RFQ.doc
DOC document 302 KB Posted
- Attached to
- Lower Frey Creek Trail Bridge Repair Federal contract opportunity
- Solicitation number
- AG-9A63-S-14-0021
About this file
Request for Quotes
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| amendment_1.rtf | RTF text file | |
| Drawings.pdf | ||
| SPS.docx | DOCX document | |
| Fire_Plan.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR QUOTATION
PAGE OF PAGES
| (THIS IS NOT AN ORDER) |
| THIS RFQ |
| FORMCHECKBOX |
| IS |
| FORMCHECKBOX |
| IS NOT A SMALL BUSINESS SET- ASIDE |
| 1 |
| 36 |
| 1. REQUEST NO. |
| 2. DATE ISSUED |
| 3. REQUISITION/PURCHASE REQUEST NO. |
| 4. CERT. FOR NAT.DEF. |
| RATING |
| AG-9A63-S-14-0021 |
| 03-06-2014 |
| 676372 |
| UNDER BDSA REG. 2 |
AND/OR DMS REG. 1
| 5a. ISSUED BY |
| 6. DELIVER BY (Date) |
USDA FOREST SERVICE, CENTRAL CALIFORNIA ACQUISITIONS
631 COYOTE STREET, NEVADA CITY, CA 95959
See Section F
| 5b. FOR INFORMATION CALL (NO COLLECT CALLS) |
| 7. DELIVERY |
| FORMCHECKBOX |
FOB DESTINATION
| NAME |
| TELEPHONE NUMBER |
FORMCHECKBOX
OTHER (See Schedule)
| AREA CODE |
| NUMBER |
| 9. DESTINATION |
Jonathan Berry, Technical Wendy Whiteman, Contracting 283-7853 478-6142
a. NAME OF CONSIGNEE
8. TO:
| a. NAME |
| b. COMPANY |
| b. STREET ADDRESS |
| c. STREET ADDRESS |
| c. CITY |
| d. CITY |
| e. STATE |
| f. ZIP CODE |
| d. STATE |
| e. ZIP CODE |
| 10. PLEASE FURNISH QUOTATIONS TO THE ISSUING OFFICE IN BLOCK 5A ON OR BEFORE |
| IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in BLOCK 5A. This request does not commit the Government to pay any costs incurred in the preparation of the |
| April 3, 2014, at 12:00 pm (noon) Pacific |
| submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter. |
11. SCHEDULE (Include applicable Federal, State and local taxes)
| ITEM NO. |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| (a) |
| (b) |
| (c) |
| (d) |
| (e) |
| (f) |
QUOTES
WILL
NOT
BE
ACCEPTED.
Fax quotes may be sent to
530-478-6126.
LOWER FREY CREEK TRAIL BRIDGE REPAIR
PLUMAS NATIONAL FOREST
Contractor MUST be registered in the System for Award Management prior to award at www.sam.gov.
Please provide the following information:
DUNS#_______________________
SEE SECTION L FOR A LIST OF DOCUMENTS REQUIRED TO BE INCLUDED WITH THE QUOTATION.
IF QUOTE IS IN EXCESS OF $150,000, A BID GUARANTEE IS REQUIRED. THE ORIGINAL BID GUARANTEE MUST BE RECEIVED BY THE DUE DATE AND TIME IN BLOCK 10.
| SEE SCHEDULE ON NEXT PAGE. |
| AWARD INFORMATION WILL BE POSTED ON THE FEDERAL BUSINESS OPPORTUNITIES WEBSITE AT www.fbo.gov. |
PLEASE ALLOW
21 DAYS
BEFORE INQUIRING ABOUT AWARD.
| a. 10 CALENDAR DAYS (%) |
| b. 20 CALENDAR DAYS |
| c. 30 CALENDAR DAYS |
| d. CALENDAR DAYS |
12. DISCOUNT FOR PROMPT PAYMENT
| NUMBER |
| PERCENTAGE |
| NOTE: Additional provisions and representations |
| FORMCHECKBOX |
| are |
| FORMCHECKBOX |
are not attached.
| 13. NAME AND ADDRESS OF QUOTER |
| 14. SIGNATURE OF PERSON AUTHORIZED TO |
| 15. DATE OF |
| a. NAME OF QUOTER |
| SIGN QUOTATION |
| QUOTATION |
| b. STREET ADDRESS |
| 16. SIGNER |
| a. NAME (Type or print) |
| b. TELEPHONE |
c. COUNTY
AREA CODE
| d. CITY |
| e. STATE |
| f. ZIP CODE |
| c. TITLE (Type or Print) |
| NUMBER |
NSN 7540-01-152-8084
Previous edition not usable
| 18-121 |
| STANDARD FORM 18 (Rev. 6-95) |
Prescribed by GSA-FAR (48 CFR) 53.215-1(a)
PART 1, SCHEDULE OF ITEMS
SECTION B
SUPPLIES OR SERVICES, AND PRICES/COSTS
| PROJECT |
| LOWER FREY CREEK TRAIL BRIDGE REPAIR |
| UNIT |
| PLUMAS NATIONAL FOREST |
| SOL. # |
| AG-9A63-S-14-0021 |
| ITEM NO. |
| DESCRIPTION |
| METHOD OF MEASURE |
| UNIT |
| QUANTITY |
| UNIT PRICE |
| TOTAL PRICE |
| 1 |
| 151-01 Mobilization |
| CQ |
| LSQ |
| 1. |
| $ - |
| $ - |
| 2 |
| 151-60 Transportation of Materials and Equipment |
| CQ |
| LSQ |
| 1. |
| $ - |
| $ - |
| 3 |
| 157-13 Soil Erosion and Pollution Prevention |
| CQ |
| LSQ |
| 1. |
| $ - |
| $ - |
| 4 |
| 203-04 Removal of Existing Damaged Bridge |
| CQ |
| LSQ |
| 1. |
| $ - |
| $ - |
| 5 |
| 556-01 Timber Bridge Railing, Untreated |
| CQ |
| LF |
| 410. |
| $ - |
| $ - |
| 6 |
| 557-04 Treated Structural Timber (Install Bridge) |
| CQ |
| LSQ |
| 1. |
| $ - |
| $ - |
| TOTAL |
| $ - |
| NOTES: |
| 1) Respondent must price each item to be considered for award. |
2) Responses for quantities less than those listed may be rejected.
