PHASE 5
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AMENDED_AG-83A7-S-15-00017_CARSON_TREE_THINNING_PHASE_1-6.rtf | RTF text file | |
| SF30_SOLICITATION_AMENDMENT_001.pdf | ||
| PHASE_6_US_84_Corridor_Unit_2_SOW_Specifications.docx | DOCX document | |
| Wages_Taos.txt | TXT text file | |
| PHASE_2_-_Canjilon_WUI_LMJD18_SOW_Specifications.docx | DOCX document | |
| SF1449.pdf | ||
| PHASE_1_-_CWUI_Unit_M16_M19_SOW_Specifications.docx | DOCX document | |
| AG-83A7-S-15-00017_CARSON_TREE_THINNING_PHASE_1-6.rtf | RTF text file | |
| PHASE_3_Baca_canyon_contract.doc | DOC document | |
| Fire_Plan.pdf | ||
| PHASE_6_-_US_84_Corridor_Unit_1_SOW_Specifications.docx | DOCX document | |
| phase_4_Ensenada.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PHASE 5 – CABALLOS THINNING
PART I – THE SCHEDULE
SECTION B – SERVICES AND PRICES
TREE THINNING
B-1. Furnish all equipment, labor, supplies, supervision, transportation, and incidentals to perform precommercial tree thinning and work in accordance with the specifications contained herein. There is no Government-furnished property or materials for this project.
B-2. Schedule Of Items
Bid Item 1 – Ensenada Thinning
BID
ITEM #
| DESCRIPTION |
| UNIT |
| QUANTITY |
| 1 |
| Hand Tree Thinning SPa |
Lop & Scatter Slash Unit 1.
| Acres |
| 125 |
B-3 The contractor shall provide a contract representative for the duration of contract work. The name of this person and an alternate(s) who shall act for the contractor when the contractor is absent shall be designated in writing to the contracting officer. The contractor representative or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contractor representative and alternate(s) must be able to read, write, speak, and understand English.
B-4 Contract Time Requirement by Contract Item/Sub-item
Item (or Subitem) Estimated Beginning Date 7/1/15
Contract Time 35 Calendar Days
The Contractor shall maintain progress at a rate which will assure completion of work within the calendar time specified above. The Government will issue a Notice to Proceed as soon as weather and ground conditions are favorable for work. The count of contract time will start on the date contractor signs the Notice to Proceed. A pre-work conference will be held as close to the starting date of contract time as possible.
If fire danger becomes extreme, the thinning may be stopped until conditions become less severe. No days will be charged against contract time during this time period. Contract time will be suspended if winter weather conditions preclude access to the project area.
B-5 Measurement
The acreages were measured on a horizontal plane within the established boundaries.
The Contractor may at any time after award but before final invoice is submitted, request remeasurement of any treatment area. The request will be made in writing. Remeasurement must be made within the established boundaries of the treatment area. If remeasurement indicates a variance of 5 percent or less from the acreages stated in the contract, the Contractor shall pay for the actual cost of remeasurement, and no adjustment shall be made in the acreage. If remeasurement indicates a variance greater than 5 percent from the acreages stated in the contract, payment will be based on the remeasured acreage, and the government will pay for the remeasurement.
After inspection of completed acreage, the Contracting Officer will calculate the pay rate. The pay rate will be calculated by multiplying the inspection percentage times the contract unit price per acre. When the percent of satisfactory thinning is 90 percent or greater, payment will be made at the contract unit price. Pullback, lopping and scattering of slash will be considered incidental to thinning and no separate payment will be made.
The area will be thinned in an orderly manner to facilitate inspection and calculation of partial payments. The contractor may choose his starting point against the boundary and may proceed in the direction of his choice. However, the contractor will not be permitted to move to a new starting point and leave unthinned areas between completed areas. The order in which units are thinned will be determined by Contracting Officer or his/her representatives.
B-6 Cut Trees
The average number of cut trees during thinning process is estimated to range from 200-800 trees per acre in unit 1. The primary tree species to be cut are white fir, Douglas-fir, and ponderosa pine.
