PLANS-HC-SCOTT-BAR-BAER_WITH_OPTIONS.pdf
PDF 4 MB Posted
- Attached to
- Happy Camp-Scott Bar BAER Federal contract opportunity
- Solicitation number
- AG-9AC7-S-15-0056
About this file
Drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_0002.pdf | ||
| CA9.txt | TXT text file | |
| Amendment_One.pdf | ||
| General_Decision_Number.pdf | ||
| Bid_Bond.pdf | ||
| Solicitation_Scott_Bar_BAER.pdf | ||
| Special_Project_Specifications.pdf | ||
| 2012_Fire_Plan.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Dave Seiler
Ken Stagg
Ted McArthur
P atri ci a Granth am
LOCALITY MAP
NO SCALE
COUNTY ROAD
FOREST SERVICE
ROAD NUMBER
LEGEND
PROJECT ROAD
ITEM
NO
DESCRIPTION
METHOD OF
MEASURE
-MENT
PAY
UNIT
46N64
ROAD NO. & TOTALS
CQ LS ALL ALL
ALL ALLLSQ LS
16.00 5.53DQ MILE
ALL ALL
ALL ALL
7.40 2.00
45N77 45N65 45N1645N05Y
ALL
ALL
15101 MOBILIZATION
30304 ROADBED RECONDITIONING, GRADE ROAD, PULL
DITCH
15754 SOIL EROSION & POLLUTION CONTROL
AQ EA 8 0 3 20
60605 FLARED END SECTION
LSQ LS ALL ALL ALL ALLALL
60701 CLEAN/RECONDITIONING/REPAIR EXISTING DRAINAGE
STRUCTURES
AQ EA 18 18 30 224
20420 DRAINAGE EXCAVATION, TYPE IV ROLLING DIP, CLASS
L (LOWBOY)
AQ EA 2 1 4 00
60452 DROP INLET COVER, TYPE A
ALL
ALL
ALL
ALL
ALL ALL
0.90 0.45 1.01
44N45
44N45C
OPT #1 OPT #2
METAL PIPE, PIPE ARCHES OR ARCHES
SECTION 602 OR 605 604 605 621 251
C O
R R
U G
A T
I O
N S
Ø
C M P
Ø
C M P
Ø
C M P
E L
B O
W
B R
A N
C H
O N
N
E N
D
S
E C
T I O
N
I N
L E
T
R
I S
E R
P I P
E
I N
L E
T
P R
E F
A B
R I C
A T
E D
R A
I N
S F
G R
A N
U L
A
F
I L
L E
R
M A
T E
R I A
L
C
Y
I N
C H
I N
C H
I N
C H
I N
C H
A N
C H
S
T A
K E
G E
O T
E X
T I L
E
SIZE
Ø
C M P
Ø
C M P
Ø
C M P
Ø
C M P
D E
B R
C
K
T
Y P
E
TYPE
PREFAB DRAIN
CORR. METAL SPILLWAY RIPRAP
REMARKS
VIII V III SY
SITE
MILE POST
ROAD NO.
NOTES:
1. QUANTITIES ON THIS SHEET ARE BASED ON
DESIGN DATA ONLY & ARE SUBJECT TO
ADJUSTMENTS BEFORE & DURING
CONSTRUCTION TO SUIT FIELD CONDITIONS.
ABBREVIATIONS:
Al = ALUMINUM ALLOY Fe = GALVANIZED STEEL CMP = CORRUGATED METAL PIPE
SPP = STRUCTURAL PLATE PIPE SPPA = STRUCTURAL PLATE PIPE ARCH SPA = STRUCTURAL PLATE ARCH
PP = PERFORATED PIPE CMPA = CORRUGATED METAL PIPE ARCH CSBC = CORRUGATED STEEL BOX CULVERT
SIZE TYPE NO TYPE
CU. YDS.
