Specifications
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment Two.pdf | ||
| Amendment One.pdf | ||
| Return Package.pdf | ||
| Solicitation.pdf | ||
| Fire Plan.pdf | ||
| Drawing.pdf | ||
| Davis Bacon Wages.pdf | ||
| Caribou Trail Signs Requisition.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contract Specifications for
CARIBOU WILDERNESS TRAIL
RESTORATION
ALMANOR RANGER DISTRICT
LASSEN NATIONAL FOREST
Table of Contents
Section Page
General Specifications
901 Abbreviations, Acronyms, and Terms 3
902 Definitions 5
903 Intent of Contract 8
904 Maintenance for Traffic 9
905 Control of Materials 10
906 Measurement and Payment 11
907 Quality Assurance and Quantity Measurement 13
908 Staking, Flagging, and Cleanup 14
Construction Specifications
911 Clearing and Grubbing 15
912 Excavation and Embankment 17
914 Switchbacks 19
915 Existing Trail Restoration 20
922 Waterbars 22
923 Rock Spillways 24
926 Herringbone Water Dispersion Structure 25
935 Rock Retaining Walls 26
Incidental Construction
951 Mobilization 27
952 Sign, Post, and Cairn Installation 28
953 Barriers 30
954 Obliteration of Abandoned Trailways 31
955 Seeding and Mulching 32
Materials
961 Rock, Grid Pavement Units, and Aggregate 34
962 Material for Timber Structures 36
Maintenance Specifications
981 Brush Cutting 37
982 Logging Out 38
983 Danger Tree Removal 39
984 Loose Rock Removal 40
985 Rock and Root Removal 41
986 Borrow 42
991 Drainage Maintenance 43
Section 900
General Specifications
Section 901
Abbreviations, Acronyms, and Terms
901.01 Terms, Organizations, and Standards
(a) Specification Terms. These specifications are generally written in the imperative mood. In sentences using the imperative mood, the subject "the Contractor," is implied. Also implied in this language is "shall," "shall be," or similar words or phrases. In material specifications, the subject may also be the supplier, fabricator, or manufacturer supplying material, products, or equipment for use on the project:
Wherever "directed," "required," "prescribed," or similar words are used, the "direction," "requirement," or "order" of the CO is intended. Similarly, wherever "approved," "acceptable," suitable," "satisfactory," or similar words are used, they mean "approved by," "acceptable to," or "satisfactory to" the CO.
The word "will" generally pertains to decisions or actions of the CO.
Whenever in these .specifications, or in other contract documents, the following terms (or pronouns in place of them) are used, the intent and meaning shall be interpreted as follows: reference to a specific standard, test, testing method, or specification shall mean the latest published edition or amendment that is in effect at the solicitation issue date for the public works contracts.
(b) Abbreviations and Acronyms
AASHTO American Association of State Highway and Transportation Officials ABS Acrylonitrile- Butadiene-Styrene AQ Actual Quantities APA American Plywood Association ASTM American Society for Testing and Material AWPA American Wood Preservers Association
C.F. Cubic Feet
CO Contracting Officer
C.Y Cubic Yards
DQ Design Quantities
EA Each f () feet
HDPE High-Density Polyethylene gal gallon hr hour in (") inches lb pounds
L.F. Linear Feet LS Lump Sum LSQ Lump Sum Quantities mi miles NBS National Bureau of Standards NCMA National Concrete Masonry Association PE polyethylene
PS Product Standard issued by the U.S. Department of Commerce
PVC polyvinyl chloride
S.F. square feet
SQ Staked Quantifies
S.Y Square Yards
WCLIB West Coast Lumber Inspection Bureau
WWPA Western Wood Products Association
(c) Slope notation (horizontal: vertical).
Section 902
Definitions
When the following terms, or pronouns in place of them, are used in these specifications or in other contract documents, the intent and meaning are as follows:
Base Course. The layer or layers of specified material of designed thickness placed on a trailbed to support surfacing.
Batter. A backward and upward slope of the face of a wall.
Berm. The ridge of material formed on the outer edge of the trail that projects higher than the tread.
Borrow. Suitable materials taken from approved sources designated on the drawings or on the ground, to be used for embankments and backfilling.
Bridge. A structure, including supports, erected over a depression or stream, and having a deck for carry traffic.
Cap Rock Rock placed in the top or uppermost layer in a constructed rock structure, such as a talus or rubble rock section or rock retaining wall.
Catch Point. The outer limits of a trailway where the excavation and/or embankment intersect with the ground line.
Clearing Limit. The area over and beside the trail that is cleared of trees, limbs, and other obstructions.
Climbing Tern. A reverse in direction of trail grade without a level landing used to change elevation on a steep slope.
Compacted. Consolidation that is obtained by tamping or rolling suitable material until no noticeable displacement of material is observed.
Contracting Officer (CO).
An official of the Government with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings. The term includes certain authorized representatives of the CO acting within the limits of their authority as delegated by the CO.
Culvert. A drainage structure composed of rock, metal, or wood that is placed approximately perpendicular to and under the trailway.
Cushion Material.
Native or imported .material, generally placed over rocky section of unsurfaced trail. to provide a usable and maintained traveled way.
Danger Tree. An unstable tree 5" or greater in diameter at breast height that is likely to fall across the trail.
Designated on the Ground.
The location of materials, work areas, and construction items, including lines and grades, marked on the ground with stakes, flagging, tags, or paint.
Drawings. Documents showing details for construction of a facility, including but not limited to straight-line diagrams, trail logs, standard drawings, construction logs, plan and profile sheets, cross-sections, diagrams, layouts, schematics, descriptive literature, and similar materials.