PART I – THE SCHEDULE
SECTION C - DESCRIPTION OF WORK/WORK STATEMENT
C-1 Scope of Contract
This contract requires tree thinning, lop and scattering of slash in addition to related work in compliance with its terms, specifications, and provisions. This includes furnishing labor, equipment, supervision, transportation, operating supplies, safely equipment, and incidentals except those items listed as government-furnished property.
C-2 Location/Description
Unit Number Township Range Sections
1 T.27 N. R. 7 E. 15
Bid Item Location
The project area is located in section 15 of township 26 north and range 7 east. The unit is accessed approximately 6 miles west of Vallecitos on FR 106A. See figures 1 & 2 attached in this document for more details.
C-3 List of Specifications
3.1 Performance Standards Common To Unit 1
| The contractor shall select the trees to leave. Leave trees shall generally be those of the |
| tallest height, largest crown, and straightest stems that are free of damage due to insects, |
| disease, physical, or mechanical causes. If no healthy undamaged tree exists at the |
| required spacing interval, trees with minor damage may be left. If no healthy tree with |
| minor damage exists, all trees shall be cut. Thin trees 5.0” DBH to 12.0” DBH from |
below to an average spacing of 20-30ft.Vary spacing to leave the best trees in a clumpy appearance. Residual spacing is measure off all trees with the exception of snags. No Aspen or snags shall be cut.
3.2 Leave Tree Priorities
The contractor shall select leave trees in the following order:
| 1.Leave all aspen trees. | |
| 2.Leave in order of preference - ponderosa pine then Douglas-fir. |
3.Leave trees will be the healthiest trees with the fullest crown. *A healthy tree is one with 40% or more of live crown ratio, conical shape, little or no sign of insect, disease or mechanical damage, evidence of recent height growth, no dead tops
3.3 Cut Tree Priorities
1. Cut all white fir less than 12 inches DBH
2. Thin remaining unit from below, 5 to 12.0 inches dbh, to 20 to 30 foot spacing
3. Retain clumps (5-8 trees per clump) of ponderosa pine 8-12 inch dbh randomly across 10% of the unit (~14 acres) or as much as the condition presents itself- but at least 30 feet away from large (>21 inch dbh) ponderosa pine. 14 acres or 10% of the unit is a goal. It is acceptable if condition does not exist across 10% of the unit but should not represent more than the 10% of the unit).
4. Regardless of spacing, apply a radial thin (2x the drip line) around *healthy individual ponderosa pine trees that are >21 inch dbh. (*refer to items 1-4 above on selecting leave trees).
5. Cut all trees between 5.0” DBH and the maximum DBH of 9.0” with dwarf mistletoe infection ratings of 3-6. (refer to the dwarf mistletoe rating system, Exhibit 3.)
6. If aspen is ecnountered, cut all conifer trees under 12” dbh within 60 feet of healthy aspen clones to stimulate regeneration
3.4 Stump Height – Removal Of Live Limbs
Stump height shall not exceed 6 inches on the high side of the stump or 4 inches above natural obstacles. All felled trees shall be completely severed from the stumps. All live limbs below the stump height shall be removed, except when prevented by natural obstacles. Along roads, the high side of stump shall face toward the road where possible.
| 3.5 Piling |
| Piling is not required under the terms of this contract. |
3.6 Bucking
Bucking is not required under the terms of this contract.
| 3.7 Lopping and Scattering |
| All slash created as part of the thinning process will be lopped to a maximium depth of 24 inches from ground level. If slash depth cannot be met by lopping then rearranging of slash concentrations to achieve slash depth will be required. |
3.8 Slash Pull Back
All created slash and materials will be pulled back 10 ft. from existing fencelines. fencelines. Slash shall be pulled back so as not to lay on existing Forest Roads Slash shall be pulled back at least 10 ft. away from trees >18” DBH.
3.9 Hang-Up Trees
No cut trees shall be left hanging on leave trees. All hung up trees shall be brought to the ground.
3.10 Directional Felling
Trees to be cut along fenceline will be felled so as not to land on existing fencelines. Contractor will be required to remove any trees that land on fencelines. Secondly, directional felling will be required along existing roads. Trees shall be felled away from road when safely possible.
3.11 Pruning
When mistletoe infections are within 4 feet of the ground, the infected branches on the tree may be pruned off instead of felling the entire tree.
