General Decision Number: UT080091 12/19/2008 UT91

State: Utah

Construction Type: Highway

County: Cache County in Utah.

Modification Number Publication Date 0 10/31/2008 1 11/07/2008 2 12/19/2008

ELEC0354-010 06/01/2007

Rates Fringes

ELECTRICIAN

(Traffic Signal Installation Only)..........$ 26.72 6.25+4.3%

ENGI0003-070 07/01/2008

Rates Fringes

POWER EQUIPMENT OPERATOR

(1) Mechanic................$ 26.71 12.71

(3) Backhoe Loader Combination.................$ 24.53 12.71

(4) Asphalt Paver, Oil Distributor.................$ 23.53 12.71

(5) Horizontal Directional Drill, Trencher.............$ 22.53 12.71 Crane Oiler..............$ 21.75 12.71 Crane Piledriver.........$ 27.49 12.71 Crane (Under 35 tons).....$ 24.86 12.71 Crane (35 to 100 tons).....$ 26.15 12.71 Crane (Over 100 tons)......$ 27.49 12.71

IRON0027-015 07/01/2008

Rates Fringes

IRONWORKER, REINFORCING AND

STRUCTURAL (Excluding Fence Erection)........................$ 25.61 10.60

* LABO0295-029 07/01/2008

Rates Fringes

LABORER

(1)Traffic Control, sets cones and barrels...........$ 17.66 5.40 (4)Asphalt Shoveler.........$ 18.16 5.40

SUUT2008-074 09/10/2008

Rates Fringes

CARPENTER, Including Formwork....$ 15.75 2.80

CEMENT MASON/CONCRETE FINISHER...$ 14.40 2.41

ELECTRICIAN, Excluding Traffic Signal Installation......$ 21.00 0.00

LABORER: Common or General......$ 11.30 2.73

LABORER: Fence Erector..........$ 12.47 2.84

LABORER: Flagger................$ 9.03 1.75

LABORER: Landscape..............$ 10.04 2.53

LABORER: Mason Tender - Cement/Concrete..................$ 13.17 3.47

LABORER: Pipelayer..............$ 11.86 3.54

LABORER: Grade Checker...........$ 12.30 3.55

LABORER: Power Tool Operator:

(Chain/Concrete Saw, Dirt Compactor (Hand Held), Hand Held Drill and Jackhammer Only)............................$ 13.84 3.13

OPERATOR: Asphalt Laydown.......$ 17.05 4.92

OPERATOR: Asphalt Roller........$ 17.21 6.65

OPERATOR: Blade/Grader..........$ 17.96 6.94

OPERATOR: Bobcat/Skid Loader....$ 12.36 3.31

OPERATOR: Broom.................$ 18.63 5.82

OPERATOR: Bulldozer.............$ 17.56 7.08

OPERATOR: Concrete Finishing Machine..........................$ 18.76 6.55

OPERATOR: Concrete Pump, Truck Mounted....................$ 19.18 4.23

OPERATOR: Rock Chip Spreader....$ 16.29 7.08

OPERATOR: Roller (Dirt and Grade Compaction)................$ 14.13 5.37

OPERATOR: Rotomill..............$ 20.68 6.84

OPERATOR: Scraper...............$ 17.36 6.49

OPERATOR: Screed................$ 15.70 4.62

OPERATOR: Tractor...............$ 17.95 7.33

OPERATOR:

Backhoe/Excavator/Trackhoe.......$ 20.04 7.27

OPERATOR: Front End Loader.......$ 17.15 7.08

PAINTER (Parking Lot and Highway Striping Only)...........$ 14.05 1.62

TEAM0222-023 07/01/2008

Rates Fringes

TRUCK DRIVER (Dump Truck, Bottom-end or side) Less than 8 cu. yds.........$ 18.16 8.43 8 cu. yds. to less than 14

cu. yds.....................$ 18.31 8.43 14 cu. yds. to less than 35 cu. yds..................$ 18.46 8.43 35 cu. yds. to less than 55 cu. yds..................$ 18.66 8.43 55 cu. yds. to less than 75 cu. yds..................$ 18.86 8.43 75 cu. yds. to less than 95 cu. yds..................$ 19.06 8.43 95 cu. yds. to less than 105 cu. yds.................$ 19.26 8.43 105 cu. yds. to less than 130 cu. yds.................$ 19.38 8.43 TRUCK DRIVER (Lowboy/Tractor Haul)............................$ 21.238 8.43 TRUCK DRIVER (Oil Distribution)....................$ 18.86 8.43 TRUCK DRIVER (Pickup)............$ 17.99 8.43 TRUCK DRIVER (Sweeper)...........$ 18.31 8.43 TRUCK DRIVER (Water, Fuel & Oil Tank) less than 1,200 gal.........$ 18.04 8.43 1,200 gal. to less than 2,500 gal...................$ 18.16 8.43 2,500 gal. to less than 4,000 gal...................$ 18.31 8.43 4,000 gal. to less than 6,000 gal...................$ 18.61 8.43 6,000 gal. to less than 10,000 gal..................$ 18.86 8.43 10,000 gal. to less than 15,000 gal..................$ 19.11 8.43 15,000 gal. to less than 20,000 gal..................$ 18.36 8.43 20,000 gal. to less than 25,000 gal..................$ 19.71 8.43 25,000 gal. and over........$ 19.86 8.43

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in he matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).

Write to:

Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

Other files for this federal contract opportunity

Other files attached to Logan Peak Road Project (Phase 2), newest first.
File Type Posted
amendment_01.rtf RTF text file
Exhibit 04_X_Sections_Millville Peak Rd 20168_1.pdf PDF
AG-84N8-S-09-0078 Logan Peak Road.doc DOC document
Exhibit 02_ Specifications.pdf PDF
Exhibit 01_Drawings.pdf PDF
Exhibit 07_EXPERIENCE AND EQUIPMENT INFORMATION.doc DOC document
Exhibit 03_Location Map.pdf PDF
Exhibit 05_X_Sections_Top spring hollow 20126_1.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .