DRAWINGS
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Atth2-WD.pdf | ||
| Atth1-Fire_Plan.pdf | ||
| Solicitation.pdf | ||
| Atth3-FSR556-418specifications.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNITED STATES DEPARTMENT OF AGRICULTURE
FOREST SERVICE
REGION 3
COCONINO NATIONAL FOREST
COCONINO COUNTY, ARIZONA
CONSTRUCTION DRAWINGS FOR
FY15 FSR 556/418
IMPROVEMENT PROJECT
INDEX TO
SHEETS
SHEET NO.
DESCRIPTION
1. TITLE SHEET
2. TYPICAL SECTIONS
3. CULVERT /DRAINAGE
4. INVERTED DIP DETAILS
5. ROLLING DIP DETAILS
6. GENERAL NOTES
7. WORK DESCRIPTIONS
PROJECT
AREA
PROJECT
AREA
DESCRIPTION OF WORK
This project will consist of hauling (from a commercial source) and spreading of 5” (compacted) crushed aggregate surface course material on approximately 2.58 miles of Forest Road 556 and approximately .2 miles of Forest Road 418. The material must be approved by COR prior to placement and the blending in of a government provided clay binder material may be required at a specified percentage. There is 2.58 miles of road and drainage structure reconditioning that shall be done prior to the spreading and compaction of the crushed aggregate surface course. The installation of construction warning signs and the maintenance of all haul roads are required. The contractor shall be responsible to obtain all permits as required by Arizona Department of Environmental Quality (ADEQ) for the contractor's methods of operation(s). The project is located on the Flagstaff Ranger District of the Coconino National Forest located in Coconino County, Arizona.
FSR GENERAL NOTES
FOREST ROAD 556 MP 2.1 - MP 4.68 AND FOREST ROAD 418 FOR 0.2 MILES:
RECONDITION ROAD IN ACCORDANCE WITH FP-03 SPECIFICATIONS SECTION 303,
RESURFACE ROAD IN ACCORDANCE WITH FP-03 SPECIFICATIONS SECTION 301 UTILIZING
COMMERCIAL SOURCE.
WORK DESCRIPTION/FEATURES
FOREST SERVICE ROAD 556 -MP 2.1 TO MP 4.68
0.000-BEGGINNING OF PROJECT AND FSR 556A
0.731-ROLLING DIP
0.913- NO MATERIAL ADDED IN DRAINAGE ACROSS ROAD
1.009- NO MATERIAL ADDED IN DRAINAGE ACROSS ROAD
1.262-ROLLING DIP TO LEAD OUT NORTH
1.358- NO MATERIAL ADDED IN DRAINAGE ACROSS ROAD
2.157- 36' CULVERT NEEDS MAINTAINED
2.234-ROLLING DIP TO LEAD OUT SOUTH
2.404-ROLLING DIP TO NORTH
2.456-ROLLING DIP TO NORTH
2.580-JUNCTION 420
OPTIONAL ITEM 1
FOREST SERVICE ROAD 556
0.340-TWO-24 INCH CULVERTS
0.617-TWO-24 INCHE CULVERTS
OPTIONAL ITEM 2
FOREST SERVICE ROAD 556- MP 1.5 TO MP 2.1
1.5- BEGIN PROJECT
2.1-END PROJECT
FOREST SERVICE ROAD 418 -MP 3.255 TO MP 3.355
3.255-BEGGINNING OF PROJECT
3.281-ROLLING DIP
3.355-END PROJECT
FOREST SERVICE ROAD 418 -MP 3.580 TO MP 3.680
3.580-BEGGINNING OF PROJECT
3.633-ROLLING DIP
3.680-END PROJECT
OPTIONAL 3
FOREST SERVICE ROAD 418 -MP 3.782 TO MP 3.882
3.782-BEGGINNING OF PROJECT
3.791-ROLLING DIP
3.882-END PROJECT
OPTIONAL 4
FOREST SERVICE ROAD 418 -MP 1.650TO MP 1.750
1.650-BEGGINNING OF PROJECT
1.691-ROLLING DIP
1.750-END PROJECT
| FSR55615Title Page1-Layout1 (2).pdf |
| FSR55641815Single lane road_TypicPAGE2.pdf |
| FSR55615TYP_culvertPAGE3.pdf |
| FSR55615Idippage4.pdf |
| FSR55615RdipPAGE5.pdf |
| FSR55615GENERALNOTESPAGE6.pdf |
| FSR55615WORKDECRIPTION7.pdf |