1-Detailed_Unit_Information_Sheet.pdf
PDF 139 KB Posted
- Attached to
- Westside Scott River Site Prep by Felling and Piling Federal contract opportunity
- Solicitation number
- AG-9AC7-S-16-0145
About this file
Detailed Unit Information Sheet
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AG-9AC7-S-16-0145.pdf | ||
| Response_Packet.pdf | ||
| 6-WD_1977-0727_Rev49_5Jan16.pdf | ||
| 2-NEPA_Project_Design_Features.pdf | ||
| 4-Map_Vicinity.pdf | ||
| 3-Map_Project_Area.pdf | ||
| 5-Fire_Plan.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WESTSIDE SCOTT RIVER SITE PREP
BY FELLING AND PILING
Detailed Unit Information
ITEM
#(s)
UNIT # ACRES STAND
TREATMENT
Cut Trees and
Brush at specified DBH and/or Height
Range
STAND
AGE
SLASH TREATMENT
531-0002
NEPA:
Westside
Fire
Recovery
Felling trees, cutting brush and hand piling
CONIFERS
≤ 12” DBH
≤10% LCR
HARDWOODS
BRUSH
> 8” Tall
24 years
Handpiles will be spread out and not
“stacked” above one another with a minimum 6-foot break between piles.
Pile Dimensions:
Height: 3 – 6 Ft
Diameter: ≤ 6 Ft
Handpiles will be covered with 4-mil polyethylene plastic or alternate pile covering material approved by the
COR.
529-0037
34 Felling trees, 44 years
530-0019
≤20% LCR
46 years
529-0052
≤ 14” DBH
33 years
ITEM
#(s)
UNIT #
ACRES
STAND
TREATMENT
Leave Trees and Brush at specified DBH and/or Height
Range
STAND
AGE
SLASH TREATMENT
OPTIONAL
531-0012
24 years
File details come from the government source that posted it. Updated .