AG-9AC7-S-16-0125_Amd01.pdf
PDF 532 KB Posted
- Attached to
- SIMS Plantation Thin & Release Federal contract opportunity
- Solicitation number
- AG-9AC7-S-16-0125
About this file
Amendment 01
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A_-_Unit_Information_Sheet.pdf | ||
| F_-_WD_77-0727_Rev49_5Jan16.pdf | ||
| B_-_Plot_Inspection_Sheet.pdf | ||
| Response_Forms.pdf | ||
| Response_Forms.rtf | RTF text file | |
| AG-9AC7-S-16-0125.pdf | ||
| Response_Forms.doc | DOC document | |
| D_-_Maps.pdf | ||
| E_-_Fire_Plan_and_Checklist.pdf | ||
| C_-_Site_Preparation_and_Fireline_Construction_Specification.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
AG-9AC7-S-16-0125
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
9AC7
REDDING CA 96002
3644 AVTECH PARKWAY SUITE 180
R5 NO-CAL ACQ SERVICE AREA NCASA
USDA FOREST SERVICE
07/01/201601
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
07/01/2016
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Machine/Hand Cutting, Chipping, Shredding, Punning, Piling, and Fireline Construction
Shasta-Trinity National Forest
This amendment replaces the original Attachment C with the new Attachment C, provided. There are no other changes and the response deadline is not extended.
Period of Performance: 07/19/2016 to 09/01/2017
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
SANDRA VINCENT
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Sandra Vincent 7/5/2016
Attachment C-Site Preparation and Fireline Construction Specification
AS UPDATED BY AMENDMENT 01
VARIABLE THINNING SITE PREP (mechanical units)
DESCRIPTION OF WORK
Site prep with the use of mechanical equipment to thin and reduce competing vegetation and to prepare areas for planting trees for forest health and timber stand improvement. Vegetation to be treated will require cutting, chipping, shredding and/or hand piled. The contractor shall utilize appropriately sized machinery to accomplish contract prescription. The project consists of an estimated 135 acres.
PROJECT LOCATION
The work site is located approximately 5 miles northeast of Hyampom, CA on the Hayfork Ranger
District of the Shasta-Trinity National Forest. Treatment units are in elevation, (2000 to 3400 feet).
See attachment D, Maps.
Maps: Included map shows the location of the treatment units, unit acres, and other topographic
Features and general vicinity.
SPECIFIC WORK REQUIREMENT
Leave trees shall generally be those of tallest height, live, largest crown ratio, consistent or increasing height growth, good leaf retention, good color and form, and straightest stems that are free of damage due to insects, disease, physical or mechanical causes. The Contractor shall select leave trees according to the following:
1. Retain all green conifers
2. Treat all dead standing trees less than 14 DBH. All of the larger snags that require felling for safety reasons will remain on site, whole and unbucked. Large diameter hazard trees may be felled, but the best, sound snags will be retained for wildlife trees.
3. In general, healthy single-stemmed dominant and co-dominant hardwood species will be cultured. Thin the co-dominant and dominant clumps to 2 or 3 dominant stems. Desired spacing for these hardwoods is 20 feet with a range of 15 to 20 feet. If selection criteria for two adjacent trees are equal, leave trees in the following order: alder, maple, dog wood, chinkapin, madrone, and oak.
4. Conifers will not count towards spacing.
5. Treat all shrubs greater than 1 foot high and suppressed and intermediate hardwoods within five feet of any leave tree.
6. Unless otherwise agreed, residual masticated vegetative debris resulting from contractor’s operations shall lie flat on the ground and generally not exceed 6 inches in height. Individual pieces of vegetative debris shall generally not exceed 6 feet in length. No masticated or cut material shall accumulate against a leave tree.
7. Within 150’ of roads and private land, lower limbs of residual trees will be pruned 6 feet from the ground. Trees less than 25 tall feet will be pruned to the lower 1/3 of the bole.
8. Riparian Reserves within Units; there will be not cutting within the inner gorge of riparian. Riparian zones will be flagged in blue and white stripe flagging.
9. Geo Riparian’s; Hand treat only in Geo riparian’s. Geo riparian’s will be flagged in pink and yellow and white stripe flagging.
