Amendment_001_with_Questions_and_SOI.pdf

PDF 185 KB Posted

Attached to
Abandoned Mine Lands Remediation Federal contract opportunity
Solicitation number
AG-8371-S-15-0011
Issued by
Department of Agriculture Forest Service R3-Southwestern Region

About this file

Amendment 001

View the file

Other files for this federal contract opportunity

Other files attached to Abandoned Mine Lands Remediation, newest first.
File Type Posted
SF1442-14a_Corrected.pdf PDF
AG_8371_S_15_0011.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

1 8

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

001 7/28/2015

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

USDA FS, R3 RO - AQM

333 Broadway Blvd. S.E.

Albuquerque, NM 87102

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.

AG-8371-S-15-0011

9B. DATED (SEE ITEM 11)

June 30, 2015

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN

THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.

1 - Questions 1 pp attached.

2 – New Schedule of Items Attached 3 – New cover page SF-1442 to correct solicitation number and add date

Offer receipt date IS NOT extended.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

RUFUS KI COLE, Supervisory Contracting Officer

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

RUFUS KI COLE 7-28-2015

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Questions received as of July 29, 2015

1. Is a bid guarantee required for this submittal? No bid guarantee is required for this solicitation.

2. On the bid schedules it calls for % per hour over DB wage, the Contractor Representative and Mine Safety Qualified Person are normally "exempt" positions as salaried employees could not find a rate for them on the DB wage rate pages. How would you like to see these hourly rates listed? The Schedule of Items for Labor has been edited to reflect the changes caused by this question and is a part of this amendment.

3. The SF 1442 form it states Sealed Proposals, so no electronic submittals as in the past correct? Electronic submittals are encouraged. Please email them to: rcole01@fs.fed.us .

4. On the bid schedules for the Polyurethane Foam per Cubic Yard, this is for the cost of the foam only, not an installed cost.

Correct – for foam only. Labor to install is under LABOR category in the Schedule of Items.

5. Please provide wage decision(s) number to be used for pricing the work included in the solicitation. These will vary within each state. The web address for DOL is www.wdol.gov.

6. Since this project covers both Arizona and New Mexico, it would be advisable to have separate bid schedules for each state. This would be based upon potential differences in the wage decision(s). Thank you for this suggestion but we are maintaining one bid schedule for the region.

7. Is a day considered 8 hours?

For equipment a day is considered 24 hours.

8. Is a week considered 40 hours?

For equipment purposes a week is considered to be calendar 7 days.

9. For mobilization/demobilization of backhoe or dozer, what is typical distance from a major city (i.e.

Phoenix, Flagstaff, Tucson, Albuquerque, Las Cruces)? Since project areas will vary the offeror must make their best estimate. Locality maps, and exact location of projects sites will be included in every task order.

We believe the average to be around 100 miles or less to a major city however, any miles over 100 miles are the responsibility of the contractor”

10. Will the unit prices quoted be the maximum allowed by the individual task order? Or is this being used only for contractor evaluation? This is the maximum allowed.

11. Please clarify how you would like contractors to mark up (i.e., show percentage increases) to the Davis Bacon wage determination rates for the specified positions. Wage determinations vary widely depending upon location and, in the case of heavy equipment operators, the type of equipment being operated. Percentage is requested by the solicitation.

mailto:rcole01@fs.fed.us http://www.wdol.gov/

PART I—THE SCHEDULE

SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS

Labor – Base Year

DESCRIPTION % PER HOUR over DB Wages

Heavy Equipment Operator % ______________

Truck Driver % ______________

Welder % ______________

Laborer % ______________

List the % per hour over the DOL Davis Bacon Wage Determination that you will charge for the above labor categories. Example – if you charge 55% over the established wage rates then state 55 above.

DESCRIPTION $ PER *WORK DAY

Contractors’ Representative $ ______________

Mine Safety Qualified Person $ ______________

Clerical Support $ ______________

Typical *Work Day for these three work types is defined as 8 hours.

Equipment – Base Year

DESCRIPTION UNIT OF MEASURE UNIT PRICE

Backhoe (Case 580 or equivalent with Extendahoe) Week $_____________ Dozer (Cat D7 or equivalent) Week $_____________ Mobilization/Demobilization – Backhoe Each $_____________ Mobilization/Demobilization – Dozer Each $_____________ PUF Spray – Proportioner Day $_____________ Welder Day $_____________ Haul Truck - Hwy Dump 10CY Week $_____________ Chop Saw – Cutting Torch Day $_____________ Rock Drill (for anchoring Bat-grates) Day $_____________ Lowboy - 35 ft., 24 ton (for mobilization) Hour $_____________ Truck - 4-wheel drive Day $_____________ Truck - Stake bed 2 ton (For transport of PUF) Hour $_____________

Week is 7 days. Day is 24 hours.