3) If award is made in excess of $30,000, bond(s) will be required. (See Section I.) The Standard Forms 25A (Payment Bond) and 25 (Performance Bond) may be found at www.gsa.gov.
4) If quote is greater than $150,000, include bid bond =20% of the total price. The Standard Form 24 (Bid Bond) may be found at www.gsa.gov. The original bid guarantee must be received by the quote due date and time.
5) Email quotes will NOT be accepted.
PRICE SUBMITTED BY:
Signature
Phone
Vendor Name
FAX
Address
SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
Scope of Contract
This contract is for the demolition, removal, and installation of the Lower Frey Bridge on the Feather Falls Trail. Work includes, but is not limited to, removal of the damaged bridge, transportation & installation of the new bridge utilizing government-furnished materials (such as treated wood), and furnishing & installation of new railing.
Project Location
The project is located on the Feather River Ranger District of the Plumas National Forest. The site is located approximately one mile from the Feather Falls Trailhead on the lower trail. The trailhead is located at the end of the Bryant Ravine Road / FS 21N35Y adjacent to the Feather Falls Campground. Travel east from Oroville, CA, on SR 162 to the Forbestown Road then proceed north on the Lumpkin Road to Feather Falls. See the location map (Sheet 2 of the drawings for location and GPS information).
NOTE: Any prospective bidder desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request it in writing soon enough to allow a reply to reach all prospective bidders before submission of their bids. Oral explanations or instructions given before the award of a contract will not be binding. In no event shall failure to inspect the site constitute grounds for a claim after contract award. (See Section L, 52.236-27, SITE VISIT.)
Price Range The Government's estimate is between $25,000 and $100,000.
Worker's Compensation Insurance
The Contractor shall provide evidence of Worker's Compensation Insurance or a written explanation as to why the Contractor is exempt from the requirement. NOTE: The Contractor working alone is not required to carry the insurance.
Camping and Housing
(see also Section H, Camping Permit Compliance)
Camping is permitted in US Forest Service campgrounds subject to arrangement with the campground operator/concessionaire. Contractor will not be permitted to camp elsewhere on US Forest Service land. Camping on Forest Service land is not a right; permission may be revoked for failure to comply with the terms of the permit.
FAR 52.236-4 PHYSICAL DATA (APR 1984)
Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
A. The indications of physical conditions on the drawings and in the specifications are the result of site investigations by site visit and surface survey.
B. Transportation facilities: Transportation of materials and personnel to and from the work sites shall be the full responsibility of the contractor.
Maps
INCLUDED WITH DRAWINGS
SPECIFICATIONS
Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects
FP-03 (US Customary Units)
This document is incorporated by reference and is available on the web in either MS Word
(http://www.wfl.fha.dot.gov/design/specs/English/FP03_USCust_final_111403.doc) or Acrobat
(http://www.wfl.fha.dot.gov/design/specs/English/FP03_USCust_final_111403.pdf)
It is also available as a wire-bound book that can be purchased from the US Government Printing
Office:
Superintendent of Documents U.S. Government Printing Office Mail: Stop SSOP, Washington, DC 20402-0001 Phone: (toll free) 866.512.1800 Stock Number: 050-001-00341-4 (U.S. Customary)
Trail Specifications-- Standard Specifications applicable to this project can be found in Standard Specifications for Construction and Maintenance of Trails, September 1996 (EM-7720-103), which is incorporated by reference. The publication is available for purchase from the Superintendent of Documents, US Government Printing Office (GPO), Washington, DC 20402 (202-512-1800). The GPO stock number is 001-001-00661-1. It may also be accessed electronically at the following website address: http://www.fs.fed.us/.ftproot/pub/acad
AASHTO Standards
American Association of State Highway and Transportation Officials
341 National Press Building
Washington, DC 20024 https://bookstore.transportation.org/
AWPA
American Wood Preservers Association
PO Box 849
Stevensville, MD 21666 http://www.awpa.com/standards/index.asp
WWPA
Western Wood Products Association (Grading Rules)
1500 Yeon Building
Portland, OR 97204 http://www2.wwpa.org/ The Special Project Specifications in Section J are incorporated within this solicitation.
