A-11_Attachment_1_Section_558.docx

DOCX document 18 KB Posted

Attached to
Prefabricated/Movable Temporary Bridge Federal contract opportunity
Solicitation number
AG-82MK-S-16-0022
Issued by
Department of Agriculture Forest Service R2-Rocky Mountain Region

About this file

Attachment 1 - Section 558

View the file

Other files for this federal contract opportunity

Other files attached to Prefabricated/Movable Temporary Bridge, newest first.
File Type Posted
A-11_Pg1-30_AG82MKS160022.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AG-82MK-S-16-0022

Attachment 1 – Section 558 1 | Page Section 558 - Prefabricated, Modular Bridge Superstructure

Description

558.01 Work. Design, fabricate, deliver, and install a prefabricated, modular bridge superstructure, or transport and install Government-furnished prefabricated, modular superstructure and components as DESIGNATED IN THE SCHEDULE OF ITEMS. Construct the length, width, and capacity of the structure, including curbs and railings and the horizontal and vertical alignment, as SHOWN ON THE DRAWINGS.

Also furnish material for, and construct, bridge railing as SHOWN ON THE DRAWINGS or on approved manufacturer’s drawings. Unless components are furnished by the Government, furnish prefabricated, modular bridge superstructure components complete and in place, including deck and railing, when required, to form a bridge superstructure capable of supporting traffic as soon as construction of approaches is complete. Include all incidental materials required to provide a completed structure ready for use.

When there are specific requirements for design, materials, appearance, and/or construction, they shall be SHOWN ON THE DRAWINGS or in the SPECIAL PROJECT SPECIFICATIONS.

Materials

558.02 Requirements. Furnish materials that meet the requirements specified in the following sections and subsections:

Bridge Railing556
Hardware & Structural Steel716.02
Precast Concrete Structures553A
Prestressed Concrete553
Reinforcing Steel554
Steel Structures555
Structural Concrete552
Timber Structures557

Concrete compressive strength, structural steel tensile strength, finish, designation, timber species, grade, treatment, and other material specifications shall be as SHOWN ON THE DRAWINGS or in the SPECIAL PROJECT SPECIFICATIONS. If material specifications are not in the contract documents, take them from the manufacturer’s drawings, and have them approved by the CO prior to fabrication.

558.03 Design Requirements. Design in accordance with the AASHTO “LRFD Bridge Design Specifications, 4th Edition” or latest edition and interims, for the HL-93 loading, including impact, unless otherwise SHOWN ON THE DRAWINGS or in the SPECIAL PROJECT SPECIFICATIONS.

When design of the structure is required, provide on all the drawings and calculations that are submitted for review the signature and seal of a professional engineer who is currently licensed in the State where the bridge will initially be located.

Use materials that are durable enough to allow removal, transportation, and reinstallation using typical forest logging or construction equipment. Use design techniques and fabrication methods to minimize field erection difficulties. Fabricate primary components from steel unless otherwise SHOWN ON THE DRAWINGS or in the SPECIAL PROJECT SPECIFICATIONS.

Rig main superstructure components with permanent lifting devices to facilitate efficient installation and removal of these items with equipment common to logging or construction operations. Place lifting devices so as not to interfere with traffic utilizing the structure.

558.04 Design Drawings. When furnishing a prefabricated bridge superstructure, submit design drawings, calculations, and/or shop drawings sufficiently in advance of the start of fabrication to allow time for review by the CO and correction of any changes. Such time shall be proportional to the work, but not less than 21 days. Include plan, elevation, and section views of the modular bridge superstructure, dimensions of all components, welding and connection details, and general and specific notes regarding design and construction.

When Government-furnished prefabricated bridge superstructure components are specified, material lists, erection information, and manufacturer’s instructions will be furnished by the Government.

Construction

558.05 General. Perform all construction of substructures, under Sections 552, 553A, 554, 555, 557, 564, and 602 as applicable.

558.06 Performance. Provide 2 weeks’ notice prior to delivery and/or installation.

If the prefabricated superstructure is not installed immediately upon delivery to the project site, provide appropriate equipment and labor to unload and stack, support, and store all material at the delivery point. Support and stack all components to prevent damage. Furnish and install blocking such that all components are supported at least 12 inches above the ground.

Furnish all tools, devices, special equipment, and material needed for installation in well-marked watertight containers suitable for long-term, outdoor storage.

558.07 Contractor-Furnished Prefabricated Bridge Superstructure. As applicable, furnish the CO with the following items for approval prior to delivery of the bridge component:

(a) Supplier or inspection agency certification of wood species and grade of all timber and a conformance certificate for all sawn and glued laminated members.

(b) Certification by an approved inspection and testing agency of wood treatment, listing method of treatment, type of preservative, retention, and penetration. Supplier certification is permitted if each piece is stamped or branded with a legible American Wood Preservers Bureau quality mark.

(c) Certification of structural steel, fasteners, and hardware.

(d) Certification of galvanizing process used.

(e) Steel fabricator certification that steel fabrication and quality control meet the requirements of the AISC Code of Standard Practice; and that all welding meets the requirements of ANSI/AASHTO/AWS D 1.5 Bridge Welding Code.

(f) A complete list of all bridge components, hardware, and fasteners.

(g) Complete erection instructions and drawings. Provide drawings that are black line, on a reproducible mylar media, on ANSI sheet size B or D.

As appropriate to the type of modular bridge, mark each major component of the bridge superstructure with the same serial number. Ensure that the marking is permanent and clearly visible on each component, both when stacked in storage and when erected on a bridge site.

When called for in the SPECIAL PROJECT SPECIFICATIONS, assemble each bridge superstructure prior to delivery to ensure proper fit-up of all components. Notify the CO of the assembly 2 weeks in advance so that inspection of the assembly can be arranged.

558.08 Government-Furnished Prefabricated Bridge Superstructure. When Government-furnished prefabricated bridge units are specified, transport all designated material from the storage site(s) designated in the SPECIAL PROJECT SPECIFICATIONS or SHOWN ON THE DRAWINGS to the bridge site, and install the superstructure complete and in place, including connection of all girders, diaphragms, railings, panels, transoms, and other elements.

Upon taking possession of the Government-furnished units at the storage site, assume all liability for damage resulting from handling, transporting, and/or erecting the units in place, until final acceptance of the project.

Measurement

558.09 Method. Use the method of measurement that is DESIGNATED IN THE SCHEDULE OF ITEMS.

Measure prefabricated bridge superstructures on a lump sum basis. Include all materials and work necessary to furnish, transport, and install the superstructure, including the deck and railing, as SHOWN ON THE DRAWINGS.

Payment

558.10 Basis. The accepted quantities will be paid for at the contract unit price for each PAY ITEM DESIGNATED IN THE SCHEDULE OF ITEMS.

Payment will be made under:

Pay Item Pay Unit

558(01) Prefabricated temporary bridge superstructure and precast concrete abutments- design, fabricate, deliver, and install Each

558(02)Government-furnished prefabricated bridge
superstructure - transport and installEach