TEEPEE CREEK - SUPPLEMENTAL SPECIFICATIONS
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Contractor's Experience Questionnaire.pdf | ||
| AG-82B1-S-10-0432.pdf | ||
| COVER PAGE - AG-82B1-S-10-0432.pdf | ||
| Drawings_TeePee Cr Bridge.pdf | ||
| SF 1442.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
i
FOREST SERVICE SUPPLEMENTAL
SPECIFICATIONS
For
TEPEE CREEK
BRIDGE REPLACEMENT
Road 308, MP 0.077
U.S.D.A. FOREST SERVICE
FLATHEAD NATIONAL FOREST, GLACIER VIEW RANGER DISTRICT
FLATHEAD COUNTY, MONTANA
March 2010 ii
Table of Contents
Table of Contents ............................................................................................................................. i
101 - Terms, Format, and Definitions
101.01 Meaning of Terms
101.03 Abbreviations
101.04 Definitions
102 - Bid, Award, and Execution of Contract
103 - Scope of Work
103.01 Intent of Contract
104 - Control of Work
104.05 Load Restrictions
105 - Control of Material
105.02 Material Sources
106 - Acceptance of Work
106.07 Delete
107 - Legal Relations and Responsibility to the Public
107.02 Protection and Restoration of Property and Landscape
107.05 Responsibility for Damage Claims
107.09 Legal Relationship of the Parties
107.10 Environmental Protection
108 - Prosecution and Progress
108 Delete
109 - Measurement and Payment
109 .02 Measurement Terms and Definitions
109 Deletions
109.10 Methods of Measurement
151 - Mobilization
151.01 Description
154 - Contractor Sampling and Testing
154.01 Delete
154.03 Testing
154.06 Delete
154.07 Delete
155 - Schedules for Construction Contracts
156 - Public Traffic
156.03 Accommodating Traffic During Work
156.04 Maintaining Roadways During Work
156.08 Traffic and Safety Supervisor
157 - Soil Erosion Control
157.02 Materials
157.03 General
157.04 Controls and Limitations on Work
157.08 Water Crossings
201 – Clearing and Grubbing
201.06 Disposal
iii
201.08 Delete
203 - Removal of Structures and Obstructions
203.05 Disposing of Material
203.05 Disposing of Material
204 - Excavation and Embankment
204.11 Compaction
204.13 Sloping, Shaping, and Finishing
204.14 Disposal of Unsuitable or Excess Material
204.15 Waste
208 - Structure Excavation and Backfill for Selected Major Structures
208.01 Delete
208.11 Compacting
308 - Minor Crushed Aggregate
308.05 Compacting and Finishing Crushed Aggregate
553 - Prestressed Concrete
553.03 Method Approval
553A - Precast Concrete Structures
553A.01 Work
553A.02 Requirements
553A.03 Performance
553A.04 Casting Yard
553A.05 Handling, Transporting & Erecting
553A.06 Acceptance
553A.07 Measurement
553A.08 Payment
622 - Rental Equipment
622.02 Rental Equipment
622.04 Measurement
625 – Turf Establishment
625.07 Seeding
625.08 Mulching
713 - Roadside Improvement Material
713.05 Mulch
725 - Miscellaneous Material
725.40 High-Strength Nonshrink Grout
725.41 Mortar
iv
Preface
Preface_wo_03_15_2004_m
Delete all but the first paragraph and add the following:
The Forest Service, US Department of Agriculture has adopted FP-03 for construction of
National Forest System Roads.
101 - Terms, Format, and Definitions
101.00_nat_us_07_25_2005
101.01_nat_us_02_17_2005
101.01 Meaning of Terms.
Add the following:
Delete all references in FP-03 to Transportation Acquisition Regulations (TAR).