10. No equipment use on slopes greater than 35% slope.
11. Noxious weed exclusion zones; known yellow star thistle infestations are flagged for avoidance.
Flagging will be orange, imprinted with “Noxious Weeds”. See work requirements below for details.
CUTTING REQUIREMENTS
Cut brush, stobs will be no taller than 3 inches.
The maximum height of cut stumps shall not exceed 6 inches above ground level or 4 inches above natural obstacles.
All live limbs must be severed from the stump.
PILING SLASH AND COVERING PILES
Where piling is required, the Contractor shall pile all natural and activity created slash. Slash 8” or less shall be piled. Material over the diameter specified shall be limbed and the limbs piled. Cut material to be placed in piles will be bucked in 3’ to 5’lengths.
LOCATION OF PILE REQUIREMENTS
Piles shall be spread out and not “stacked” above one another.
No portion of the pile shall be under the crown of a living tree or within 5 feet of the trunk.
No piles will be placed within 10 feet of standing snags.
No piles will be placed within 10 feet of remaining downed logs greater than 20 inches in diameter.
No piles will be placed within 25 feet of private property boundaries.
If conditions make it impractical to locate piles to avoid damage to live trees, a space shall be cleared and all material shall be piled in the cleared area.
Cleared areas (openings) should be no more than 75 feet. The Contracting Officer and or
COR must approve alternate piling sites.
Gaps in treatment may be allowed but must be approved by the Contracting Officer and or
COR.
CONSTRUCTION AND COVERING OF PILE REQUIREMENTS
Piles shall be constructed by aligning individual pieces of small material in the same direction and placing the heavier slash on top. Piles shall have a stable base to prevent toppling. The log axis of individual pieces shall be oriented up and down the slope. Protruding pieces shall be trimmed to allow covering in a manner that permits the piles to shed water.
All piles shall be as compact as possible and free of noncombustible material. In general height shall be no less than 4 feet and no greater than 8 feet. Pile diameter shall not exceed 8 feet.
In openings, piles may be up to 8 feet tall and 10 feet wide.
All piles shall be covered with a plastic covering. Piles shall not be less than fifty percent covered, with the covering extending not less than half way down all sides. Pieces of burnable material shall be placed on top of the plastic covering to keep the covering from blowing off the pile.
FIRELINE CONSTRUCTION
Construction of fire line is 2-foot scrape to mineral soil and an 8 foot clearance cut of overhanging branches and brush.
Fire line will be located on Forest Service land and/or follow the Forest Boundary so as not to encroach on private lands.
Fire line will follow the designated flagging but located to minimize fire spread, the use of natural barriers, and exposure to heavy loading.
SPECIFICATIONS FOR NOXIOUS WEEDS
Equipment Cleaning (pressure washing): Infested areas known by the Forest are mapped.
All off-road equipment and vehicles used for project implementation shall be cleaned of attached mud, dirt or plant parts before entering the project area. All heavy equipment, mechanical equipment and vehicles that come into contact with yellow star thistle during the course of implementation must be cleaned prior to leaving the project area.
Progression of Work: Implementation of the fuel break shall operate first in areas that are least vulnerable and least infested and move from these areas to those areas of heavy infestation. This design features lowers the risk of spreading invasive plant seed. Progression of work areas (treat first, treat last) are identified on Figure XX in association with a section of Rt 4N20 in Section 30 Implement units M-5, M-6, M-7, M-8 and M-9 last in progression of work.
Equipment operators shall avoid using turnouts, landings or clearings (or sections thereof) known to be infested with invasive plants, specifically yellow starthistle. These areas are flagged with orange noxious weed flagging. If avoidance is not feasible, before use, blade the clearing to remove yellow starthistle away from where equipment will be operating. Before operation (e.g. bladed to remove plants from areas of operations). The project area with the most significant cover of yellow starthistle in the clearings is associated with the section of Rt
4N20 in Section 30—the area where work is to be performed last (associated with M-6, M-7, M-8) (Figure XX below)
As feasible, avoid operations during the time of year when invasive plants pose the highest risk of spread. For yellow star thistle timing is associated with spine development on the flower and fruits which occurs around mid-summer to fall.
Route 4N20, yellow starthistle in clearing associated with M-6, M-7, M-8
File details come from the government source that posted it. Updated .