Drawings and Plans.pdf

PDF 149 KB Posted

Attached to
RECOVERY: Rivreside Day Use Federal contract opportunity
Solicitation number
AG-9702-S-10-0414
Issued by
Department of Agriculture Forest Service Washington Office Economic Recovery Operations Center Southwest

About this file

Attachment 2 Drawings and Plans

View the file

Other files for this federal contract opportunity

Other files attached to RECOVERY: Rivreside Day Use, newest first.
File Type Posted
Fire Plan.pdf PDF
Davis Bacon Wage Determination.pdf PDF
Solicitation.pdf PDF
Specifications.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OREGON

EU""",

oRE1JDlNG

SACRAMENTO ~ 0 RENO

o N

-0

1(, SAN

~'RANas

SON~Q

STANISlAUS N.F.

o FRESNO t (I BAKERSFIElD

0'- NEEDLES

°c lOS

ANGElES

~1- -"""eo

STATE OF CAUFORNIA

INLJ"X MAP

UNITED STATES DEPARTMENT OF AGRICULTURE

FOREST SERVICE

REGION FIVE

STANISLAUS NATIONAL FOREST

DRAWINGS FOR PROPOSED

Riverside Day Use

Paving

TUOLUMNE COUNTY, CALIFORNIA

R.S.

.TIONAL

GROVELAND

R.S.

FOREST

STANISLAUS NATIONAL FOREST

Water Source

INDEX TO SHEETS

NO I DESCRIf1TlON

1 TiTLE SHEET

2 GENERAL NOTES & WORK

DESCRIPTION

SHEET

NUMBER SHEIiTS

: Ot.(,,,<t'IO

-t,3~dl,.,.

DESIGNER ICT RANGER

Natural Ground 2" Hot Bituminous Concrete

5' ,I • I

18"

Water for construction activities may be obtained from the water source shown on the Vicinity Map. Watering shall be as per Section 207.

Hot Bituminous Concrete may obtained from a commercial source, The bituminous material shall be PG-6416 and the aggregate shall ~" maximum.

Any staging areas shall be approved by Contracting Officer.

Before any excavation activities begin, the Contractor shall locate all underground utilities using one of the following services: USA - 1-800-227-2600, the National 811 number or the website

- http://www.caIl811.com.

The Contractor shall notify the Contracting Officer (CO) 15 days in advance of the start work date.

The Contractor shall provide incidental to Section 156, Public Traffic, a warning signs with 3 inch letters stating "Notice the (Site being closed) will be closed from (start date) to (end date) for Construction". The sign shall be installed by the Contractor at the entrance of the Riverside Day Use area and as approved by the COR.

The work shall consist of the placement of 2" compacted thickness of Hot Bituminous Concrete and a Tack Coat to the existing asphalt in the damaged area of the lower parking lot, to the path leading to the access road and the path on island.

General Notes 8< Work Description

FOREST I PROJECT I ROAD # ISHEET

STF Riverside I AS APPLICABLE I 2 2

"t')1 r I kNatlve material from adjacent slopes Backfill - ; 2? .

Note: Backfill shall be the native material Natural Ground pulled down from the cut slope.

Restrooom

Typical Pavement Detail

Areas to be paved ~ Lower Parking Lot

'lii L d

:E

<t.

j m C " o

<II

.. \1\ "5 u.

d :z .. d d " :i1f c d

Water Source:

Hot Bituminous Concrete

Staging Area:

Utility Location:

Traffic Control:

Description of Work:

File details come from the government source that posted it. Updated .