101.03_nat_us_02_17_2005
101.03 Abbreviations.
Add the following to (a) Acronyms:
AFPA
MSHA
NIST
NESC
WCLIB
American Forest and Paper Association
Mine Safety and Health Administration
National Institute of Standards and Technology
National Electrical Safety Code
West Coast Lumber Inspection Bureau
Add the following to (b) SI Symbols:
mp Milepost ppm Part Per Million
101.04_nat_us_02_22_2005
101.04 Definitions.
Delete the following definitions and substitute the following:
Bid Schedule--The Schedule of Items.
Bridge--No definition.
Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “purchaser”.
Culvert--No definition.
Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.
http://www.nist.gov/
Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal Acquisition
Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.
Change--“Change” means “change order” as used in the Federal Acquisition Regulations, or
“design change” as used in the Timber Sale Contract.
Forest Service--The United States of America, acting through the Forest Service, U.S.
Department of Agriculture.
Neat Line--A line defining the proposed or specified limits of an excavation or structure.
Pioneer Road--Temporary construction access built along the route of the project.
Purchaser--The individual, partnership, joint venture, or corporation contracting with the
Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.
Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.
Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36
CFR, part 260.
Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, unit price, and amount.
Utilization Standards--The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.
Add Figure 101-1—Illustration of road structure terms:
Figure 101-1—Illustration of road structure terms.
R ig h t o f
W a y
R o a d si d e
R o a d si d e
C le a ri n g W id th
R o a d w a y
C le a ri n g
L im it X
Y
G ro u n d
L in e
T ra ve le d W a y
C L B e rm
S u rf a ce
C o u rs e B a se
C o u rs e
F ill
S lo p e
B a ck
S lo p e
D ra in a g e D itc h
G ro u n d
L in e
S u b g ra d e
R o a d B e d
S h a p e s a n d d im e n s io n s w ill v a ry t o f it lo ca l c o n d iti o n s.
S e e d ra w in g s fo r ty p ic a l s e ct io n s.
X a n d Y d e n o te c le a rin g o u ts id e o f ro a d w a y.
N o te
Right - of - Way Line
Right - of - Way Line
Clearing Limit
Shoulder
Shoulder
102 - Bid, Award, and Execution of Contract
102.00_nat_us_02_16_2005
102 Bid, Award, and Execution of Contract
Delete Section 102 in its entirety.
103 - Scope of Work
103.01 Intent of Contract. Delete this subsection and replace with the following:
The intent of the contract is to replace an existing timber bridge with a precast, prestressed concrete slab bridge set on precast concrete abutments. The structure is located on Road 308, mile post 0.077, in Section 13, T. 36 N., R.22 W.
The precise details of performing the work are not stipulated except as considered essential for the successful completion of the work. Furnish all labor, material, equipment, tools, transportation, and supplies necessary to complete the work according to the contract.
Delete the remaining subsections in this Section.
104 - Control of Work
104.01_nat_05_11_2004
104 Control of Work:
Delete sections 104.01, 104.02, 104.04 and 104.06.
104.05_nat_05_17_2004
104.05 Load Restrictions.
Add the following:
The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.
105 - Control of Material
105.02_nat_05_11_2004
105.02 Material Sources
Add the following before the first paragraph.
Sources have been designated for this project as follows:
Riprap Source – Government Source – The designated source for Riprap is the Hay
Creek Pit located on Road 376 in Section 26, T35N, R22W.
The Contractor may be required to sort material to achieve the designated gradation.
Crushed Aggregate Surfacing Source – Commercial Source – There is no designated
Government source for crushed aggregate surfacing.
Unclassified Borrow – Government Source- The designated source for unclassified borrow is the Whale Creek Pit located in Section 20, T.36N., R.22W.
Structural Backfill – Government Source- If material meeting the gradation requirements for backfill behind the bridge abutments cannot be conserved from structure excavation, the designated source for structural backfill is the Whale Creek Pit located in
Section 20, T.36N., R.22W.
Waste Site – Government Furnished – The designated waste site for unsuitable material will be the Whale Creek Pit located in Section 20, T36N, R22W.
