ATTACHMENT TWO STATEMENT OF WORK

View the file

Other files for this federal contract opportunity

Other files attached to Goodwin Fire BAER Aerial Seed & Straw Mulching, newest first.
File Type Posted
Amendment0002.pdf PDF
Goodwin_BAER_Project.zip ZIP file
Questions-Answers_Amend0001.docx DOCX document
AG-94TZ-S-17-0120-0001.pdf PDF
AG-94TZ-S-17-0120.pdf PDF
Att_1_Goodwin_BAER_Aerial_Seeding_and_Mulching_Map.pdf PDF
Att_4_-_Wage_Determination_15-5472.txt TXT text file
Att_5_PNF_Fire-Plan2017.pdf PDF
Att_3_-_Wage_Determination_95-0222_Rev41.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No. AG-94TZ-S-17-0120 Goodwin Fire BAER Aerial Seeding and Mulching

SCOPE OF WORK

The Goodwin Fire BAER Aerial Seeding and Mulching project is a full-service end-result contract. The contractor shall provide all necessary equipment and supplies to meet the specifications described below for seed and straw application to the areas listed in the Schedule of Items. Such equipment and supplies shall include but not be limited to, equipment/aircraft, ground crews, loading equipment, safety equipment, transportation, lodging and meals for contractor personnel. The Contractor shall provide all incidentals to complete this work, including documentation of initial collection weed free certificates from the Arizona Crop Improvement Association on all straw mulch and documentation for the identified weed free grass seed mix.

In support of the Burned Area Emergency Response Plan (BAER) the Prescott National Forest has a requirement for seeding and mulching of approximately 2105 acres of moderate to high burn severity on the Goodwin Fire. Mulch shall be applied at a rate of 1 ton per acre to an approximate depth of 1 inches well distributed over the treatment area. The awarded contractor shall provide all necessary mulch, labor, supplies and equipment necessary to complete the work, including fluffing, loading, moving and handling products during operations. Seeding shall be applied at a rate of 13 pounds per acre with the seed mix consisting of Common barley, Sand dropseed, Sideoats grama, and Western wheatgrass. The seed weight will be PLS (pure live seed) weight. The seed must be certified weed free by an independent third-party seed lab that follows the standards of the Association of Official Seed Analysts. The Forest Service will provide 3,224 lbs of the specified seed mix. The awarded contractor shall provide the remainder of the seed, labor, supplies and equipment necessary to complete the work, along with the necessary laboratory testing of viability and weed free status documents submitted to the COR prior to the work commencing.

Seed Mixture for Goodwin Fire Stabilization

Common Name
Scientific Name
% of Seed Mix per Acre
Pounds per Acre
Total Pounds Needed
Barley
Hordeum vulgar
77
10
20,850
Sand dropseed
Sporobolus cryptandrus
7.7
1
2,085
Sideoats grama
Bouteloua curtipendula
7.7
1
2,085
Western wheatgrass
Pascopyrum smithii
7.7
1
2,085

27,105

The work under this contract will consist of seeding and mulching the areas designated on the attached project map. The contractor is responsible for making all necessary arrangements for purchasing, delivery, storage, and unloading of seed and mulch to the staging areas. The contractor is responsible for storage of seed and mulch at the staging areas in a manner that keeps the product dry.

There are 2 distinct project areas. They are located on the Prescott National Forest, Bradshaw Ranger District. One is approximately 2 miles northwest of Mayer, Arizona. To access this site, travel 1 mile down Forest Service road 87A off highway 69. The other project area is approximately 8 miles southwest of Mayer, Arizona. To access this site, travel 8 miles down County Road 177 from Mayer, Arizona. This project area is directly adjacent to the community of Pine Flat. There are locations for 2 staging areas provided. Staging area 1 is 4-5 miles from 200 of the treatment acres and 3-4 miles from the remaining 1900 acres. Staging area 2 is 1-2 miles from 1900 of the treatment acres and 5-6 from the remaining 200 acres..

DEFINITIONS

Acceptable Quality Level (AQL). The maximum allowable deviation from perfect performance that may occur before the Government will invoke payment deduction.

An AQL does not allow a contractor to knowingly offer defective service, but limits reduced payment to circumstances in which defective performance results in a measured reduction in the value of services rendered.

Defective Service. A unit of service which contains one or more defects, or nonconformance with specified requirements.

Performance Requirements Summary (PRS). Identifies the key service outputs of the contract that will be evaluated by the government to assure contract performance standards are met by the contractor.

Quality Assurance. Those actions taken by the Government to assure services meet the Requirements of the Performance Work Statement (PWS).

Contracting Officers Representative (COR). A Government person appointed by the contracting officer to help the contracting officer with contract admin and surveillance.

Government Inspector. A Government person responsible for surveillance of contractor performance.

Quality Assurance Surveillance Plan (QASP). An Organized written document used for quality assurance surveillance. The document contains specific methods the Government will use to perform surveillance of the contractor.