C L
A S
S
C L
A S
S
C L
A S
S
I N
L E
T
A S
S E
M B
L Y
FLUME OUTLET
PIPE
46N64 5.88 3010 CONSTRUCT TYPE IV ROLLING DIP
Ø
C M P
Ø
C M P
Ø
C M P
Ø
C M P
5.96 3010 CONSTRUCT TYPE IV ROLLING DIP, INSTALL DI LID
6.03 3010 CONSTRUCT TYPE IV ROLLING DIP, INSTALL END SECTION
6.09 3010 CONSTRUCT TYPE IV ROLLING DIP
6.10 INSTALL END SECTION1
6.16 3010 CONSTRUCT TYPE IV DIP
A
6.20 3010 CONSTRUCT TYPE IV ROLLING DIP
46N64
46N64
46N64
46N64
46N64
46N64
46N64
46N64
46N64
46N64
46N64
46N64
46N64
46N64
46N64
46N64
46N64
46N64
46N64
46N64
46N64
46N64
6.35 3010 CONSTRUCT TYPE IV ROLLING DIP
6.38 3010 CONSTRUCT TYPE IV ROLLING DIP
10.23 3010 CONSTRUCT TYPE IV ROLLING DIP
10.89 3010 CONSTRUCT TYPE IV ROLLING DIP
11.00 3010 CONSTRUCT TYPE IV ROLLING DIP
12.56 3010 CONSTRUCT TYPE IV ROLLING DIP
12.67 3010 CONSTRUCT TYPE IV ROLLING DIP
6.43 3010 CONSTRUCT TYPE IV ROLLING DIP, INSTALL END SECTION1
7.03 3010 CONSTRUCT TYPE IV ROLLING DIP, INSTALL END SECTION1
10.19 3010 CONSTRUCT TYPE IV ROLLING DIP, INSTALL END SECTION1
12.46 INSTALL END SECTION1
12.89
14.40
14.55
14.95
15.24
3010 CONSTRUCT TYPE IV ROLLING DIP
3010 CONSTRUCT TYPE IV ROLLING DIP
INSTALL END SECTION1
INSTALL END SECTION1
INSTALL DROP INLET LIDA
45N77 3.64 3010 CONSTRUCT TYPE IV ROLLING DIP
45N77 3.73
45N77 3.84
45N77 3.89
3010 CONSTRUCT TYPE IV ROLLING DIP, INSTALL DI LIDA
3010 CONSTRUCT TYPE IV ROLLING DIP
C O
R R
U G
A T
I O
N S
Ø
C M P
Ø
C M P
Ø
C M P
E L
B O
W
B R
A N
N
N
E N
D
S
E C
T I O
N
I N
L E
T
R
I S
E R
P I P
E
I N
L E
T
P R
E F
A B
R I C
A T
A
I N
S F
G R
A N
U L
L
L E
R
M A
T E
R I A
L
C
Y
I N
C H
I N
C H
I N
C H
I N
C H
A N
C H
A
K E
G E
O T
E X
T I L
E
SIZE
Ø
C M P
Ø
C M P
Ø
C M P
Ø
C M P
D E
B R
C
K
T
Y P
E
TYPE
PREFAB DRAIN
CORR. METAL SPILLWAY RIPRAP
REMARKS
VIII V III SY
SITE
MILE POST
ROAD NO.
NOTES:
1. QUANTITIES ON THIS SHEET ARE BASED ON
DESIGN DATA ONLY & ARE SUBJECT TO
ADJUSTMENTS BEFORE & DURING
CONSTRUCTION TO SUIT FIELD CONDITIONS.
ABBREVIATIONS:
Al = ALUMINUM ALLOY Fe = GALVANIZED STEEL CMP = CORRUGATED METAL PIPE
SPP = STRUCTURAL PLATE PIPE SPPA = STRUCTURAL PLATE PIPE ARCH SPA = STRUCTURAL PLATE ARCH
PP = PERFORATED PIPE CMPA = CORRUGATED METAL PIPE ARCH CSBC = CORRUGATED STEEL BOX CULVERT
SIZE TYPE NO TYPE
CU. YDS.
C L
A S
S
C L
A S
S
C L
A S
S
I N
L E
T
A S
S E
M B
L Y
FLUME OUTLET
PIPE
Ø
C M P
Ø
C M P
Ø
C M P
Ø
C M P
45N77 3.96
45N77 4.04
45N77 4.09
45N77 4.12
45N77 4.26
45N77 4.48
45N77 4.58
45N77 4.66
45N77 4.86
45N77 4.96
45N77 5.05
45N77 5.16
45N77 5.28
45N77 5.34
3010 CONSTRUCT TYPE IV ROLLING DIP
3010 CONSTRUCT TYPE IV ROLLING DIP
3010 CONSTRUCT TYPE IV ROLLING DIP
3010 CONSTRUCT TYPE IV ROLLING DIP
3010 CONSTRUCT TYPE IV ROLLING DIP
3010 CONSTRUCT TYPE IV ROLLING DIP
3010 CONSTRUCT TYPE IV ROLLING DIP
3010 CONSTRUCT TYPE IV ROLLING DIP
3010 CONSTRUCT TYPE IV ROLLING DIP
3010 CONSTRUCT TYPE IV ROLLING DIP
3010 CONSTRUCT TYPE IV ROLLING DIP
3010 CONSTRUCT TYPE IV ROLLING DIP
3010 CONSTRUCT TYPE IV ROLLING DIP
3010 CONSTRUCT TYPE IV ROLLING DIP
45N65 1.63 3010 CONSTRUCT TYPE IV ROLLING DIP