SECTION E--INSPECTION AND ACCEPTANCE
FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.acquisition.gov/far/
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.246-12 Inspection of Construction (AUG 1996)
Inspections Government inspections are for the purpose of satisfying the Government that the supplies and/or services are acceptable and do not relieve the Contractor of the responsibility for maintaining quality control. The Contracting Officer's Representative or designated inspector will conduct all inspections. The Contractor (or designated representative) is encouraged to be present to observe inspections
SECTION F--DELIVERIES OR PERFORMANCE
FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.acquisition.gov/far/
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.242-14 Suspension of Work (APR 1984)
Estimated Start Date
June 2, 2014
FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984) The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 90 calendar days after the effective date of the notice to proceed. The time stated for completion shall include final cleanup of the premises.
Work Timing
Delays due to normal adverse weather, weekends, and holidays have been included in the calculation of contract time.
Winter Shutdown
When winter weather sets in and the continuation of work is impractical, the Contracting Officer may authorize a total suspension until such time as work can proceed. During the period of total suspension, the calendar days elapsed will not be charged against the contract time specified.
SECTION G--CONTRACT ADMINISTRATION DATA
GOVERNMENT-FURNISHED PROPERTY
The Government will provide the following item(s) of Government property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with the provisions of the "Government Property" FAR clause contained elsewhere in the contract.
| Description |
| Location |
| Date Available |
| Pressure Treated wood materials for the Lower Frey Bridge |
| Feather Falls Parking Area |
| June 9, 2014 |
| Salvaged fasteners from the Lower Frey Bridge |
| Existing bridge site |
| June 2, 2014 |
Invoices
All invoices are to be submitted via the electronic Invoice Processing Platform (IPP). This is a mandatory requirement initiated by the U.S. Department of Treasury and you can find more information at this website https://www.ipp.gov/index.htm. There is no pre-award registration.
After award of a contract, please make sure that your company registers promptly at https://www.ipp.gov/vendors/enrollment-vendors.htm to establish your account. The one-time enrollment in IPP means a series of emails will be sent to the point of contact (POC) established in your System for Award Management (SAM) account at www.sam.gov. So, please verify that the POC’s email address is up to date in your company’s SAM account PRIOR to starting the IPP enrollment process. If you have questions on the IPP enrollment process, the help desk phone number is 1-866-973-3131.
Invoices shall be accompanied by the signed contractor payment certification, using the exact wording in the clauses, FAR 52.232-5, and be up-to-date on certified payrolls for the invoiced timeframe, FAR 52.222-8. (See next page for invoice certification language.) Invoices that do not meet these requirements will be rejected.
The Contractor shall submit payrolls weekly for each week in which any contract work is performed. The copies shall be sent to the COR. Payrolls submitted shall set out accurately and completely all of the information listed on the form WH-347 (available for download at www.dol.gov), including the payroll certification verbatim from the WH-347. Forms from other State or County governments are not compliant.
PAYMENT CERTIFICATION
I hereby certify, to the best of my knowledge and belief, that—
(1) The amounts requested are only for performance in accordance with the specifications, terms, and conditions of the contract;
(2) All payments due to subcontractors and suppliers from previous payments received under the contract have been made, and timely payments will be made from the proceeds of the payment covered by this certification, in accordance with subcontract agreements and the requirements of Chapter 39 of Title 31, United States Code;
(3) This request for progress payments does not include any amounts which the prime contractor intends to withhold or retain from a subcontractor or supplier in accordance with the terms and conditions of the subcontract; and
(4) This certification is not to be construed as final acceptance of a subcontractor’s performance.
(Name)
(Title)
(Date)
(Invoiced Timeframe) Payment for Materials Off Site
In accordance with Clause 52.232-5, progress payments may include payment for materials stored off site. Contractor shall provide a copy of the paid invoice; provide evidence that the material will be included in the finished project; and identify the location where the materials are stored, so that the government may make visual inspection if the Contracting Officer deems it necessary. The Contractor shall be liable for loss, damage, or destruction of the materials until such time as the materials are physically in the possession and control of the government. The Contractor will not be held liable to the extent that the Contracting Officer determines that the loss, damage, or destruction occurred through the fault or negligence of the government or its agents.
Incidental Items
The intent of the contract is to provide for the completion of the project described in the contract. Unless otherwise provided, the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies and perform all work required to complete the project in accordance with drawings, specifications, and provisions of the contract. Payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work and materials will be considered as incidental to and included in the payment of items shown.
Preconstruction Conference
This required conference will be scheduled by the COR. (See also Section I, Clause 52.236-26.)
SUBMITTALS
The following shall be submitted on this project:
| Title |
| Referenced By Specification No. |
| Time of Government Approval after Submittal |
| HDG Steel / Stainless steel Fasteners |
| 716.02 |
| 7 days |
| Railing |
| 5557. Drawings |
| 7 days |
SHOP DRAWINGS
The following shop drawings shall be submitted on this project:
| Title |
| Referenced By Specification No. |
| Time of Government Approval after Submittal |
| Girder Connector |
| Drawings |
| 7 days |
MATERIAL CERTIFICATIONS AND TESTING REPORTS
The following material certifications and/or testing reports shall be submitted on this project:
| Title |
| Referenced By Specification No. |
Untreated wood railing, 2 X 6
| Hot-Dipped Galvanized fasteners |
| 716.02, Drawings, Sheet 4, F-1 & F-2 |
| Epoxy Adhesive |
| 725.21 |
PRODUCT SUBSTITUTION
Any modification of other items, designs, materials, products or equipment (including Government-furnished property), made necessary because of a substitution, will be the responsibility of the Contractor without adjustment in contract price or time. The Contracting Officer's approval of any substitute will not affect the Contractor's responsibility for such modification. Any and all substitutions will be requested by the Contractor after award of the contract has been made. No approvals will be made prior to award.
