AG-9AC7-S-15-0008_Attachments.pdf

PDF 2 MB Posted

Attached to
Gasquet Complex BAER Federal contract opportunity
Solicitation number
AG-9AC7-S-16-0008
Issued by
Department of Agriculture Forest Service R5-Pacific Southwest Region

About this file

Attachments

View the file

Other files for this federal contract opportunity

Other files attached to Gasquet Complex BAER, newest first.
File Type Posted
Amendment_001_package.pdf PDF
Gasquet_BAER_Justification.pdf PDF
AG-9AC7-S-16-0008_Solicitation_pkg.pdf PDF
A7_SF_24-Bid_Bond_06302016.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL NOTES-ROAD LOGS

GENERAL NOTES

Section 303 – Reconditioning: This work consists of reconditioning ditches, shoulders, roadbeds, aggregate surfaces, or the entire road.

Section 602 – Culverts and Drains: As stated in the specification, the contractor shall determine the final location, skew, length, elevations, and grade. This also includes installation of down pipes on existing culverts. Do not order or install culverts until the CO has accepted the final structure size, length, and alignment.

Section 607 – Cleaning, Reconditioning, and Repairing Existing Drainage Structures - Work under this section includes specifically the cleaning of all culvert inlets and outlets up to 48” diameter and any material inside the culvert when noted in the road log. The road log will detail the items of work required under this pay item.

Final shaping of the road at culvert installation and replacement sites shall be constructed so no water diversion potential exists in case the culvert plugs and fails. This shall be accomplished by shaping a dip in the road over the culvert location, or installing a rolling dip downgrade of the culvert at the soonest possible location.

Pay Item 20467 – Drivable Drainage Dip: This pay item includes the excavation, shaping, and aggregate surfacing for rolling dip installation. The aggregate shall be spread the full length of the constructed dip, the full width of the road, and at a 4 inch compacted depth.

Pay Item 30201 – Roadway Aggregate: This pay item includes aggregate surfacing over culvert locations, spot rocking, and where required as designated on the ground.

ROAD LOGS

Road MP Treatment

17N05 0 Intersection with US Hwy 199 17N05 3.0-9.0 Restore ditch function 17N05 3.0-9.0 Repair failed/burned bituminous surfaces as designated 17N05 6.0 Install Warning Sign

15N01 3 miles Restore ditches as staked from Intersection of 14N39A to 18.3 mp 15N01 11.3 Install Warning Sign

16N02 1.5-3.5 Restore ditch function 16N02 1.5 Install Rip Rap 16N02 0.6 Install Rolling Dip 16N02 1.3 Reshape existing Dip

16N02 1.9 Install Rolling Dip 16N02 2.2 Outslope for 200” 16N02 2.6 Reshape existing Dip 16N02 Install Warning Sign at Intersection with 17N05

17N07G 0.0 Install Warning Sign 17N07G 0.6-1.6 Restore ditch function 17N07G 0.8 Reshape existing Dip 17N07G 1.0 Reshape existing dip 17N07G 1.2 Outslope for 200’

17N24 0.0 Install Warning Sign 17N24 0.7 Install Rolling Dip

17N29 0.0 Install Warning Sign 17N29 0.2 Install Rolling Dip 17N29 0.3 Reshape existing Dip

16N36B 0.0

Install Warning Sign

16N36B 0-0.8 Restore Ditch Function 16N36B 0.1 Install Rolling Dip 16N36B 0.4 Install Flared end on 24” pipe 16N36B 0.5 Install Rolling Dip 16N36B 0.6 Install Flared end on 24” pipe 16N36B 0.7 Install Rolling Dip 16N36B 0.8 Install Water Bar x 2

16N19 0.0 Install Warning Sign 16N19 1.3 Repair Bridge Plate 16N19 2.0-4.0 Restore Ditch Function 16N19 4.0 Install Rip Rap 16N19 4.5 Outslope for 400’ 16N19 5.7 Install Rip Rap 16N19 5.8-8.8 Restore Ditch Function 16N19 6.5 Install Rolling Dip 16N19 7.1 Install Rolling Dip 16N19 9.0 Install Rolling Dip

Gasquet Complex BAER

AG-9AC7-S-16-0008

Table of Contents

Table of Contents Preface 101 - Terms, Format, and Definitions

101.01 Meaning of Terms

101.03 Abbreviations

101.04 Definitions

102 - Bid, Award, and Execution of Contract 102 Bid, Award, and Execution of Contract

103 - Scope of Work Deletions

104 - Control of Work Deletions

104.06 Use of Roads by Contractor

105 - Control of Material

105.02 Material Sources

105.02(a) Government-provided sources

105.02(b) Government Provided Sources

105.05 Use of Material Found in the Work

106 - Acceptance of Work

106.07 Delete

107 - Legal Relations and Responsibility To the Public

107.02 Protection and Restoration of Property and Landscape

107.05 Responsibility for Damage Claims

107.06 Contractor’s Responsibility for Work

107.09 Legal Relationship of the Parties

107.10 Environmental Protection

107.02 Protection and Restoration of Property and Landscape

108 - Prosecution and Progress 108 Delete

109 - Measurement and Payment 109 Deletions

109.02 Measurement Terms and Definitions

151 - Mobilization

151.01 Description

155 - Schedules for Construction Contracts 155 Delete

156 - Public Traffic

156.08 Traffic and Safety Supervisor

157 - Soil Erosion Control

157.03 General

157.08 Water Crossings

201 - Clearing and Grubbing

201.01 Description

201.04 Clearing. (c)

204 - Excavation and Embankment

204.11 Compaction

204.13 Sloping, Shaping, and Finishing

Table 204-2 Construction tolerances

204.14 Disposal of Unsuitable or Excess Material

251 - Riprap

251.03 General

301 - Untreated Aggregate Courses 301 Title Change

301.01 Work

301.03 General

301.04 Mixing and Spreading

301.05 Compacting

303 - Road Reconditioning

303.01 Work

430 - Asphalt Pavement Patching 602 - Culverts and Drains

602.03 General

607 - Cleaning, Reconditioning, and Repairing Existing Drainage Structures

607.04 Cleaning Culverts in Place

703 - Aggregate

703.05 Subbase, Base, Surface Course, and Screened Aggregate

Table 703-7 Target Value Ranges

Table 703-3. Gradation TV ranges for surface courses

Table 703-3. Gradation ranges for Size Ratio surface courses

Add Table 703-16:

718 - Traffic Signing and Marking Material

718.05 Aluminum Panels

Preface

Preface_wo_03_15_2004_m

Delete all but the first paragraph and add the following:

The Forest Service, US Department of Agriculture has adopted FP-03 for construction of National Forest System Roads.

