03-Schedule_of_Items_4-28-2017.pdf
PDF 22 KB Posted
- Attached to
- SQF Culvert Material Federal contract opportunity
- Solicitation number
- AG-9AB5-S-17-0075
About this file
Schedule of items
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 05-Culvert_Materials_Schematics_4-28-2017.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AG-9AB5-S-17-0075
SQF Culvert Materials
SCHEDULE OF ITEMS
CULVERT MATERIALS PURCHASE
SEQUOIA NATIONAL FOREST
Item # Item Description Method of Measure
Pay Unit
Est.
Quantity Unit Price Amount
1 12" Spillway Inlet Assembly, 12 GA AQ EA 55 2 Flume Taper Flex Neck, 12 GA AQ EA 55 3 Flume 12" x 7", 10' Segments, 16 GA AQ EA 60 4 Bolts 1/2" x 3" AQ EA 500 5 Nuts 1/2" Flange AQ EA 500 6 18" Metal End Section w/ Rod AQ EA 15 7 24" Metal End Section w/ Rod AQ EA 15 8 36" Metal End Section w/ Rod AQ EA 5 9 36" Band Couplers AQ EA 5
Metal Anchor Stakes Flat, 3/8" x 1-1/2" x 36", Pointed at one end and a 1/2" dia hole drilled 2" from the top, Galv Steel
AQ
EA
11 Freight Charges L.S. L.S. 1
Notes:
All Materials Shall be Galvanized.
Delivered all Materials to 480 North Henrahan St.
Porterville, CA 93257.
Name of Business: DUNS#:______________________
Signature: DATE: _______________________
Title:
[ ] I certify that I have an active registration at www.sam.gov
Total Bid All Items:
http://www.sam.gov/
File details come from the government source that posted it. Updated .