Quality Control. Those actions taken by a contractor to control the performance of services so they meet the requirements of the Pleasant Valley District.

Random Sampling. A sampling method in which each service output in a unit has an equal chance of being selected.

Hazardous Material. Materials that may or may not be identified that have a potential to be hazardous to humans, pets, wildlife or vegetation. Some examples are un-labeled containers that are leaking any substance, any kind of barrel, and syringes.

Development. Any structure not native to the area that has been installed.

Travelway. Ground surface that is designated by signage or appearance to be used by visitors to travel upon such as forest roads, pullouts, parking, or obvious pathways within a site boundary.

QUALIFICATIONS

Offeror shall be the owner, operator or authorized personnel, or shall be fully trained to operate, repair, maintain and service the product for which a quote will be provided. Offeror shall provide, seed-handling and mulch-handling and loading equipment, safety equipment, transportation, lodging, and meals for their personnel. Contractor shall have sufficient equipment and personnel to complete the aerial application within 30 calendar days from start of work, weather permitting.

Contractor will be responsible for all seed acquisition per the mix specifications and all seed loading/handling operations in and around the location of operations.

Contractor will be responsible for all mulch loading operations. Movement of seed and straw mulch in and around staging operations shall be the responsibility of the contractor.

Contractor shall be properly licensed and bonded to perform the work contained herein. Contractor is responsible to obtain all licenses, permits and insurance required by the State of Arizona and Federal Government.

Global Positioning Satellite (GPS) tracking equipment, fully functional and operating within manufacturer specifications, which can map seed and mulch application areas and download information for contractor and agency use shall be used in this work. The contractor can substitute ground collected GPS data to document completion of the application areas.

SEEDING OBJECTIVES

1. Seed shall be applied at 13 pounds per acre (2105 acres). The seed weight will be PLS (pure live seed) weight. The Forest Service will provide 3,224 lbs of the specified seed mix. The awarded contractor shall provide the remainder of the seed.

2. No seed shall be applied during excessive rain, wind or snowstorms. Application will only be made when weather conditions allow.

3. Seeding applications will begin at higher elevations and proceed to lower elevations. Seed will be applied in areas of primarily high burn severity. A certain amount of pilot discretion is recognized to be necessary while in the air to determine appropriate application within treatment areas. It is not necessary to apply seed in areas of low or unburned severity (green needles still on trees). The COR or inspector can assist in making this determination.

MULCHING OBJECTIVES

1. Mulch shall be applied at the rate of 1 ton per acre to cover approximately 80 percent of the ground surface to approximately (1) inch depth within the delineated polygons on the treatment map over 2105 acres.

2. No mulch should be applied during excessive rain, wind or snowstorms. Application will only be made when weather conditions allow. Mulch should not be applied if the project area is covered with snow.

3. Mulch will be applied to areas of moderate to high burn severity. A certain amount of pilot discretion is recognized to be necessary while in the air to determine appropriate application within treatment areas. It is not necessary to apply mulch in areas of low or unburned severity (green needles still on trees). The COR or inspector can assist in making this determination. Target areas are primarily slopes ranging from 15 to 50 percent that exhibit moderate to high burn severity. Mulch should not be applied directly to drainages, rock outcrops where 50% or more of the ground is rock; or in areas where needle cast/leaf litter is present.

4. The mulch should be processed in a manner which promotes even distribution when aerially released from cargo nets or similar equipment (often referred to as fluffing). The mulch should be dry (less than 15% moisture on an air-dry basis) and baled to facilitate uniformity of spread. Crews will monitor straw clumping and adjust the processing to ensure as much even distribution of the mulch application can be achieved to meet the desired coverage.

PROJECT SAFETY AND RESOURCE PROTECTION OBJECTIVES

1. Conduct project operations in a safe manner

2. Prevent spread of noxious weeds by ensuring all equipment is free of soil, seeds, vegetative matter, or other debris that could contain or hold noxious weed seeds. All ground based off-highway equipment shall be washed and inspected prior to entering the project area.

3. Mitigate damage or potential damage to private property

SITE LOCATION

The project is located on the Prescott National Forest, approximately 2 miles northwest of Mayer, Arizona and approximately 8 miles southwest of Mayer, Arizona. The project area ranges in elevation from 4,500 to 6,000 feet. The area to be seeded and mulched occurs where moderate to high burn severity exists.

PERIOD OF PERFORMANCE

Work shall not begin until a Notice to Proceed is issued. The performance period shall be 30 calendar days.

GOVERNMENT FURNISHED PROPERTY

Project Map - A map of the project area will be provided as an attachment item to the Solicitation.

Prescott National Forest Fire Plan - Provided as a reference.

GIS shapefiles - Shapefiles of the treatment units and staging areas with coordinate system NAD 83, UTM Zone 12 will be provided as an attachment to the Solicitation.

Grass Seed - The Forest Service will provide 3,224 lbs of the specified seed mix. The awarded contractor shall provide the remainder of the seed.