Duff. Organic material overlying rock or mineral soil.
Embankment. A structure of suitable material placed on the prepared ground surface and constructed to the trailbed elevation.
Excess Excavation.
Material in the trailway in excess of that needed for construction of designed trailways.
Ford. A water-level stream crossing constructed to provide a level surface for safe traffic passage.
Full Bench. Trailbed constructed entirely on undisturbed material.
Grade. The vertical distance of ascent or descent of the trail expressed as a percentage of the horizontal distance.
Header Rock. Rock laid with the narrow end towards the face of the wall.
Inslope. Where the trail tread is sloped downward toward the backslope.
Mineral Soil. Soil or aggregate that is free from organic substances and contains no particles larger than 2" at their greatest dimension.
Outslope. Where the trail tread is sloped downward toward the embankment or daylight side of the trailway.
Sideslope. The natural slope of the ground, usually expressed as a percentage.
Slough. That material from the backslope or the area of the backslope that has raveled onto the trailbed
Slump. Where the trailbed material has moved downward, causing a dip in the trail grade.
Special Project Specification.
Specifications that detail the conditions and requirements peculiar to an individual project, including additions and revisions to the standard specifications.
Surfacing. Material placed on top of the trailbed or base course that provides the desired tread.
Suitable Material.
Rock that can be accommodated in the trail structure, and soil free of duff with a recognizable granular texture.
Switchback. A reverse in direction of trail grade with a level landing used to change elevation on a steep slope, usually involving special treatment of the approaches, barriers, and drainages.
Trailbed. The finished surface on which base course or surfacing may be constructed. For trails without surfacing the trailbed is the tread.
Trailway. The portion of the trail within the limits of the excavation and embankment.
Tread. The surface portion of the trail upon which traffic moves.
Turnout. A short section of extra trail width to provide for passage of trail users.
Waterbar. A structure used for turning water off the trail, usually made of logs or stones.
Water Courses. Any natural or constructed channel where water naturally flows or will collect and flow during spring runoff, rainstorms, etc.
Section 903
Intent of Contract
903.01 Intent. The intent is to provide for the completion of the project described in the contract. Furnish all labor, materials, equipment, tools, transportation, and supplies and perform all work required to complete the project in accordance with drawings, specifications, and provisions of the contract.
Section 904
Maintenance for Traffic
904.01 General. Keep existing trails that are undergoing improvements open and maintained in such a condition as to safely accommodate traffic. Provide and maintain temporary detours, approaches, or crossings and intersections with trails, roads, businesses, parking lots, and campgrounds in a safe and passable condition. Perform no work that interferes or conflicts with traffic until a plan for handling traffic has been submitted and approved. Specific requirements for detours or closures are SHOWN ON THE DRAWINGS or in the SPECIAL PROJECT SPECIFICATIONS.
Before any suspension of work take precautions necessary to prevent damage to the project, such as temporary detours, approaches, crossings, or intersections, and make provisions for normal drainage and to minimize erosion. Leave all trailways in a condition suitable for traffic unless otherwise specified.
The Government may permit use of portions of the project during periods when operations are shut down.
All maintenance attributable to permitted use during periods of work suspension will be provided by the Government. The contractor is responsible for any maintenance that is not attributable to use or that is necessary during suspensions resulting from fault or negligence of the contractor.
Section 905
Control of Materials
905.01 Handling Materials. Transport and handle all materials to preserve their quality and fitness for the work Stockpile, load, and transport aggregates in a manner that will preserve specified gradation and avoid contamination.
Store materials to assure the preservation of their quality and fitness for the work Locate stored materials to facilitate their prompt inspection. Sites on Government-administered land that are not already designated may be. used for storage purposes and for placing of equipment only when approved in advance by the CO. Restore all storage sites in accordance with requirements SHOWN ON THE DRAWINGS or as otherwise specified. Arrangements for storage on other than designated sites are the responsibility of the contractor.
905.02 Material Sources
(a) Designated Sources. Sources for materials such as, but not limited to, soil, rock, or logs that are not available from trailway excavation or clearing operations will be designated. Sources of local materials designated in the SPECIAL PROJECT SPECIFICATIONS or SHOWN ON THE DRAWINGS are guaranteed by the Government for the quality and quantity of material in the source.
Use all needed suitable material from the source. The designation of a source includes the right to use areas SHOWN ON THE DRAWINGS for the purposes designated (such as plant sites, stockpiles, haul roads). Operations are restricted to the confines of the area(s) designated.
(b) Contractor-Furnished Sources. Furnish material that produces an end product equivalent in performance to that specified.
905.03 Restoration. Shape and grade borrow areas on Government-administered land to make them stable and to minimize future erosion. Dispose of debris resulting from development of material sources by scattering, unless otherwise specified. Do not scatter debris within the clearing limits of trails or within roadsides. Cut off stumps to less than 1' above the ground as measured on the uphill side of the stump.
Section 906
Measurement and Payment
906.01 General. Measurement and payment for contract work will be made only for and under those pay items included in the SCHEDULE OF ITEMS. All other work and materials will be considered incidental and included in the payment of the PAY ITEMS in the SCHEDULE OF ITEMS.
When more than one class, size, or thickness is specified in the SCHEDULE OF ITEMS for any PAY ITEM, suffixes will be added to the item number to differentiate between the items.
906.02 Determination of Quantities. The following measurements and calculations are to be used to determine contract quantities for payment:
Make measurements for seeding, geotextiles, and erosion control blankets along slope lines.