101 - Terms, Format, and Definitions

101.00_nat_us_07_25_2005

101.01_nat_us_01_22_2009

101.01 Meaning of Terms

Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.

101.03_nat_us_06_16_2006

101.03 Abbreviations.

Add the following to (a) Acronyms:

AFPA

MSHA

NIST

NESC

WCLIB

American Forest and Paper Association Mine Safety and Health Administration National Institute of Standards and Technology National Electrical Safety Code West Coast Lumber Inspection Bureau

Add the following to (b) SI symbols:

mp Milepost ppm Part Per Million

101.04_nat_us_03_29_2007 http://www.nist.gov/

101.04 Definitions.

Delete the following definitions and substitute the following:

Bid Schedule--The Schedule of Items.

Bridge--No definition.

Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “purchaser”.

Culvert--No definition.

Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.

Add the following:

Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.

Change--“Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.

Design Quantity--“Design quantity” is a Forest Service method of measurement from the FS-96 Forest Service Specifications for the Construction of Roads and Bridges. Under these FP specifications this term is replaced by the term “Contract Quantities”.

Forest Service--The United States of America, acting through the Forest Service, U.S. Department of Agriculture.

Neat Line--A line defining the proposed or specified limits of an excavation or structure.

Pioneer Road--Temporary construction access built along the route of the project.

Purchaser--The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.

Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.

Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction.

Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.

Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, unit price, and amount.

Self Consolidating Concrete (SCC) – a highly-fluid and non-segregating concrete mixture that is able to flow and fill every part and corner of the formwork, even in the presence of dense reinforcement, purely by means of its own mass.

Utilization Standards--The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.

Figure 101-1—Illustration of road structure terms.

102 - Bid, Award, and Execution of Contract

102.00_nat_us_02_16_2005

102 Bid, Award, and Execution of Contract

Delete Section 102 in its entirety.

103 - Scope of Work

103.00_nat_us_02_16_2005

Deletions

Delete all but subsection 103.01 Intent of Contract.

104 - Control of Work

104.00_nat_us_06_16_2006

Deletions

Delete Sections 104.01, 104.02, and 104.04.

104.06_nat_us_02_17_2005

Add the following subsection:

104.06 Use of Roads by Contractor

The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.

105 - Control of Material

105.02_nat_us_01_18_2007

105.02 Material Sources.

105.02(a) Government-provided sources.

Add the following:

Comply with the requirements of 30 CFR 56, subparts B and H. Use all suitable material for aggregate regardless of size unless otherwise designated. When required, re-establish vegetation in disturbed areas according to section 625.

105.02_nat_us_02_17_2005

105.02(b) Government Provided Sources.

(a) Government-provided sources. Add the following:

Government-provided sources for this project are identified as follows:

(1) Government-provided mandatory sources.

Obtain material for use as (borrow/riprap/boulders/etc.) and in the production of aggregates under Sections (301/401/411/etc.) as follows:

• Riprap – is available near the application site

• Aggregate is located at the intersection of FS Road 17N05 and FS Road 16N02.

105.05_nat_us_05_12_2004

105.05 Use of Material Found in the Work.

Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:

Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The Government is not obligated to make reimbursement for the cost of producing these materials.

106 - Acceptance of Work

106.07_nat_us_05_11_2004

106.07 Delete

Delete subsection 106.07.

107 - Legal Relations and Responsibility To the Public

107.02_nat_us_02_17_2005

107.02 Protection and Restoration of Property and Landscape.

Examples: (Include language to clarify or interpret permit or other requirements).

Do not work within the wetted perimeter of streams before July 1 or after September 15.

Do not work within 1000 feet of an occupied dwelling on any legal holiday or between 12 noon Saturday and 6 a.m. the following Monday.

Do not work (except hauling material) within 1500 feet of osprey nests between March 1 and May 31.

No known active nests were located within the 1500 feet limit as of June 15, 1991. If a new nest is found, suspend work (except hauling material) within 1500 feet of the nest location. See Subsection 108.06.

107.05_nat_us_05_11_2004

107.05 Responsibility for Damage Claims.

Delete the entire subsection.

107.06_nat_us_06_16_2006

107.06 Contractor’s Responsibility for Work.

Delete the following from the first paragraph.

“except as provided in Subsection 106.07”.

107.09_nat_us_06_16_2006

107.09 Legal Relationship of the Parties.

Delete the entire subsection.

107.10_nat_us_06_16_2006

107.10 Environmental Protection.

Add the following:

Design and locate equipment repair shops, stationary refueling sites, or other facilities to minimize the potential and impacts of hazardous material spills on Government land.

Before beginning any work, submit a Hazardous Spill Plan. List actions to be taken in the event of a spill. Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, and similar information. Immediately notify the CO of all hazardous material spills. Provide a written narrative report form no later than 24 hours after the initial report and include the following:

• Description of the item spilled (including identity, quantity, manifest number, and other identifying information).

• Whether amount spilled is EPA or state reportable, and if so whether it was reported, and to whom.

• Exact time and location of spill including a description of the area involved.

• Containment procedures.

• Summary of any communications the Contractor had with news media, Federal, state and local regulatory agencies and officials, or Forest Service officials.

• Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue.

When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.

The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. Clean up spills or leaks to the satisfaction of the CO and in a manner that complies with Federal, state, and local laws and regulations.

107.10_05_us_05_04_2007

107.02 Protection and Restoration of Property and Landscape

Meet the requirements chapters 10, 11, and 12.2 in their entirety of “Water Quality Management for National Forest System Lands in California Best Management Practices” dated September 2000

108 - Prosecution and Progress

108.00_nat_us_02_16_2005

108 Delete.

Delete Section 108 in its entirety.

109 - Measurement and Payment

109.00_nat_us_02_17_2005

109 Deletions

Delete the following entire subsections:

109.06 Pricing of Adjustments.

109.07 Eliminated Work.

109.08 Progress Payments.

109.09 Final Payment.

109.02_nat_us_06_16_2006

109.02 Measurement Terms and Definitions.

(b) Contract quantity.

Add the following:

Contract quantities will be adjusted only when there are errors in the original design of 15% or more.

Change the following:

“(b) Cubic yard” to “(c) Cubic yard”.

