J-3_SpecialProjectSpecifications.pdf

PDF 856 KB Posted

Attached to
DAKOTA PRAIRIE GRASSLANDS: 2015 MDH Trail Projects Federal contract opportunity
Solicitation number
AG-87BJ-S-15-0004
Issued by
Department of Agriculture Forest Service R1-Northern Region

About this file

J-3_Special-Project-Specifications

View the file

Other files for this federal contract opportunity

Other files attached to DAKOTA PRAIRIE GRASSLANDS: 2015 MDH Trail Projects, newest first.
File Type Posted
AG-87BJ-S-15-0004.pdf PDF
J-5_SF-1413.pdf PDF
J-4_Drawings.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2015 MDH Trail Projects J‐3 Special Project Specifications

Section 622 – Rental Equipment

Description

622.01 This work consists of furnishing and operating equipment for construction work ordered by the CO and not otherwise provided for under the contract.

Construction Requirements

622.02 Rental Equipment.

The CO will order in writing rental equipment for use on the project. Contractor shall make equipment available for inspection and approval before use.

Contractor shall furnish and operate equipment with such auxiliary attachments as are usually needed for efficient operation of the equipment. Keep the equipment in good repair. Operators shall be competent and experienced in the work.

622.03 Equipment Description

A mini excavator equipped with Roll over Protection and capable of a track width adjustment to 39”, outside-to-outside or less. 14 HP minimum rating. Minimum operating weight 3500lbs.

Equipped with a front dozer blade and a back-hoe bucket.

622.04 Acceptance

Acceptance is based on visual inspection of the work for compliance with the contract and prevailing industry standards.

Measurement

622.05 Measure the Section 622 items listed in the bid schedule according to the following.

An hour consists of 60 minutes of actual operation of equipment on authorized Government work. Moving of equipment under its own power, when so ordered by the CO will constitute authorized work. Nonproductive time such as, but not restricted to, lack of operating supplies or qualified operator, service time, time lost by reason of breakdown or being stuck or loading time of specified accessories shall not constitute “actual operation”. Hours of actual operation will be maintained by the CO.

The Government will maintain a daily record for each piece of equipment showing hours of operation authorized to nearest quarter hour. The daily record will constitute the basis for calculating the sum due to the contractor

DPG SPS (11/14)

Section 622 – Rental Equipment (continued)

622.06 Point of Hire/Release for Pay Item #2 Only

Moving of equipment, accessories, support equipment and personnel to the point of hire and from the point of release shall be paid under Section 951 Mobilization.

Point of Hire – NE1/4, Section 36, Township 146 North, Range 100 West (See Map) Point of Release – CCC Campground, Section 3, Township 147 North, Range 99 West (See Map)

Moving of equipment and specified accessories between job locations shall be at Government expense. The CO shall determine the method of moving equipment. Moving of support equipment and personnel between job locations shall be at the Contractors’ expense.

Payment

622.07 Basis. The accepted quantities will be paid at the contract unit price of measurement for each pay item listed in the schedule of items.

Payment will be made under:

Pay Item Pay Unit

622 Rental Equipment (Mini Excavator)……………………………………. Hour

DPG SPS (11/14)

Section 906 – Measurement & Payment

906.01 General. Measurement and payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work and materials will be considered incidental to and included in the payment of the pay items in the Schedule of Items.

Work measured and paid for under one pay item will not be paid for under any other pay item.

906.02 Determination of Quantities. The following measurements and calculations are used to determine contract quantities for payment.

For items that are measured by the linear foot, station, or mile measurements will be made along the centerline and parallel to the specified grade or foundation, unless otherwise Shown on the Drawings.

906.03 Units of Measurement. Payment will be by units defined and determined according to U.S. standard measure and by the following.

(A) Lump Sum (LS) The quantities that denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job.

(B) Linear Foot (LF) Measurement of 12 inches along a reference line.

(C) Cubic Yard (CY) The measurement computed by the average end area method from measurements made longitudinally along a centerline of reference line.

(D) Each (EA) One complete unit which may consist of one or more parts. The quantity is the actual number or units completed and accepted.

(E) Hour (H) Measurements will be for the actual number of hours performed by the contractor.

DPG SPS 906 (4/06)

Section 906-Measurement and Payment (continued)

906.04 Methods of Measurement. One of the following methods of measurement for determining payment is Designated on the Schedule of Items for each Pay Item.

(A) Actual Quantities. (AQ) these quantities are determined from measurements of completed work.

(B) Lump Sum Quantities. (LSQ) these quantities denote one complete unit of work as required by or described in the contract, including necessary material, equipment, and labor to complete the job.

(C) Contract Quantities. (CQ) These quantities denote the final number or units to be paid for under the terms of the contract. They are based upon the original design data available prior to advertising the project. Original design data include the preliminary survey information, design assumptions, calculations and drawings. Changes in the number of units Designated in the Schedule of Items maybe authorized under the following:

1. As a result of changes in the work approved by the CO.

2. As a result of the CO determining that errors exist in the original design that cause a

Pay Item quantity to change by 15 percent or more.

3. As a result of the contractor submitting to the CO a written request showing evidence of errors in the original design that cause a Pay Item quantity to change by 15 percent of more. The evidence must be verifiable and consist of calculations, drawings, or other data that show how the designed quantity is believed to be in error.