Under (b) Contractor-located sources add the following:
Prior to any pit development or use of materials, the pit site shall be approved by the CO that the pit site is free of noxious weed as listed on the "All States Noxious Weeds List”.
106 - Acceptance of Work
106.07_nat_us_05_11_2004
106.07 Delete
Delete subsection 106.07.
107 - Legal Relations and Responsibility to the Public
107.02 Protection and Restoration of Property and Landscape.
Work will not be allowed to begin before September 13 th
, and must be completed by
October 4 th to minimize the closure to the river access, and Forest Service rental cabin located at the site.
107.05_nat_us_05_11_2004
107.05 Responsibility for Damage Claims.
Delete the entire subsection.
107.09_nat_us_05_11_2004
107.09 Legal Relationship of the Parties.
Delete the entire subsection:
107.10_nat_us_02_23_2005
107.10 Environmental Protection.
Add the following:
Design and locate equipment repair shops, stationary refueling sites, or other facilities to minimize the potential and impacts of hazardous material spills on Government land.
Before beginning any work, submit a Hazardous Spill Plan. List actions to be taken in the event of a spill. Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, and similar information. Immediately notify the CO of all hazardous material spills. Provide a written narrative report form no later than 24 hours after the initial report and include the following:
Description of the item spilled (including identity, quantity, manifest number, and other identifying information).
Whether amount spilled is EPA or state reportable, and if so whether it was reported, and to whom.
Exact time and location of spill including a description of the area involved.
Containment procedures.
Summary of any communications contractor had with news media, Federal, state and local regulatory agencies and officials, or Forest Service officials.
Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue.
When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.
The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. Clean up spills or leaks to the satisfaction of the CO and in a manner that complies with Federal, state, and local laws and regulations.
108 - Prosecution and Progress
108.00_nat_05_11_2004
108 Delete.
Delete Section 108 in its entirety.
109 - Measurement and Payment
109.02_nat_05_11_2004
109.02 Measurement Terms and Definitions.
Add the following definition:
(p) Thousand Board Feet (Mbf). 1,000 board feet based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job. For glued laminated timber, 1,000 board feet based on actual width, thickness, and length of each piece actually incorporated in the job.
109.03_nat_05_11_2004
109 Deletions
Delete the following entire subsections:
109.06 Pricing of Adjustments.
109.07 Eliminated Work.
109.08 Progress Payments.
109.09 Final Payment.
Add the following Subsection:
109.10 Methods of Measurement
One of the following methods of measurement for determining final payment is DESIGNATED
IN THE SCHEDULE OF ITEMS for each PAY ITEM:
(a) Designed Quantities (DQ). These quantities denote the final number of units to be paid for under the terms of the contract. They are based upon the original design data available prior to advertising the project. Original design data include the preliminary survey information, design assumptions, calculations, drawings, and the presentation in the contract. Changes in the number of units DESIGNATED IN THE SCHEDULE OF ITEMS may be authorized under any of the following conditions:
(1) Changes in the work authorized by the CO.
(2) A determination by the CO that errors exist in the original design that cause a
PAY ITEM quantity to change by 15 percent or more.
(3) A written request submitted to the CO showing evidence of errors in the original design that cause the quantity of a PAY ITEM to change by 15 percent or more. The evidence must be verifiable and consist of calculations, drawings, or other data that show how the designed quantity is in error.
(b) Stake Quantities (SQ). These quantities are determined from staked measurements prior to construction.
(c) Actual Quantities (AQ). These quantities are determined from measurements of completed work.
(d) Vehicle Quantities (VQ). These quantities are measured or weighed in hauling vehicles.
(e) Lump Sum Quantities (LSQ). These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job.
151 - Mobilization
151.01_0105_us_02_23_2005
151.01 Description
Add the following at the end of the last sentence:
“Work also includes cleaning of all equipment used at the project site. Clean all construction equipment prior to entry on the project site. Remove all dirt, plant parts and material that may carry noxious weed seeds into the area. Only construction equipment inspected by the Forest
Service will be allowed to operate within the project area. Treat subsequent move-ins of equipment the same as the initial move-in. Clean truck beds and dump boxes hauling to the project site prior to entering the work area.”