For retaining walls, measure by the square meter of front wall face.
Measure structures according to neat lines SHOWN ON THE DRAWINGS or as altered by the CO in writing to fit field conditions. Make measurements along the centerline and parallel to the specified grade or foundation or as SHOWN ON THE DRAWINGS.
Deduct lengths for stairways, turnpike, puncheon, retaining walls, wire baskets, switchbacks, bridges, and bridge approaches from the measurement of excavation in Section 912 unless these items are specified as incidental to excavation in Section 912.
For standard manufactured items, such as fence, wire, plates, rolled shapes, and pipe conduits identified by gage, weight, section dimensions, and the like, such identification shall be considered the nominal weights or dimensions. Manufacturer's tolerances will be accepted unless controlled by tolerances in the cited specifications.
906.03 Units of Measurement. Payment will be made by units defined and determined according to standard metric measure and by the following:
(a) Cubic Yard. A measurement computed by one of the following methods:
(1) Excavation, embankment, or borrow. The measurement computed by the average-end-area method from measurements made longitudinally along a centerline or other reference line.
(2) Material in place or stockpiled the measurement computed with the dimensions of the in place material using average-end-area method or prismodial formula.
(3) Material in the Delivery Vehicle. The measurement computed using measurements of material in the hauling vehicles at the point of delivery. Vehicles shall be loaded to at least their water-level capacity.
Leveling of the loads may be required when vehicles arrive at the delivery point.
(b) Each (EA). One complete unit, which may consist of one or more parts.
(c) Lump Sum (LS). The quantities that denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job.
906.04 Methods of Measurement. One of the following methods of measurement for determining final payment is DESIGNATED ON THE SCHEDULE OF ITEMS for each PAY ITEM:
(a) Designed Quantities. These quantities denote the final number of units to be paid for under the terms of the contract. They are based upon the original design data available prior to advertising the project.
Original design data include the preliminary survey information, design assumptions, calculations, and drawings. Changes in the number of units DESIGNATED IN THE SCHEDULE OF ITEMS may be authorized under the following conditions:
(1) As a result of changes in the work approved by the CO.
(2) As a result of the CO determining that errors exist in the original design that cause a PAY ITEM quantity to change by 15 percent or more.
(3) As a result of the contractor submitting to the CO a written request showing evidence of errors in the original design that cause a PAY ITEM quantity to change by 15 percent or more. The evidence must be verifiable and consist of calculations, drawings, or other data that show how the designed quantity is believed to be in error.
(b) Staked Quantities (SQ). These quantities are determined from staked measurements prior to the construction.
(c) Actual Quantities (AQ). These quantities are determined from measurement of completed work.
(d) Vehicle Quantities. These quantities are measured or weighed in hauling vehicles:
(e) Lump Sum Quantities (LSQ). These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job.
906.05 Government-Furnished Materials. When materials are furnished by the Forest
Service, the note "Government-Furnished Materials" will be added to the description of the PAY ITEM.
Section 907
Quality Assurance and Quantity Measurement
Description
907.01 Work. Work consists of providing certification that the quality and quantity of construction conform to the drawings, specifications, and requirements of the contract.
Construction
907.02 Certification and Measurements
(a) Offsite-Produced Materials. Furnish signed certificates executed by the manufacturer, supplier, or vendor, stipulating that all offsite-produced materials incorporated in the work meet applicable requirements SHOWN ON THE DRAWINGS or stated in the specifications. Furnish a certificate for each commodity or invoice.
(b) Quantity Measurements. Submit quantities to the CO for periodic progress payments, and the CO will compute payments. Quantities are subject to verification.
907.03 Records. Maintain a set of contract drawings depicting as-built conditions resulting from approved changes. Maintain the drawings in a current condition and indicate changes from the original contract drawings in red. Give the drawings to the CO upon the completion of the contract work.
Measurement
907.04 Method. There will be no separate measurement for this item.
Payment (Special Project Specification)
907.05 Basis. Payment will be considered incidental to other pay items in this contract.
Section 908
Staking, Flagging, and Cleanup
Description
908.01 Work. This work consists of establishing any control points needed in addition to existing staking, and removing and disposing of all construction stakes, tags, flagging, and plastic ribbon from the project area.
Construction
908.02 General. The Government will set initial construction stakes or flagging, and control points, and furnish the contractor with all necessary information relating to lines, slopes, and grades. These stakes and flagging constitute the field control.
Furnish and maintain all additional stakes, flagging, templates, batter boards, and other materials and supplies necessary for marking and maintaining points and lines established. Do not perform work in the absence of control points. If any-construction control points are destroyed, displaced, or erroneous, notify the CO. Uniformly contour alignment and construct grade from control point to control point.
Remove all construction stakes, tags, flagging, and plastic ribbon from the project area within 7 days after the final inspection of all other work on the project. Dispose of all stakes, tags, flagging, and plastic ribbon off Government-administered lands unless otherwise designated.
Measurement
908.03 Method. There will be no separate measurement for this item.
Payment (Special Project Specification)
908.04 Basis. Trail staking, flagging and cleanup will be considered incidental to other pay items in this contract, and additional payment will not be made.
Section 911
Clearing and Grubbing
Description
911.01 Work. Work consists of clearing, grubbing, trimming, removing, and treating trees, logs, limbs, branches, brush, plants, and other vegetation within the clearing limits. Work includes the felling and treatment of designated trees outside the clearing limits. Also included are the protection from injury or defacement of trees and other objects not designated for removal and the treatment of damaged trees.