DPG SPS 906 (4/06)

Section 912 – Trail Excavation and Embankment

Description

912.01 Work.

Work consists of the excavation and placement of excavated material, regardless of its nature, from within the trailway.

Construction

912.02 Use and Disposal of Excavated Material.

Remove all duff, debris, stumps and excavation from within trailbed limits and uniformly spread 4 feet outside the trailway limits, on the downslope, not more than 4 inches in depth. Do not obstruct drainage or create piles, berms, or windrows of debris. Remove stumps located between the edge of the trailbed and the edge of the trailway that the contractor cannot cut flush with the finished slope or that are not tightly rooted.

912.03 Trail Excavation. Excavation and embankment shall be accomplished to meet the lines and grades as (SHOWN ON THE DRAWINGS OR AS STAKED ON THE GROUND)

Provide a uniform trailbed finish with no depressions or berms to obstruct drainage. Remove all roots from trailbed before placing aggregate. Leave the finished slope in a uniform and roughened condition.

Measurement

912.04 Method. Measure the quantities in accordance with section 109.

Payment

912.05 Basis. Pay for the accepted quantities in accordance with Section 109 at the contract unit price for each PAY ITEM SHOWN IN THE SCHEDULE OF ITEMS.

Make payment under:

Pay Item Pay Unit

912 Excavation………………………………………………… LF

DPG SPS 912(7/11)

Back slope Ratio Rock ½ : 1 Common 1 : 1

Fill slope Ratio 2:1

Trailbed 40"

1´

1´

Trail Typical Section

2 % Out slope

Wolf Trail # 8013

MDH II #7011

TRAIL EXCAVATION

Section 941- Trail Aggregate Surfacing

Description

941.01 Work. This work consists of furnishing, hauling, watering, placing and compacting aggregate surfacing course.

Materials

941.02 Handling Materials. Stockpile, remove, transport, and spread aggregates in a manner that shall preserve gradation and avoid contamination. Do not intermingle stockpiles of aggregate having different gradations.

941.03 Aggregate. Contact Pete Wirtzfeld at 701-872-4123 for information about the aggregate source. Dust caused by hauling operations on roads that create a hazard to traffic or a nuisance to the public shall be treated with dust abatement as necessary to control the dust.

Construction

941.05 Preparation of Subgrade. Prepare and finish trail bed as required under Section 912.

Obtain written approval of the trail bed by the COR before placing aggregate.

941.06 Spreading and Compacting. Use aggregate that is uniformly mixed at optimum moisture content and spread and compact in layers to the final thickness and width SHOWN ON THE DRAWINGS. The maximum thickness of any one layer shall be 6 inches. Obtain compaction by mechanical vibratory compactors over the full area of each layer until visual displacement ceases, but not fewer than three passes. A pass shall consist of one complete coverage of the surface.

941.07 Tolerances. Do not vary the total compacted thickness of the aggregate by more or less than ½ inch from the specified thickness or place it consistently below or above the specified depth. Do not vary the aggregate width by more than 3 inches from the specified width or place it consistently narrower or wider than the specified width. On flat trail way segments with no side slope, aggregate shall be at least 1-inch above the surrounding ground and have a 1-inch crown on the aggregate surface. In no case shall the final grade of the compacted aggregate be lower than the existing ground line.

Measurement. The method of measurement is Actual Quantities Compacted in Place.

Basis. Pay for the accepted quantities in accordance with Section 906 at the contract unit price of each PAY ITEM SHOWN IN THE SCHEDULE OF ITEMS.

Make payment under:

Pay Item Pay Unit

941(01)………………………………………………………….LF

DPG SPS 941(12/14)

On the FLAT section, the finished aggregate surface has to be a minimum of one inch above the surrounding natural ground elevation.

4” 36”

2 %

36” 4”

TRAIL SURFACING

TYPICAL TRAIL CROSS SECTION

FLAT SECTION

Section 951 – Mobilization

Description

951.01 Work. This work consists of moving personnel, equipment, material and incidentals to the project and performing all work necessary before beginning work at the project site.

Mobilization includes the costs associated with obtaining permits, insurance, and bonds.

Mobilization is not intended to pay the costs of materials before they are used on the project site.

Work also includes cleaning of all equipment used at the project site. Clean all construction equipment prior to entry on the project site. Remove all dirt, plant parts and material that may carry noxious weed seeds into the area. Only construction equipment inspected by the Forest Service will be allowed to operate within the project area. Treat subsequent move-ins of equipment the same as the initial move-in. Clean truck beds and dump boxes hauling to the project site prior to entering the work area.”

951.02 Basis. Pay for the accepted work at the contract unit price for the PAY ITEM SHOWN

IN THE SCHEDULE OF ITEMS.

(a) Reimburse for bond premiums before issuing the Notice to Proceed if evidence of payment is received.

(b) When 5 percent or more of the original contract amount is earned from other PAY

ITEMS, pay mobilization at the rate of 50 percent, or up to 5 percent of the original contract amount, whichever is less.

(c) When 10 percent or more of the original contract amount is earned from other PAY

ITEMS, pay mobilization at the rate of 100 percent, or up to 10 percent of the original contract amount, whichever is less.

(d) Pay any unpaid amount for mobilization upon final acceptance of all work items.

Make payment under:

PAY ITEM PAY UNIT

951 Mobilization …………………………………………………………..LS