Add the following definition:

(p) Thousand Board Feet (Mbf). 1,000 board feet based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job. For glued laminated timber, 1,000 board feet based on actual width, thickness, and length of each piece actually incorporated in the job.

151 - Mobilization

151.01_0105_us_05_04_2007

151.01 Description

Add the following at the end of the last sentence:

“Work also includes cleaning of all equipment used at the project site. Clean all construction equipment prior to entry on the project site. Remove all dirt, plant parts and material that may carry noxious weed seeds into the area. Only construction equipment inspected by the Forest Service will be allowed to operate within the project area. Treat subsequent move-ins of equipment the same as the initial move-in. Clean truck beds and dump boxes hauling to the project site prior to entering the work area.”

155 - Schedules for Construction Contracts

155.00_nat_us_05_11_2004

155 Delete.

Delete Section 155 in its entirety.

156 - Public Traffic

156.08_nat_us_02_24_2005

156.08 Traffic and Safety Supervisor.

Delete this subsection in its entirety.

157 - Soil Erosion Control

157.03_0510_us_01_20_2005

157.03 General.

Delete the first two paragraphs and add the following:

Submit an Erosion Control Plan detailing permanent and temporary control measures to minimize erosion and sedimentation during and after construction according to the contract specifications, contract permits, Section 107, and this Section. Contract permits amend the requirements of this Section. Do not modify the type, size, or location of any control or practice without approval. Submit the erosion control plan proposal at least 7 days before operations begin to the Contracting Officer for approval.

Reflect in the erosion control plan special concerns and measures necessary to protect resources and government improvements. Include:

1. The construction activities and sequence of implementation relating to specific erosion control measures.

2. The location and type of permanent controls to be implemented during construction.

3. The location and type of temporary controls to be implemented during construction.

4. For work in stream channels with running water a detailed dewatering plan.

5. For work in stream channels without flowing water describe level of ground and vegetative disturbance and measures to reduce potential sediment delivery.

6. Describe what monitoring will take place.

Add to the third paragraph:

Upon completion of construction at the site, all temporary dewatering materials and equipment are to be removed from Government property.

157.08 Water Crossings.

Add the following:

At any channel crossing where there is running water dewater by rerouting water flow around the site before and during excavation and embankment operations.

201 - Clearing and Grubbing

201.01_nat_us_02_18_2005

201.01 Description

Replace with the following

This work consists of clearing and grubbing within clearing limits and other designated areas.

201.04_nat_us_02_22_2005

201.04 Clearing. (c)

Delete paragraph (c) and replace with the following:

(c) In areas outside the excavation, embankment, and slope rounding limits, cut stumps to within 12 inches or one-third of the stump diameter of the ground, whichever is higher, measured on the side adjacent to the highest ground. For timber sales, stump heights will meet the requirements of the Timber Sale contract.

201.04 Clearing.

Delete subsection (d) and replace with the following:

(d) Do not cut vegetation less than 3 feet tall and less than 3 inches in diameter, that is within the clearing limits but beyond the roadway and not in a decking area, and that does not interfere with sight distance along the road.

Add the following:

(e) Trim branches of remaining trees or shrubs to give a clear height of 14 feet above the roadbed unless otherwise indicated. Trim tree limbs as near flush with the trunk as practicable.

(f) Remove brush from log decks. Deck logs so that logs are piled parallel to one another; can be removed by standard log loading equipment; will not damage standing trees; will not interfere with drainage, and will not roll. Keep logs in log decks free of brush and soil.

204 - Excavation and Embankment

204.11_nat_us_04_11_2005

204.11 Compaction.

Delete the first paragraph and replace it with the following:

For compaction according to method (a), (b), or (c), use AASHTO T 27 to determine the amount of material retained on a Number. 4 sieve. For compaction methods (d) or (e) no sieve test is required.

Add the following compaction methods:

(d) Layer Placement Method (Hauling and Spreading Equipment). Place material by end dumping to the minimum depth needed for operation of spreading equipment. Level and smooth each embankment layer before placing the next layers. Operate hauling and spreading equipment uniformly over the full width of each layer. Construct a solid embankment with adequate compaction by working smaller rock and fines in with the larger rocks to fill the voids, and by operating hauling and spreading equipment uniformly over the full width of each layer as the embankment is constructed.

(e) Layer Placement (Roller Compaction) Method. Place material by end dumping to the minimum depth needed for operation of spreading equipment. Adjust the moisture content of the material to obtain a mass that will not visibly deflect under the load of the hauling and spreading equipment.

Operate compaction equipment over the full width of each layer until visible deformation of the layer ceases or, in when a sheepsfoot roller is used, the roller “walks out” of the layer. Make at least three complete passes.

204.13_nat_us_03_02_2005

204.13 Sloping, Shaping, and Finishing.

Delete section (d) and add the following:

(d) Finishing. For surfaced roads, remove all material larger than 6 inches from the top 6 inches of the roadbed. For all roads, finish the roadbed to be smooth and uniform, and shaped to conform to the typical sections. Remove unsuitable material from the roadbed and replace it with suitable material.

Finish roadbeds to the tolerance class shown in table 204-2.

Ensure that the subgrade for both surfaced and unsurfaced roads is visibly moist during shaping and dressing. Scarify to 6 inches below the bottom of low sections, holes, cracks, or depressions and bring back to grade with suitable material. Maintain proper ditch drainage.

For unsurfaced roads, use one of the following methods to finish the roadbed:

(1) Method A. Remove all material larger than 6 inches from the top 6 inches of the roadbed and replace with suitable material.

(2) Method B. Use a vibratory grid roller or approved equal with a minimum weight of 10 tons.

Roll at least 5 full-width passes or until visible displacement ceases.

(3) Method C. For roads designated as Construction Tolerance Class K, L, or M, finish the roadbed by spreading the excavation. Eliminate rock berms.

Add Table 204-2—Construction Tolerances:

Table 204-2 Construction tolerances.