Construction
911.02 Clearing Limits. Clear to the dimensions SHOWN ON THE DRAWINGS or 12" beyond the fill and backslope catch points, whichever is greater.
911.03 Material to Be Cleared. Remove and dispose of trees, logs, limbs, branches, brush, herbaceous plants, and other vegetation within the clearing limits, except for the following:
a) Live, sound, and firmly rooted trees of the size SHOWN ON THE DRAWINGS.
b) Live brush, herbaceous plants, and trees between the trailway and the clearing limits that are less than 12" in height and less than 1/3" in diameter at ground line.
Except as provided above, cut all limbs and branches more than 1/2" in diameter that extend into the clearing limits. Cut limbs flush with the tree trunks or stems or cut at the ground surface as SHOWN ON
THE DRAWINGS.
Fall and limb designated trees.
911.04 Damaged trees. When felling, cutting, or trimming, do not cause bark damage to standing timber.
If damage does occur to standing trees, treat the injured trees as SHOWN ON THE DRAWINGS.
Remove and dispose of trees with major roots exposed by construction that are rendered unstable.
911.05 Removal of Stumps. Remove all stumps within the trailbed. Remove stumps located between the edge of the trailbed and the edge of the tramway that cannot be cut flush with the finished slope or that are not tightly rooted.
911.06 Disposal of Clearing Slash, Logs, Stumps, Brush, and Roots. Limb all felled trees to a 4" diameter top, including designated trees outside the clearing limits.
Do not place clearing slash, logs, stumps, brush, or roots in concentrated piles. Scatter all logs, limbs, lopped tops, brush, and grubbed stumps and roots below the trailway and outside the clearing limits, with the following exceptions:
(a) Where the sideslope above the trail is less than 10 percent, material may be scattered above the trail.
(b) Logs may be left on the uphill side of the trail if they are placed so that they will not move into the clearing limits.
Do not place clearing and grubbing debris in water courses, snow ponds, lakes, meadows, or in locations where it could impede the flows to, through, or from drainage structures.
Measurement
911.07 Method. Measure the quantities in accordance with Section 906.
Payment
911.08 Basis.
Pay for the accepted quantities in accordance with Section 906 at the contract unit price for each PAY ITEM SHOWN IN THE SCHEDULE OF ITEMS. Make payment under:
PAY ITEM PAY UNIT
911(02) Clearing and Grubbing.................................................. L.F.
Section 912
Excavation and Embankment
Description
912.01 Work. Work consists of the excavation and placement of excavated material, regardless of its nature, from within the trailway or from other sources, except for material included under other pay items
SHOWN IN THE SCHEDULE OF ITEMS.
Includes excavation, embankment, and backfill construction required to shape and finish the trailbed, ditches, backslopes, fill slopes, drainage dips, trail passing sections, and turnouts. Also includes excavation and embankment work required to construct shallow stream fords and gully crossings, talus and rubble rock sections, and climbing turns.
Materials
912.02 Requirements. Use materials meeting the requirements of the following sections:
961 - Rock, Grid Pavement Units, and Aggregate
962 - Material for Timber Structures 964 - Geo synthetics
Construction
912.03 Use and Disposal of Excavated Material. Conserve and use all suitable material for specified work Conserve excess excavated rock suitable for specified project work and use in place of materials from designated sources.
Remove all duff and debris from within trailway limits and uniformly spread outside the clearing limits, not more than 4" in depth (unless otherwise SHOWN ON THE DRAWINGS). Do not obstruct drainage or create piles, berms, or windrows of debris.
Place excess and unsuitable excavation beyond the downslope edge of the trailbed Do not obstruct drainage and spread to a depth not exceeding 4". This includes any material removed in the grubbing operation and deposited in the same area.
Place rocks over 4" in greatest dimension not used in construction beyond the hinge point on the downslope side. Place rocks so that the tops are at least 6" lower than the trailbed surface. Ensure that no blockage of drainage or creation of a windrow effect occurs.
912.04 Trailway Excavation and Embankment. Minor deviations of f 12" in vertical alignment and 36" in horizontal alignment with smooth transitions of at least 30' on each side of the deviation are acceptable unless otherwise SHOWN ON THE DRAWINGS.
Construct embankments with suitable compacted material. Compact all disturbed soil within the trailbed area.
Remove any rock within or above the backslopes that is unstable. Use or dispose of rock in accordance with Subsection 912.03.
Leave the finished slope in a uniform and roughened condition.
Make necessary adjustments of horizontal or vertical alignment, within the tolerances specified in this subsection, to produce the designed trailway section and balance earthwork. Such adjustments shall not be considered as changes.
912.05 Trailbed Finish. Fill holes with suitable material, compact, and cut high points to provide a uniform trailbed finish.
912.06 Talus or Rubble Rock Sections. Through talus or rubble rock slide areas, fill all voids with suitable material to the depth SHOWN ON THE DRAWINGS. Use cap rocks that weigh a minimum of 130 lbs and have a length of at least twice their width. At least 50 percent of all hand placed outer rocks should weigh a minimum of 1301bs. Construct tread by building out rather than by removing material from the inner bank.
912.07 Ditches. Construct ditches to be free of loose rocks, roots, sticks, and other obstructions.
912.08 Geosynthetics. Where SHOWN ON THE DRAWINGS, place geosynthetics flat and parallel to centerline of the trail before placing embankment. Overlap geosynthetics a minimum of 24". Install anchors or fasteners as recommended by the geosynthetic manufacturer.