45N65 1.70
45N65 1.80
45N65 1.87
45N65 2.02
45N65 2.07
45N65 2.24
45N65 2.31
45N65 2.48
3010 CONSTRUCT TYPE IV ROLLING DIP
3010 CONSTRUCT TYPE IV ROLLING DIP
3010 CONSTRUCT TYPE IV ROLLING DIP
3010 CONSTRUCT TYPE IV ROLLING DIP
3010 CONSTRUCT TYPE IV ROLLING DIP
3010 CONSTRUCT TYPE IV ROLLING DIP, INSTALL DI LIDA
3010 CONSTRUCT TYPE IV ROLLING DIP, INSTALL DI LIDA
INSTALL DROP INLET LIDA
45N65 2.59
45N65 2.68
45N65 3.17
45N65 3.32
3010 CONSTRUCT TYPE IV ROLLING DIP
3010 CONSTRUCT TYPE IV ROLLING DIP
C O
R R
U G
A T
I O
N S
Ø
C M P
Ø
C M P
Ø
C M P
E L
B O
W
B R
A N
N
N
E N
D
S
E C
T I O
N
I N
L E
T
R
I S
E R
P I P
E
I N
L E
T
P R
E F
A B
R I C
A T
A
I N
S F
G R
A N
U L
L
L E
R
M A
T E
R I A
L
C
Y
I N
C H
I N
C H
I N
C H
I N
C H
A N
C H
A
K E
G E
O T
E X
T I L
E
SIZE
Ø
C M P
Ø
C M P
Ø
C M P
Ø
C M P
D E
B R
C
K
T
Y P
E
TYPE
PREFAB DRAIN
CORR. METAL SPILLWAY RIPRAP
REMARKS
VIII V III SY
SITE
MILE POST
ROAD NO.
NOTES:
1. QUANTITIES ON THIS SHEET ARE BASED ON
DESIGN DATA ONLY & ARE SUBJECT TO
ADJUSTMENTS BEFORE & DURING
CONSTRUCTION TO SUIT FIELD CONDITIONS.
ABBREVIATIONS:
Al = ALUMINUM ALLOY Fe = GALVANIZED STEEL CMP = CORRUGATED METAL PIPE
SPP = STRUCTURAL PLATE PIPE SPPA = STRUCTURAL PLATE PIPE ARCH SPA = STRUCTURAL PLATE ARCH
PP = PERFORATED PIPE CMPA = CORRUGATED METAL PIPE ARCH CSBC = CORRUGATED STEEL BOX CULVERT
SIZE TYPE NO TYPE
CU. YDS.
C L
A S
S
C L
A S
S
C L
A S
S
I N
L E
T
A S
S E
M B
L Y
FLUME OUTLET
PIPE
Ø
C M P
Ø
C M P
Ø
C M P
Ø
C M P
45N05Y 0.05 3010 CONSTRUCT TYPE IV ROLLING DIP
45N05Y 0.35 3010 CONSTRUCT TYPE IV ROLLING DIP
45N05Y 0.43 3010 CONSTRUCT TYPE IV ROLLING DIP
45N05Y 0.53 3010 CONSTRUCT TYPE IV ROLLING DIP
45N65 3.44
45N65 3.78
45N65 3.91
45N65 4.04
45N65 4.09
3010 CONSTRUCT TYPE IV ROLLING DIP
INSTALL DROP INLET LIDA
3010 CONSTRUCT TYPE IV ROLLING DIP, INSTALL END SECTION1
3010 CONSTRUCT TYPE IV ROLLING DIP, INSTALL END SECTION1
INSTALL END SECTION1
45N65 4.39 3010 CONSTRUCT TYPE IV ROLLING DIP
45N65 4.64 3010 CONSTRUCT TYPE IV ROLLING DIP
45N65 4.75 3010 CONSTRUCT TYPE IV ROLLING DIP
45N65 4.93 3010 CONSTRUCT TYPE IV ROLLING DIP
45N65 4.99 3010 CONSTRUCT TYPE IV ROLLING DIP
45N65 5.11 3010 CONSTRUCT TYPE IV ROLLING DIP
45N65 5.24 3010 CONSTRUCT TYPE IV ROLLING DIP
45N65 5.70 3010 CONSTRUCT TYPE IV ROLLING DIP
45N65 5.97 3010 CONSTRUCT TYPE IV ROLLING DIP
45N65 6.16 3010 CONSTRUCT TYPE IV ROLLING DIP
45N65 6.23 3010 CONSTRUCT TYPE IV ROLLING DIP
45N65 6.47 3010 CONSTRUCT TYPE IV ROLLING DIP
45N65 6.93 3010 CONSTRUCT TYPE IV ROLLING DIP
45N65 7.01 3010 CONSTRUCT TYPE IV ROLLING DIP
45N65 7.12 3010 CONSTRUCT TYPE IV ROLLING DIP
C O
R R
U G
A T
I O
N S
Ø
C M P
Ø
C M P
Ø
C M P
E L
B O
W
B R
A N
N
N
E N
D
S
E C
T I O
N
I N
L E
T
R
I S
E R
P I P
E
I N
L E
T
P R
E F
A B
R I C
A T
A
I N
S F
G R
A N
U L
L
L E
R
M A
T E
R I A
L
C
Y
I N
C H
I N
C H
I N
C H
I N
C H
A N
C H
A
K E
G E
O T
E X
T I L
E
SIZE
Ø
C M P
Ø
C M P
Ø
C M P
Ø
C M P
D E
B R
C
K
T
Y P
E
TYPE
PREFAB DRAIN
CORR. METAL SPILLWAY RIPRAP
REMARKS
VIII V III SY
SITE
MILE POST
ROAD NO.