Section 154. Contractor Sampling and Testing
Description
154.01 Delete this subsection and replace with the following:
This work consists of obtaining samples for testing, testing and reporting required test results. It does not include Contractor quality control testing required under Section 153.
However, include the work required under this Section in the Section 153 quality control plan.
Construction Requirements
154.03 Testing. Delete this subsection and replace with the following:
The Contractor is responsible to perform all tests required by the Sampling and Testing
Requirement tables at the end of the following sections in accordance with the approved
Quality Control plan:
SECTION 553 - Prestressed Concrete
SECTION 553A – Precast Concrete Structures
For precast backwalls and wingwalls in accordance with 553A.02
Measurement
154.06 Delete this subsection and replace with the following:
Do not measure Contractor Sampling and Testing for Payment
Payment
154.07 Delete this subsection and replace with the following:
Do not measure Contractor Sampling and Testing for Payment
155 - Schedules for Construction Contracts
Delete Section 155 in its entirety.
156 - Public Traffic
156.03_nat_11_05_2004
156.03 Accommodating Traffic During Work.
Delete the first paragraph and replace with the following:
Accommodate traffic according to the requirements set forth below, MUTCD, and Section
635. Submit a traffic control plan for acceptance at least 30 days before intended use.
Delete the following from the last paragraph:
…..according to Subsection 106.07(b)
The Contractor will be allowed to close Road No. 308 to public traffic during the construction period stated in Section 107.02 of these specifications.
Develop a construction sign plan identifying the type and location of all advanced warning signs necessary to safely restrict or pass public traffic. Install construction signs conforming to the
Manual on Uniform Traffic Control Devices (MUTCD) prior to proceeding with any construction work. Furnish, maintain and remove all barricades and signs required for construction signing and road closures.
156.04 Maintaining Roadways During Work.
(a) Add the following:
The construction of detour roads for this project is not allowed.
156.08 Traffic and Safety Supervisor.
Delete this section in its entirety.
157 - Soil Erosion Control
157.02_01_08_23_2004
157.02 Materials
Provide bales, wattles, logs and rolls from a certified noxious weed free source.
157.03_0510_11_10_2004
157.03 General
Delete the first two paragraphs and add the following:
"This work includes submitting an Erosion Control Plan detailing permanent and temporary control measures to minimize erosion and sedimentation during and after construction according to the contract specifications, contract permits, Section 107, and this Section. Contract permits amend the requirements of this Section. Do not modify the type, size, or location of any control or practice without approval. Submit the erosion control plan proposal at least 7 days before operations begin to the Contracting Officer for approval.
The erosion control plan reflects special concerns and measures necessary to protect resources and government improvements. The Erosion Control Plan shall, at a minimum:
1. Describe the construction activities and sequence of implementation relating to specific erosion control measures.
2. Describe the location and type of permanent controls to be implemented during construction.
3. Describe the location and type of temporary controls to be implemented during construction.
4. For work in stream channels with flowing water include a detailed dewatering plan.
5. Include procedures and temporary control measures to be implemented to minimize sediment delivery during re-watering of any new culvert with streambed simulation material.
6. For work in stream channels without flowing water describe level of ground and vegetative disturbance and measures to reduce potential sediment delivery.
7. Describe what monitoring will take place.”
Add to the third paragraph:
“Upon completion of construction at the site, all temporary dewatering materials and equipment are to be removed from Government property."
157.04 Controls and Limitations on Work.
Add the following to the second paragraph:
“Temporary erosion control measures will be in place at the end of each days operation if greater than 30 percent chance of rainfall is predicated. Earthwork operations may be temporarily suspended if significant rainfall is forecasted.”
157.08 Water Crossings.
“Any site where there is running water through a channel crossing shall be dewatered by rerouting the flow around the site before and during excavation and embankment operations that has the potential for sediment delivery to the live stream.”