Measurement
912.09 Method. Measure the quantities in accordance with Section 906.
Payment (Special Project Specification)
912.10 Basis. Pay for the accepted quantities in accordance with Section 906 at the contract unit price for each PAY ITEM SHOWN IN THE SCHEDULE OF ITEMS. Material borrow will be considered incidental to other pay items in this contract, and additional payment will not be made.
Make payment under: PAY ITEM
PAY UNIT
912(01) Excavation....................................................................................................................... L.F.
912(08) Shallow Stream Ford and Gully Crossing Structure........................................................ LS
Section 914
Switchbacks Description
914.01 Work consists of construction of switchbacks, including excavation, associated barriers, ditches, retaining walls, and approach sections.
Materials
914.02 Requirements. Use materials meeting the requirements of the following sections:
961 - Rock, Grid Pavement Units, and Aggregate 962 - Material for Timber Structures Construction
914.03 Excavation and Embankment. Perform excavation and embankment in accordance with Section 912.
914.04 Retaining Walls. When SHOWN ON THE DRAWINGS, construct retaining walls in accordance with Section 934 or Section 935.
914.05 Barriers. When SHOWN ON THE DRAWINGS, construct barriers at each switchback in accordance with Section 953.
914.06 Ditches. When SHOWN ON THE DRAWINGS, construct ditches in accordance with Section 912.07.
914.07 Limits of Switchback Beginning and ending of switchback will be as SHOWN ON THE DRAWING or as DESIGNATED ON THE GROUND.
Measurement
914.08 Method. Measure the quantities in accordance with Section 906.
Payment (Special Project Specification)
914.09 Basis. Pay for the accepted quantities in accordance with Section 906 at the contract unit price for each PAY ITEM SHOWN IN THE SCHEDULE OF ITEMS. Materials borrow, ditch & retaining walls will be considered incidental to other pay items in this contract, and additional payment will not be made.
Make payment under:
914(01) Switchback............................. Ea
Section 915
Existing Trail Restoration Description
915.01 Work consists of restoring the original trail template, including clearing, removing slough and berm, borrow, filling ruts and troughs, reshaping backslopes, excavation, reshaping trail tread, restoring drainage and other trail structures, constructing check dams, and removing protruding rocks, roots, stumps, slough, and berets.
Materials
915.02 Requirements. Use materials meeting the requirements of the following sections:
961 - Rock, Grid Pavement Units, and Aggregate 962 - Material for Timber Structures Construction
915.03 Clearing and Grubbing. Clear and grub in accordance with the requirements of Section 911 and as SHOWN ON THE DRAWINGS.
915.04 Excavation and Embankment. Excavate and place all excavated material in accordance with the requirements of Section 912 and as SHOWN ON THE DRAWINGS.
915.05 Rock and Root Removal. Uniformly scatter the removed rocks and roots below the trailway and distribute to ensure no blockage of watercourses or creation of a windrow. Fill holes with suitable material and compact.
915.06 Slough and Berm Removal and Excess Material. Use suitable slough and beret material within the trailway to restore the trailbed as SHOWN ON THE DRAWINGS. Place all unsuitable and excess material beyond the downslope edge of the trailbed and uniformly spread to a depth not exceeding 4" and so as not to obstruct drainage or interfere with the drainage of outsloped tread.
Remove berm when daylight can be obtained within a distance of 5' from the outslope edge of finished tread unless otherwise DESIGNATED ON THE GROUND or SHOWN ON THE DRAWINGS.
915.07 Fill Material and Borrow. Use suitable material to fill ruts, troughs, and potholes in the tread that cannot be leveled and outsloped through performance of work in Subsection 915.06. Compact and shape as SHOWN ON THE DRAWINGS.
Obtain borrow from areas SHOWN ON THE DRAWINGS or DESIGNATED ON THE GROUND.
915.08 Drainage. Restore drainage dips and ditches to reestablish drainage as SHOWN ON
THE DRAWINGS by removing obstructions such as rocks, roots, and sticks to make ditches and culverts free draining.
Restore rock spillways in accordance with Section 923 and as SHOWN ON THE DRAWINGS.
915.09 Stream Channel Cleaning. Clean channel of obstructions in areas SHOWN ON THE DRAWINGS.
Remove debris and rocks from the stream channel and scatter outside of the side slopes of the stream channel and beyond the clearing limits.
915.10 Check Dams. When constructing check dams for gullies, use dimensional lumber, sound peeled logs, or a row of stones placed across the gully in the subgrade with the ends securely embedded in the banks as SHOWN ON THE DRAWINGS and at locations STAKED ON THE GROUND.
Use suitable material for backfill as SHOWN ON THE DRAWINGS. Place and compact backfill to meet the density of the existing trailbed and to form a smooth tread.
915.11 Switchbacks. Restore switchbacks in accordance with Section 914 and as SHOWN ONTHE
DRAWINGS.
915.12 Waterbars. Restore waterbars in accordance with Section 922 and as SHOWN ON THE DRAWINGS. Reestablish drainage by removing accumulated material and replacing loose or missing rocks, unsuitable logs, and deteriorated rubber belting.
915.13 Turnpikes. Restore turnpikes in accordance with Section 913 and as SHOWN ON THE DRAWINGS by replacing missing, rotten, or loose retainer logs and stakes, or missing or loose retainer rocks. Backfill with suitable material.
915.14 Trail Structures. Restore all trail structures at locations SHOWN ON THE DRAWINGS or
DESIGNATED ON THE GROUND.
915.15 Reshaping and Finishing Trailbed and Backslopes. Provide a firm and uniformly finished trailbed in accordance with cross-sections SHOWN ON THE DRAWINGS.