NOTES:
1. QUANTITIES ON THIS SHEET ARE BASED ON
DESIGN DATA ONLY & ARE SUBJECT TO
ADJUSTMENTS BEFORE & DURING
CONSTRUCTION TO SUIT FIELD CONDITIONS.
ABBREVIATIONS:
Al = ALUMINUM ALLOY Fe = GALVANIZED STEEL CMP = CORRUGATED METAL PIPE
SPP = STRUCTURAL PLATE PIPE SPPA = STRUCTURAL PLATE PIPE ARCH SPA = STRUCTURAL PLATE ARCH
PP = PERFORATED PIPE CMPA = CORRUGATED METAL PIPE ARCH CSBC = CORRUGATED STEEL BOX CULVERT
SIZE TYPE NO TYPE
CU. YDS.
C L
A S
S
C L
A S
S
C L
A S
S
I N
L E
T
A S
S E
M B
L Y
FLUME OUTLET
PIPE
Ø
C M P
Ø
C M P
Ø
C M P
Ø
C M P
45N16 0.12 3010 CONSTRUCT TYPE IV ROLLING DIP
45N16 0.18
45N16 0.22
45N16 0.24
45N16 0.42
45N16 0.43
45N16 1.11
45N16 1.19
45N16 1.33
45N16 1.45
45N16 1.58
45N16 1.80
45N16 1.88
3010 CONSTRUCT TYPE IV ROLLING DIP
3010 CONSTRUCT TYPE IV ROLLING DIP
3010 CONSTRUCT TYPE IV ROLLING DIP
3010 CONSTRUCT TYPE IV ROLLING DIP
3010 CONSTRUCT TYPE IV ROLLING DIP
3010 CONSTRUCT TYPE IV ROLLING DIP
3010 CONSTRUCT TYPE IV ROLLING DIP
3010 CONSTRUCT TYPE IV ROLLING DIP
3010 CONSTRUCT TYPE IV ROLLING DIP
3010 CONSTRUCT TYPE IV ROLLING DIP
INSTALL END SECTION2
INSTALL END SECTION1
45N16 1.54 3010 CONSTRUCT TYPE IV ROLLING DIP
45N16 1.51 3010 CONSTRUCT TYPE IV ROLLING DIP
45N16 1.48 3010 CONSTRUCT TYPE IV ROLLING DIP
45N16 1.38 3010 CONSTRUCT TYPE IV ROLLING DIP
45N16 1.62 3010 CONSTRUCT TYPE IV ROLLING DIP
45N16 1.68 3010 CONSTRUCT TYPE IV ROLLING DIP
45N16 1.75 3010 CONSTRUCT TYPE IV ROLLING DIP
45N16 1.83 3010 CONSTRUCT TYPE IV ROLLING DIP
45N16 1.85 3010 CONSTRUCT TYPE IV ROLLING DIP
45N16 1.93 3010 CONSTRUCT TYPE IV ROLLING DIP
45N16 1.96 3010 CONSTRUCT TYPE IV ROLLING DIP
2"
1"
#4
#200
80-100 (±6)
64-94 (±6)
40-69 (±6)
31-54 (±6)
4.0-7.0 (±3)
NOT TO SCALE
DROP INLET LID TYPE A
CTY ROAD 7F01
PROJECT LIMIT
REF JCT COUNTY ROAD 7F01
BEGIN RECONDITION
DRAINAGE STRUCTURES
BEGIN ROAD
RECONDITIONING
***AT THE CONTRACTOR'S DISCRETION, HAZARDOUS VEGETATION CAN BE BRUSHED/CLEAREDREMOVED BY THE CONTRACTOR IN ORDER TO PERFORM THE WORK. WORK ASSOCIATED W/ THIS VEGETATION SHALL BE INCIDENTAL TO THE WORK BEING PERFORMED***
HAPPY CAMP BAER
SCOTT BAR ROAD BASE PACKAGE
46N64 EAST
MP 0.00
N
MP 6.03 REF 18"Ø CMP
INSTALL FLARED END SECTION
CONSTRUCT TYPE IV ROLLING
DIP LT.