201 – Clearing and Grubbing
201.06 Disposal. Delete this subsection and substitute the following:
“Dispose of construction slash by either scattering outside the clearing limits without damaging trees, or by placing on embankment slopes to reduce soil erosion. When placing slash on embankment slopes start at the toe of the fill and place as flat as practicable on the completed slope.”
Measurement
201.08 Delete this subsection and replace with the following:
“Do not measure clearing and grubbing for payment”
203 - Removal of Structures and Obstructions
203.01_nat_05_12_2004
203.05 Disposing of Material.
(a) Remove from project Add the following:
All materials designated for removal become the property of the Contractor and are to be disposed of by removing off of Forest Service Lands in accordance with all local, state and federal requirements.
203.05 Disposing of Material.
(b) Burn. Delete this subsection
(c) Bury. Delete this subsection
204 - Excavation and Embankment
204.11 Compaction.
Delete this subsection and substitute the following:
Adjust the moisture content to a level suitable for compaction. Fill the interstices around rock with earth or other fine material as practical. Use compression-type rollers at speeds less than 6 feet per second and vibratory rollers at speeds less than 3 feet per second. Compact each layer of material full width with one of the following and until there is no visible evidence of further consolidation.
(1) Four roller passes of a vibratory roller having a minimum dynamic force of 40,000 pounds impact per vibration and a minimum frequency of 1000 vibrations per minute.
(2) Eight roller passes of a 20-ton compression-type roller.
(3) Eight roller passes of a vibratory roller having a minimum dynamic force of 30,000 pounds impact per vibration and a minimum frequency of 1000 vibrations per minute.
Increase the compactive effort for layers deeper than 12 inches as follows:
For each additional 6 inches or fraction thereof, increase the number of roller passes in
(1) above by four passes.
For each additional 6 inches or fraction thereof, increase the number of roller passes in
(2) and (3) above, by eight passes.
204.13 Sloping, Shaping, and Finishing.
Delete section (d) and add the following:
(d) Finishing. For surfaced roads, remove all material larger than 6 inches from the top 6 inches of the roadbed. For all roads, finish the roadbed to be smooth and uniform, and shaped to conform to the typical sections. Remove unsuitable material from the roadbed and replace it with suitable material.
Ensure that the subgrade for both surfaced and unsurfaced roads is visibly moist during shaping and dressing. Bring low sections, holes, cracks, or depressions to grade with suitable material.
Maintain proper ditch drainage.
204.14_nat_05_12_2004
204.14 Disposal of Unsuitable or Excess Material.
Delete the text of the first paragraph and substitute the following:
Dispose of unsuitable or excess material at designated sites. Place unsuitable or excess material in low spots/ holes at the waste site and shape material to a uniform surface and slope to drain.
Seed and mulch new waste material after shaping.
204.16 (e) Waste. Delete this paragraph
208 - Structure Excavation and Backfill for Selected Major Structures
208.01 Delete this subsection and replace with the following
This work consists of excavating material for the construction of the culverts and for new channels. This work includes preserving channels, shoring and bracing, constructing cofferdams, sealing foundations, dewatering, excavating, hauling and spreading excess excavated material, preparing foundations, backfilling, constructing the road subgrade and subsequent removal of safety features and cofferdams.
208.11 Compacting. Delete this subsection and replace with the following
Adjust the moisture content of the material to a moisture content suitable for compaction.
Operate compaction equipment over the full width of each layer until visible deformation of the layer ceases or, when a sheepsfoot roller is used, the roller “walks out” of the layer. Make at least three complete passes.
308 – Minor Crushed Aggregate
308.05 Compacting and Finishing Crushed Aggregate.
(a) Roadway aggregate. Delete this subsection and replace with the following:
Adjust the moisture content of the material to a level suitable for compaction. Operate compaction equipment over the full width of each layer until visible deformation of the layer ceases. Make at least three complete passes
Blade the surface of each layer during the compaction operations to remove irregularities and produce a smooth, even surface.