SECTION H--SPECIAL CONTRACT REQUIREMENTS
Emergencies
Fire Plan See Section J, Fire Plan
Area of Responsibility for Fire. The limits of a contractor's area of responsibility for fire under the terms of the Fire Plan (Section J): Trail Construction - 100 feet on either side of the centerline.
Utility Services
No utility services are available at the work site.
Superintendence by Contractor
In addition to Clause 52.236-6, the following applies: The name and the specific authorities of the foreman or superintendent must be designated in writing to the Contracting Officer. The Contractor may use his/her own prepared letterhead stationery or a "Designation of Contractor's Representative" form available from the Contracting Officer. If the Contractor or the designee is not present when work is being performed on the contract, a Suspend Work Order may be issued with contract time continuing to run. The Contractor shall have a person on-site that is fully conversant in the English language.
Loss, Damage or Destruction
Equipment Furnished with Operator. The Government shall not be liable for loss, damage, or destruction of equipment furnished under this contract except for such loss, damage, or destruction resulting from the negligent or wrongful act(s) of Government employee(s) while acting within the scope of their employment.
Other. Even though this contract may provide for performing services at the direction of Government personnel, the contract is not for personal services, and neither the Contractor nor his or her personnel are Government employees. The Government assumes no liability for injury occurring to Contractor personnel or to third parties, or for loss, damage, or destruction involving third parties' property as a result of the Contractor's operation. Except that the Government is liable for such loss, damage, or destruction resulting from the negligent or wrongful act(s) of Government employee(s) acting within the scope of their employment.
Camping Permit Compliance
Contractor shall comply with all terms and conditions of any camping permit issued to allow use of premises. Any non-compliance will result in suspension of work until compliance is achieved.
Archaeological and Historic Sites
Location of known archaeological, historic, or pre-historic materials--such as Amerind artifacts and/or historic mining, logging, or fur trapping remains protected by the American Antiquities Act (l6 USC 433)--will be identified for the contractor before work commences.
Spill Plan
If the total oil or oil products storage exceeds 1,320 gallons or if any single container exceeds a capacity of 660 gallons, the Contractor shall prepare and implement a Spill Prevention and Countermeasures (SPCC) Plan. Such plan shall meet applicable EPA requirements (40 CFR 112), including certification by a registered professional engineer. The Contractor under the direction of the Contracting Officer, or in the absence of said officer, acting independently, shall immediately take action to contain and clean up, without expense to the Government, all petroleum products spills on or in the vicinity of the project which are caused by the Contractor's employees directly or indirectly as a result of contract operations. The Contractor may be held liable for all damages and costs of additional labor, subsistence, equipment, supplies, and transportation deemed necessary by the Government for the containment and clean up of petroleum products spills caused by Contractor's employees or resulting from contract operations. The Contractor shall immediately report all petroleum products spills to the Contracting Officer.
Equipment Cleaning
All off-road equipment used on this project shall be washed before moving into the project area so that the equipment is free of soil, seeds, vegetative material, or other debris that could contain or hold seeds of noxious weeds. “Off-road equipment” includes all logging and construction equipment and such brushing equipment as brush hogs, masticators, and chippers; it does not include log trucks, chip vans, service vehicles, water trucks, pickup trucks, and similar vehicles not intended for off-road use.
Equipment will be considered clean when visual inspection does not reveal soil, seeds, plant material, or other such debris. Disassembly of equipment components or specialized inspection equipment is not required. Contractor shall notify the Contracting Officer at least five days in advance of moving equipment in so that arrangements can be made for inspection.
If the project area is known to contain noxious weeds, the equipment shall be cleaned before moving to other Forest Service system lands which do not contain noxious weeds.
Transportation of Materials, Equipment, and Personnel
Contractor is soley responsible to determine the method and means of transportation if materials, equipment, and personnel to and from the work site(s). The submitted Safety Plan shall address the utilized means of transportation. The utilized means shall comply with all applicable clauses, sections, and provisions of the contract.
Traffic Control
The Contractor shall provide, erect and maintain all necessary barricades, suitable and sufficient lights, danger signals, signs, and other traffic control devices, and shall take all necessary precautions for the protection of the work and safety of the public. Suitable warning signs shall be provided to properly control and direct traffic.
The bridge(s) and adjacent trail(s) shall be closed to public access at all times during construction. TRAIL CLOSED signs shall be placed at proximal intersections and trailheads indicating that the trail is closed. The trail shall reman closed until the replacement/repair work is completed and accepted for use by the government.
AGAR 452.237-74 Key Personnel (Feb 1988)
(a) The Contractor shall assign to this contract the following key personnel:
· Project Manager
· Site Superintendent
(b) During the first ninety (90) days of performance, the Contractor shall make no substitutions of key personnel unless the substitution is necessitated by illness, death, or termination of employment. The Contractor shall notify the Contracting Officer within 15 calendar days after the occurrence of any of these events and provide the information required by paragraph (c) below. After the initial 90-day period, the Contractor shall submit the information required by paragraph (c) to the Contracting Officer at least 15 days prior to making any permanent substitutions.
