. EXTEND DIP FROM MP

0.89 TO 0.91

MP 0.93 REF CMP, CONSTRUCT TYPE IV

ROLLING DIP LT, END REMOVE

BERM LT

MP 1.00 CONSTRUCT TYPE IV ROLLING

DIP LT

MP 1.13 CONSTRUCT TYPE IV ROLLING

DIP LT

MP 1.15 CONSTRUCT TYPE IV ROLLING

DIP LT

N

N

MP 0.91 BEGIN REMOVE BERM LT

NOTE: ALL ROLLING DIPS ON THIS ROAD SHALL BE CLASS L-M (LOWBOY MOD)

***AT THE CONTRACTOR'S DISCRETION, HAZARDOUS VEGETATION CAN BE BRUSHED/CLEAREDREMOVED BY THE CONTRACTOR IN ORDER TO PERFORM THE WORK. WORK ASSOCIATED W/ THIS VEGETATION SHALL BE INCIDENTAL TO THE WORK BEING PERFORMED***

ROADS BASE PACKAGE

46N50

N

MP 1.25 CONSTRUCT TYPE IV ROLLING

DIP LT.

MP 1.43 REF JCT FS 47N77 LT

MP 1.40 CONSTRUCT TYPE IV ROLLING

DIP LT.

MP 1.41 REF CMP, MAINTAIN CMP

MP 1.45 CONSTRUCT TYPE IV ROLLING

DIP LT.

MP 1.48 CONSTRUCT TYPE IV ROLLING

DIP LT.

MP 1.59 CONSTRUCT TYPE IV ROLLING

DIP LT.

MP 1.61 CONSTRUCT TYPE IV ROLLING

DIP LT.

MP 1.67 CONSTRUCT TYPE IV ROLLING

DIP LT.

MP 1.62 REF CMP, MAINTAIN CMP

MP 1.86 REF MAPLE CULLCH,

REF CMP, MAINTAIN CMP

MP 1.88 REF PROJECT LIMIT

N

NOTE: ALL ROLLING DIPS ON THIS ROAD SHALL BE CLASS L-M (LOWBOY MOD)

FS 46N50 ROAD

REF JCT FS ROAD 46N50

BEGIN RECONDITION

DRAINAGE STRUCTURES

BEGIN ROAD

RECONDITIONING

***AT THE CONTRACTOR'S DISCRETION, HAZARDOUS VEGETATION CAN BE BRUSHED/CLEAREDREMOVED BY THE CONTRACTOR IN ORDER TO PERFORM THE WORK. WORK ASSOCIATED W/ THIS VEGETATION SHALL BE INCIDENTAL TO THE WORK BEING PERFORMED***

GAP BAER

ROADS BASE PACKAGE

47N77

MP 0.00

N

REF FISH GULCH BRIDGE. ALL

EQUIPMENT CROSSING

BRIDGES SHALL BE HIGHWAY

LEGAL OR HAVE AN

INDIVIDUAL FOREST SERVICE

OVER-LOAD PERMIT FOR EACH

PIECE OF EQUIPMENT

MP 0.02

MP 0.33 REF CMP, CONSTRUCT TYPE IV

ROLLING DIP LT.

MP 0.36 REF CMP, CONSTRUCT TYPE IV

ROLLING DIP LT.

MP 0.50 CONSTRUCT TYPE I ROLLING

DIP LT.

MP 0.68 CONSTRUCT TYPE I ROLLING

DIP LT.

N

N

MP 0.77 REF CMP, REF MAIN DRAW,

CONSTRUCT TYPE IV ROLLING

DIP LT. INSTALL 48"Ø X 60' CMP

MP 0.97 REF CMP, CONSTRUCT TYPE IV

ROLLING DIP LT.

MP 1.00 REF CMP, CONSTRUCT TYPE IV

ROLLING DIP LT.

MP 1.06 REF CMP, CONSTRUCT TYPE IV

ROLLING DIP LT. INSTALL

ENERGY DISSIAPTER @ CMP

OUTLET

MP 1.09 REF CMP, CONSTRUCT TYPE IV

ROLLING DIP LT. INSTALL

ENERGY DISSIAPTER @ CMP

OUTLET

MP 1.14 REF CMP, CONSTRUCT TYPE IV

ROLLING DIP LT. INSTALL

ENERGY DISSIAPTER @ CMP

OUTLET

MP 1.22 CONSTRUCT TYPE I ROLLING

DIP LT.

MP 1.37 CONSTRUCT TYPE I ROLLING

DIP LT.

MP 1.44 REF CMP, CONSTRUCT TYPE IV

ROLLING DIP LT.

MP 1.25 REF CMP, CONSTRUCT TYPE IV

ROLLING DIP LT. INSTALL

ENERGY DISSIAPTER @ CMP

OUTLET

MP 1.48 REF CMP, CONSTRUCT TYPE IV

ROLLING DIP LT.

MP 1.51 REF 18"Ø CMP, INSTALL METAL

END SECTION, CONSTRUCT

TYPE IV ROLLING DIP LT.

MP 1.66 CONSTRUCT TYPE I ROLLING

DIP LT.

NOTE: ALL ROLLING DIPS ON THIS ROAD SHALL BE CLASS M (LOG TRUCK)

MP 0.74 REF CMP, CONSTRUCT TYPE IV

ROLLING DIP LT.