Ensure that the thickness and width of the compacted aggregate conform to the dimensions
SHOWN ON THE DRAWINGS, and that measurements on the compacted aggregate meet the following criteria:
(a) The maximum variation from the compacted specified thickness is ½ inch.
(b) The compacted thickness is not consistently above or below the specified thickness and the average thickness of 4 random measurements for any ½ mile of road segment is within + ¼ inch of the specified thickness.
(c) The maximum variation from the specified width will not exceed +12 inches at any point.
(d) The compacted width is not consistently above the specified width and the average of any four random measurements along any ½ mile of road segment is within +4 inches of the specified width.
553 – Prestressed Concrete
553.03 Method Approval. Add the following:
Precast prestressed concrete members must be manufactured by a plant certified by the
Prestressed Concrete Institute (PCI). Submit a copy of the transmittal letter of the latest PCI inspection with the shop drawings.
553A – Precast Concrete Structures
553A.01 Work. Construct precast concrete members. In addition, manufacture, test materials for, transport, store, and install all precast concrete portions except piling, and perform all necessary grouting, welding, or other connections. Furnish precast concrete members complete and in place, including all concrete reinforcing steel and incidentals connected therewith.
Materials
553A.02 Requirements. Provide materials that meet the requirements specified in the following subsections:
High-Strength Nonshrink Grout ……………………………… 725.40
Mortar ………………………………………………………… 725.40
Reinforcing Steel ……………………………………………… 709.01
Sealants, Fillers, Seals, & Sleeves …………………………….. 712.01
Structural Concrete ……………………………………………. 552
Structural Steel ………………………………………………… 717.01
Provide precast concrete members of the size, shape, strength, air content, and finish that are
SHOWN ON THE DRAWINGS. Precast concrete members must be manufactured by a plant certified by the Prestressed Concrete Institute (PCI). Submit a copy of the transmittal letter of the latest PCI inspection with the shop drawings.
Perform all sampling, testing, and inspection necessary to ensure quality control of the component materials and the concrete. Sample and test for quality control and acceptance testing in accordance with the AASHTO or ASTM test methods prescribed in Section 552.
Maintain adequate records of all inspections and tests. Keep records that indicate the nature and number of observations made, the number and type of deficiencies found, the quantities approved and rejected, and the nature of any corrective action taken.
Construction
553A.03 Performance. Construct precast concrete structural members in accordance with the following sections and subsections, as applicable:
Reinforcing Steel ………………………………………………... 554
Storing, Transporting, & Erecting ………………………………. 553.08
Structural Concrete ……………………………………………… 552
Submit four sets of shop drawings to the CO for approval, including the concrete mix design for each class of concrete proposed for use, a minimum of 21 days before fabrication of the precast member(s).
553A.04 Casting Yard. The precasting of concrete structural members may only be done at a casting yard of a PCI Certified plant.
553A.05 Handling, Transporting, & Erecting. Provide additional reinforcement, as needed, to meet the requirements of handling, transporting, and erecting precast members.
553A.06 Acceptance. Reinforcing steel, anchor devices, elastomeric bearings, and material for concrete and grout will be evaluated under Subsection 106.03. Furnish production certifications for hydraulic cement, and reinforcing steel.
Concrete for precast concrete members will be evaluated under Subsections 106.02, 106.03, and
106.04.
Construction of precast concrete members will be evaluated under Subsections 106.02 and 106.04.
Reinforcing steel will be evaluated under Section 554.
Falsework and forms will be evaluated under Section 562.
Measurement
553A.07 Measure the Section 553A items listed in the bid schedule according to Subsection
109.02 and the following as applicable.
Do not measure reinforcing steel, concrete, anchorages, plates, nuts, and other material contained within or attached to the unit for precast concrete structural members.
Payment
553A.08 The accepted quantities will be paid at the contract price per unit of measurement for the
Section 553A pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.
622 - Rental Equipment 622.02_01_08_20_2004
622.02 Rental Equipment
Delete the first two sentences of the first paragraph and add the following:
Hydraulic Excavator. Provide a track mounted hydraulic excavator in acceptable operating condition as determined by the CO. Bucket must be equipped with an hydraulic "thumb". It is anticipated that an excavator of a size capable of performing the excavation needs for the project, i.e. structure excavation, riprap construction, etc., will be of an adequate size to be acceptable for any work that the Contractor may be directed to perform under this section.
Large Dump Truck. Provide a large dump truck with a minimum capacity of 12 cubic yards in acceptable operating condition as determined by the CO.
622.04 Add the following:
The Government reserves the right to reduce or eliminate entirely the work under this item with no adjustment in contract unit price.
625 – Turf Establishment
625.07 Seeding.
Add the following:
The application of seed and fertilizer to cut & fill slopes shall be within fourteen (14) days after the road has been constructed to final grade, unless otherwise agreed by the CO. Cut & Fill slopes damaged by construction activities such as surface blading or additional excavation shall be reseeded within ten (10) days of the damage.
Application Methods for Seed and Fertilizer:
Apply seed by the Dry Method. The kind of seed to be furnished and the amounts to be applied in terms of pure live seed shall be as follows:
Kind of seed Species Pounds (PLS) % by
Per Acre weight
1. Blue Wildrye Elymus glaucus 12 48
2. Mountain Brome Bromus marginatus 5 20
3. Bluebunch Wheat Grass Pseudoroegneria spicata 4 16
4. Slender Wheatgrass Elymus trachycaulus 4 16
Total................25 Pounds/ Acre
Pounds of seed to be furnished per acre shall be obtained by dividing the pounds of pure live seed (PLS) required per acre by the product of the percent purity & percent germination.
Example: (5 lbs. PLS/acre) = 6.55 lb.
(0.90 x 0.85) where purity = 90% & germination = 85%
Purchaser shall provide to the Forest Service:
1. Blue tags, or copies of blue tags from each seed lot. Only certified, blue-tagged seed shall be used.
The blue tag represents a field certification and serves as evidence of the genetic purity and varietal identity of the seed contained in the seed lot.
2. Labels which indicate the percentage composition of various species in the seed mix.
3. Copies of Seed Analysis Reports from a certified seed analyst for each seed lot used in the specified mix. Purchaser will obtain this report from the seed provider. Analysis report must include at a minimum, content of any noxious weed seeds listed on the current “Montana Noxious weeds list”.
Only after the Forest Service has reviewed documentation to verify that the seed does not contain any weeds on the current “Montana Noxious Weeds List”, will the seed be accepted and used.
Fertilizer shall be applied at a rate of 100 pounds per acre in one application by the Dry Method and have a chemical analysis as listed below:
Nutrient Percent
Nitrogen (N) 16
Phosphorus (P2O5) 16
Potassium (K) 16
625.08 Mulching
Delete the entire subsection and replace with the following:
Apply straw or hay mulch that is Montana certified weed free within 48 hours after seeding by the following methods.
(a) Dry Method. Apply mulch by hand or with a mechanical spreader at a uniform rate of
2000 pounds per acre. Apply mulch by hand in areas inaccessible to mulching equipment.
Apply mulch uniformly over the entire disturbed area.
713 - Roadside Improvement Material
713.05_nat_05_13_2004
713.05 Mulch.
Assure that mulch used on the project is certified noxious weed free by the appropriate authority in the jurisdiction of use.
725 - Miscellaneous Material
725.40_01_08_27_2004
Add the following section:
725.40 High-Strength Nonshrink Grout
Furnish grout that is packaged and ready for use with the addition of water at the construction site. Ensure that each bag is stamped to show the last date on which it may be used. Use grout that consists of a hydraulic cementitious system, graded and processed natural fine aggregate, and additional technical components such that the product meets the following conditions:
(a) Free of inorganic accelerators, including chlorides.
