Attachment 4_PAL_Checklist.doc
DOC document 57 KB Posted
- Attached to
- Whole Tree Chipping Federal contract opportunity
- Solicitation number
- AG-9A40-S-11-0028A
About this file
Attachment 4- PAL Checklist
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation.pdf | ||
| Attachment 6_Map_Wooded Hill_5Yea Plan.pdf | ||
| Attachment 2_Wage Determination.pdf | ||
| Attachment 3_ Fire Plan.pdf | ||
| Attachment 5_Vicinity Map.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Activity Level Variance Check List
Project Name: Wooded Hill Whole Tree Chipping Contract Number: __________________________ Purchaser/Contractor Name: _______________________________
Request #__, for period: __________________________________
Units/Subdivisions Affected: _______________________________
Location of operation:
Slope
Aspect
Elevation
Fuels on site
Fuels in surrounding area
10 day Forecast
Short range predictions (Red Flags)
Fuel Moistures
Response time of suppression resources
Potential for ignition
RAWS location
Current Fire Situation:
Draw down information
National Readiness Level
Contractual considerations:
Operating Season
Frequency of recent contract fires in area
Type of operation
Purchaser/Contractors past performance
Other site specific mitigation or precaution (i.e. Purchaser/Contractors proposals)
Social & Community Considerations:
Proximity of high value resources
Sensitivity of location
Remarks:
I have considered the above items and have determined the following actions must be implemented to continue operations in Project Activity Levels ________ through EV Fire Management Consulted _______________________________________________
Name
Line Officer Concurred____________________________________________________
Name
Contracting Officer or Delegated Representative ___________________________________
Date:_________________________________
Purchaser/Contractor Rep.__________________________ Date_______________________
Instructions for Determining Variances for Continued Operations Within Specific Units and With a Specific Time Frame
1. Variances are in addition to the stated requirements for the Predicted Activity Level.
2. The Line Officer in consultation with the Forest Fire Management Officer or his/her representative will evaluate the items in the above check list as they relate to the existing and planned activities, add any mitigation measures as needed and the Line Officer will advise the Contracting Officer to execute the variance. The name of the Fire Management Representative and the Line Officer involved must be filled in but a signature is not required.
3. The delegated authority can be at the FSR/COR level since they would usually have more knowledge of the ground and access to the District Ranger.
4. The project area should be evaluated for differences in potential fire activity if a fire starts. This could necessitate the use of multiple forms. Examples of this would be units on a north slope near riparian areas vs. those on south slopes that would be dryer and expected to have more severe fire conditions or there is a significant difference from the predicted PAL and the actual conditions.
5. The Purchaser/Contractor or their representative should be consulted when determining types of variances that are being considered. They might be able to come up with other options.
6. Examples of written variances are:
A. Local assessment determines that existing precautions are adequate
B. Use of specialized detection equipment such as an infrared detection device for locating heat sources is required
C. Provide additional fire suppression resources ( i.e. crews, equipment etc.) to achieve shorter response time.
7/14/2011
File details come from the government source that posted it. Updated .