Tolerance Class(a)

A B C D E F G H I J K L M Roadbed width (ft) +0.5 +0.5 +1.0 +1.0 +1.0 +1.0 +1.5 +1.0 +2.0 +2.0 +2.0 +2.0 +2.0

Subgrade elevation

(ft)

+0.1 +0.2 +0.2 +0.5 +0.5 +1.0 +1.0 +1.5 +2.0 +3.0 +2.0 +3.0 (c)

Centerline alignment (ft)

+0.2 +0.2 +0.5 +0.5 +1.0 +1.0 `+1.5 +1.5 +2.0 +3.0 +3.0 +5.0 (c)

Slopes, excavation, and embankment (% slope(b)

+3 +5 +5 +5 +5 +5 +10 +10 +10 +10 +20 +20 +20

a. Maximum allowable deviation from construction stakes and drawings.

b. Maximum allowable deviation from staked slope measured from slope stakes or hinge points.

c. Unless otherwise shown the centerline alignment and subgrade elevation, as built, have no horizontal curves with a radius of less than 80 feet, and no vertical curves with a curve length of less than 80 feet when the algebraic difference in the grade change is less than 10 percent, or a curve length of less than 100 feet when the algebraic difference of the grade change is greater than or equal to 10 percent. The centerline grade is not to exceed 20 percent in 100 feet of length.

204.14_nat_us_03_02_2005

204.14 Disposal of Unsuitable or Excess Material.

Delete the text of the first paragraph and substitute the following:

Dispose of unsuitable or excess material at designated sites or legally off of the project.

251 - Riprap 251.03_nat_us_08_05_2009

Construction Requirements

251.03 General.

Add the following:

Place riprap under or adjacent to structures before placing prefabricated superstructure units or constructing superstructure falsework unless otherwise approved by the CO.

251.08 Measurement.

Add the following:

Payment for excavation and embankment required for placement of riprap is indirectly included in the pay item for riprap.

301 - Untreated Aggregate Courses

301.00_nat_us_03_03_2005

301 Title Change.

Change the title to: Section 301 Aggregate Courses 301.01_nat_us_03_03_2005

301.01 Work.

Add the following:

Work includes producing aggregate by pit-run, grid rolling, screening, or crushing methods, or placing Government-furnished aggregate. Work may include additive mineral filler, or binder.

301.03_nat_us_02_28_2013

301.03 General.

Add the following:

Written approval of the roadbed is required before placing aggregate.

For pit run or grid-rolled material, furnish material smaller than the maximum size. No gradation other than maximum size will be required for pit-run or grid-rolled material. For grid rolling, use all suitable material that can be reduced to maximum size. After processing on the road, remove all oversize material from the road and dispose of it as directed by the CO.

Provide additives or binder, if required, at the proportions specified.

Develop and use Government furnished sources according to Section 105.

If the aggregate is produced and stockpiled before placement, handle and stockpiled according to Section 320. Establish stockpile sites at locations approved. Clear and grub stockpile sites according to Section 201.

301.04_nat_us_03_03_2005

301.04 Mixing and Spreading.

Delete the first sentence of the first paragraph and add the following:

Ensure that aggregate and any required additives, water, mineral filler, and binder are mixed by the specified method except, if crushed aggregate products are being produced and mineral filler, binder, or additives are required, uniformly blend following crushing. Control additive proportions to 0.5 percent dry weight.

(a) Stationary Plant Method. Mix the aggregate with other required materials in an approved mixer.

Add water during the mixing operation in the amount necessary to provide the moisture content for compacting to the specified density. After mixing, transport the aggregate to the jobsite while it contains the proper moisture content, and place it on the roadbed or base course using an aggregate spreader.

(b) Travel Plant Method. After placing the aggregate for each layer with an aggregate spreader or windrow-sizing device, uniformly mix it with other required materials using a traveling mixing plant.

During mixing, add water to provide the necessary moisture content for compacting.

(c) Road Mix Method. After placing the aggregate for each layer, mix it with other required materials at the required moisture content until the mixture is uniform throughout. Mix aggregate, water, and all other materials until a uniform distribution is obtained.

Spread the aggregate in a uniform layer, with no segregation of size, and to a loose depth that will provide the required compacted thickness.

When placing aggregate over geotextile, place aggregate in a single lift to the full depth specified.

Route and distribute hauling and leveling equipment over the width and length of each layer.

301.05_nat_us_05_17_2005

301.05 Compacting

Delete and replace with the following:

Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road.

Along curbs, headers, walls, and all places not accessible to the roller, compact the material with approved tampers or compactors.

Compact the aggregate using one of the following methods as specified:

Compaction A. Operating spreading and hauling equipment over the full width of the travelway.

Compaction B. Operate rollers and compact as specified in Subsection 204.11(a)(1).

Compaction C. Moisten or dry the aggregate to a uniform moisture content between 5 and 7 percent based on total dry weight of the mixture. Operate rollers and compact as specified in Subsection 204.11(a)(1).

Compaction D. Compact to a density of at least 95 percent of the maximum density, as determined by AASHTO T 99, method C or D.

Compaction E. Compact to a density of at least 96 percent of the maximum density, as determined by the Modified Marshall Hammer Compaction Method (available upon request from USDA Forest Service, Regional Materials Engineering Center, P.O. Box 7669, Missoula, MT 59807).

Compaction F. Compact to a density of at least 95 per-cent of the maximum density, as determined by AASHTO T 180, method C or D.

Compaction G. Compact to a density of at least 100 percent of the maximum density as determined by the Modified Marshall Hammer Compaction Method (available upon request from USDA Forest Service, Regional Materials Engineering Center, P.O. Box 7669, Missoula, MT 59807).

For all compaction methods, blade the surface of each layer during the compaction operations to remove irregularities and produce a smooth, even surface. When a density requirement is specified, determine the in place density and moisture content according to AASHTO T 310 or other approved test procedures.

303 - Road Reconditioning

303.01_nat_us_03_02_2005

303.01 Work.

Delete and add the following:

This work consists of reconditioning ditches, shoulders, roadbeds, cattleguards, asphalt surfaces, and aggregate surfaces.

430 - Asphalt Pavement Patching

430.00_nat_us_07_27_2007

Description

430.01 This work consists of performing full depth patching, patching with geotextiles, skin patching, spray-injection patching, and removal and replacement of asphalt berms.

Material

430.02 Conform to the following Subsections:

Minor Hot Asphalt Pavement 404.02

Asphalt Binder 702.01 Cutback Asphalt 702.02

Emulsified Asphalt 703.03

Application Temperatures 702.04

Cold Asphalt Mix 702.10

Aggregate 703.07 (a) and (b)

Choker Aggregate 703.12

Geotextile Type VI 714.01

Sand 703.15

Construction

430.03 Composition of Mix (Job-Mix Formula). Furnish either Minor Hot Asphalt Pavement or Minor Cold Asphalt Mix as approved by the CO.