(c) The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the Contracting Officer. Proposed substitutes should have comparable qualifications to those of the persons being replaced. The Contracting Officer will notify the Contractor within 15 calendar days after receipt of all required information of the decision on substitutions. The contract will be modified to reflect any approved changes of key personnel.
PART II--CONTRACT CLAUSES
SECTION I--CONTRACT CLAUSES
FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
www.acquisition.gov/far/ www.usda.gov/procurement/policy/agar.html
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.202-1 Definitions (JUL 2004) 52.204-7 System for Award Management (JUL 2013)
52.209-6 Protecting the Government's Interest when Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (DEC 2010)
52.222-3 Convict Labor (JUN 2003)
52.222-6 Davis-Bacon Act (JUL 2005)
52.222-7 Withholding of Funds (FEB 1988)
52.222-8 Payrolls and Basic Records (JUNE 2010)
52.222-9 Apprentices and Trainees (JUL 2005)
52.222-10 Compliance with Copeland Act Requirements (FEB 1988)
52.222-11 Subcontracts (Labor Standards) (JUL 2005) 52.222-12 Contract Termination - Debarment (FEB 1988)
52.222-13 Compliance with Davis-Bacon and Related Act Regulations (FEB 1988)
52.222-14 Disputes Concerning Labor Standards (FEB 1988)
52.222-15 Certification of Eligibility (FEB 1988)
52.222-21 Prohibition of Segregated Facilities (FEB 1999)
52.222-26 Equal Opportunity (MAR 2007)
52.222-27 Affirmative Action Compliance Requirements for Construction (FEB 1999)
52.222-35 Equal Opportunity for Veterans (SEP 2010) (Applicable if contract exceeds $100,000)
52.222-36 Affirmative Action for Workers with Disabilities (OCT 2010 (Applicable if contract exceeds $15,000)
52.222-37 Employment Reports on Veterans (SEP 2010) (Applicable if contract exceeds $100,000)
52.222-50 Combating Trafficking In Persons (FEB 2009)
52.223-6 Drug-Free Workplace (MAY 2001) (Applicable if contract is awarded to an individual) 52.225-13 Restrictions on Certain Foreign Purchases (JUN 2008)
52.227-4 Patent Indemnity -- Construction Contracts (DEC 2007)
52.228-2 Additional Bond Security (OCT 1997) (Applicable if contract exceeds $30,000)
52.228-11 Pledges of Assets (JAN 2012) (Applicable if contract exceeds $30,000) 52.228-14 Irrevocable Letter of Credit (DEC 1999) (Applicable if contract exceeds $30,000) 52.232-5 Payments Under Fixed-Price Construction Contracts (SEP 2002)
52.232-9 Limitation on Withholding of Payments (APR 1984)
52.232-23 Assignment of Claims (JAN 1986)
52.232-27 Prompt Payment for Construction Contracts (JUL 2013)
52.232-33 Payment by Electronic Funds Transfer—Central Contractor Registration (JUL 2013)
52.233-1 Disputes (JUL 2002)--Alternate I (DEC 1991)
52.233-3 Protest After Award (AUG 1996)
52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004)
52.236-2 Differing Site Conditions (APR 1984)
52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984)
52.236-5 Material and Workmanship (APR 1984)
52.236-6 Superintendence by the Contractor (APR 1984)
52.236-7 Permits and Responsibilities (NOV 1991)
52.236-8 Other Contracts (APR 1984)
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (APR 1984)
52.236-10 Operations and Storage Areas (APR 1984)
52.236-11 Use and Possession Prior to Completion (APR 1984)
52.236-12 Cleaning Up (APR 1984)
52.236-13 Accident Prevention (NOV 1991) Alternate I (NOV 1991) 52.236-15 Schedules for Construction Contracts (APR 1984)
52.236-17 Layout of Work (APR 1984)
52.236-21 Specifications and Drawings for Construction (FEB 1997) Alternate II (APR 1984) 52.236-26 Preconstruction Conference (FEB 1995)
52.242-13 Bankruptcy (JUL 1995)
52.243-5 Changes and Changed Conditions (APR 1984)
52.244-6 Subcontracts for Commercial Items (DEC 2013)
52.245-1 Government Property (AUG 2010) 52.245-9 Use and Charges (AUG 2010) 52.246-21 Warranty of Construction (MAR 1994) 52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short From) (APR 1984)
52.249-10 Default (Fixed-Price Construction) (APR 1984) 52.253-1 Computer Generated Forms (JAN 1991)
AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES
452.232-70 Reimbursement for Bond Premiums – Fixed-Price Construction Contracts (NOV 1996)
452.236-71 Prohibition Against the Use of Lead-Paint (NOV 1996)
452.236-72 Use of Premises (NOV 1996)
452.236-73 Archeological or Historic Sites (FEB 1988)
452.236-74 Control of Erosion, Sedimentation and Pollution (NOV 1996)
452.236-76 Samples and Certificates (FEB 1988)
452.236-77 Emergency Response (NOV 1996)
FAR 52.225-9 Buy American Act—Construction Materials (JAN 2005)
(a) Definitions. As used in this clause- "Component" means an article, material, or supply incorporated directly into a construction material.
"Construction material" means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
"Cost of components" means-
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction materials.
"Domestic construction material" means-
(1) An unmanufactured construction material mined or produced in the United States; or
(2) A construction material manufactured in the United States, if the cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic.