Provide a uniform and roughened surface on disturbed backslopes in accordance with cross-sections SHOWN ON THE DRAWINGS. Gut all roots flush.
Measurement
915.16 Method. Measure the quantities in accordance with Section 906.
Payment (Special Project Specification)
915.17 Basis. Pay for the accepted quantities in accordance with Section 906 at the contract unit price for each PAY ITEM SHOWN IN THE SCHEDULE OF ITEMS. Materials borrow will be considered incidental to other pay items in this contract, and additional payment will not be made.
Make payment under:
PAY ITEM PAY UNIT
915(01) Trail Restoration.......................................................... L.F.
915(03) Check Dams................................................................. EA
Section 922
Waterbars
Description
922.01 Work: This work consists of installing waterbars, including excavation and backfill; selecting log and rock materials; and other materials.
Materials
922.02 Requirements. Use materials meeting the requirements of the following sections:
961 - Rock, Grid Pavement Units, and Aggregate 962 - Material for Timber Structures
Construction
922.03 General. Install waterbars of the types and at the locations SHOWN ON THE DRAWINGS or as
DESIGNATED ON THE GROUND.
922.04 Excavation and Embankment. Perform excavation and embankment in accordance with Section
912. Around waterbars, backfill and compact suitable material that is free of rocks larger than 3" in size.
Compact material on the downgrade side of rock, log, and treated timber waterbars, flush with the top of waterbars.
Outslope the trailbed on the upgrade side of the waterbar with a slope equal to or greater than the trail grade leading into the waterbar. Provide a uniform outsloped plane that forms a gutter against the waterbar.
922.05 Rock Waterbar. Tightly embed selected rocks into the trailbed Place waterbar rocks with tops relatively even, with no sharp points. Use rocks with lengths greater than or equal to 1.5 times the width.
922.06 Log. Embed peeled native logs into the trailbed to form a waterbar across the trail. Use anchor methods as SHOWN ON THE DRAWINGS at log or timber ends outside the trail tread. Pre-drill pilot holes (for steel pins) through timbers prior to treatment. Anchor stakes firmly in the ground, and tightly nail to the log without splitting. In the absence of a backslope, anchor the upgrade end of the log or timber waterbar in the same manner as the downgrade end.
(Special Project Specification)
922.08 Armored Rock Waterbar. Riprap tray is built with rock placed in an excavated trench. The tops of the rocks are flush with the existing tread surface, so they’re not an obstacle to traffic. Tightly embed selected rocks into the trailbed place waterbar rocks, bury two-thirds of each rock at a 45- to 60-degree angle to the trail with tops relatively even, with no sharp points. Use rocks with lengths greater than or equal to 1.5 times the width place heaviest rock at the downhill side. Add a retainer bar of rock angled in the opposite direction from the waterbar. Fill the space between the waterbar and retainer with compacted tread material. AS SHOWN IN THE DETAIL. Directing water into a rock spillway (section 923) incidental to construction of waterbar
Measurement
922.09 Method. Measure the quantities in accordance with Section 906.
Payment (Special Project Specification)
922.10 Basis. Pay for the accepted quantities in accordance with Section 906 at the contract unit price for each PAY ITEM SHOWN IN THE SCHEDULE OF ITEMS. Materials borrow & rock spillway (section 923) will be considered incidental to other pay items in this contract, and additional payment will not be made.
Make payment under:
PAY ITEM PAY UNIT
922(01) Native Log Waterbar................................................................. EA
922(02) Rock Waterbar.......................................................................... EA
(Special Project Specification)
922(05) Armored Rock Waterbar with Spillway...................................... EA
Section 923
Rock Spillways
Description
923.01 Work. This work consists of constructing rock spillways, including selecting, excavating, and placing rock material.
Materials
923.02 Requirements. Use materials meeting the requirements of Section 961. Construction
923.03 General. Construct rock spillways at locations SHOWN ON THE DRAWINGS or DESIGNATED ON THE GROUND. Construct spillways so the flow of water from the facility being drained is centered on and flows down the full length of the spillway.
923.04 Excavation. Excavate for the spillway in accordance with Section 912. Construct a horizontal bench into undisturbed material and compact it as a foundation for the toe of the rock spillway.
923.05 Rock Placement. Construct the spillway by hand-placing rock, with the larger rock in the bottom layers. Place each rock to provide a stable course. Interlock each rock with adjacent rocks, and minimize voids. Use small rocks to fill voids. Do not break, jar, or displace rocks already set.
Measurement
923.06 Method. Measure the quantities in accordance with Section 906.
Payment (Special Project Specification)
923.07 Basis. Rock Spillways will be considered incidental to other pay items in this contract, and additional payment will not be made.
Section 926
Herringbone Water Dispersion Structure
(Special Project Specification)
Description
926.01 Work: This work consists of installing water dispersion structure, including excavation and backfill;
selecting log and rock materials; and other materials.
Materials
926.02 Requirements. Use materials meeting the requirements of the following sections:
961 - Rock, Grid Pavement Units, and Aggregate 962 - Material for Timber Structures .
Construction
926.03 General. Install water dispersion structures of the type at the locations as DESIGNATED ON THE
GROUND.
926.04 Excavation and Embankment. Perform excavation and embankment in accordance with Section
912. Around water dispersion structure, backfill and compact suitable material that is free of rocks larger than 3" in size. Compact material on the downgrade side of logs.
Place water dispersion structure at an angle equal to slope in direction away from trail. Draining into rock spillway (section 923) incidental to construction. Provide a uniform outsloped plane that forms a gutter against the water dispersion structure.