430.04 Full Depth Patch.

Remove material to a minimum depth of 4 inches, or as necessary to reach firm support. If firm support for a patch is unavailable, notify the CO prior to placing any material.

Trim or mill the edges of the prepared hole to form a vertical face in un-fractured asphalt surfacing.

Make the prepared hole rectangular, and clean it of all loose material. When the hole is dry, apply emulsified asphalt to the bottom and faces of the hole. Barricade prepared sites. Patch the sites immediately after the emulsified asphalt breaks. Place the asphalt concrete mixture in layers not exceeding 4 inches. Thoroughly compact each layer with hand or mechanical tampers or rollers. For hot asphalt concrete mixtures, compact the mix while it is above 230 °F.

Compact the finished surface with a steel-wheel roller or vibratory plate compactor. Ensure that the compacted patch is approximately 1/8 to 1/4 inches above the level of the adjacent pavement. Seal the edges of the completed patch with emulsified asphalt, and blot with fine sand.

430.05 Patching with Geotextile. Prepare the surface by digging out and patching according to Subsection 430.04 or by cleaning the surface, removing vegetation, and filling all cracks more than 1/4 inch wide with an approved crack-filling material. Remove excess crack-filling material. Spray the prepared surface with asphalt cement or emulsified asphalt according to the geotextile manufacturer’s direction. Immediately place the geotextile over the repaired area. Allow emulsified asphalt to break before placing geotextile. Extend the fabric a minimum of 6 inches beyond the repaired or patched area onto sound adjoining pavement. Use a minimum of 2 inches overlap where adjacent fabric panels are needed to cover the repaired area.

Do not place the asphalt concrete mixture until authorized by the CO. Uniformly distribute asphalt concrete mixture in layers not to exceed 2 inches compacted depth. Feather the edges of skin patches.

When placing more than one layers, offset all joints at least 6 inches between layers. Compact each layer with an 8 to 10 ton steel roller. For hot asphalt concrete mixtures, compact the mix while it is above 230°F. Ensure that the completed patch does not have abrupt transitions that could adversely affect the steering of a passenger car traveling across the area. Provide transition tapers for skin patches that are 12 inches long per 1/8 inch thickness of patch in the direction on travel.

430.06 Skin Patches. Prepare the surface on which the skin patch is placed by cleaning the surface, removing vegetation, and filling all cracks more than 1/4 inch wide with an approved crack-filling material. Remove excess crack-filling material. Spray the surface with emulsified asphalt at the rate approved by the CO.

Apply the asphalt concrete mixture according to Subsection 430.05.

430.07 Spray-Injection Patching. Use an approved continuous process that cleans and dries the area to be patched, sprays a tack coat of binder on the sides and bottom of the pothole, place aggregate coated with emulsified asphalt, and covers the area with a choker aggregate.

430.08 Asphalt Berm. Remove damaged segments of berm and bevel exposed ends at approximately 45 degrees from vertical. Clean and patch the berm foundation as necessary. Coat the foundation and joining surfaces with emulsified asphalt. Place and compact asphalt mix to conform to the shape of the undamaged segment.

430.09 Waste Material. Dispose of all materials removed from potholes, patches, and berms in accordance with Subsection 203.05(a).

430.10 Acceptance. Asphalt concrete mixtures will be evaluated under Subsections 106.02 and

106.03. Geotextiles will be evaluated under Subsection 106.03. Spray-injection patching will be evaluated under Subsections 106.02 and 106.03.

Measurement

430.11 Measure the Section 430 items listed in the bid schedule according to Subsection 109.02.

Payment

430.12 The accepted quantities will be paid at the contract unit price per unit of measurement for Section 430 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05

602 - Culverts and Drains

602.03_nat_us_09_06_2005

602.03 General.

Add the following:

Ensure that the final installed alignment of all pipe allows no reverse grades, and does not permit horizontal and vertical alignments to vary from a straight line drawn from center of inlet to center of outlet by more than 2 percent of pipe center length or 1.0 feet, whichever is less.

607 - Cleaning, Reconditioning, and Repairing Existing Drainage Structures

607.04_nat_us_05_01_2013

607.04 Cleaning Culverts in Place.

Add the following:

If approved by the CO, all or part of the pipe designated to be cleaned in-place may be removed, cleaned, and re-laid in accordance with Section 602. In these cases, furnish all material required to replace damaged pipe and joints and relay the pipe.

703 - Aggregate

703.05_nat_us_08_14_2009

Delete 703.05 and replace with the following:

703.05 Subbase, Base, Surface Course, and Screened Aggregate.

(a) Subbase or base aggregate. Furnish hard, durable particles or fragments of crushed stone, crushed slag, or crushed gravel conforming the following:

(1) Gradation Table 703-2

(2) Liquid limit, AASHTO T 89 25 max.

(3) Plastic limit, AASHTO T 90 Nonplastic

(4) Los Angeles abrasion, AASHTO T 96 40% max.

(5) Sodium sulfate soundness loss (5 cycles), 12% max.

AASHTO T 104

(6) Durability index (coarse), AASHTO T 210 35 min.

(7) Durability index (fine), AASHTO T 210 35 min.

(8) Fractured faces, ASTM D 5821 50% min.

(9) Free from organic matter and lumps or balls of clay

Do not use material that breaks up when alternately frozen and thawed or wetted and dried.

Obtain the aggregate gradation by crushing, screening, and blending processes as necessary. Fine aggregate, material passing the No. 4 sieve, shall consist of natural or crushed sand and fine mineral particles.

(b) Surface course aggregate. Furnish hard, durable particles or fragments of crushed stone, crushed slag, or crushed gravel conforming the following:

(1) Gradation Table 703-3

(2) Liquid limit, AASHTO T 89 35 max.

(3) Plastic Index, AASHTO T 90

a) If the percent passing the No. 200 sieve is less than 12% 2 to 9

b) If the percent passing the No. 200 sieve is greater than 12% Less than 2

(4) Los Angeles abrasion, AASHTO T 96 40% max.

(5) Sodium sulfate soundness loss (5 cycles), 12% max.

AASHTO T 104

(6) Durability index (coarse), AASHTO T 210 35 min.

(7) Durability index (fine), AASHTO T 210 35 min.

(8) Fractured faces, ASTM D 5821 75% min.

(9) Free from organic matter and lumps or balls of clay

Do not furnish material that contains asbestos fibers.