"Foreign construction material" means a construction material other than a domestic construction material.
"United States" means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference.
(1) This clause implements the Buy American Act (41 U.S.C. 10a - 10d) by providing a preference for domestic construction material. The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to the construction material or components listed by the Government as follows:
__NONE______________________________________
[Contracting Officer to list applicable excepted materials or indicate "none"]
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that-
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American Act is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;
(ii) The application of the restriction of the Buy American Act to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American Act.
(1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including-
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American Act applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American Act applies, use of foreign construction material is noncompliant with the Buy American Act.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Price Comparison
| Construction Material Description |
| Unit of Measure |
| Quantity |
| Price (Dollars)* |
Item 1:
| Foreign construction material |
| _______ |
| _______ |
| _______ |
| Domestic construction material |
| _______ |
| _______ |
| _______ |
| Item 2: |
| _______ |
| _______ |
| _______ |
| Foreign construction material |
| _______ |
| _______ |
| _______ |
Domestic construction material
[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.] [Include other applicable supporting information.] [* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).]
FAR 52.228-13 Alternative Payment Protections (JUL 2000) (Applicable to Contracts greather than $30,000 but equal to or less than $150,000)
(a) The Contractor shall submit one of the following payment protections
(1) Payment bond
(2) Certified or cashier’s checks, bank drafts, money orders, or currency
(b) The amount of the payment protection shall be 100 percent of the contract price.
(c) The submission of the payment protection is required within 10 days of contract award.
(d) The payment protection shall provide protection for the full contract performance period plus a one-year period.
(e) Except for escrow agreements and payment bonds, which provide their own protection procedures, the Contracting Officer is authorized to access funds under the payment protection when it has been alleged in writing by a supplier of labor or material that a nonpayment has occurred, and to withhold such funds pending resolution by administrative or judicial proceedings or mutual agreement of the parties.
(f) When a tripartite escrow agreement is used, the Contractor shall utilize only suppliers of labor and material that signed the escrow agreement.
FAR 52.232-35 Designation of Office for Government Receipt of Electronic Funds Transfer Information (JUL 2013)
(a) As provided in paragraph (b) of the clause at 52.232-34, Payment by Electronic Funds Transfer—Other than System for Award Management, the Government has designated the office cited in paragraph (c) of this clause as the office to receive the Contractor’s electronic funds transfer (EFT) information, in lieu of the payment office of this contract.
(b) The Contractor shall send all EFT information, and any changes to EFT information to the office designated in paragraph (c) of this clause. The Contractor shall not send EFT information to the payment office, or any other office than that designated in paragraph (c). The Government need not use any EFT information sent to any office other than that designated in paragraph (c).
(c) Designated Office:
Name: USDA NATIONAL FINANCE CENTER Telephone Number: (800) 421-0323
AGAR 452.209 – 71 ASSURANCE REGARDING FELONY CONVICTION OR TAX DELINQUENT STATUS FOR CORPORATE APPLICANTS, ALTERNATE 1 (FEB 2012)
(a) This award is subject to the provisions contained in the Consolidated Appropriations Act, 2012 (P.L. No. 112-74), Division E, Sections 433 and 434 regarding corporate felony convictions and corporate federal tax delinquencies. Accordingly, by accepting this award the contractor acknowledges that it –
(1) does not have a tax delinquency, meaning that it is not subject to any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability, and
(2) has not been convicted (or had an officer or agent acting on its behalf convicted) of a felony criminal violation under any Federal law within 24 months preceding the award, unless a suspending and debarring official of the United States Department of Agriculture has considered suspension or debarment of the awardee, or such officer or agent, based on these convictions and/or tax delinquencies and determined that suspension or debarment is not necessary to protect the interests of the Government.
(b) If the awardee fails to comply with these provisions, the Forest Service may terminate this contract for default and may recover any funds the awardee has received in violation of sections 433 or 434.
AGAR 452.228-70 Alternative Forms of Security (NOV 1996)
If furnished as security, money orders, drafts, cashier's checks, or certified checks shall be drawn payable to: USDA Forest Service.
Order of Precedence--Construction Any inconsistency in this solicitation or contract shall be resolved by giving precedence in the following order:
(1) The Schedule (excluding the specifications)
(2) Representations and Other Instructions
(3) Contract Clauses
(4) Other Documents, Exhibits, and Attachments
(5) The Specifications
(6) Drawings
PART III--LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J--LIST OF ATTACHMENTS
WAGE SUMMARY
FIRE PLAN (separate document) SPECIAL PROJECT SPECIFICATIONS (separate document)
DRAWINGS (separate document)
Decision No.