MP 3.33 REF JCT FS ROAD 46N62 RT
N
MP 5.88 CONSTRUCT TYPE IV ROLLING
DIP LT.
MP 5.96 INSTALL NEW DROP INLET LID.
CONSTRUCT TYPE IV ROLLING
DIP LT.
MP 6.09 CONSTRUCT TYPE IV ROLLING
DIP LT.
MP 6.10 REF 18"Ø CMP
INSTALL FLARED END SECTION
MP 6.16 CONSTRUCT TYPE IV ROLLING
DIP LT.
N
MP 6.20 CONSTRUCT TYPE IV ROLLING
DIP LT.
MP 6.35 CONSTRUCT TYPE IV ROLLING
DIP LT.
MP 6.38 CONSTRUCT TYPE IV ROLLING
DIP LT.
MP 6.43 REF 18"Ø CMP
INSTALL FLARED END SECTION
CONSTRUCT TYPE IV ROLLING
DIP LT.
MP 6.50 REF JCT FS ROAD 44N51 RT &
44N24Y LT
MP 7.03 REF 18"Ø CMP
INSTALL FLARED END SECTION
CONSTRUCT TYPE IV ROLLING
DIP LT.
MP 7.62 REF JCT FS ROAD 44N51Y LT
MP 8.04 REF JCT FS ROAD 44N96 LT
MP 10.19 REF 18"Ø CMP
INSTALL FLARED END SECTION
CONSTRUCT TYPE IV ROLLING
DIP LT.
MP 10.23 CONSTRUCT TYPE IV ROLLING
DIP LT.
MP 10.80 REF JCT FS ROAD 44N49Y RT
MP 10.89 CONSTRUCT TYPE IV ROLLING
DIP RT.
MP 11.00 CONSTRUCT TYPE IV ROLLING
DIP RT.
MP 12.46 REF 18"Ø CMP
INSTALL FLARED END SECTION
MP 12.56 CONSTRUCT TYPE IV ROLLING
DIP RT.
MP 12.67 CONSTRUCT TYPE IV ROLLING
DIP RT.
***AT THE CONTRACTOR'S DISCRETION, HAZARDOUS VEGETATION CAN BE BRUSHED/CLEAREDREMOVED BY THE CONTRACTOR IN ORDER TO PERFORM THE WORK. WORK ASSOCIATED W/ THIS VEGETATION SHALL BE INCIDENTAL TO THE WORK BEING PERFORMED***
N
REF JCT FS ROAD 45N08 RT
HAPPY CAMP BAER
SCOTT BAR ROAD BASE PACKAGE
45N77
MP 12.89 CONSTRUCT TYPE IV ROLLING
DIP RT.
MP 13.60
MP 14.40 REF 18"Ø CMP
INSTALL FLARED END SECTION
MP 14.55 REF 18"Ø CMP
INSTALL FLARED END SECTION
MP 14.95 INSTALL DROP INLET LID ONLY
MP 15.24 CONSTRUCT TYPE IV ROLLING
DIP RT.
REF JCT FS ROAD 45N77 LTMP 15.78
REF JCT 45N75 RT
PROJECT LIMIT
END RECONDITION DRAINAGE
STRUCTURES
END ROAD RECONDITIONING
MP 16.00
HAPPY CAMP BAER
SCOTT BAR ROAD BASE PACKAGE
46N64 EAST
FS 46N64 EAST
PROJECT LIMIT
REF JCT FS 46N64
BEGIN RECONDITION DRAINAGE
STRUCTURES
BEGIN ROAD RECONDITIONING
MP 0.00
N
N
REF TRAILHEAD
PROJECT LIMIT
END RECONDITION DRAINAGE
STRUCTURES
END ROAD RECONDITIONING
MP 5.53
REF JCT FS ROAD 45N90Y RTMP 2.84
MP 3.64 CONSTRUCT TYPE IV ROLLING
DIP RT.
MP 3.73 INSTALL DROP INLET LID
CONSTRUCT TYPE IV ROLLING
DIP RT.
MP 3.84 CONSTRUCT TYPE IV ROLLING
DIP RT.
MP 3.89 CONSTRUCT TYPE IV ROLLING
DIP RT.
MP 3.96 CONSTRUCT TYPE IV ROLLING
DIP RT.
MP 4.04 CONSTRUCT TYPE IV ROLLING
DIP RT.
MP 4.09 CONSTRUCT TYPE IV ROLLING
DIP RT.
MP 4.12 CONSTRUCT TYPE IV ROLLING
DIP RT.
MP 4.26 CONSTRUCT TYPE IV ROLLING
DIP RT.