Obtain the aggregate gradation by crushing, screening, and blending processes as necessary. Fine aggregate, material passing the No. 4 sieve, shall consist of natural or crushed sand and fine mineral particles.

(c) Screened aggregate – Furnish hard, durable particles or fragments of stone, slag, or gravel conforming the following:

(1) Gradation Table 703-16

(2) Plastic Index, AASHTO T 90 Less than 9

(3) Los Angeles abrasion, AASHTO T 96 55% max.

(4) Free from organic matter and lumps or balls of clay.

Obtain the aggregate gradation by crushing, screening, and blending processes as necessary.

Delete Table 703-2 and replace with the following:

T ab le

-2 ar ge t V al ue R an ge s f or

S ub ba se a nd

B as e G ra da tio n

Pe rc en t b y M as s P as si ng D es ig na te d Si ev e

(A A

SH

T

O T an d

T

1)

G ra di ng

D es ig na tio n

E (B as e)

(6

(6

(4

4.

7.

(3

T he v al ue in th e pa re nt he se s i s t he a llo w ab le d ev ia tio n

) f ro m th e ta rg et v al ue s..

D (B

(6

(6

(6

(4

4.

7.

(3

C (B

(6

(6

4.

–7 .0

(3

B (S ub ba se

(8

4.

.0 (4

A (S ub ba se

(7

(6

(4

4.

8.

(3

Si ev e Si ze

2½ in ch

1½

3/

1/

N o.

N o.

Delete Table 703-3 and replace with the following:

T ab le

-3 ar ge t V al ue R an ge s f or

S ur fa ce

G ra da tio n Pe rc en t b y

M as s P as si ng

D es ig na te d

Si ev e (A

A

SH

T O

T an d T

1) ra di ng D es ig na tio n U

(6

(7

(5

8.

.0 (4

T he v al ue in th e pa re nt he se s i s t he a llo w ab le d ev ia tio n

) f ro m th e ta rg et v al ue s.

If th e pl as tic ity in de x

(P I) is gr ea te r t ha n 0, th e

TV

ra ng e fo r t he N o.

si ev e siz e is

-1

(4

(7

(5

8.

.0 (4

S 10

(6

(7

(5

8.

.0 (4

H

(6

(6

(5

9.

.0 (4

(6

(6

(5

.0

6.

(4

F 10

-1

-8

-6

(6

-5

-3

(6

-2

(5

.0

-1 6.

(4

Si ev e Si ze

N o.

N o.

Add Table 703-16:

Table 703-16

Gradation Requirements for Screened Aggregate

Sieve Size

Percent by Mass Passing Designated Sieve (AASHTO T 27 and T 11)

Grading Designation L M N O P Q R

6 inch 100 100

4 inch 100 100

3 inch 100 100

2 inch 100

No. 4 15-45 15-45 15-45

703.10_nat_us_03_02_2005

Delete Table 703-7 and substitute the following:

Table 703-7 Target Value Ranges

Table 703-7 Target Value Ranges for

Single and Multiple Course Surface Treatment Aggregate Gradation

Sieve Percent by Mass Passing Designated Sieve

(AASHTO T 27 & T 11)

Size

Grading Designation

A B C D E F 1½ inch 100(1)

1 inch 90-100(3) 100(1) ¾ inch 0-35(5) 90-100(3) 100(1)

½ inch 0-8(3) 0-35(5) 90-100(3) 100(1)

⅜ inch — 0-12(3) 0-35(5) 85-100(3) 100(1) 100(1)

No. 4 — — 0-12(3) 0-35(5) 85-100(3) 85-100(1)

No. 8 — — — 0-8(3) 0-23(4) —

No. 200 0-1(1) 0-1(1) 0-1(1) 0-1(1) 0-1(1) 0-10(1)

(1) Statistical procedures do not apply.

( ) The value in the parentheses is the allowable deviation (±) from the target values.

703.20_01_us_10_12_2006

Replace Table 703-3 with the following:

Table 703-3. Gradation TV ranges for surface courses.

% by Mass Passing Designated Sieve (AASHTO T 27 and T 11)

Grading Designation Sieve Size F G H S T U 1 ½ in. 100 100 1 in. 97-100 100 72-92 (6) 100 ¾ in. 76-89 (6) 97-100 97-100 - - 100 ½ in. - - - - 71-91 (6) - 3/8 in. 56-68 (6) 70-80 (6) 80-92 (6) 51-71 (6) - 71-90 (6) No. 4 43-53 (7) 51-63 (7) 58-70 (7) 36-53 (7) 43-60 (7) 50-68 (7) No. 8 - - - 26-40 (6) 30-46 (6) 34-51 (6) No. 16 23-32 (6) 28-39 (6) 28-40 (6) - - - No. 30 15-23 (5) 19-27 (5) 16-26 (5) - - - No. 40 - - - 14-25 (5) 16-28 (5) 19-30 (5) No. 200 10-16 (4) 10-16 (4) 9 14 (4) 8-15 (4) 8-15 (4) 8-15 (4)

Note: Allowable deviations (±) from TV are shown in parentheses. If the plasticity index (PI) is greater than 0, the TV range for the No. 200 sieve size is 6-12 (4).

Table 703-3. Gradation ranges for Size Ratio surface courses.

% by Mass Passing Designated Sieve (AASHTO T 27 and T 11)

Grading Designation Sieve Grading Grading Grading Grading Size F-SR F-SR with

Bentonite G-SR G-SR with

Bentonite 1 ½ in. 100 100 1 in. 97-100 97-100 100 100 ¾ in. 70 - 98 70 - 98 97-100 97-100 ½ in. 58 - 88 58 - 88 70 - 98 70 - 98 No. 4 36 - 60 36 - 60 44 - 70 44 - 70 No. 16 25 - 47 25 - 47 30-54 30-54 No. 30 12 - 31 12 - 31 15 - 34 15 - 34 No. 200 8 –20 (a) 6 - 15 8 – 20 (a) 6 - 15

Note: SR and PI are abbreviations for Size Ratio and Plasticity Index.

(a) If the minus No. 40 material in finished product has a PI greater than 0, the percent pass No. 200 range is 6 to 15%.

The gradation shall closely parallel the specification gradation curves. Percent passing ½ inch, No. 4, and No. 30 sieves shall all be in either the upper, middle, or lower portion of the specification band.

Size ratios, as defined below, shall be determined for each sieve analysis test. The maximum difference between the ½ inch and No. 4 size ratio, the No 4 and No. 30 size ratio, and the ½ inch and No. 30 size ratio, shall not exceed 0.50.