926.05 Log water dispersion structure. Embed peeled native logs upslope side of trail to form a water dispersion away from the trail. 5’ to 15’ from trail. Use anchor methods as SHOWN ON THE DRAWINGS at log. Pre-drill pilot holes (for steel pins) through timbers prior to installation. Anchor stakes firmly in the ground, and tightly nail to the log without splitting. In the absence of a backslope, anchor the upgrade end of the log or timber waterbar in the same manner as the downgrade end.
Measurement
926.06 Method. Measure the quantities in accordance with Section 906.
Payment
926.07 Basis. Pay for the accepted quantities in accordance with Section 906 at the contract unit price for each PAY ITEM SHOWN IN THE SCHEDULE OF ITEMS.
Make payment under:
926(01) water dispersion structure.......................................... EA
Section 935
Rock Retaining Walls Description
935.01 Work consists of constructing rock retaining walls, including excavating, placing borrow, backfilling, and trailbed and slope finishing.
Materials
935.02 Requirements. Use materials meeting the requirements of the following section:
961 - Rock, Grid Pavement Units, and Aggregate 964 - Geo synthetics Construction
935.03 Excavation. Excavate in accordance with Section 912 to provide a full bench foundation.
935.04 Wall Construction. Construct rock retaining walls at locations SHOWN ON THE DRAWINGS and DESIGNATED ON THE GROUND. Stagger vertical joints a minimum of 4" horizontally from vertical joints in adjoining courses.
Use uniformly distributed header rocks for at least 25 percent of the rocks in the front and rear faces of the wall each having a length at least 2.5 times its width. Place all header rocks with the greatest dimension extending into the wall (at right angle to trail centerline), except at corners. At corners, lay alternating courses containing headers with greatest dimension parallel with wall.
Place the exposed face of each rock parallel to the face of the wall in which it is set. Stabilize each rock on the course that supports it. Do not break, loosen, or displace rocks already set. Use rocks of a general rectangular shape. Fill voids with small rock fragments or fine aggregate.
Measurement
935.05 Method. Measure the quantities in accordance with Section 906.
Payment (Special Project Specification)
935.06 Basis. Pay for the accepted quantities in accordance with Section 906 at the contract unit price for the PAY ITEM SHOWN IN THE SCHEDULE OF ITEMS. Materials borrow will be considered incidental to other pay items in this contract, and additional payment will not be made.
Make payment under:
935(03) Rock Retaining Wall..................................................... SF
Section 951
Mobilization
Description
951.01 Work. This work consists of moving personnel, equipment, material and incidentals to the project and performing all work necessary before beginning work at the project site. Mobilization includes the costs associated with obtaining permits, insurance, and bonds. Mobilization is not intended to pay for the costs of materials before they are used on the project site.
Payment
951.02 Basis. Pay for the accepted work at the contract unit price for the PAY ITEM SHOWN IN THE
SCHEDULE OF ITEMS.
Make progress payments for mobilization as follows:
(a) Reimburse for bond premiums before issuing the Notice to Proceed if evidence of payment is received.
(b) When 5 percent or more of the original contract amount is earned from other PAY ITEMS, pay mobilization at the rate of 50 percent, or up to 5 percent of the original contract amount, whichever is less.
(c) When 10 percent or more of the original contract amount is earned from other PAY ITEMS, pay mobilization at the rate of 100 percent, or up to 10 percent of the original contract amount, whichever is less.
(d) Pay any unpaid amount for mobilization upon final acceptance of all work items. Make payment under:
951(01) Mobilization................................................................. LS
Section 952
Sign, Post, and Cairn Installation Description
952.01 Work. This work consists of furnishing and installing signs and posts and constructing rock cairns:
Materials
952.02 Requirements. Use materials meeting the requirements of the following sections:
961 - Rock, Grid Pavement Units, and Aggregate 962 - Material for Timber Structures
Construction
952.03 General. Erect signs, posts, and cairns at the locations SHOWN ON THE DRAWINGS or
DESIGNATED ON THE GROUND.
952.04 Sign Installation. Tighten hardware snug, but do not damage the sign panel surface.
952.05 Post Installation. Dig posthole width not more than three times the width of the post and to the depth SHOWN ON THE DRAWINGS. If necessary because of obstacles, the post hole may be moved within the tolerances SHOWN ON THE DRAWINGS, or stabilize the post with concrete or rock mounds built in accordance with rock cairn specifications.
Compact suitable material between the post and the post hole in 4" layers to produce a solid and plumb installation.
952.06 Rock Cairn Construction. Slope each rock layer toward the center. Place each rock with at least three points of contact. Do not wedge small rocks into cracks between large rocks to stabilize the large rocks.
Measurement
952.07 Method. Measure the quantities in accordance with Section 906.
Rock cairns built to support signposts will be considered incidental to the PAY ITEM for signposts, and separate payment will not be made.
Payment (Special Project Specification)
952.08 Basis. Pay for the accepted quantifies in accordance with Section 906 at the contract unit price for each PAY ITEM SHOWN IN THE SCHEDULE OF ITEMS. Post and Hardware associated with installation will be considered incidental to other pay items in this contract, and additional payment will not be made.
Make payment under:
PAY ITEM PAY UNIT (Special Project Specification)
952(10) Furnish and Install trail signs..................................................... EA
952(11) Furnish and Install wilderness signs.......................................... EA
952(12) Furnish and Install information kiosk......................................... EA
952(13) Furnish and Install small trailhead signs.................................... EA
952(14) Furnish and Install large trailhead signs......................................... EA
Section 953
Barriers Description
953.01 Work consists of constructing barriers, including subgrade widening, debris disposal, and excavation.
Materials
953.02 Requirements. Use materials meeting the requirements of the following sections:
961 - Rock, Grid Pavement Units, and Aggregate 962 -Material for Timber Structures Construction
953.03 General. Construct barriers at locations SHOWN ON THE DRAWINGS or DESIGNATED ON THE
GROUND.