(b) Free of oxidizing catalysts.
(c) Free of gas-producing agents.
(d) When mixed to 130 percent flow on flow table (ASTM C 230 at 10 drops), it does not reduce in linear dimension when tested in accordance with ASTM C157.
Take measurements at 72 hours and 7 days.
(e) Produces no bleeding for the first 2 hours after mixing when mixed to 130 percent flow on flow table (ASTM C 230 at 10 drops), as tested in accordance with
ASTM C232.
(f) Has a minimum strength as follows when tested in accordance with ASTM C 109:
(1) After 72 hours, 25 MPa (3500 psi).
(2) At 7 days, 40 MPa (6000 psi).
(3) After 28 days, 50 MPa (7200 psi).
Provide performance characteristics at 115 to 120 percent flow on flow table
(ASTM C 230 at 10 drops).
(g) It must be designed, as stated by the manufacturer, to be mixed, placed, and cured at atmospheric temperatures of 5 O C to 30
O C (40
O F to 85
O F). Submit products proposed for use for approval by the CO and accompany them with manufacturer’s submittals substantiating all requirements in this subsection, including graphs or charts showing the time, temperature, and humidity requirements for curing to achieve the specified grout strengths; and recommendations for storage, mixing, application, and curing procedures.
As specified as grout on the contract plans, the following products meet the above requirements.
1. MASTERFLOW 928 GROUT, manufactured by Chemrex.
2. CRYSTEX GROUT, manufactured by L&M Construction Chemicals, Inc.
3. CEMENT ALL, manufactured by CTS Cement Manufacturing Co.
4. SURE-GRIP HIGH PERFORMANCE GROUT manufactured by Dayton Superior.
725.41 Mortar
Furnish mortar that is packaged and ready for use with the addition of water at the construction site. Ensure that each bag is stamped to show the latest date on which it may be used. Use mortar that consists of a cementitious system made up of:
(a) Natural aggregate, 3/8” maximum size, that meets the requirements specified in
ASTM C 33 except for grading. Accomplish grading by blending sieve sizes to obtain the optimum density.
(b) Metallic aggregate free from nonferrous material, soluble alkaline compounds, and visible rust.
(c) Water reducers, workability agents, air-entraining agents, and catalysts.
Blend the materials to minimize bleeding, increase workability, resist exposure to freeze-thaw cycles and deicing salts, and prevent shrinkage within and at the perimeter of the patch, keyway, or other area to be filled.
Ensure that the minimum compressive strength of the mortar, as tested by ASTM C 109 for a 3” slump, is:
24-hour...........................................................................................35MPa (5000 psi)
7-day...............................................................................................60 MPa (8500 psi)
28-day.............................................................................................70 MPa (10,000 psi)
Ensure that the durability of the products when tested at 300 cycles, ASTM C 666, procedure A is:
Submerged in: DF (%)
Water 98
5% CaCl2 solution 95
5% NaCL solution 85
Ensure that the scaling resistance has a rating of 3, Moderate Scaling, after 50 cycles when tested in accordance with ASTM C 672.
Provide certification from the manufacturer that the product is compatible for work that is 1” or more in depth and more than 1” in width; and where the mixing, placing, and curing temperatures may range from 5 O C to 30
O C (40
O F to 85
O F).
Submit products proposed for use to the CO for approval, and accompany them with the manufacturer’s submittals substantiating all requirements in this section, including (1) graphs or charts showing the time, temperature, humidity, and curing requirements to achieve mortar strengths equal to the adjacent concrete; and (2) complete recommendations for storage, mixing, application, and curing procedures.
As specified as mortar on the contract plans, the following products meet the above requirements.
1. EMACO T425 or T430, manufactured by Chemrex.
2. RAPID SET DOT REPAIR MIX manufactured by CTS Cement Manufacturing Co.
3. SURE-GRIP HIGH PERFORMANCE GROUT (when extended with pea gravel) manufactured by Dayton Superior .