CA10009
| updated as of 03/05/14 |
| B utte County in Plumas National Forest |
APPLICABILITY OF COMPLETE WAGE RATE DECISION: In addition to the wage rates in this solicitation, the complete decision of the Secretary of Labor contains wage rates for other classes of laborers and mechanics. Because it does not appear that the work called for by this solicitation will require the use of such other classes, the wage rates applicable to them have not been reprinted herein. However, if any such classes of laborers or mechanics actually are employed to perform work under the contract resulting from this solicitation, payment will be required as specified in this clause entitled "Davis-Bacon Act" at wage rates contained in the complete decision of the Secretary of Labor. Offerors desiring the complete decision may request it from the Contracting Officer.
| BUTTE COUNTY - SKILLED LABOR / TRADES |
| BASIC HOURLY RATES |
| FRINGE BENEFITS |
| TOTAL WAGES & BENEFITS |
| Carpenter (Area 4) |
| 32.12 |
| 26.58 |
| 58.70 |
| - Bridge Builder |
| 39.35 |
| 26.58 |
| 65.93 |
| - Shingler, Scaffold & Shoring Erector |
| 32.27 |
| 26.58 |
| 58.85 |
| - Millwright |
| 34.62 |
| 28.17 |
| 62.79 |
| Ironworker, Fence Erector |
| 26.58 |
| 17.74 |
| 44.32 |
| Ironworker, Ornamental, Reinforcing, Structural |
| 33.00 |
| 26.30 |
| 59.30 |
| - Mechanical jobs ($200,000 and under) |
| 29.08 |
| 26.14 |
| 55.22 |
| - Mechanical jobs (over $200,000) |
| 37.81 |
| 27.95 |
| 65.76 |
| CONSTRUCTION CRAFT LABORERS (AREA B) |
| BASIC HOURLY RATES |
| FRINGE BENEFITS |
| TOTAL WAGES & BENEFITS |
| Construction Specialist Group: Asphalt Ironer and Raker / Chainsaw, Blaster, Diamond Driller |
| 26.84 |
| 15.82 |
| 42.66 |
| GROUP 1: Faller, Log Loader, Bucker / Jack Hammer, Compactors, Hydro Seeder, Pipe Layer, Post Hole Digger, Form Raiser, Asphalt Spreader Boxes, Kettle Tender |
| 26.14 |
| 15.82 |
| 41.96 |
| GROUP 1(a): Rock Drillers (All Types), Mech. Pipe Layer, All working/placing/and blasting of all powder and explosives |
| 26.36 |
| 15.82 |
| 42.18 |
GROUP 1(b): Sewer Cleaner ($4.00 per day above GROUP 1 wages)
| 30.14 |
| 15.82 |
| 45.96 |
| GROUP 1(c): Burning and Welding |
| 26.19 |
| 15.82 |
| 42.01 |
| GROUP 1(e): Work on bell hole footings and shafts, and work on deep footings (15 ft. or more in depth) |
| 26.69 |
| 15.82 |
| 42.51 |
| GROUP 1(f): Wire winding machine in connection with guniting or shot crete |
| 26.72 |
| 15.82 |
| 42.54 |
| GROUP 2: Asphalt Shoveler,Cement Laborer, Chipper Feeder, Choker Setter & Rigger (clearing work), all pneumatic, air, gas, and eletric tools not in GROUPS 1 - 1(f) |
| 25.99 |
| 15.82 |
| 41.81 |
| GROUP 3: Construction Laborers, including, Dump Load Spotter, Flagman, Fire Watcher, Fence/Guardrail Erector, Brush Loader/Plier, |
| 25.89 |
| 15.82 |
| 41.71 |
| GROUP 4: Cleanup Work of debris, grounds, and buildings |
| 19.58 |
| 15.82 |
| 35.40 |
| POWER EQUIPMENT OPERATORS |
| BASIC HOURLY RATES |
| FRINGE BENEFITS |
| TOTAL WAGES & BENEFITS |
| GROUP 1: Power Shovel, Excavator (> 7 CY), Helicopter Oper.erection work |
| 39.02 |
| 26.27 |
| 65.29 |
| GROUP 2: Power Blade Operator (finish), Power Shovels (1-7 CY), Hydralic Excavator (3 1/2 - 7 CY), Highline Cableway |
| 37.49 |
| 25.16 |
| 62.65 |
| GROUP 3: Excavator (up to 3 ½ CY), Loader (4 CY+), Combo Backhoe -Loader (> 3/4CY), Dozer / Multi. Engine Scraper (push-pull), Power Shovels (up to and incl.14CY), Asphalt Milling Machine, Wheel Excavator (up to 750 CY/hr.) |
| 36.01 |
| 25.16 |
| 61.17 |
| GROUP 4: Asphalt Plant Engineer, Combo. Backhoe-Loader (up to 3/4 CY), Concrete Batch Plant (wet/dry), Dozer and/or Push Cat, Timber Skidder, Loader (< 4 CY), Roller Operator (AC), Scraper, Track Loader (up to 4 CY), Welder, Lube & Service Engineer, Grade Setter & Grade Checker |
| 34.63 |
| 25.16 |
| 59.79 |
| GROUP 5: Cast-in-place Pipe Laying Machine, Drilling Equipment, Trenching Mach.(max.>5' in depth), Concrete Mixer/Finisher, Portable Crusher |
| 33.36 |
| 25.16 |
| 58.52 |
| GROUP 6: Self Loading Chipper/Chip Spreading Machine, Assist. Plant & Bridge Deck Engineer, Soils & Materials Tester |
| 32.04 |
| 25.16 |
| 57.20 |
| GROUP 7: Roller (except AC) Chip Seal Automatic Curing Machine, Self-Propelled Compactor (w/o Dozer), Boom Truck (under 15 Ton) |
| 30.90 |
| 25.16 |
| 56.06 |
| GROUP 8: Compressor Oper., Deckhand, Forklift Oper., Self-Propelled Power Sweeper, Tar Pot Firetender |
| 29.76 |
| 25.16 |
| 54.92 |
| GROUP 8-A: Mini-Excavator (backhoe, trencher (< 25 h.p.), Skidster Loader/Bobcat 743 series or smaller (w/o attachments), Tub Grinder, Wood Chipper |
| 27.55 |
| 25.16 |
| 52.71 |
| Crane Opperator, Group 3, Under 45 tons, Hydraulic and Boom Trucks |
| 36.40 |
| 25.16 |
| 61.56 |
| - Oiler |
| 35.94 |
| 25.16 |
| 61.10 |
| TRUCK DRIVERS |
| BASIC HOURLY RATES |
| FRINGE BENEFITS |
| TOTAL WAGES & BENEFITS |
| GROUP 1: Dump Truck (< 6 CY), Forklift, Comcrete Pump Truck, Fuel & Greese truck, Single Unit Flat Rack (2-Axle), Bus or Person-Haul Driver |
| 27.44 |
| 23.69 |
| 51.13 |
| GROUP 2: Dump Truck (6 CY & under 8 CY), Transit mixer (thru 10 CY), Water Trucksa < 7000 Gal.), Single Unit Flat Rack (3-axle), Highbed Heavy Duty Transit, Road Oil Truck or Bootman |