MP 4.48 CONSTRUCT TYPE IV ROLLING
DIP RT.
MP 4.58 CONSTRUCT TYPE IV ROLLING
DIP RT.
MP 4.66 CONSTRUCT TYPE IV ROLLING
DIP RT.
MP 4.86 CONSTRUCT TYPE IV ROLLING
DIP RT.
MP 4.96 CONSTRUCT TYPE IV ROLLING
DIP RT.
MP 5.05 CONSTRUCT TYPE IV ROLLING
DIP RT.
MP 5.16 CONSTRUCT TYPE IV ROLLING
DIP RT.
MP 5.28 CONSTRUCT TYPE IV ROLLING
DIP RT.
MP 5.34 CONSTRUCT TYPE IV ROLLING
***AT THE CONTRACTOR'S DISCRETION, HAZARDOUS VEGETATION CAN BE BRUSHED/CLEAREDREMOVED BY THE CONTRACTOR IN ORDER TO PERFORM THE WORK. WORK ASSOCIATED W/ THIS VEGETATION SHALL BE INCIDENTAL TO THE WORK BEING PERFORMED***
FS 45N64
PROJECT LIMIT
REF FS 45N64
BEGIN RECONDITION
DRAINAGE STRUCTURES
BEGIN ROAD
RECONDITIONING
HAPPY CAMP BAER
SCOTT BAR ROAD BASE PACKAGE
45N65
MP 0.00
N
MP 1.63 CONSTRUCT TYPE IV ROLLING
DIP RT.
MP 3.17 CONSTRUCT TYPE IV ROLLING
DIP LT.
MP 4.09 REF 18"Ø CMP
INSTALL FLARED END SECTION
MP 3.91 REF 18"Ø CMP
INSTALL FLARED END SECTION
CONSTRUCT TYPE IV ROLLING
DIP RT.
N
N
MP 1.70 CONSTRUCT TYPE IV ROLLING
DIP RT.
MP 1.80 INSTALL DROP INLET LID
CONSTRUCT TYPE IV ROLLING
DIP RT.
MP 1.87 CONSTRUCT TYPE IV ROLLING
DIP RT.
MP 2.02 INSTALL DROP INLET LID
CONSTRUCT TYPE IV ROLLING
DIP RT.
MP 2.07 INSTALL DROP INLET LID
MP 2.24 CONSTRUCT TYPE IV ROLLING
DIP RT.
MP 2.31 CONSTRUCT TYPE IV ROLLING
DIP RT.
MP 2.48 CONSTRUCT TYPE IV ROLLING
DIP RT.
MP 2.59 CONSTRUCT TYPE IV ROLLING
DIP RT.
MP 2.68 CONSTRUCT TYPE IV ROLLING
DIP RT.
MP 3.32 CONSTRUCT TYPE IV ROLLING
DIP LT.
MP 3.44 CONSTRUCT TYPE IV ROLLING
DIP RT.
MP 3.78 INSTALL DROP INLET LID
MP 4.04 REF 18"Ø CMP
INSTALL FLARED END SECTION
CONSTRUCT TYPE IV ROLLING
DIP RT.
MP 4.39 CONSTRUCT TYPE IV ROLLING
DIP RT.
MP 4.64 CONSTRUCT TYPE IV ROLLING
DIP RT.
MP 4.75 CONSTRUCT TYPE IV ROLLING
DIP RT.
MP 4.93 CONSTRUCT TYPE IV ROLLING
DIP RT.
MP 4.99 CONSTRUCT TYPE IV ROLLING
DIP RT.
MP 5.11 CONSTRUCT TYPE IV ROLLING
DIP RT.
MP 5.24 CONSTRUCT TYPE IV ROLLING
DIP RT.
MP 5.70 CONSTRUCT TYPE IV ROLLING
DIP LT.
MP 5.97 CONSTRUCT TYPE IV ROLLING
***AT THE CONTRACTOR'S DISCRETION, HAZARDOUS VEGETATION CAN BE BRUSHED/CLEAREDREMOVED BY THE CONTRACTOR IN ORDER TO PERFORM THE WORK. WORK ASSOCIATED W/ THIS VEGETATION SHALL BE INCIDENTAL TO THE WORK BEING PERFORMED***
HAPPY CAMP BAER
SCOTT BAR ROAD BASE PACKAGE
45N65
N
MP 6.16 CONSTRUCT TYPE IV ROLLING
DIP RT.
MP 6.23 CONSTRUCT TYPE IV ROLLING
DIP RT.
MP 6.47 CONSTRUCT TYPE IV ROLLING
DIP RT.
MP 6.93 CONSTRUCT TYPE IV ROLLING
DIP RT.
MP 7.01 CONSTRUCT TYPE IV ROLLING
DIP RT.