½ inch size ratio = (Test % Pass ½ inch) - (Min % Pass 1/2 inch)

(Max % Pass 1/2 inch) - (Min % Pass 1/2 inch)

No.4 size ratio = (Test % Pass No.4) - (Min % Pass No.4)

(Max % Pass No.4) - (Min % Pass No.4)

No.30 size ratio = (Test % Pass No.30) - (Min % Pass No.30)

(Max % Pass No.30) - (Min % Pass No.30)

Add Table 703-16:

Table 703-16 Gradation Requirements for Screened Aggregate

Sieve Size

Percent by Mass Passing Designated Sieve (AASHTO T 27 and T 11)

Grading Designation

L M N O P Q R

6 inch 100 100

4 inch 100 100

3 inch 100 100

2 inch 100

No. 4 15-45 15-45 15-45

718 - Traffic Signing and Marking Material

718.05_nat_us_08_05_2009

718.05 Aluminum Panels

Delete the third paragraph and replace with the following:

Clean, degrease and properly prepare the panels according to methods recommended by the sheeting manufacturer. Conversion coatings will conform to ASTM B-921 or ASTM B-449.

DETAIL OF WOOD COVER

TYPICAL PLAN VIEW OF INSTALLATION

SECTION B-B

TYPICAL FRONT VIEW

DROP INLET

METAL IN DROP INLETS SHALL BE

THE SAME AS THAT IN CULVERTS

ON WHICH THEY ARE PLACED.

DROP INLETS SHALL BE

FABRICATED IN THE FIELD

FROM 36" DIAMETER 12 GAUGE

NOTE:

WOOD COVER

(SEE DETAIL)

36"

TYPICAL SIDE VIEW

VARIES

18" OR 24"

PIPE

WINDOW DIMENSION

12"X24"

3/8" GALVANIZED BOLT

2 PER BOARD

BB

2"+1/4"

FABRICATED FROM STANDARD

GRADE DOUGLAS FIR OR EQUAL

2"X6" OR OVER

3'-3" DIAMETER

NOTE:

SLOPE GROUND 4%

TO PROVIDE DRAINAGE

TO DROP INLET OPENING

CL

TOP OF

CUT

DITCH

COMPACTED

BACKFILL

SLOPE

NO DITCH

+10

4'

* SLOPE

TRAVEL WAY

PIPE TO FIT CONDITIONS.

DITCH

TITLE

DRAWING APPROVED833-2

Six Rivers National Forest

I S

L A

N

D L

A K

E

N0

16N28

17N27A

16N10B

N2

7B

17N 27C

16N32 C

1 7 N 1 9

1 6 N

6 N

N

1 7 N 05 E

1 6 N 0

1 7 N 3 2 F 1 7 N 2 9

1 7 N 0 3

1 7 N 0 4

1 8

N 0

1 7 N 0 5 F

1 7 N 2 4

7 N 3 1

1 6 N

1 6

1 7 N 0 4 S

1 7 N 3 2 B

1 7 N 3 2 G

1 7 N 2 7

N

1 7 N 3 2

1 6 N 3 2

6 N 0 2

1 7 N 0 5

1 8 N 0 8

Bear

B U

C K

L A K E

D E

V

IL

' S

PU

N

CH

BOWL

Klamath National Forest

Bear Fire Treatments8x11P_GasquetComplex_20150924.mxd T:\FS\NFS\SixRivers\Program\2500Watershed\2520WatershedProtectionMgmt\GIS\BAER_2015\GasquetComplex\mxd\

0 1 20.5 Miles

1:52,412 ± cyamagiwa

Date Saved: 9/29/2015 11:46:30 AM

Bear

Treatments

BAER

Gasquet Complex

CA-SRF-001488

") Non-Native Invasive Species

!. Road, Hazard warning sign

!. Trail, Hazard warning sign

!. Hazard tree falling @ parking/campsite

Gasquet_Complex Roads with BAER Treatments SRF_RecreationSitePoint selection

TYPE

8 CAMPING AREA

!o LOOKOUT/CABIN

!C TRAILHEAD; trailhead

Trail KNF_Trail Trail Road Fire Perimeter

NON-FS

óóóCompleted Dozer Line 2I I Hand Line

! Drop Point â Helispot

ÑØ Water Source

L I

T

L E B A

L D

H I

L L

S

Six Rivers National Forest

O L

D S

O U

T H

K E

L S

E Y

L I T T L E B A

L D

H I L L S

15N01

17N07R

15N59

1 6 N1

9 D

N

1 9 F

1 6N 3 4 A

1 6 N 4 1 C

1 6 N 15 1 6 N 3

B

1 7 N 0 7 K

1 6 N 1 9 E

G A S - 60 45 0 1

1 6 N 2 5

6 N

3 4

1 6 N

1 6 N 3

N 0 3

1 6 N 4 1

1 5 N 1 1 B

N

1 9 B

G A S - 6 0 4 9

7 N 0 7 J

N

F

1 7 N 0 7 G

1 6 N 3 8

1 5 N 1 1 A 1 5

N 3 7

5 N

N 2 1

D N

4 0 5

1 5 N 0 2

1 6 N 2 3

1 7 N 0 7

1 6 N 1 9

D N 4 2 7

Coon

Coon Fire Treatments8x11P_GasquetComplex_20150924.mxd T:\FS\NFS\SixRivers\Program\2500Watershed\2520WatershedProtectionMgmt\GIS\BAER_2015\GasquetComplex\mxd\