Use logs in which the true centerline deviates no more than 4" from the line between the centers of the ends of the log.
Measurement
953.04 Method. Measure the quantities in accordance with Section 906 and include spaces between individual units in each barrier section as SHOWN ON THE DRAWINGS.
Payment (Special Project Specification)
953.05 Basis. Pay for the accepted quantities in accordance with Section 906 at the contract unit price for each PAY ITEM SHOWN IN THE SCHEDULE OF ITEMS. will be considered incidental to other pay items in this contract, and additional payment will not be made.
Section 954
Obliteration of Abandoned Trailways
Description
954.01 Work. This work consists of obliteration of trailways, construction of drainage structures, and reestablishment of natural drainage patterns and vegetation.
Construction
954.02 General. Obliterate trailways in locations SHOWN ON THE DRAWINGS or DESIGNATED ON
THE GROUND.
954.03 Trail Closure. Block trailway entrances to traffic by placing rocks, logs, tree branches, and duff across the trailway. Place rocks, logs, branches, and duff to conceal the abandoned trailway and discourage future use. Use rocks and other materials that are available in the areas to be obliterated.
954.04 Drainage Structures. Leave existing water bars on the abandoned trail segments in place unless designated for removal. Construct additional drainage structures in locations SHOWN ON THE DRAWINGS or DESIGNATED ON THE GROUND.
954.05 Check Dams and Ditches. Construct check dams and ditches in locations SHOWN ON THE DRAWINGS or DESIGNATED ON THE GROUND.
954.06 Scarify. Scarify the trail to promote the establishment of vegetation at locations SHOWN ON THE DRAWINGS or DESIGNATED ON THE GROUND. Scarification is defined as breaking up the compacted soil to a depth and maximum clod size as SHOWN ON THE DRAWINGS.
954.07 Contour Restoration. Backfill trail sections where SHOWN ON THE DRAWINGS. On sidehill sections, pull fill material from the lower side of the trail, or the upper cut area, and place fill material in the original cut area to restore a natural-appearing contour and a natural drainage pattern.
954.08 Trench Backfill. Backfill trenched trail sections with compact suitable material until flush with the adjacent ground surface. Obtain backfill material from designated borrow sources.
Measurement
954.09 Method. Measure the quantities in accordance with Section 906.
Payment
954.10 Basis. Pay for the accepted quantities in accordance with Section 906 at the contract unit price for each PAY ITEM SHOWN IN THE SCHEDULE OF ITEMS.
Make payment under:
954(02) Obliteration.................................................................. L.F.
Section 955
Seeding and Mulching
Description
955.01 Work This work consists of preparing seedbeds and furnishing and placing required seed, fertilizer, mulch, net, and blanket material.
Materials
955.02 Seed. Do not use seed that is wet, moldy, or has been damaged in transit or storage.
Furnish seed, separately or in mixture, in standard containers with (1) seed name, (2) lot number, (3) net weight, (4) percentages of purity and germination, and (5) percentage of maximum weed seed content clearly marked for each kind of seed. Certify that seed meets the type as SHOWN ON THE DRAWINGS.
Furnish the CO with duplicate copies of a statement by the vendor certifying that each lot of seed has been tested by a recognized laboratory for seed testing within 6 months of the date of delivery. Include in the certificate (1) name and address of the laboratory, (2) date of test, (3) lot number for each kind of seed, and (4) results of tests as to name, percentage of purity and of germination, and percentage of weed content for each kind of seed furnished, and, in case of mixture, the proportions of each kind of seed.
955.03 Fertilizer. Use standard commercial-grade fertilizer and provide the minimum percentage of available nutrients as SHOWN ON THE DRAWINGS.
Furnish fertilizer in new, clean, and sealed containers with the name, weight, and guaranteed analysis of contents clearly marked. Fertilizer failing to meet the specified analysis may be used providing sufficient materials are applied to supply the specified nutrients without additional cost to the Government.
955.04 Mulch. Use commercially produced mulch as SHOWN ON THE DRAWINGS.
955.05 Erosion Control Blanket. Use erosion control materials of the type and in the locations SHOWN
ON THE DRAWINGS.
(a) Burlap. Use burlap of standard weave with a weight of 4, ±1/2 oz/SY.
(b) Excelsior Blanket. Use excelsior blanket consisting of a machine-produced mat or curled wood excelsior of 80-percent, 8" or longer fiber length with consistent thickness and the fiber evenly distributed over the entire area of the blanket. Use blanket with mesh dimensions of 1" by 2" plus or minus 25 percent. Provide blanket with average weight of 8 oz/SY plus or minus 10 percent at time of manufacture.
Construction
955.06 Seeding Seasons. Seed during the seeding dates as SHOWN ON THE DRAWINGS. Do not apply seeding materials during windy weather or when the ground is excessively wet or frozen.
955.07 Soil Preparation. Shape and finish cutslopes, fillslopes, embankments, or other areas to be seeded as required by other applicable sections or as SHOWN ON THE DRAWINGS. Prepare soil as specified in other sections.
955.08 Mulch. Spread mulch immediately after seeding, or after seeding and fertilizing, to a loose depth of 1" to 2" at locations SHOWN ON THE DRAWINGS.
955.09 Erosion Control Blankets.