3.12 Cultural Sites
No trees shall be cut or marked within areas delineated with white or pink flagging or paint. Do not drive or park in areas delineated with white or pink flagging.
C-4.Standard Definitions.
Acceptable Quality Level (AQL) - The maximum allowable deviation from perfect performance that may occur before the Government will invoke payment deduction. An AQL does not allow a contractor knowingly to offer defective service, but limits reduced payment to circumstances in which defective performance results in a measurable reduction in the value of services rendered.
Defective Service - A unit of service which contains one or more defects or nonconformance with specified requirements.
Performance Requirements Summary (PRS) - Identifies the key service outputs of the contract that will be evaluated by the Government to assure contract performance standards are met by the contractor.
Quality Assurance.- Those actions taken by the Government to assure services meet the requirements of the technical specification.
Contracting Officer’s Representative (COR) - A Government person appointed by the contracting officer to help the contracting officer with contract administration and surveillance.
Government Inspector. - A Government person responsible for surveillance of contractor performance.
Quality Assurance Surveillance Plan (QASP) - An organized written document used for quality assurance surveillance. The document contains specific methods the Government will use to perform surveillance of the contractor.
Quality Control - Those actions taken by a contractor to control the performance of services so that they meet the requirements of the PWS.
Random Sampling - A sampling method in which each service output in a unit has an equal chance of being selected.
C-5. Technical Definitions.
The following definitions are provided to aid in understanding:
Average Spacing - The average of the distances between all leave trees necessary to provide the desired number of leave trees per acre.
Bole - Tree trunk or main stem of a tree.
Bucking – Cutting the bole to specified lengths.
Buffer - A wide strip of uncut trees separating or bordering sensitive areas such as streams or riparian zones.
Co-dominant - Trees that are not as tall as dominants, with crowns receiving overhead light. They may be confined laterally by dominants and usually make up the main canopy with the dominants.
Conifer - A cone-bearing tree with needles.
Crook - A defect in trees, consisting of an abrupt curvature or bend.
Crown - That portion of a tree which has green needles or leaves.
Cut tree - Trees designated to be cut down.
D.B.H. (Diameter at Breast Height) - Diameter of the trunk measured at a point 4-1/2 feet above the ground level on the uphill side of a tree.
DRC (Diameter root collar) – Diameter of the trunk of a tree measured at ground level.
Damage - Includes any defect or deformity of a tree resulting from agents such as wind, snow, animals, insects, disease, and equipment, and evidenced by such things as dead or broken tops or trunks, crooks, and deep scars.
Dominant - Trees that are somewhat above the general level of the canopy and are exposed to full sunlight from above and to a certain extent laterally.
Excess Trees - Uncut trees that do not meet specifications and should have been cut.
Excessive Damage - Contractor-caused damage to leave trees in excess of contract specifications. Excessive damage will include damage to the bole of the tree where the wood is exposed, broken out tops, root damage as evidenced by lean or splitting of the bole, and any tree pushed out of the soil.
Existing slash - Debris created prior to work under this contract (both natural and as a result of previous operations).
Girdling - A cut through the bark and cambium tissue completely encircling the tree trunk for the purpose of killing the tree.
Hang-up Tree - Any tree with one end suspended more than 3 feet off the ground.
Intermediate - Trees that are definitely subordinate in position receiving direct sunlight only through holes in the canopy. All trees of this class are subject to strong lateral competition.
Leave Trees - Any tree that is selected or required to be left standing as provided in the specifications.
Live-Crown Ratio – Percent of live crown in relation to the total height of the tree.
Live Limb - A woody stem that exceeds 2 inches in length with green needles or leaves growing from the tree bole.
Lopping - Cutting limbs and boles of trees to reduce depth of slash created by felled trees.
Minor Damage - Crooks in the trunk which are offset less than 3 inches from the long axis and within 13 feet of the ground, no forks, broken top, or bark damage extending more than one-fourth of the circumference of the tree.
Missing Leave Trees - Those trees cut that should have been left.
Piling – Gathering and stacking of thinning slash into piles constructed and located as indicated by technical specification.
Pull-back - Pulling thinning slash, by hand methods, back into thinned unit to clear roadway, drainage ditches, culverts, stream channels, trails, etc.
