Revised Schedule of Items
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0002.pdf | ||
| Amendment 0001.pdf | ||
| Wage Determination.pdf | ||
| Plans and Drawings Log Springs ARRA.pdf | ||
| SF 1442 page 3 - 44.pdf | ||
| Special Project Specs.doc | DOC document | |
| SF 24 Bid Bond.pdf | ||
| SF 1442 page 1 - 3.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PART I – THE SCHEDULE
SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS
SCHEDULE OF ITEMS (REVISED)
ITEM
NO.
DESCRIPTION
PAY
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
PRICE
15101
Mobilization
Lump Sum
20105
Clearing and grubbing, disposal of tops and limbs (g), logs (i), stumps (f)
20305
Removal of structures and obstructions
20426
Grade dips, Rolling, compaction method (e)
Each
20490
Roadway excavation, compaction method (e)
25102
Placed riprap, class 2
Ton
60709
Cleaning culverts in place
TOTAL $________
NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under
151.01 Mobilization. Payment will be made on actual work performed as described in FP-03 109.01 unless otherwise noted.
File details come from the government source that posted it. Updated .