MP 7.12 CONSTRUCT TYPE IV ROLLING
DIP RT.
REF PROJECT LIMIT
END RECONDITION DRAINAGE
STRUCTURES
END ROAD RECONDITIONING
MP 7.40
REF JCT FS ROAD 45N05Y LTMP 6.90
N
Y
FS 45N65
PROJECT LIMIT
REF FS 45N65
BEGIN RECONDITION
DRAINAGE STRUCTURES
BEGIN ROAD
RECONDITIONING
MP 0.00
HAPPY CAMP BAER
SCOTT BAR ROAD BASE PACKAGE
45N05Y
REF PROJECT LIMIT
END RECONDITION DRAINAGE
STRUCTURES
END ROAD RECONDITIONING
MP 0.90
MP 0.05 CONSTRUCT TYPE IV ROLLING
DIP LT.
MP 0.35 CONSTRUCT TYPE IV ROLLING
DIP LT.
MP 0.43 CONSTRUCT TYPE IV ROLLING
DIP LT.
MP 0.53 CONSTRUCT TYPE IV ROLLING
DIP LT.
HAPPY CAMP BAER
SCOTT BAR ROAD BASE PACKAGE
45N16
CTY ROAD 7F01
PROJECT LIMIT,
REF JCT COUNTY ROAD 7F01,
BEGIN RECONDITION DRAINAGE
STRUCTURES
BEGIN ROAD RECONDITIONING
ARCHEOLOGICAL MONITOR ZONE -
THE CONTRACTOR SHALL NOTIFY
THE FOREST SERVICE AT LEAST 3
BUSINESS DAYS PRIOR TO DOING
ANY WORK ON THIS ROAD
MP 0.00
N
N
MP 0.12 CONSTRUCT TYPE IV ROLLING
DIP RT.
MP 0.18 CONSTRUCT TYPE IV ROLLING
DIP RT.
MP 0.22 CONSTRUCT TYPE IV ROLLING
DIP RT.
MP 0.24 REF 24"Ø CMP
INSTALL FLARED END SECTION
MP 0.42 CONSTRUCT TYPE IV ROLLING
DIP LT.
MP 0.43 REF 36"Ø CMP
INSTALL FLARED END SECTION
MP 1.11 CONSTRUCT TYPE IV ROLLING
DIP LT.
MP 1.45 CONSTRUCT TYPE IV
ROLLING DIP RT.
MP 1.54 CONSTRUCT TYPE IV
ROLLING DIP RT.
MP 1.96 CONSTRUCT TYPE IV
ROLLING DIP RT.
MP 1.88 REF ARCH PIPE
CONSTRUCT TYPE IV
ROLLING DIP RT.
MP 2.00
REF PROJECT LIMIT
END RECONDITION
DRAINAGE STRUCTURES
END ROAD
RECONDITIONING
***AT THE CONTRACTOR'S DISCRETION, HAZARDOUS VEGETATION CAN BE BRUSHED/CLEAREDREMOVED BY THE CONTRACTOR IN ORDER TO PERFORM THE WORK. WORK ASSOCIATED W/ THIS VEGETATION SHALL BE INCIDENTAL TO THE WORK BEING PERFORMED***
N
MP 1.19 CONSTRUCT TYPE IV ROLLING
DIP LT.
MP 1.33 CONSTRUCT TYPE IV ROLLING
DIP LT.
MP 1.39 REF JCT FS ROAD 45N16B LT
MP 1.38 CONSTRUCT TYPE IV ROLLING
DIP LT.
MP 1.48 CONSTRUCT TYPE IV
ROLLING DIP RT.
MP 1.51 CONSTRUCT TYPE IV
ROLLING DIP RT.
MP 1.85 CONSTRUCT TYPE IV
ROLLING DIP RT.
MP 1.83 CONSTRUCT TYPE IV
ROLLING DIP RT.
MP 1.80 CONSTRUCT TYPE IV
ROLLING DIP RT.
MP 1.75 CONSTRUCT TYPE IV
ROLLING DIP RT.
MP 1.68 CONSTRUCT TYPE IV
ROLLING DIP RT.
MP 1.62 CONSTRUCT TYPE IV
ROLLING DIP RT.
MP 1.58 CONSTRUCT TYPE IV
ROLLING DIP RT.
MP 1.93 CONSTRUCT TYPE IV
ROLLING DIP RT.