***AT THE CONTRACTOR'S DISCRETION, HAZARDOUS VEGETATION CAN BE BRUSHED/CLEAREDREMOVED BY THE CONTRACTOR IN ORDER TO PERFORM THE WORK. WORK ASSOCIATED W/ THIS VEGETATION SHALL BE INCIDENTAL TO THE WORK BEING PERFORMED***

ROADS BASE PACKAGE

47N77

N

N

N

MP 1.88 CONSTRUCT TYPE I ROLLING

DIP RT.

MP 2.02 CONSTRUCT TYPE I ROLLING

DIP RT.

MP 2.05 CONSTRUCT TYPE I ROLLING

DIP RT.

MP 2.07 CONSTRUCT TYPE I ROLLING

DIP RT.

MP 2.12 REF CMP, MAINTAIN CMP

CONSTRUCT TYPE IV ROLLING

DIP RT

MP 2.32 REF CMP, MAINTAIN CMP

CONSTRUCT TYPE IV ROLLING

DIP RT. INSTALL ENERGY

DISSIPATER @ CMP OUTLET

MP 2.39 CONSTRUCT TYPE I ROLLING

DIP RT.

MP 2.44 CONSTRUCT TYPE I ROLLING

DIP RT.

MP 2.49 CONSTRUCT TYPE I ROLLING

DIP RT.

MP 2.58 CONSTRUCT TYPE I ROLLING

DIP RT.

MP 2.60 CONSTRUCT TYPE I ROLLING

DIP RT.

MP 2.64 CONSTRUCT TYPE I ROLLING

DIP RT.

MP 2.68 CONSTRUCT TYPE I ROLLING

DIP RT.

MP 2.74 REF DAMAGED CMP, REMOVE

& INSTALL 24"Ø X 30' CMP

CONSTRUCT TYPE IV ROLLING

DIP RT.

MP 2.77 REF CMP, MAINTAIN CMP

CONSTRUCT TYPE IV ROLLING

DIP RT. INSTALL ENERGY

DISSIPATER @ CMP OUTLET

MP 2.83 CONSTRUCT TYPE I ROLLING

DIP RT.

MP 2.88 CONSTRUCT TYPE I ROLLING

DIP RT.

MP 2.92 CONSTRUCT TYPE I ROLLING

DIP RT.

MP 2.97 CONSTRUCT TYPE I ROLLING

DIP RT.

MP 3.11 CONSTRUCT TYPE I ROLLING

DIP RT.

MP 3.79 REF NARROW ROAD IN DRAW.

CONTRACTOR TO FIELD

VERIFY EQUIPMENT CAN

SAFELY NEGOTIATE ROAD IN

THIS LOCATION. IF TOO TIGHT,

ENGINEER MAY RE-LOCATE

DIPS BETWEEN MP 3.79 & MP

5.02 TO SELECT LOCATIONS

BETWEEN MP 0.00 & MP 3.79.

***AT THE CONTRACTOR'S DISCRETION, HAZARDOUS VEGETATION CAN BE BRUSHED/CLEAREDREMOVED BY THE CONTRACTOR IN ORDER TO PERFORM THE WORK. WORK ASSOCIATED W/ THIS VEGETATION SHALL BE INCIDENTAL TO THE WORK BEING PERFORMED***

ROADS BASE PACKAGE

47N77

N

N

N

MP 4.24 CONSTRUCT TYPE I ROLLING

DIP RT.

MP 4.31 CONSTRUCT TYPE I ROLLING

DIP RT.

MP 4.39 CONSTRUCT TYPE I ROLLING

DIP RT.

MP 4.43 CONSTRUCT TYPE I ROLLING

DIP RT.

MP 4.87 CONSTRUCT TYPE I ROLLING

DIP RT.

MP 4.95 CONSTRUCT TYPE I ROLLING

DIP RT.

MP 5.02 REF NARROW ROAD IN DRAW.

IT IS HIGHLY UNLIKELY HEAVY

EQUIPMENT CAN NEGOTIATE

THIS TURN SAFELY FROM THIS

SIDE. SITES BEYOND THIS MP

WILL NEED TO BID COMING

FROM LOW GAP OR WIDEN THE

ROAD @ NO ADDITIONAL COST

TO GOVT.

MP 5.11 CONSTRUCT TYPE I ROLLING

DIP RT.

MP 5.33 REF CMP, MAINTAIN CMP

CONSTRUCT TYPE IV ROLLING

DIP RT

MP 5.30 REF CMP, MAINTAIN CMP,

CLEAN CATCH BASIN

MP 6.08 CONSTRUCT TYPE I ROLLING

DIP RT.

MP 6.10 CONSTRUCT TYPE I ROLLING

DIP RT.

MP 6.24 CONSTRUCT TYPE I ROLLING

DIP RT.

MP 6.49 CONSTRUCT TYPE I ROLLING

DIP RT.

MP 6.52 CONSTRUCT TYPE I ROLLING

DIP RT.

MP 6.54 CONSTRUCT TYPE I ROLLING

DIP RT.

MP 6.57 CONSTRUCT TYPE I ROLLING

DIP RT.

MP 6.60 REF PROJECT LIMIT

LOW GAP IS ~ MP 12.50

MP 5.97 CONSTRUCT TYPE I ROLLING

DIP RT.

MP 5.64 CONSTRUCT TYPE I ROLLING

DIP RT.

MP 5.07 CONSTRUCT TYPE I ROLLING

DIP RT.

P01
P02
P03
P04
P05
P06
P07
P08
P09
P10
P11
P12
P13
P14
P15
P16
P17
P18
P19
P20
P21
P22
P23
P24
P25
P26
P27
P28

File details come from the government source that posted it. Updated .