Stateline_Map.pdf
PDF 761 KB Posted
- Attached to
- Stateline Stewardship Federal contract opportunity
- Solicitation number
- AG84M8S160002
- Issued by
- Department of Agriculture Forest Service
About this file
Contract Area Map
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Appendix_A_Stateline_per_amendment_01.doc | DOC document | |
| Stateline_Stewardship_Site_Visit_Info.docx | DOCX document | |
| AG-84M8-S-16-0002_0001.pdf | ||
| AG-84M8-S-16-0002_revised_per_amendment_01.docx | DOCX document | |
| Contract_Area_Map_per_Amendment_01.pdf | ||
| State_Line_Appendix_A.pdf | ||
| State_Line_Appendix_B_and_C.doc | DOC document | |
| AG-84M8-S-16-0002.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
60081
U2
4A
60081
81-
A
U2
A
U2
1B
U2
C
U272113A
U272111D
U2
0C
U272110A
23 24
Sale Name: State Line National Forest: Salmon-Challis Ranger District: North Fork
Contract Area Boundary, BT1.1 Payment Unit Boundary, BT1.1
Notes:
1) Cutting Unit Boundaries are Marked with three Vertical Orange Paint Stripes.
2) Cut trees are marked with Blue Paint. Leave trees are marked with Orange Paint.
3) Map Contour interval is 80 feet.
4) Contract Area Boundary for Timber Removal covers approximately 875 acres.
5) Winter Logging is NOT permitted; GT.6.6.
Roads 60081 & 60081-A shall be kept open; BT.1.
6) All unit landing slash pile areas to be reclaimed post harvest and post burn.
(Schedule of Service Items, Item No. 2).
7) Payment Unit 1 = 2,282 ccf, 2 = 1,485 ccf, 3 = 1,431 ccf, 4 = 1,521 ccf
Type of Slash Disposal
60128-A
0 10.5 Miles
State Line Stewardship Contract Area Map
Map Prepared By: Erin Pierson Date: August 2015
R Use of Road Restricted, KT-FT.1.2#
T
KO
R
TBC Road "To Be Closed", KT-FT.3.4#, Appendix C
US93
ID43
60079
60703 CONTRACT AREA
VICINITY MAP
Ida ho
Mont ana
Mont ana
HWY 43
Idah o
US
T.27.N., R.21.E.
Unit Boundary, BT2.3, BT1.1, and CT2.301#
Payment Unit Number, BT1.1
Contour (80')
X Hauling Prohibited, CT5.12# ã Remove/Install Earthen Barriers, Appendix C
KO Keep Road Open, BT.1
T.27.N.
R.21.E
Township/Range Description, BT.1, AT
Section Number, BT.1, AT11,13, 14,23
T
LTM
T
LTM
T
LTM
T
LTM
T
LTM
T
LTM
T
LTM
T
LTM
T
LTM
T
CTM
KO
KO
KO
KO
T
LTM
X
X
X
R
RR
R
R
Rã ã ã ã
Restore trail to original profile, GT.6,3, KT-FT.3.4#
MONTANA
MONTANA
IDAHO
IDAHO
1) {Clean System Roads}
2) {Yard Limbs and Tops}
3) {Lopping Damaged Residual and Tops and Limbs}
4) {Fell Damaged Residual}
5) {Scatter Logging Slash allowed to stay in units}
6) {Landing Cleanup}
HWY 93
LOST TRAIL
SKI AREA
X
Payment Units Unit 1,2,3,4 = Payment Unit 1
Unit 5,6,7,8,9 = Payment Unit 2 Unit 10,11,12 = Payment Unit 3
Unit 13 = Payment Unit 4
TBC
TBC
TBC
TBC
HWY 93
HWY 43
CTM
Leave Tree Mark, K-CT.3.5.6#
Tractor Unit, BT.1, GT.4.2
LTM
Cut Tree Mark, K-CT.3.5.7#
T
CTM
T
CTM
Unit Number
Area (Acres)
Harvest Method
Volume
(CCF)
Total
Tractor Tractor Tractor Tractor Tractor Tractor Tractor Tractor Tractor Tractor Tractor Tractor Tractor
1 Cutting Unit Number, BT1.1, BT2.35, GT2.301#, and CT2.356#
Open Forest Route, BT.1(e)
Road Number
Unclassified Transportation Route, BT.1(e)
Streamcourse Protection, III.44 Stream Coarse Protection
State Highway, BT.1(e)
File details come from the government source that posted it. Updated .