SUBMITTALS

Quality Control Plan- See below for requirements of Quality Control Plan Daily Operational Report- Daily progress reports are required to be communicated to the COR or BAER Implementation Team leader no later than 2100 hours each day, with the following information:

· Updated maps indicating the areas (acres) within the polygons treated Project Aviation Safety Plan (PASP) – The PASP shall address communications, coordination with other agency operations and emergency procedures as a minimum.

Traffic Management Plan – Signing and monitoring public safety is the responsibility of the contractor when their operations are adjacent to travel ways.

Spill Prevention Plan – Shall be addressed in the submittal.

Fire Prevention and Suppression Plan – The Contractor will provide information on Operations Fire Prevention and Suppression. The Prescott National Forest Fire Plan is provided as part of the conditions of this contract.

Final Report- a final report (4 hard copies, one electronic) shall be provided, which includes at a minimum:

· As-Built Project Application Map. This must delineate all areas covered by the product under this contract.

· A written report of the daily field conditions, application rates, and areas covered

· Site conditions, and any other pertinent data that records the application of the product.

FURNISHING AND STORAGE OF MATERIALS, EQUIPMENT AND SUPPLIES

The Contractor is responsible for determining the types and quality of materials, equipment and supplies necessary to accomplish the work in a timely manner. Unless otherwise stated elsewhere herein, the Contractor shall furnish all material, equipment and supplies required for the performance of the contract. All items shall comply with the specifications or commercial standards. The Contractor shall furnish and deliver items to the site of the work and store items in such a manner that their quality and fitness for work is preserved.

All storage, staging and temporary work sites approved by the Government shall be restored to a satisfactory condition at the contractor’s expense.

PRE-WORK CONFERENCE

Prior to commencement of work, the Contracting Officer shall arrange a meeting with the contractor by phone to discuss the contract terms and work performance requirements.

CONTRACTOR QUALITY CONTROL PLAN

A. Quality Control Plan The Contractor is responsible for Quality Control and shall provide a copy of its Quality Control Plan (QCP) prior to start of the contract. The Plan must demonstrate how the Contractor shall assure that quality of performance meets the objectives and requirements of the contract. The QCP shall specify:

· How quality will be monitored to ensure performance standards are met.

· How the work will be supervised.

· Identify the personnel responsible for performing quality control.

· How results of the monitoring will result in quality performance.

B. Contractor Quality Control Inspection The Contractor shall assure that performance meets contract specifications, in accordance with FAR 52.212-4, Contract Terms and Conditions—Commercial Items, paragraph (a), prior to requesting the Government to inspect for payment or acceptance. The Contractor shall contact the Contracting Officer upon completion of a unit. The Contracting Officer may observe the Contractors inspection at any time and shall otherwise have unlimited access to the inspection data.

PERFORMANCE REQUIREMENTS SUMMARY

The contractor shall perform the following major items in the contract with the incentives and deductions for the work described.

Work Statement
Performance

Standard Government Method of Assessment Incentives and Deductions for meeting the Standard

Seeding/Mulching Services

Work meets specification requirements as stated in the PWS
COR and Inspector conduct periodic random monitoring
The quality provided by the Contractor will be reflected in the performance evaluation either positive or negative. If the Contractor fails to meet standards, work may be suspended or terminated for Cause for failure to take corrective action immediately and result in adverse performance evaluation. If the Government does not receive the services as stated in the specifications, a deduction may be made in price.

Quality control

Contractor maintains control on all aspects of operation
COR or Inspector randomly observe observations
The Quality Control provided by the Contractor will be reflected in the performance evaluation as either positive or negative incentive. Contractor’s work not completed on schedule is subject to default and may result in termination for cause including assessment of re-procurement costs and result in adverse performance evaluation.

Work Plan Schedule and Communications

Work meets schedule as per PWS. Contractor keeps COR/Inspector advised of where they can be reached by phone during the contract.
COR and Inspector conduct periodic random monitoring.
Contractor’s ability to maintain the work schedule and complete work on schedule will be reflected in the performance evaluation as either positive of negative incentive. Contractor’s work not completed on schedule is subject to default and may result in termination for cause including assessment of re-procurement costs and result in adverse performance evaluation.

Loss, damage or destruction of Government property

Contractor shall protect the Government property at the recreation sites while in service
COR and Inspector conduct periodic random monitoring
Contractor shall be responsible for loss; damage or destruction of Government property unless the Contractor can show the damage resulted from causes beyond the Contractor’s control and without the Contractor’s fault or negligence.

ADDITIONAL REQUIREMENTS:

Supervision/Contractors Representative: The Contractor shall perform the following:

· Designate one supervisor, conversant in the English language, in writing for each crew. The written designation shall indicate the limits of the supervisor’s authority. When two or more people are designated as supervisor, their written delegation shall indicate the priority of their designations so one is designated as the Contractors Representative.