N
FS 44N44
PROJECT LIMIT
REF JCT 44N44
BOX CAMP SADDLE
MP 0.00
HAPPY CAMP BAER
SCOTT BAR ROAD BASE PACKAGE
OPTION #1 44N45
REF PROJECT LIMIT
END RECONDITION DRAINAGE
STRUCTURES
END ROAD RECONDITIONING
MP 5.44
N
FS 44N45C
PROJECT LIMIT
REF FS 44N45
BEGIN RECONDITION
DRAINAGE STRUCTURES
BEGIN ROAD
RECONDITIONING
MP 0.00
HAPPY CAMP BAER
SCOTT BAR ROAD BASE PACKAGE
OPTION #2 44N45C
REF PROJECT LIMIT
END RECONDITION DRAINAGE
STRUCTURES
END ROAD RECONDITIONING
MP 1.01
MP 5.15 CONSTRUCT TYPE IV ROLLING
DIP RT.
MP 5.23 CONSTRUCT TYPE IV ROLLING
DIP RT.
BEGIN RECONDITION
DRAINAGE STRUCTURES
BEGIN ROAD
RECONDITIONING
MP 4.99
MP 0.37 CONSTRUCT TYPE IV ROLLING
DIP RT.
MP 0.47 CONSTRUCT TYPE IV ROLLING
DIP RT.
MP 0.53 CONSTRUCT TYPE IV ROLLING
DIP RT.
MP 0.60 CONSTRUCT TYPE IV ROLLING
DIP RT.
MP 0.65 CONSTRUCT TYPE IV ROLLING
DIP RT.
MP 0.83 CONSTRUCT TYPE IV ROLLING
DIP RT.
MP 0.95 CONSTRUCT TYPE IV ROLLING
DIP RT.
MP 1.00 CONSTRUCT TYPE IV ROLLING
DIP RT.
MP 0.89 CONSTRUCT TYPE IV ROLLING
***AT THE CONTRACTOR'S DISCRETION, HAZARDOUS VEGETATION CAN BE BRUSHED/CLEAREDREMOVED BY THE CONTRACTOR IN ORDER TO PERFORM THE WORK. WORK ASSOCIATED W/ THIS VEGETATION SHALL BE INCIDENTAL TO THE WORK BEING PERFORMED***
44N45 5.15 3010 CONSTRUCT TYPE IV ROLLING DIP
44N45 5.23 3010 CONSTRUCT TYPE IV ROLLING DIP
METAL PIPE, PIPE ARCHES OR ARCHES
SECTION 602 OR 605 604 605 621 251
C O
R R
U G
A T
I O
N S
Ø
C M P
Ø
C M P
Ø
C M P
E L
B O
W
B R
A N
N
N
E N
D
S
E C
T I O
N
I N
L E
T
R
I S
E R
P I P
E
I N
L E
T
P R
E F
A B
R I C
A T
A
I N
S F
G R
A N
U L
L
L E
R
M A
T E
R I A
L
C
Y
I N
C H
I N
C H
I N
C H
I N
C H
A N
C H
A
K E
G E
O T
E X
T I L
E
SIZE
Ø
C M P
Ø
C M P
Ø
C M P
Ø
C M P
D E
B R
C
K
T
Y P
E
TYPE
PREFAB DRAIN
CORR. METAL SPILLWAY RIPRAP
REMARKS
VIII V III SY
SITE
MILE POST
ROAD NO.
NOTES:
1. QUANTITIES ON THIS SHEET ARE BASED ON
DESIGN DATA ONLY & ARE SUBJECT TO
ADJUSTMENTS BEFORE & DURING
CONSTRUCTION TO SUIT FIELD CONDITIONS.
ABBREVIATIONS:
Al = ALUMINUM ALLOY Fe = GALVANIZED STEEL CMP = CORRUGATED METAL PIPE
SPP = STRUCTURAL PLATE PIPE SPPA = STRUCTURAL PLATE PIPE ARCH SPA = STRUCTURAL PLATE ARCH
PP = PERFORATED PIPE CMPA = CORRUGATED METAL PIPE ARCH CSBC = CORRUGATED STEEL BOX CULVERT
SIZE TYPE NO TYPE
CU. YDS.
C L
A S
S
C L
A S
S
C L
A S
S
I N
L E
T
A S
S E
M B
L Y
FLUME OUTLET
PIPE
Ø
C M P
Ø
C M P
Ø
C M P
Ø
C M P
44N45C 0.37 3010 CONSTRUCT TYPE IV ROLLING DIP
44N45C 0.47 3010 CONSTRUCT TYPE IV ROLLING DIP
44N45C 0.53 3010 CONSTRUCT TYPE IV ROLLING DIP
44N45C 0.60 3010 CONSTRUCT TYPE IV ROLLING DIP
44N45C 0.65 3010 CONSTRUCT TYPE IV ROLLING DIP
44N45C 0.83 3010 CONSTRUCT TYPE IV ROLLING DIP
44N45C 0.89 3010 CONSTRUCT TYPE IV ROLLING DIP
44N45C 0.95 3010 CONSTRUCT TYPE IV ROLLING DIP
44N45C 1.00 3010 CONSTRUCT TYPE IV ROLLING DIP