Updated Schedule of Items.pdf

PDF 63 KB Posted

Attached to
South Fork Sacramento Stornproofing Federal contract opportunity
Solicitation number
AG-9AC7-S-11-0064
Issued by
Department of Agriculture Forest Service R5-Pacific Southwest Region

About this file

Updated Schedule of Items

View the file

Other files for this federal contract opportunity

Other files attached to South Fork Sacramento Stornproofing, newest first.
File Type Posted
CA9_Revison 28 dated 08122011.pdf PDF
SF30.pdf PDF
SF30 Amendment 1.pdf PDF
CA9_Revision 27 dated 08052011.pdf PDF
updated complete drawings.pdf PDF
complete drawing.pdf PDF
June2006_PAL Fire Plan.pdf PDF
SF 24 Bid Bond.pdf PDF
CA9_Version 26 dated072911.pdf PDF
AG-9AC7-S-11-0064.pdf PDF
C7. Special Project Specifications.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

South Fork Sacramento Stormproofing Shasta-Trinity National Forest Solicitation: AG-9AC7-S-11-0064 Page 1 of 2

SOUTH FORK SACRAMENTO STORMPROOFING

Mount Shasta District

Shasta-Trinity National Forest Siskiyou County

B-1 - Schedule of Items

Item No. Desc. Unit Qty Unit Price Total

BASE BID

151 Mobilization Job 1

157 Soil Erosion Control LS 1

204.01 Excavation and Embankment Rolling dip EA 60

204.02 Excavation and Embankment Rolling dip with class 3 rip rap dissipator EA 11

204.03

Excavation and Embankment Rocked critical dip with class 3 rip rap dissipator EA 7

204.04 Excavation and Embankment Ditch construction LF 245

204.05 Excavation and Embankment Berm removal LF 350

Riprap placed CY 19

Aggregate surface course, CalTrans Class II, 6" depth, compaction by 204.11(a) TON 822

303.01 Road Reconditioning Ditches LF 535

303.02 Road Reconditioning Compaction by 204.11(a) SY 3030

Culverts and Drains 24" diameter CMP, Approx 25' length LF 25

Cleaning Reconditioning and Repairing Existing Drainage Structures Culverts EA 17

Paved Waterways Placed Riprap Waterway (Type 6) EA 3

802 Through Cut fill LS 1

BASE BID TOTAL

South Fork Sacramento Stormproofing Shasta-Trinity National Forest Solicitation: AG-9AC7-S-11-0064 Page 2 of 2

OPTION A

204.01 Excavation, rolling dip EA 14

204.03 Excavation, rocked critical dip with class 3 rip rap dissipator EA 1

204.05 Excavation, berm removal LF 100

Aggregate surface course, CalTrans Class II, 6" depth, compaction by 204.11(a) TON 55

303.02 Road reconditioning, compaction by 204.11(a) SY 1600

Culverts, 24" diameter CMP, Approx 40' length LF 40

607 Cleaning drainage structures, culverts EA 2

OPTION A TOTAL

OPTION B

204.01 Excavation, rolling dip EA 34

204.02 Excavation, rolling dip with class 3 rip rap dissipator EA 1

204.03 Excavation, rocked critical dip with class 3 rip rap dissipator EA 1

Aggregate surface course, CalTrans Class II, 6" depth, compaction by 204.11(a) TON 210

303.01 Road reconditioning, ditches LF 250

303.02 Road reconditioning, compaction by 204.11(a) SY 890

607 Cleaning drainage structures, culverts EA 3

OPTION B TOTAL

OPTION C

801 Concrete Ford LS 1

OPTION D

803 Turnpike construction LS 1

OPTION E

602 Culverts, 24" diameter CMP, 30' length LF 30

B2 – NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 Mobilization.

Payment will be made on actual work performed as described in FP-03 109.01 unless otherwise noted.