0 1 20.5 Miles

1:55,706 ± cyamagiwa

Date Saved: 9/29/2015 11:50:08 AM

Coon Treatments

BAER

Gasquet Complex

CA-SRF-001488

E Install Rolling Dip or Waterbar

") Non-Native Invasive Species

!. Road, Hazard warning sign

Gasquet_Complex Roads with BAER Treatments SRF_RecreationSitePoint selection

TYPE

!y BOATING SITE

!9 CAMPGROUND

8 CAMPING AREA

!O DAY USE AREA

!5 PICNIC SITE; Picnic Site

!C TRAILHEAD; trailhead

Trail Trail Road Fire Perimeter

NON-FS

óóóCompleted Dozer Line 2I I Hand Line â Helispot

B O U

N

D

A R

Y

Six Rivers National Forest

B O U N

D A R Y

B O

U

N D A R

Y

F O R K S O F

B L

U E

C R

E E

K

S U

M M

I T

V A

L L

E Y

S O U T H K E L S E Y

15N

14N46B

14N39C

13N 35G

N0

13N35A

13N35E

13N37A

1 4 N10

14 N 38

15 N 0 1B

15N 2 9

1 4 N 0 8

1 4N

A

14N 3 2 A

14N 0 1B

13N34A

1 3 N 2 6D

1 3N 4 2 A

1 3 N 1 3

1 5 N0 1 U

N

5 N

1 5 N

0 1 P

1 5 N 01 Q

N3

9 G

N 1 8

1 5 N3 9A

1 3N

1 3 N 2 7

1 3 N 4 2

1 4 N

3 2

1 4 N

2 9

1 4 N 0

G1 4 N 3 3

4 N 3 9 A

1 3 N

5 N 3 9

N

1 4 N 4 6

N

N 3 9

N

1 4 N 0 1

1 5 N 0 1

Peak

Feeder

S

A W

T O

O

T H

S

A W

T O

O

T H

Peak & Feeder Fire Treatments8x11P_GasquetComplex_20150924.mxd T:\FS\NFS\SixRivers\Program\2500Watershed\2520WatershedProtectionMgmt\GIS\BAER_2015\GasquetComplex\mxd\

0 1 20.5 Miles

1:82,249 ± cyamagiwa

Date Saved: 9/29/2015 11:53:14 AM

Feeder

Peak

Treatments

BAER

Gasquet Complex

CA-SRF-001488

") Non-Native Invasive Species

!. Road, Hazard warning sign

!. Trail, Hazard warning sign

Gasquet_Complex Roads with BAER Treatments Treatment

INSTALL ROCK WATERBARS AND REPAIR BURNED-OUT TREAD

SRF_RecreationSitePoint selection

TYPE

8 CAMPING AREA

!C TRAILHEAD; trailhead

Trail KNF_Trail Trail Road Fire Perimeter

NON-FS

óóóCompleted Dozer Line

2I I Hand Line

! Drop Point

FIRE PLAN FOR CONSTRUCTION AND SERVICE CONTRACTS

03/06/2013

1. SCOPE:

The provisions set forth below outline the responsibility for fire prevention and suppression activities and establish a suppression plan for fires within the contract area. The contract area is delineated by map in the contract. The provisions set forth below also specify conditions under which contract activities will be curtailed or shut down.

2. RESPONSIBILITIES:

A. Contractor

(1) Shall abide by the requirements of this Fire Plan.

(2) Shall take all steps necessary to prevent his/her employees, subcontractors and their employees from setting fires not required in completion of the contract, shall be responsible for preventing the escape of fires set directly or indirectly as a result of contract operations, and shall extinguish all such fires which may escape.

(3) Shall permit and assist in periodic testing and inspection of required fire equipment. Contractor shall certify compliance with specific fire precautionary measures in the fire plan, before beginning operations during Fire Precautionary Period and shall update such certification when operations change.

(4) Shall designate in the Fire Plan and furnish on Contract Area, during operating hours, a qualified fire supervisor authorized to act on behalf of Contractor in fire prevention and suppression matters.

B. Forest Service

The Forest Service may conduct one or more inspections for compliance with the Fire Plan. The number, timing, and scope of such inspections will be at the discretion of agency employees responsible for contract administration. Such inspections do not relieve the Contractor of responsibility for correcting violations of the fire plan or for fire safety in general, as outlined in paragraph 2.A above.

3. DEFINITIONS:

The following definitions shall apply:

Active Landing: A location the contractor may be skidding logs into, or performing other operations such as delimbing, log manufacturing, and chipping logs. Except for EV and E days, loading logs or stockpiling chips only, on a cleared landing, does not constitute an Active Landing.

Hot Saw: A harvesting system that employs a high-speed (>1100 rpm) rotating felling head, i.e., full rotation lateral tilt head.

Mechanical Operations: The process of felling, skidding, chipping, shredding, masticating, piling, log processing and/or yarding which requires the use of motorized power which includes, chainsaws, chippers, motorized carriages, masticators, stroke delimbers, skidders , dozers etc.

4. TOOLS AND EQUIPMENT:

The Contractor shall comply with the following requirements during the fire precautionary period, as defined by unit administering contracts:

The Fire Precautionary Period is set by the State of California which is April 1 through December 1 of any year.

• This contract requires, does not require, a Fire Box and associated Fire Tools according to CPRC Section 4428.

A. Fire Tools and Equipment: Contractor shall meet minimum requirements of Section 4428 of the California Public Resources Code (C.P.R.C.). Fire tools kept at each operating landing shall be sufficient to equip all employees in the felling, yarding, loading, chipping, and material processing operations associated with each landing. Fire equipment shall include two tractor headlights for each tractor dozer used in Contractor's Operations. Tractor headlights shall be attachable to each tractor and served by an adequate power source. All required fire tools shall be maintained in suitable and serviceable condition for fire fighting purposes.

Trucks, tractors, skidders, pickups and other similar mobile equipment shall be equipped with and carry at all times a size 0 or larger shovel with an overall length of not less than 46 inches and a 2-1/2 pound axe or larger with an overall length of not less than 28 inches.

Where cable yarding is used, Contractor shall provide a size 0 or larger shovel with an overall length of not less than 46 inches and a filled backpack can (4 or 5 gallon) with hand pump within 25 feet of each tail and corner block.

B. Fire Extinguishers: Contractor shall equip each internal combustion yarder, fuel truck, and loader with a fire extinguisher for oil and grease fires (4-A:60-B:C).

Skidders and tractors shall be equipped with a minimum 5-BC fire extinguisher.

All Fire Extinguishers shall be mounted, readily accessible, properly maintained and fully charged.

Contractor shall equip each mechanized harvesting machine with hydraulic systems, powered by an internal combustion engine (chipper, feller/buncher, harvester, forwarder, hot saws, stroke delimber, etc), except tractors and skidders, with at least two 4-A:60-B:C fire extinguishers or equivalent.

C. Spark Arresters and Mufflers: Contractor shall equip each operating tractor and any other internal combustion engine with a spark arrester, except for motor vehicles equipped with a maintained muffler as defined in C.P.R.C. Section 4442 or tractors with exhaust-operated turbochargers. Spark Arresters shall be a model tested and approved under Forest Service Standard 5100-1a as shown in the.

National Wildlife Coordinating Group Spark Arrester Guide, Volumes 1 and 2, and shall be maintained in good operating condition.