Riparian - Vegetation bordering watercourses, lakes, bogs, and seeps.
Roads - The area between the outside edges of the fill slope and back slope.
Sanitation - The felling, pruning, or girdling of disease infected or disease susceptible trees to protect residual trees from infection.
Scattering – Moving and rearranging of slash concentrations to achieve slash depth required in the contract.
Shrub - A woody plant with no main stem which does not usually grow higher than seven feet (i.e., brush).
Slash - Limbs and trunks of downed trees and brush.
Spacing - The horizontal distance from the trunk of one leave tree to the trunk of the next nearest leave tree.
Sweep - Gentle curve any where in the bole of the tree.
Thinning - The removal of excess trees in order to accelerate growth on selected residual trees by reducing competition for soil moisture, nutrients, and sunlight.
Thinning slash - Debris created from work under this contract, including all cut trees and shrubs (tops, trunks, branches).
C-6 Inspections
The Contracting Officer shall make periodic inspections. The Contractor or his representative is encouraged to observe the inspection and will receive inspection summaries upon request.
C-6.1 Inspection Plot Size and Sample Procedure
Plot size specified for this contract will be 1/20th acre (26.3 feet) circular plots. A series of plots distributed over the entire unit sufficient to yield at least a 1-percent sample of each unit shall be taken. Plot centers shall be marked and numbered.
C-6.2 Inspection Quality Evaluation
Each plot will be examined to record findings on the items listed below:
| 1. Number of leave trees that should have been left. |
| 2. Number of trees that were left. |
3. Number of missing leave trees.
| 4. Number of satisfactory leave trees. |
| 5. Number of excess trees. |
Upon inspection of all plots for a unit, the quality of thinning shall be calculated as follows:
1.0 - (No. of missing leave trees + No. of excess trees) x 100 = Quality %
(No. of trees that should have been left)
C-6.3 - Rework and Reinspection After Rework
When inspection results are below 90 percent and excess trees constitute any part of the deficiency, payment will not be made until the excess tree deficiency has been corrected. Inspections after rework will be made in the same manner as the first inspection but on different plot lines. The Contractor shall pay for inspections necessitated by the rework.
The COR or inspector may require the Contractor to rework any area that has not been thinned to specifications (for example, mistletoe infected trees that should have been cut or missed clumps of trees), even though the overall inspection for the unit may exceed 90 percent.
C-6.4 - Reinspection of Thinning Upon Contractor Request
If the original inspection results are unacceptable to the Contractor a second inspection will be done. However, the inspection pattern will be shifted. If the inspection procedure shows less than 5 percent variance from the first inspection, the Contractor shall pay the cost of the second inspection, and the result of the first inspection will be used in determining payment. Requests for reinspection must be in writing.
PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J - LIST OF ATTACHMENTS
Exhibit 1 - Area Map Exhibit 2 - Project Map Exhibit 3 - Mistletoe Rating Diagram
Exhibit 1
Exhibit 2
Exhibit 3 Mistletoe Rating Diagram
The following procedure which uses Hawksworth's 6 class rating system will be used to rate dwarf mistletoe infections:
Step 1: Divide the crown into thirds
Step 2: Score each third
No Infection = 0
Light Infection = 1
Heavy infection = 2
| Light Infection - | one-half or less of the total number of branches in the third infected. | |
| No prominent witches' | brooms. |
| Heavy Infection - | more than one-half of the total number of branches in the third infected or |
| one or more witches'brooms. |
Step 3: Add the 3 scores together to determine the mistletoe rating for that tree.
Example:
| / | \ | - 0 |
| / | \ |
/ o \ - 1
| / | \ | |
| / o o | \ | - 2 |
/ o \
0 + 1 + 2 = 3
The mistletoe rating for this tree is 3.
image1.emf
Copyright: © 2013 National Geographic Society
Caballos Thinning Area Map
0 0.5 1 1.5 20.25 Miles C.Griffith 5/19/2015
Ü
Vallecitos
FR44
Project Area image2.emf
USDA, BLM and FS personnel
Caballos Thinning 15' Project Map
Project Area
FR44
FR 106A
Ü
0 0.25 0.5 0.75 10.125 Miles
C.Griffith 5/19/18
R.7 E
T.26 N image3.emf