Plot_Sheet-Attachment_B.pdf
PDF 251 KB Posted
- Attached to
- Sims Plantation Thin, Release, Site Prep Hand Work Federal contract opportunity
- Solicitation number
- AG-9AC7-S-16-0133
About this file
Plot Sheet-Attachment B
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Fire_Plan-Attachment_E.pdf | ||
| Plot_Sheet-Attachment_B.pdf | ||
| Solicitation.pdf | ||
| Solicitation.pdf | ||
| Hand_Thinning _Piling _and_Fireline_Construction_Specifications_C.pdf | ||
| Unit_Information_Sheet-Attachment_A.pdf | ||
| Vicinity_and_contract_unit_maps_attachment_D.pdf | ||
| Wage_Determination_77_Attachment_F.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Forest Contractor Forest Contractor
District Contract # District Contract #
Acres Acres
Plot A B C D E F 1 2 3 4 5 6 7 8 9 10 Plot Score Plot A B C D E F 1 2 3 4 5 6 7 8 9 10 Plot Score
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
11 11
12 12
13 13
14 14
Totals Totals
2. Spacing of residual trees 2. Spacing of residual trees
3. Stumps of trees & brush 6" or less 3. Stumps of trees & brush 6" or less
4. Prune conifer branches to 6' 4. Prune conifer branches to 6'
5. Riparian buffer compliance 5. Riparian buffer compliance
6. No Damage to Residual trees 6. No Damage to Residual trees
10. Plastic utilization/placement 10. Plastic utilization/placement
F. Any healthy conifer is cut, plot fails.
B. If more than 1 shrub is left uncut or left with too high stump.
C. Pruning; If more than 2 branches are left the plot will fail.
D. All material that is to be piled is piled, no more than 3 pieces unpiled
7. Placement of pile
E. The pile must meet all specifications.
Pass/Fail Criteria Point Criteria
A. If any trees are left uncut per specifications, the plot fails.
1. Selection of leave trees
Inspector Name:
Unit Score %
Criteria A-F (pass/fail) Criteria 1-10 are 1 point per
Item
Score %
C. Pruning; If more than 2 branches are left the plot will fail.
1. Selection of leave trees
Item
Unit
Inspector Name:
F. Any healthy conifer is cut, plot fails.
Criteria A-F (pass/fail) Criteria 1-10 are 1 point per
8. Dimension of pile
9. Structure of pile
8. Dimension of pile
9. Structure of pile
7. Placement of pile
Point CriteriaPass/Fail Criteria
A. If any trees are left uncut per specifications, the plot fails.
D. All material that is to be piled is piled, no more than 3 pieces unpiled
E. The pile must meet all specifications.
B. If more than 1 shrub is left uncut or left with too high stump.
File details come from the government source that posted it. Updated .