Supplies – Base Year

DESCRIPTION UNIT OF

MEASURE UNIT PRICE

Polyurethane Foam Cubic Yard $____________

Plastic Sheeting Square Foot $____________ Angle Iron Foot $____________ Wooden Fence Posts Each $____________ Barb Wire Foot $____________ Small tools and Supplies Day $____________ Clerical Supplies Day $____________ Adjustable Bat- friendly Grate (built and installed per specifications)

Square Foot (area covered)

Bat Cupola (built and installed per specifications)

(top area of cupola)

--------------------------------------------OPTION YEAR 1-----------------------------------------

Labor – Option Year 1

DESCRIPTION % PER HOUR over DB Wages

Heavy Equipment Operator % ______________

Truck Driver % ______________

Welder % ______________

Laborer % ______________

List the % per hour over the DOL Davis Bacon Wage Determination that you will charge for the above labor categories. Example – if you charge 55%

Dozer (Cat D7 or equivalent) Week $_____________ Mobilization/Demobilization – Backhoe Each $_____________ Mobilization/Demobilization – Dozer Each $_____________ PUF Spray – Proportioner Day $_____________ Welder Day $_____________ Haul Truck - Hwy Dump 10CY Week $_____________ Chop Saw – Cutting Torch Day $_____________ Rock Drill (for anchoring Bat-grates) Day $_____________ Lowboy - 35 ft., 24 ton (for mobilization) Hour $_____________

Supplies – Option Year 1

Polyurethane Foam Cubic Yard $____________

Plastic Sheeting Square Foot $____________ Angle Iron Foot $____________ Wooden Fence Posts Each $____________ Barb Wire Foot $____________ Small tools and Supplies Day $____________ Clerical Supplies Day $____________ Adjustable Bat- friendly Grate (built and installed per specifications)

(built and installed per specifications)

------------------------------------------------OPTION YEAR 2 -----------------------------------------

Labor – Option Year 2

DESCRIPTION % PER HOUR over DB Wages

Heavy Equipment Operator % ______________

Truck Driver % ______________

Welder % ______________

Laborer % ______________

List the % per hour over the DOL Davis Bacon Wage Determination that you will charge for the above labor categories. Example – if you charge 55%

Dozer (Cat D7 or equivalent) Week $_____________ Mobilization/Demobilization – Backhoe Each $_____________ Mobilization/Demobilization – Dozer Each $_____________ PUF Spray – Proportioner Day $_____________ Welder Day $_____________ Haul Truck - Hwy Dump 10CY Week $_____________ Chop Saw – Cutting Torch Day $_____________ Rock Drill (for anchoring Bat-grates) Day $_____________ Lowboy - 35 ft., 24 ton (for mobilization) Hour $_____________

Supplies – Option Year 2

Plastic Sheeting Square Foot $____________ Angle Iron Foot $____________ Wooden Fence Posts Each $____________ Barb Wire Foot $____________ Small tools and Supplies Day $____________ Clerical Supplies Day $____________ Adjustable Bat- friendly Grate (built and installed per specifications)

(built and installed per specifications)

------------------------------------------------OPTION YEAR 3 -----------------------------------------

Labor – Option Year 3

DESCRIPTION % PER HOUR over DB Wages

Heavy Equipment Operator % ______________

Truck Driver % ______________

Welder % ______________

Laborer % ______________

List the % per hour over the DOL Davis Bacon Wage Determination that you will charge for the above labor categories. Example – if you charge 55%

Dozer (Cat D7 or equivalent) Week $_____________ Mobilization/Demobilization – Backhoe Each $_____________ Mobilization/Demobilization – Dozer Each $_____________ PUF Spray – Proportioner Day $_____________ Welder Day $_____________ Haul Truck - Hwy Dump 10CY Week $_____________ Chop Saw – Cutting Torch Day $_____________ Rock Drill (for anchoring Bat-grates) Day $_____________ Lowboy - 35 ft., 24 ton (for mobilization) Hour $_____________

Supplies – Option Year 3

Plastic Sheeting Square Foot $____________ Angle Iron Foot $____________ Wooden Fence Posts Each $____________ Barb Wire Foot $____________ Small tools and Supplies Day $____________ Clerical Supplies Day $____________ Adjustable Bat- friendly Grate (built and installed per specifications)

(built and installed per specifications)

------------------------------------------------OPTION YEAR 4 -----------------------------------------

Labor – Option Year 4

DESCRIPTION % PER HOUR over DB Wages

Heavy Equipment Operator % ______________

Truck Driver % ______________

Welder % ______________

Laborer % ______________

List the % per hour over the DOL Davis Bacon Wage Determination that you will charge for the above labor categories. Example – if you charge 55%

Dozer (Cat D7 or equivalent) Week $_____________ Mobilization/Demobilization – Backhoe Each $_____________ Mobilization/Demobilization – Dozer Each $_____________ PUF Spray – Proportioner Day $_____________ Welder Day $_____________ Haul Truck - Hwy Dump 10CY Week $_____________ Chop Saw – Cutting Torch Day $_____________ Rock Drill (for anchoring Bat-grates) Day $_____________ Lowboy - 35 ft., 24 ton (for mobilization) Hour $_____________

Supplies – Option Year 4

Plastic Sheeting Square Foot $____________ Angle Iron Foot $____________ Wooden Fence Posts Each $____________ Barb Wire Foot $____________ Small tools and Supplies Day $____________ Clerical Supplies Day $____________ Adjustable Bat- friendly Grate (built and installed per specifications)

(built and installed per specifications)

APPLICABLE WAGE RATE DECISION

The Secretary of Labor has made a determination of the minimum prevailing wage rates which are to be paid to the classes of labor to be employed on this project. The decision number and date with minimum rates for this project will be identified within the RFQ of each Task Order.

Here is the location to find Davis Bacon Wage Determinations for counties in Arizona and New Mexico – select Heavy Construction for the proper wages:

http://www.wdol.gov/dba.aspx

Name of Person signing Offer ______________________________

Title _______________________________

Email _______________________________

DUNS Number _______________________________ http://www.wdol.gov/dba.aspx

File details come from the government source that posted it. Updated .