| 27.74 |
| 23.69 |
| 51.43 |
| GROUP 3: Dump truck (8-35 CY), Water Truck (> 7000 gal.), Lowbed Heavy Duty Transport, Self Loading truck, Boom Truck, Snow Plow |
| 28.04 |
| 23.69 |
| 51.73 |
| GROUP 4: Dump Truck (over 35-65 CY), Helicopter Pilot (when transporting men/materials), Lowboy Heavy Duty Transport |
| 28.39 |
| 23.69 |
| 52.08 |
| GROUP 5: Dump Truck (65CY and over), Lowbed Trqnsport (> 7-axles) |
| 28.74 |
| 23.69 |
| 52.43 |
PART IV--REPRESENTATIONS AND INSTRUCTIONS
SECTION K--REPRESENTATIONS, CERTIFICATIONS, AND
OTHER STATEMENTS OF OFFERORS OR RESPONDENTS
AGAR 452.219-70 Size Standard and NAICS Code Information (JAN 2005)
The North American Industrial classification System Code(s) and business size standard(s) describing the products and/or services to be acquired under this solicitation are listed below:
Contract line item(s):
ALL
--NAICS Code
237310
--Size Standard
$33.5 million
The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.
52.204-8 -- Annual Representations and Certifications (Jan 2014)
(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 237310.
(2) The small business size standard is $33.5 million.
(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.
(b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.
(2) If the provision at 52.204-7 is not included in this solicitation, and the offeror is currently registered in the System for Award Management (SAM), and has completed the Representations and Certifications section of SAM electronically, the offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The offeror shall indicate which option applies by checking one of the following boxes:
[ ] (i) Paragraph (d) applies.
[ ] (ii) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.
(c)(1) The following representations or certifications in SAM are applicable to this solicitation as indicated:
(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless—
(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;
(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or
(C) The solicitation is for utility services for which rates are set by law or regulation.
(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. This provision applies to solicitations expected to exceed $150,000.
(iii) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the provision at 52.204-7, System for Award Management.
(iv) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that—
(A) Are not set aside for small business concerns;
(B) Exceed the simplified acquisition threshold; and
(C) Are for contracts that will be performed in the United States or its outlying areas.
(v) 52.209-2, Prohibition on Contracting with Inverted Domestic Corporations—Representation. This provision applies to solicitations using funds appropriated in fiscal years 2008, 2009, 2010, or 2012.
(vi) 52.209-5, Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.
(vii) 52.214-14, Place of Performance—Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the Government.
(viii) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.
(ix) 52.219-1, Small Business Program Representations (Basic & Alternate I). This provision applies to solicitations when the contract will be performed in the United States or its outlying areas.
(A) The basic provision applies when the solicitations are issued by other than DoD, NASA, and the Coast Guard.
(B) The provision with its Alternate I applies to solicitations issued by DoD, NASA, or the Coast Guard.
(x) 52.219-2, Equal Low Bids. This provision applies to solicitations when contracting by sealed bidding and the contract will be performed in the United States or its outlying areas.
(xi) 52.222-22, Previous Contracts and Compliance Reports. This provision applies to solicitations that include the clause at 52.222-26, Equal Opportunity.
(xii) 52.222-25, Affirmative Action Compliance. This provision applies to solicitations, other than those for construction, when the solicitation includes the clause at 52.222-26, Equal Opportunity.
(xiii) 52.222-38, Compliance with Veterans’ Employment Reporting Requirements. This provision applies to solicitations when it is anticipated the contract award will exceed the simplified acquisition threshold and the contract is not for acquisition of commercial items.
(xiv) 52.223-1, Biobased Product Certification. This provision applies to solicitations that require the delivery or specify the use of USDA–designated items; or include the clause at 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts.
(xv) 52.223-4, Recovered Material Certification. This provision applies to solicitations that are for, or specify the use of, EPA–designated items.
(xvi) 52.225-2, Buy American Act Certificate. This provision applies to solicitations containing the clause at 52.225-1.
(xvii) 52.225-4, Buy American Act—Free Trade Agreements—Israeli Trade Act Certificate. (Basic, Alternates I, II, and III.) This provision applies to solicitations containing the clause at 52.225-3.
(A) If the acquisition value is less than $25,000, the basic provision applies.
(B) If the acquisition value is $25,000 or more but is less…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .